I. LOWLEVELPROJECTS-WITHOUT MICRO CONTROLLER
S.NO PROJECTS
1. High Sensitive Alcohol Sensor Buzzer Alert
2. Gas Leak with Buzzer Alert
3. Windmill Power Generation For Rural Applications
4. Solar Lighting System
5. Hydroelectric Power Generation Using DC generator
6. Renewable Energy Based Charger For RuralAreas
7. Solar Based Mobile Charger For Rural Areas
8. Intelligent-solar-emergency-light
9. Electricity Generation From Turbine
10. Hybrid Energy Generator
11. Power Generator From Dc Motor
12. Accident Prevention System On Hilly u-turn
Areas
13. Automatic Highway Light System
14. Switch On The Lights In Your House
Automatically In The Evenings.
15. Smart Road
16. Clap Switch To Toggle Electrical Appliances
17. IR Based Automatic Highway Lighting System
18. Smart Dust Bin
19. Invisible Broken Wire Detector.
20. Solar based Mobile charger(mini)
21. Wind energy system(mini)
22. Automatic Irrigation system(mini)
23. LDR based Automatic Street light Monitoring system(mini)
24. Solar Powered Automatic street light system(mini)
25. Automatic Water Tank(mini)
26. Temperature based Fan Controller(mini)
27. Health Monitoring and alert system
28. Tesla coil
29. Wireless power transfer system
30. Automatic Smoke Detector Alarm
31. Rain water Harvesting System
32. Secret Knock based door lock system
33. Smart watch for Blind people
34. Cellphone detector
35. Music based LEDs
36. Rain sensing Alarm
37. CO gas leakage detector
38. Water level indicator
39. Automatic water motor control for overhead tanks
40. Touch less calling bell
41. Automatic water tap control
42. Automatic sanitizer
43. Laser based protection system for farms
44. Fire safety and Automatic water spraying system
45. Safety locker using IR
46. Museum security system
47. Series and parallel circuits
48. PIR based motion detection and alert system
49. Hydro power generation
50. Hydraullic Crane
51. Solar system Model
52. Mini Air cooler
53. Vacuum cleaner
54. About Lungs
55. Edge Avoiding Robot
56. Obstacle avoiding robot
57. Floating House
58. EarthQuake Alarm
59. Air pressure experiment
60. Hydraulic crane
61. Mini Refrigirator
II. MEDIUMLEVELPROJECTS-WITHMICROCONTROLLER
S.NO PROJECTS
1. A smart monitor system that measures industrial machine pressure and
vibration using Bluetooth
2. Accident Prevention System on Hilly Areas and Deadly Zones
3. Advanced Wireless Power Transfer System
4. Child protection from borewell
5. Android Controlled Railway Level Gate Control Using Arduino
6. Arduino Based Automated Washroom Sanitizing System (Domains /
Embedded applications)
7. Auto Electronic School Bell using RTC
8. Automated Door Opener With Lighting Control using Arduino
9. Automatic Exhaust Fan control couple to Gas Leak Detection
10. Automatic Pill Reminder For Easy Supervision (Controllers / Arduino)
11. Automatic Railway Gate Controlling System
12. Automatic Street Light which Works Based on the Vehicle Movement
13. Automatic water tap control system
14. Density Based Traffic Signal System
15. Design and Analysis Of A Smart Blind Stick For Visual Impairment
16. Design & Implementation of An Automated Reminder Medicine Box For
Old People And Hospital (Controllers / Arduino)
17. Design of A Contactless Tachometer Using Arduino
18. Design of Sensing Soil Moisture Content By Auto Irrigation System
19. Electricity Generation from Speed Breakers
20. Elegant home with power saving, security, safety, remote controlling and
auto control of water tank motor (Controllers / Arduino)
21. Examination Room Guide Using RFID (Domains / WSN)
22. Intelligent Car Parking System using Arduino
23. IR based home automation using Arduino
24. Object Avoidance Robot
25. Parking vehicle detection using android application (Controllers /
Arduino)
26. Password Based Circuit Breaker to Save Linemen’s Life
27. Password Based Distribution Panel and Circuit Breaker Operation for the
Safety of Lineman during Maintenance Work (Domains / Electrical)
28. Smart gardening(A homegrown irrigation system) (Controllers /
Arduino)
29. Smart Glasses for Blind (Domains / OpenCV)
30. Wireless Control System for Dc Motor to Position a Dish Antenna Using
Microcomputer
31. Wireless Surveillance Robot Controlled by PC (Domains / Mechatronics)
32. Air Pollution Monitoring System Using Wireless Sensor Network
33. Child Safety Monitoring System Based on IoT (Controllers / Arduino)
34. Detection Of Pedestrian Crossing For Safe Driving Using Arduino and
RFID
35. Smart Irrigation System
36. Solar based insect Trap
37. Public Garden Automatic System
38. Remote Control Plant Watering System Using 8051
39. Smart Home
40. Automatic Pet Feeder Using Arduino
41. Co2 monitoring using gas sensor
42. Environmental monitoring using
microcontroller
43. Navigating Visually Impaired Persons Using
Blind Stick
44. House With Earth Quake Warning Alarm
45. Medicine Box Remainder
46. Pollution Monitoring System
47. Pizeo Electric Sensor Based Electric Power
Generation
48. Mini Radar System
49. Electronic Quiz Buzzer.
50. Ac Motor Speed Control system
51. Distance Measurement System Using Ultrasonic Sensor.
52. Intelligent Automatic Plant Irrigation System With Water Pump Control
Based On Soil Moister Condition
53. Atomization Of Agriculture System Using Mobile Phone
54. Solar Based Electric Fence For Rural Agriculture In Regency Areas
55. Solar Automatic Traffic And Street Light Controller
56. Solar School
57. Solar Panel With Sun Position Tracking
58. Foot Step Power Generation System For Rural Energy Applications.
59. Solar Car (running Model)
60. Automatic Hand Wash System
61. Aero Dynamic Wind Mill Power Generation For Rural Applications
62. Hand Cranked Dynamo Based Energy Generation System for Emergency
Headlamp Applications For Mining Workers
63. Electrical Power Generation Using Speed Breaker
64. Solar Highway Lighting System with Auto Turn Off On Day Time
65. Renewable Energy Management-solar Based Lighting System With
Inverter And Cfl Lamp Load
66. Solar Air Cooler
67. Man Less Railway Gate Using Ir Sensor
68. Zigbee Enabled Smart Helmet For Automobiles To Reduce Accidents
69. Vehicle Speed Control in Danger Zones
70. Speed Checker to Detect Rash Driving On Highways
71. Driver Less Car (obstacle Avoider Robot)
72. Car Parking Monitoring System
73. Voice Controlled Home Automation
74. Bidirectional Visitor Counter to Control Electrical Appliances
75. Factory Worker Alcohol Detector With Automatic Machine Shutdown
76. Rfid Based Water Dispenser System
77. Advanced Industrial Automation
78. Motion Based Automatic Door Opener
79. Motion Based Automatic Home Automation
80. Automatic Night Lamp With Morning Alarm.
81. Voice Controlled Notice Board
82. Employee Time Management System Using Rtc With Display
83. Level Indicator For Petrol Dispensing Stations With Alert System
84. Automatic Public Water Tap Control System To Reduce Wastage Of
Water
85. Automatic Staircase Light With Timer.
86. Bluetooth Controlled Home Automation
87. Home Automation System Using Mobile Phone
88. Water Level Indicator and pump control With Alarm
89. Manhole And Garbage Monitoring System
90. Intelligent Fire Detection With Automatic Sprinkler System To Avoid
Fire Accidents
91. RFID Based Automatic Door Locking System
92. Password Based School Door Opening
93. Password Based Bank Door Lock Opening
94. Metal Detector To Find Bomb War Fields
95. Android Password Based Remote Door Opener System Project
96. Secure Your Motor Bike With Rf Based Warning Receiver.
97. Alarm Protect Method For Protection Of Tree
98. Airport Security Luggage Scanner System With Conveyor Belt
Arrangement.
99. Diamond Security System In Museums With Loud db Siren.
100. Wireless Doorbell Calling System
101. Mobile Operated Robot.
102. Wireless Robot
103. Line Follower Robot
104. Advertisement Robot
105. Wireless Rf Robot
106. Voice Control Wheel Chair
107. Hand Motion Controlled Robotic Vehicle
108. Rain Sensing Automatic Car Wiper
109. Ultrasonic Radar Project
110. RTC Based Pump Switcher
111. Automatic Smoke Detector Alarm using Arduino
112. Short Circuit Indicator Project
113. Auto Electronic School Bell
114. Street light automatic intensity controller
115. Password Protected circuit breaker
116. DTMF(mobile) based load controlling system
117. Boiler monitoring and control system
118. Power grid control through PC
119. Robot control using Android phone
120. Voice controlled robot
121. Mini remote Notice board using Bluetooth
122. Line following robot
123. LDR based Automatic street light controlling system
124. Automatic Water Tank cleaner
125. Solar umbrella
126. Voice assistance for dumb people
127. Digital ammeter design using micro controller
128. Automatic spike system near traffic signals
129. Solar powered(sun light based) water Desalination system
130. Fuse Blown Indicator And Alerting System using controller
131. Temperature based Fan Speed Controller
132.Environment sensing using smart phone
133.Home appliances control system based on the android
134.Health monitoring system based on android
135.Smart restaurant with emenu card
136.Robot movement controlling using android
137.Identity authentication for examination system
138.Wireless home appliances controling system
139.Baby presence detector & warning system in car
140.Design of concealed alarm system
141.A digital security system for door lock system
142.Smart door accessing system
143.Rfid based station name announcemnet
144.Student login and logout management system
145.Bus identification device for the blind people
146.Automated speed controlling of vehicles
147.Body motion information collection
148.Gesture based wireless robot gaming
149.Energy saving system for railway plaorm
150.Paddy crop field monitoring system
151.Earthquake detection alert alarm for people security
152.Pantry system in theaters
153.Advanced time based system for garden
154.Airport security with proximity sensor for bomb detection
155.Parking slot indicator for vehicles in shopping malls apartment
156.Automatic engine locking system for drunken drivers
157.Real time battery monitoring and low voltage alert system
158.Auditorium door opening and illumination lighting system
159.Automatic irrigation soil moisture content control
160.Command based street light controlling through pc
161.Real time efficient street light controlling system
162.Car driving system to assist the physically challenged
163.A Very Simple User Access Control Technique through Smart Device
Authentication using Bluetooth Communication
164.Development of a cell phone based vehicle remote control system
165.Alcohol breath analyzer
166.Smart Remote for controlling electrical appliances through andriod mobile
167.Smart and cost effective wireless electronics notice board
168.Smart Home OR office automation through android mobile
169.Advertisement boards or status boards message updating system from
android mobile for offices and restaurants
170.Smart regulator for controlling fan speed through Android mobile
171.Advanced street light controlling system through smart phone
172. Industrial parameters monitoring system through Smartphone
173. Dc motor speed and direction control using ir
174. Stepper motor control using smart phone
175. Automatic intelligent room light controller with visitor counter using ir
176. Auditorium controlling system using ir
177. Automatic railway gate control system using ir
178. Advanced embedded automatic car parking system
179. Time measurement system for athletics
180. Ir based appliances control system
181. Shopping malls security and power management system using ir
182. Visitor counter cum display system using ir
183. Data transfer between two micro controllers using ir communication
184. Antitheft alarm system
185. Intelligent object counting system
186. Home automation using tv remote
187. Mems based hands gesture controlled robot
188.Hand movement recognition system based mouse with mems accelerometer
189.Fall detection and activity monitoring for elders
190. Touch me not
191. Boiler temperature and control system
192. Involuntary industrial power sheduler using embedded systems
193. Power saver for advertisement hoardings using rtc
194. Solar tracking system
195.Automatic Liquid Dispensing System used in Tea Coffee, Soft drink
vendingmachines
196. Advanced security systems for jeweler shops and banks
197.Accident avoiding system using ultrasonic sensor
198. Crop protection from animals
199.Water scheduling for municipalities doc
200. Wireless mobile charger
201. Rfid based bus detection for blind
202.Automated door access based on rfid using arduino
203.Automatic accident detection and notification system
204.Design and implementation of a voice controlled robot
205.Dtmf controlled robot using arduino
206.Embedded solar tracking system
207.Examination room guide using rfid for the jumbling system
208.Home security and safety alarm system using arduino
209.Indoor air quality monitering
210.Ir based security system
211.Smart shoe for blind people
III. HIGHLEVELPROJECTS-WITHMICROCONTROLLER
S.NO PROJECTS
1. Laboratory automation system using IOT devices
2. Smart Door Receptionist with Smart Lock System
3. An IOT-Based Intelligent System for Real-Time Parking
Monitoring and Automatic Billing
4. Secure fingerprint bank locker with image capture system
using Arduino
5. An IOT Based Multi-parameter Data Acquisition System
For Efficient Bio-tele Monitoring Of Pregnant Women At
Home
6. Autonomous theft proof delivery robot for food &
ecommerce
7. Body and fall detection system with heart rate monitoring
8. Automated traffic ticket checking system using IoT
9. Smart Ration Card System Using RFID and Embedded
System
10. Intrusion detection in military border and agriculture field
11. A Conveyor-belt Based Pick-and-sort Industrial Robotics
Application
12. Drunken Driving Detection Using Car Ignition Locking
13. An RFID based smart EVM system for reducing electoral
frauds
14. Intelligent food and grain storage management system for
the warehouse and cold storage
15. Arduino based vehicle seat vacancy identification
16. A Design of Intelligent Wearable Health Monitoring
System Based on IOT
17. Development of congestion level based dynamic traffic
management system using IOT
18. Intelligent Monitoring Systems for Transportation of
Perishable Products based Internet of Things(IOT)
Technology
19. IOT Based Real-Time Remote Patient Monitoring
System
20. IOT Based University Garbage Monitoring System for
Healthy Environment for Students
21. IOT Based Wireless Sensor Network for Air Pollution
Monitoring
22. IOT-Enabled Shipping Container with Environmental
Monitoring and Location Tracking
23. Real-time Wireless Embedded Electronics for Soldier
Security
24. Smart Farming System using IOT for Efficient Crop
Growth
25. Multi-Functional Blind Stick for Visually Impaired
People
26. IOT-aware Waste Management System based on Cloud
Services and Ultra-low power RFID Sensor-Tags
27. Analysis of Smart helmets and Designing an IOT based
smart helmet: A cost effective solution for Riders
28. The Design and Implementation of GPS Controlled
Environment Monitoring Robotic System based on IOT
and ARM
29. Autonomous Energy-Efficient Wireless Sensor Network
Platform for Home/Office Automation
30. A Novel Approach to Provide Protection for Women by
using Smart Security Device
31. IOT water pollution monitor RC boat
32. IOT Contactless COVID temperature testing system
33. IOT early flood detection & avoidance system
34. IOT based ICU patient monitoring system
35. Contactless IOT doorbell
36. IOT garbage segregator & bin level indicator
37. Driver Drowsiness Detection System for Accident
Prevention
38. Drink & drive detection with ignition lock project
39. Swatch Bharat using GSM
40. Red sandalwood protector using metal detector with GSM.
41. Crop monitoring using GSM
42. Crop Protection system from Wild Animals
43. Paralysis patient monitoring system
44. Patient Health Monitoring system modern Village
45. Garbage monitoring system.
46. Water quality monitoring in aquaculture
47. Automatic pet feeder with live streaming
48. Development Of Device For gesture to
49. Speech conversion for the mute community
50. Soldier health & position tracking system
51. Renewable energy monitoring system
52. Design and implementation of hybrid Solar wind power
system
53. Accident Detection System Using GPS and GSM with
automatic update to ambulance
54. Car Parking Monitoring System using IOT
55. Vehicle Tracking System Using RFID for theft Avoidance
56. Engine Locking System Using GSM technology
57. Accident detection system using GSM
58. Voice controlled home automation using
59. Google voice assistant
60. Prepaid energy meter using GSM
61. Voice controlled led notice board
62. Smart shopping system Technology
63. GSM based vehicle fuel theft detection system
64. Finger print based door lock
65. Fingerprint based authentication
66. Fingerprint and keypad based security Access system
67. Rescue child from deep bore well
68. IOT based home automation
69. IOT based home security
70. IOT based environment monitoring
71. IOT based health care monitoring.
72. IOT home security with web cam
73. IOT based smart robot using Wi-Fi module
74. Women safety device with GPS tracking & Alerts
75. Drone with remote control
76. Pick and place robot
77. Remote controlled grass cutter robot
78. House cleaning robot
79. Solar powered electric vehicle
80. Drainage cleaning robot
81. Water sprinkling robot
82. Solar powered bomb detecting robot
83. Seed sowing robot
84. Railway track fault detecting system Using LED &LDR
85. Firefighting robot
86. Hand motion controlled robotic vehicle
87. Sun tracking solar panel using Arduino
88. Arduino based autonomous firefighting robot
89. SMS based Fire Department Alerting System
90. SMS based Irrigation Monitoring &Controller
System
91. SMS based Garbage Monitoring System
92. Arduino based system to measure solar power
93. Vehicle Movement based Street Light Control
94. Accident Identification and alerting project
95. LPG Gas Accident Prevention With GSM alert
96. Voice controlled Load control system(with android app)
97. Automatic railway platform system using IOT
98. Alcohol detection and alert system for avoiding accidents
using GSM
99. Seed sowing robot for farmers wind powergeneration
and harvesting
100. Automatic school Board cleaner system
101. An advanced system to rescue bore well victims
102. Metal/Bomb detection robot
103. Solar Powered LDR based Automatic street light system
104. Fuse blown indicator and alerting system
105. Automatic railway platform system using IOT
106. Boat with remote control
107. Solar powered(sun light based) water desalination system
108. Automatic railway platform system using controller
109. Automatic spike system near traffic signals
110. A Sewer Sensor Monitoring System Based on embedded
System
111. A smart monitor system that measures industrial machine
pressure and vibration using IOT
112. A Smart Optimization of Fault Diagnosis in Electrical Grid
Using distributed software- Defined IOT system
113. Aadhar Based Fingerprint Electronic voting system
114. Advanced IOT Based Combined Remote Health
Monitoring, Home Automation and Alarm System
115. Advanced Smart Energy Saving System for
116. Modern railway station platform
117. Advanced Traffic Violation Control and penalty system
with Web Server
118. An Efficient Smart Irrigation System for solar system by
using GSM
119. Analysis and Testing of Dual Axis Solar Tracker For a
Standalone PDV System
120. Anti-Theft technology of museum cultural relics based on
internet of things
121. ATM Terminal Design Is Based On fingerprint recognition
122. Automated smart sericulture for enhancement of silk
production using embedded system
123. Automatic Fault Detection and Location of Transmission
Lines using IOT
124. Automatic gas cylinder booking over IOT
125. Automatic Pathway for Emergency Vehicle
126. Automatic waste segregation system
127. Automation of Floor Cleaning Robot
128. Bird Feeder and Poultry Conditioning monitoring using
Embedded system
129. Design & Implementation of IOT Based smart helmet for
Road Accident Detection
130. Design and Development Of Agri-Bot For
131. Automatic ploughing, seeding and watering
132. Design and implementation of a vehicle to vehicle
communication system using Li-Fi Technology
133. Design of a Monitoring System Using Pill Bottle Mounted
Wireless Sensors
134. Design of Piezoelectricity Harvester using footwear
135. Design of wind power generation system using IOT
136. Disinfecting Robot with Ultraviolet Lights
137. Dual Axis Solar Tracking System with weather monitoring
138. Embedded Based Vehicle Speed Control system using
Wireless Technology
139. Finger print based door open system
140. Fingerprint based exam hall authentication
141. Forest Monitoring By Hierarchical wireless sensor
Network
142. Garbage collector robot
143. Garbage Monitoring system using GSM
144. Gesture Vocalizer for Dumb People
145. Health Care System for Home Quarantine People
146. Heart Attack and Alcohol Detection Sensor Monitoring in
Smart Transportation System using Internet of Things
147. Heart Attack Detection by Heartbeat Sensing using IOT
148. Integrated solar food drying system
149. Intelligent Monitoring System for NICU (Neonatal
Intensive Care Unit)
150. Intelligent Traffic Signal Control System for ambulance
Using IOT
151. IOT based Organic Farming by using aquaponics Method
152. IOT Based Smart Helmets for construction workers
153. IOT Based Smart Multi Application surveillance robot
154. IOT Based Smart Museum using Bluetooth low energy
155. IOT based Smart Road intelligent highways with
Monitoring Messages
156. IOT Based Street Lighting And traffic management
System
157. IOT: A Novel Strategy for Biometric Voting system
158. IOT-BBMS: Internet Of Things-Based baby monitoring
System For Smart Cradle
159. IOT-Enabled Shipping Container with environmental
Monitoring and Location Tracking
160. Junction street light system automatic control
Using renewable energy resource
161. Low Cost Robotic Agent Design for Disabled and Covid-
19 Affected people
162. Low power Smart Vehicle Tracking, Monitoring, Collision
avoidance and Antitheft System
163. Medicine Reminder and Monitoring System for secure
Health using IOT
164. Microcontroller based greenhouse monitoring and
controlling system
165. Mobile Alarm for gas leak Detection
166. Monitoring & Controlling of Substation using IOT in
Distribution Power Grid
167. Multi-Functional Blind Stick for visually impaired People
168. Novel wearable sensor device for continuous monitoring
of cardiac activity during sleep
169. Patient Monitoring System for Home quarantine people
170. Poultry Monitoring and Controlling System
171. Renewable Energy Based Wireless power transfer
172. RFID and GPS Combination Approach Implementation in
Fisher Boat Tracking System
173. RFID Based Attendance System With automatic door Unit
174. Robotic Arm for inspection, cleaning and painting of tanks
on ships to save on time, cost And avoid accidents
175. School Zone Alert with Announcements
176. Secure Fingerprint Bank Locker With image capture
177. Smart Bag for Women Safety
178. Smart Healthcare Patient Data Privacy and security system
using IOT
179. Smart Helmet with Accident Detection
180. Smart Management of Street lights for energy conservation
using IOT
181. Smart solar grass cutter with lawn coverage
182. Smart speaking glove
183. Smart Speed Setter and Calibrator for speed control
devices
184. Smart Waste Management System using NODEMCU
185. Smart water controller in metro water supply lines
186. SMS based Voting System
187. Social Distancing & Monitoring Robot for queue
188. Solar Based Automatic Irrigation Robot for farm
monitoring
189. Solar Dryer Alarm for the safety of food
190. Solar panel with sun position tracking
191. Solar Powered Automated Multi-tasking agricultural
Robot
192. The high security smart helmet using internet of things
193. The Smart Mailbox with Motion controlled security
Camera
194. Three Phase Fault Analysis with Auto Reset for Temporary
Fault and Trip for Permanent Fault
195. Tongue controlled speaking robot for paralyzed/physically
handicapped persons
196. Transmission of Data Using Li-Fi
197. Tripping Mechanism of Over Voltage and under voltage
System
198. Ultrasonic Spectacles and Waist-belt for visually impaired
and Blind Persons
199. UV sterilization robot
200. Vehicle and license authentication using fingerprint
201. Vehicle black box system With IOT
202. Vehicle Theft Detector with Remote engine locking
203. Voice Control 230v Lamp Dimmer with 10 Level of
Intensity Control Using Android App
204. Voice controlled car using Arduino
205. Driver behavior monitoring and warning with dangerous
driving detection based on the internet of vehicles
206. IOT based real-time remote patient monitoring system
207. IOT based smart factory management system
208. Smart pothole detector
209. Smart farming system using IOT for efficient crop growth
210. Surveillance monitoring using esp32
211. Creating artificial environment for high productivity of
plants and monitoring using IOT
212. Arduino Uno based water quality monitoring and flood
alerting system using IOT
213. Air quality monitoring system
214. Electrical multipurpose agriculture vehicle
215. Smart solution to prevent the fast spread of covid-19 in
workplaces
216. Password based door locking system using Arduino
217. Design of smart and automated seed sowing and grass
cutting rover
218. Ultraviolet sanitization machine
219. E-thaap-automatic temperature measuring device
220. Smart public transport
221. Pet care unit- an automated feeding system using Bluetooth
module
222. Detection of gas level, leakage and booking using IOT
223. Design of microcontroller based agri-bot and robotic hand
224. Application of real time clock (RTC timer) in the
streetlight management using IOT
225. Automobile reverse wheel locking system
226. IOT based automated fuel station using RFID
227. Multipurpose robot
228. Railway track crack detection mechanism
229. Prevention of railway accidents by automatic gate control
using IOT
230. IOT based industrial monitoring system using Arduino
231. Vehicle accident alert system using GSM, GPS and MEMS
232. Advanced billing smart meter for electricity, water, and gas
using GSM
233. Digital notice board using IOT
234. Eye blinking monitoring system for vehicle accident
prevention
235. Microcontroller based design and development of a real
time body temperature and heart rate monitoring system
236. Smart shopping trolley using RFID reader and NODE
MCU
237. Solar air process heating systems for drying of agricultural
products
238. Design and implementation of modernization of
agriculture and crop protection using IOT
239. Harvesting solar energy using dual axis solar tracker with
added real-time monitoring through GSM
240. License based vehicle ignition system 2
241. Design and implementation of low cost IOT based smart
refrigerator
242. Solar based robotic arm using microcontroller
243. A literature survey on: walking aid stick for visually
challenged people
244. Analysis and designing of IOT based smart helmet
245. Development of automated hydroponic system for smart
agriculture
246. Automated bottle filling machine
247. Rash driving detection system on highway
248. IOT based automated hydroponic system
249. IOT based smart kitchen
250. Bridge health monitoring system using IOT
251. Design of automatic motorbike stand slider
252. Smart wheelchair with medicine reminder and autopilot
system
253. An Embedded System Based Monitoring System For
Industries By Interfacing Sensors with IOT environment
254. Real time agriculture environment for social moderation of
Indian agriculture system using ZIGBEE technology
255. Smart Trash Container for Smart Homes and Cities –Real
time concept
256. Automated Irrigation System In Agriculture Using
Wireless sensor technology
257. A survey of wireless communications and propagation
modeling in underground mines
258. Automated phone of diabetes patients readings / consultant
monitoring via the web
259. Robot Position Estimation On A RFID-Tag System In
Smart Floor for Industries
260. The Design And Implementation Of Intelligent Campus
security tracking System Based On RFID and ZIGBEE
261. Data Acquisition System Of Energy Meter
With wireless communication For Smart metering
application
262. Real time paddy crop field monitoring using ZIGBEE
network
263. Search And Rescue Robot For Victims Of Earthquake And
other natural Calamities With remote virtual
264. WIFI Based Communication And Localization Of An
Autonomous Mobile Robot For refinery inspection
265. Reliability Of An Embedded Surveillance System With
security approach
266. A Remote Measurement And Control System For
Greenhouse based on GSM-SMS
267. A ZIGBEE-based wearable physiological parameters
monitoring system
268. Industrial parameter monitoring system using can
269. Design and implementation of an embedded home
surveillance system with ultra-low alert power
270. Distributed remote temperature monitoring and acquisition
system based on can bus
271. Collide information capturing for vehicle using GSM,
GPS, and MEMS technology
272. Security integrated system based on wireless access
protocol for industrial applications with sms alert system
using GSM modem
273. ZIGBEE based industrial automation
274. Construction Of Central Control Unit For Irrigation Water
Pumps. Cost Effective Method To Control Entire
Villager’s water pumps
275. With user level authentication
276. Implementation of hi-tech agricultural solar fence security
with
277. Soil Humidity Based Automatic Irrigation and Voice
Announcement Alert On PIR Live Human Detection.
278. Remote-control system of high efficiency and intelligent
street lighting using a ZIGBEE network of devices and
sensors
279. Automated control system for air pollution detection in
vehicles
280. Lobot: low-cost, self-contained localization of small-sized
ground
281. Robotic vehicles
282. Vehicle health monitoring system using can
283. Design of vehicle bus data acquisition and fault diagnosis
system using can.
284. Safe driving using mobile phones
285. Reservation based vehicle parking system using GSM and
RFID
286. Technology
287. Multi-functional monitoring system
288. Multi-level anti-Theft Security System Using GSM
Technology
289. Design of vehicle bus data acquisition and fault diagnosis
system using can
290. A design of wireless intelligent control system for service
robots
291. Real time paddy crop field monitoring using ZIGBEE
network
292. Guard Alert, monitoring and reporting system with GSM
technology
293. Development on gas leak detection and location system
based on wireless sensor networks
294. Design of a wireless medical monitoring system
295. A ZIGBEE based smart sensing platform for monitoring
environmental parameters
296. Design of vehicle positioning system based on arm
297. Design And Implementation Of an Embedded Home
Surveillance System With Ultra-Low Alert Power
298. The design and implementation of a teacher-student
interaction system based on ZIGBEE and RFID
299. Secured wireless communication for industrial automation
and control
300. Design & development of GSM based vehicle theft control
system
301. A remote sleep monitoring medical alarm system
302. The system of wireless smart house based on GSM and
ZIGBEE
303. Role of wireless sensor networks in forest fire prevention
304. Temperature Monitoring In Wireless Sensor network
Using ZIGBEE Transceiver Module
305. Mobile monitoring system for smart home
306. Automatic toll collection with complex security system
307. Intelligent wireless mobile patient monitoring system
308. Automatic power meter reading system using GSM
network
309. Next generation ad-hoc wireless chatting system using
touch screen
310. Traffic density analyzer cum signal system for metro cities
using GSM technology.
311. Collide information capturing for vehicle using GSM, GPS
and MEMS.
312. An intelligent road traffic control system for ambulance
using RF
313. Mobile monitoring for smart home using GSM technology
314. ZIGBEE based smart meter reading system
315. Multi sensor Robot Using ZIGBEE.
316. Orchid soil moisture monitoring system based on GSM
technology
317. ATM security system using GSM & MEMS technology.
318. A remote home security system based on wireless sensor
network and GSM technology.
319. Wireless electronic notice board with multi point receivers
using ZIGBEE communication system.
320. System using real time agriculture environment for social
moderation of Indian agriculture ZIGBEE technology
321. Industrial automation using can protocol
322. GSM based wireless home appliances monitoring &control
system
323. Remote notice board implementation using GSM
communication
324. Remote parent care system using RFID& GSM technology
325. Measurement of agriculture applications using ZIGBEE
326. Weather Station Design Using ZIGBEE
327. Biometric identification for ballot mark recognition.
328. A remote measurement and control system for greenhouse
based on GSM-sms.
329. RFID bank ATM system (draft generating) and ATM
device controlling
330. GSM & GPS technology based accident detection system
and release airbags.
331. GSM based advanced security system for banks
332. based patient monitoring system
333. Security integrated system based on wireless access
protocol for industrial applications with sms alert system
using GSM modem
334. RFID based license management system.
335. Authenticated remote operated device management using
GSM technology
336. Barcode access Control Security System
337. Artificial vision systems for the blind using ultra sonic
waves
338. Wireless design of low cost irrigation system using
ZIGBEE technology
339. An Embedded Robotic Wheel chair Control Architecture
With Reactive Navigations
340. Movement based voice enabled device switching and basic
needs for physically challenged
341. GSM Based Home Automation with Voice System
342. Sms based electing system
343. Weather station design using GSM
344. RFID based access control system
345. Elegant ticketing system for buses
346. High temperature alert to doctor using GSM modem
347. Automatic railway gate control
348. Finger print based highly authentication system
349. Implementation of energy management structure for street
light control system using GSM technology
350. Security for industrial with alert system using pressure and
temperature sensor
351. Sensors Based Industrial Fault Monitoring and Controlling
using GSM
352. Biometric recognition system based digital voting system
353. Land mine detectors with automatic indication using GPS
and GSM
354. Finger Print Based ATM Authentication & Money
management System
355. GSM based data acquisition system
356. Mobile spy robot using wireless webcam
357. Low cost GSM based home automation with voice system
358. Finger print based bank and locker system for modern
secured banks
359. MEMS based wheel chair
360. Robust and efficient password-authenticated key
agreement using smart cards for campus management
361. Automated system for fault analysis in industry using GSM
technology
362. ZIGBEE wireless vehicular identification and
authentication system
363. WSN based intelligent train security system and auto
controlling
364. Touch screen based advanced menu display and ordering
system for restaurants.
365. RFID and GSM based child tracking system
366. Finger print based physical access control vehicle
immobilizer
367. Tsunami detection system using GSM and MEMS
Technology
368. Can base accident avoidance system
369. GSM based traffic signal preemption for ambulance
370. Touchscreen and ZIGBEE device controlling
371. Advanced library management and guiding system using
RFID and touch screen.
372. GPS based automatic station name announcement system
with bomb detection
373. Password based circuit breaker using 8051 microcontroller
374. Car to car communication based on GPS and Wi-Fi
SAMPLE PROJECTS
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf
MINI PROJECTS  TITLES 2022-23.pdf

MINI PROJECTS TITLES 2022-23.pdf

  • 3.
    I. LOWLEVELPROJECTS-WITHOUT MICROCONTROLLER S.NO PROJECTS 1. High Sensitive Alcohol Sensor Buzzer Alert 2. Gas Leak with Buzzer Alert 3. Windmill Power Generation For Rural Applications 4. Solar Lighting System 5. Hydroelectric Power Generation Using DC generator 6. Renewable Energy Based Charger For RuralAreas 7. Solar Based Mobile Charger For Rural Areas 8. Intelligent-solar-emergency-light 9. Electricity Generation From Turbine 10. Hybrid Energy Generator 11. Power Generator From Dc Motor 12. Accident Prevention System On Hilly u-turn Areas 13. Automatic Highway Light System 14. Switch On The Lights In Your House Automatically In The Evenings. 15. Smart Road 16. Clap Switch To Toggle Electrical Appliances 17. IR Based Automatic Highway Lighting System 18. Smart Dust Bin
  • 4.
    19. Invisible BrokenWire Detector. 20. Solar based Mobile charger(mini) 21. Wind energy system(mini) 22. Automatic Irrigation system(mini) 23. LDR based Automatic Street light Monitoring system(mini) 24. Solar Powered Automatic street light system(mini) 25. Automatic Water Tank(mini) 26. Temperature based Fan Controller(mini) 27. Health Monitoring and alert system 28. Tesla coil 29. Wireless power transfer system 30. Automatic Smoke Detector Alarm 31. Rain water Harvesting System 32. Secret Knock based door lock system 33. Smart watch for Blind people 34. Cellphone detector 35. Music based LEDs 36. Rain sensing Alarm 37. CO gas leakage detector 38. Water level indicator 39. Automatic water motor control for overhead tanks 40. Touch less calling bell 41. Automatic water tap control 42. Automatic sanitizer 43. Laser based protection system for farms
  • 5.
    44. Fire safetyand Automatic water spraying system 45. Safety locker using IR 46. Museum security system 47. Series and parallel circuits 48. PIR based motion detection and alert system 49. Hydro power generation 50. Hydraullic Crane 51. Solar system Model 52. Mini Air cooler 53. Vacuum cleaner 54. About Lungs 55. Edge Avoiding Robot 56. Obstacle avoiding robot 57. Floating House 58. EarthQuake Alarm 59. Air pressure experiment 60. Hydraulic crane 61. Mini Refrigirator
  • 6.
    II. MEDIUMLEVELPROJECTS-WITHMICROCONTROLLER S.NO PROJECTS 1.A smart monitor system that measures industrial machine pressure and vibration using Bluetooth 2. Accident Prevention System on Hilly Areas and Deadly Zones 3. Advanced Wireless Power Transfer System 4. Child protection from borewell 5. Android Controlled Railway Level Gate Control Using Arduino 6. Arduino Based Automated Washroom Sanitizing System (Domains / Embedded applications) 7. Auto Electronic School Bell using RTC 8. Automated Door Opener With Lighting Control using Arduino 9. Automatic Exhaust Fan control couple to Gas Leak Detection 10. Automatic Pill Reminder For Easy Supervision (Controllers / Arduino) 11. Automatic Railway Gate Controlling System 12. Automatic Street Light which Works Based on the Vehicle Movement 13. Automatic water tap control system 14. Density Based Traffic Signal System 15. Design and Analysis Of A Smart Blind Stick For Visual Impairment
  • 7.
    16. Design &Implementation of An Automated Reminder Medicine Box For Old People And Hospital (Controllers / Arduino) 17. Design of A Contactless Tachometer Using Arduino 18. Design of Sensing Soil Moisture Content By Auto Irrigation System 19. Electricity Generation from Speed Breakers 20. Elegant home with power saving, security, safety, remote controlling and auto control of water tank motor (Controllers / Arduino) 21. Examination Room Guide Using RFID (Domains / WSN) 22. Intelligent Car Parking System using Arduino 23. IR based home automation using Arduino 24. Object Avoidance Robot 25. Parking vehicle detection using android application (Controllers / Arduino) 26. Password Based Circuit Breaker to Save Linemen’s Life 27. Password Based Distribution Panel and Circuit Breaker Operation for the Safety of Lineman during Maintenance Work (Domains / Electrical) 28. Smart gardening(A homegrown irrigation system) (Controllers / Arduino) 29. Smart Glasses for Blind (Domains / OpenCV) 30. Wireless Control System for Dc Motor to Position a Dish Antenna Using Microcomputer 31. Wireless Surveillance Robot Controlled by PC (Domains / Mechatronics)
  • 8.
    32. Air PollutionMonitoring System Using Wireless Sensor Network 33. Child Safety Monitoring System Based on IoT (Controllers / Arduino) 34. Detection Of Pedestrian Crossing For Safe Driving Using Arduino and RFID 35. Smart Irrigation System 36. Solar based insect Trap 37. Public Garden Automatic System 38. Remote Control Plant Watering System Using 8051 39. Smart Home 40. Automatic Pet Feeder Using Arduino 41. Co2 monitoring using gas sensor 42. Environmental monitoring using microcontroller 43. Navigating Visually Impaired Persons Using Blind Stick 44. House With Earth Quake Warning Alarm 45. Medicine Box Remainder 46. Pollution Monitoring System 47. Pizeo Electric Sensor Based Electric Power Generation 48. Mini Radar System 49. Electronic Quiz Buzzer. 50. Ac Motor Speed Control system
  • 9.
    51. Distance MeasurementSystem Using Ultrasonic Sensor. 52. Intelligent Automatic Plant Irrigation System With Water Pump Control Based On Soil Moister Condition 53. Atomization Of Agriculture System Using Mobile Phone 54. Solar Based Electric Fence For Rural Agriculture In Regency Areas 55. Solar Automatic Traffic And Street Light Controller 56. Solar School 57. Solar Panel With Sun Position Tracking 58. Foot Step Power Generation System For Rural Energy Applications. 59. Solar Car (running Model) 60. Automatic Hand Wash System 61. Aero Dynamic Wind Mill Power Generation For Rural Applications 62. Hand Cranked Dynamo Based Energy Generation System for Emergency Headlamp Applications For Mining Workers 63. Electrical Power Generation Using Speed Breaker 64. Solar Highway Lighting System with Auto Turn Off On Day Time 65. Renewable Energy Management-solar Based Lighting System With Inverter And Cfl Lamp Load 66. Solar Air Cooler 67. Man Less Railway Gate Using Ir Sensor 68. Zigbee Enabled Smart Helmet For Automobiles To Reduce Accidents 69. Vehicle Speed Control in Danger Zones
  • 10.
    70. Speed Checkerto Detect Rash Driving On Highways 71. Driver Less Car (obstacle Avoider Robot) 72. Car Parking Monitoring System 73. Voice Controlled Home Automation 74. Bidirectional Visitor Counter to Control Electrical Appliances 75. Factory Worker Alcohol Detector With Automatic Machine Shutdown 76. Rfid Based Water Dispenser System 77. Advanced Industrial Automation 78. Motion Based Automatic Door Opener 79. Motion Based Automatic Home Automation 80. Automatic Night Lamp With Morning Alarm. 81. Voice Controlled Notice Board 82. Employee Time Management System Using Rtc With Display 83. Level Indicator For Petrol Dispensing Stations With Alert System 84. Automatic Public Water Tap Control System To Reduce Wastage Of Water 85. Automatic Staircase Light With Timer. 86. Bluetooth Controlled Home Automation 87. Home Automation System Using Mobile Phone 88. Water Level Indicator and pump control With Alarm 89. Manhole And Garbage Monitoring System 90. Intelligent Fire Detection With Automatic Sprinkler System To Avoid Fire Accidents
  • 11.
    91. RFID BasedAutomatic Door Locking System 92. Password Based School Door Opening 93. Password Based Bank Door Lock Opening 94. Metal Detector To Find Bomb War Fields 95. Android Password Based Remote Door Opener System Project 96. Secure Your Motor Bike With Rf Based Warning Receiver. 97. Alarm Protect Method For Protection Of Tree 98. Airport Security Luggage Scanner System With Conveyor Belt Arrangement. 99. Diamond Security System In Museums With Loud db Siren. 100. Wireless Doorbell Calling System 101. Mobile Operated Robot. 102. Wireless Robot 103. Line Follower Robot 104. Advertisement Robot 105. Wireless Rf Robot 106. Voice Control Wheel Chair 107. Hand Motion Controlled Robotic Vehicle 108. Rain Sensing Automatic Car Wiper 109. Ultrasonic Radar Project 110. RTC Based Pump Switcher 111. Automatic Smoke Detector Alarm using Arduino 112. Short Circuit Indicator Project 113. Auto Electronic School Bell
  • 12.
    114. Street lightautomatic intensity controller 115. Password Protected circuit breaker 116. DTMF(mobile) based load controlling system 117. Boiler monitoring and control system 118. Power grid control through PC 119. Robot control using Android phone 120. Voice controlled robot 121. Mini remote Notice board using Bluetooth 122. Line following robot 123. LDR based Automatic street light controlling system 124. Automatic Water Tank cleaner 125. Solar umbrella 126. Voice assistance for dumb people 127. Digital ammeter design using micro controller 128. Automatic spike system near traffic signals 129. Solar powered(sun light based) water Desalination system 130. Fuse Blown Indicator And Alerting System using controller 131. Temperature based Fan Speed Controller 132.Environment sensing using smart phone 133.Home appliances control system based on the android 134.Health monitoring system based on android 135.Smart restaurant with emenu card 136.Robot movement controlling using android
  • 13.
    137.Identity authentication forexamination system 138.Wireless home appliances controling system 139.Baby presence detector & warning system in car 140.Design of concealed alarm system 141.A digital security system for door lock system 142.Smart door accessing system 143.Rfid based station name announcemnet 144.Student login and logout management system 145.Bus identification device for the blind people 146.Automated speed controlling of vehicles 147.Body motion information collection 148.Gesture based wireless robot gaming 149.Energy saving system for railway plaorm 150.Paddy crop field monitoring system 151.Earthquake detection alert alarm for people security 152.Pantry system in theaters 153.Advanced time based system for garden 154.Airport security with proximity sensor for bomb detection 155.Parking slot indicator for vehicles in shopping malls apartment 156.Automatic engine locking system for drunken drivers 157.Real time battery monitoring and low voltage alert system 158.Auditorium door opening and illumination lighting system 159.Automatic irrigation soil moisture content control 160.Command based street light controlling through pc 161.Real time efficient street light controlling system
  • 14.
    162.Car driving systemto assist the physically challenged 163.A Very Simple User Access Control Technique through Smart Device Authentication using Bluetooth Communication 164.Development of a cell phone based vehicle remote control system 165.Alcohol breath analyzer 166.Smart Remote for controlling electrical appliances through andriod mobile 167.Smart and cost effective wireless electronics notice board 168.Smart Home OR office automation through android mobile 169.Advertisement boards or status boards message updating system from android mobile for offices and restaurants 170.Smart regulator for controlling fan speed through Android mobile 171.Advanced street light controlling system through smart phone 172. Industrial parameters monitoring system through Smartphone 173. Dc motor speed and direction control using ir 174. Stepper motor control using smart phone 175. Automatic intelligent room light controller with visitor counter using ir 176. Auditorium controlling system using ir 177. Automatic railway gate control system using ir 178. Advanced embedded automatic car parking system 179. Time measurement system for athletics 180. Ir based appliances control system 181. Shopping malls security and power management system using ir 182. Visitor counter cum display system using ir 183. Data transfer between two micro controllers using ir communication 184. Antitheft alarm system
  • 15.
    185. Intelligent objectcounting system 186. Home automation using tv remote 187. Mems based hands gesture controlled robot 188.Hand movement recognition system based mouse with mems accelerometer 189.Fall detection and activity monitoring for elders 190. Touch me not 191. Boiler temperature and control system 192. Involuntary industrial power sheduler using embedded systems 193. Power saver for advertisement hoardings using rtc 194. Solar tracking system 195.Automatic Liquid Dispensing System used in Tea Coffee, Soft drink vendingmachines 196. Advanced security systems for jeweler shops and banks 197.Accident avoiding system using ultrasonic sensor 198. Crop protection from animals 199.Water scheduling for municipalities doc 200. Wireless mobile charger 201. Rfid based bus detection for blind 202.Automated door access based on rfid using arduino 203.Automatic accident detection and notification system 204.Design and implementation of a voice controlled robot 205.Dtmf controlled robot using arduino 206.Embedded solar tracking system 207.Examination room guide using rfid for the jumbling system 208.Home security and safety alarm system using arduino
  • 16.
    209.Indoor air qualitymonitering 210.Ir based security system 211.Smart shoe for blind people
  • 17.
    III. HIGHLEVELPROJECTS-WITHMICROCONTROLLER S.NO PROJECTS 1.Laboratory automation system using IOT devices 2. Smart Door Receptionist with Smart Lock System 3. An IOT-Based Intelligent System for Real-Time Parking Monitoring and Automatic Billing 4. Secure fingerprint bank locker with image capture system using Arduino 5. An IOT Based Multi-parameter Data Acquisition System For Efficient Bio-tele Monitoring Of Pregnant Women At Home 6. Autonomous theft proof delivery robot for food & ecommerce 7. Body and fall detection system with heart rate monitoring 8. Automated traffic ticket checking system using IoT 9. Smart Ration Card System Using RFID and Embedded System 10. Intrusion detection in military border and agriculture field 11. A Conveyor-belt Based Pick-and-sort Industrial Robotics Application 12. Drunken Driving Detection Using Car Ignition Locking 13. An RFID based smart EVM system for reducing electoral frauds
  • 18.
    14. Intelligent foodand grain storage management system for the warehouse and cold storage 15. Arduino based vehicle seat vacancy identification 16. A Design of Intelligent Wearable Health Monitoring System Based on IOT 17. Development of congestion level based dynamic traffic management system using IOT 18. Intelligent Monitoring Systems for Transportation of Perishable Products based Internet of Things(IOT) Technology 19. IOT Based Real-Time Remote Patient Monitoring System 20. IOT Based University Garbage Monitoring System for Healthy Environment for Students 21. IOT Based Wireless Sensor Network for Air Pollution Monitoring 22. IOT-Enabled Shipping Container with Environmental Monitoring and Location Tracking 23. Real-time Wireless Embedded Electronics for Soldier Security 24. Smart Farming System using IOT for Efficient Crop Growth 25. Multi-Functional Blind Stick for Visually Impaired People 26. IOT-aware Waste Management System based on Cloud
  • 19.
    Services and Ultra-lowpower RFID Sensor-Tags 27. Analysis of Smart helmets and Designing an IOT based smart helmet: A cost effective solution for Riders 28. The Design and Implementation of GPS Controlled Environment Monitoring Robotic System based on IOT and ARM 29. Autonomous Energy-Efficient Wireless Sensor Network Platform for Home/Office Automation 30. A Novel Approach to Provide Protection for Women by using Smart Security Device 31. IOT water pollution monitor RC boat 32. IOT Contactless COVID temperature testing system 33. IOT early flood detection & avoidance system 34. IOT based ICU patient monitoring system 35. Contactless IOT doorbell 36. IOT garbage segregator & bin level indicator 37. Driver Drowsiness Detection System for Accident Prevention 38. Drink & drive detection with ignition lock project 39. Swatch Bharat using GSM
  • 20.
    40. Red sandalwoodprotector using metal detector with GSM. 41. Crop monitoring using GSM 42. Crop Protection system from Wild Animals 43. Paralysis patient monitoring system 44. Patient Health Monitoring system modern Village 45. Garbage monitoring system. 46. Water quality monitoring in aquaculture 47. Automatic pet feeder with live streaming 48. Development Of Device For gesture to 49. Speech conversion for the mute community 50. Soldier health & position tracking system 51. Renewable energy monitoring system 52. Design and implementation of hybrid Solar wind power system 53. Accident Detection System Using GPS and GSM with automatic update to ambulance 54. Car Parking Monitoring System using IOT 55. Vehicle Tracking System Using RFID for theft Avoidance 56. Engine Locking System Using GSM technology 57. Accident detection system using GSM
  • 21.
    58. Voice controlledhome automation using 59. Google voice assistant 60. Prepaid energy meter using GSM 61. Voice controlled led notice board 62. Smart shopping system Technology 63. GSM based vehicle fuel theft detection system 64. Finger print based door lock 65. Fingerprint based authentication 66. Fingerprint and keypad based security Access system 67. Rescue child from deep bore well 68. IOT based home automation 69. IOT based home security 70. IOT based environment monitoring 71. IOT based health care monitoring. 72. IOT home security with web cam 73. IOT based smart robot using Wi-Fi module 74. Women safety device with GPS tracking & Alerts 75. Drone with remote control 76. Pick and place robot 77. Remote controlled grass cutter robot 78. House cleaning robot 79. Solar powered electric vehicle
  • 22.
    80. Drainage cleaningrobot 81. Water sprinkling robot 82. Solar powered bomb detecting robot 83. Seed sowing robot 84. Railway track fault detecting system Using LED &LDR 85. Firefighting robot 86. Hand motion controlled robotic vehicle 87. Sun tracking solar panel using Arduino 88. Arduino based autonomous firefighting robot 89. SMS based Fire Department Alerting System 90. SMS based Irrigation Monitoring &Controller System 91. SMS based Garbage Monitoring System 92. Arduino based system to measure solar power 93. Vehicle Movement based Street Light Control 94. Accident Identification and alerting project 95. LPG Gas Accident Prevention With GSM alert 96. Voice controlled Load control system(with android app) 97. Automatic railway platform system using IOT 98. Alcohol detection and alert system for avoiding accidents using GSM 99. Seed sowing robot for farmers wind powergeneration and harvesting
  • 23.
    100. Automatic schoolBoard cleaner system 101. An advanced system to rescue bore well victims 102. Metal/Bomb detection robot 103. Solar Powered LDR based Automatic street light system 104. Fuse blown indicator and alerting system 105. Automatic railway platform system using IOT 106. Boat with remote control 107. Solar powered(sun light based) water desalination system 108. Automatic railway platform system using controller 109. Automatic spike system near traffic signals 110. A Sewer Sensor Monitoring System Based on embedded System 111. A smart monitor system that measures industrial machine pressure and vibration using IOT 112. A Smart Optimization of Fault Diagnosis in Electrical Grid Using distributed software- Defined IOT system 113. Aadhar Based Fingerprint Electronic voting system 114. Advanced IOT Based Combined Remote Health Monitoring, Home Automation and Alarm System 115. Advanced Smart Energy Saving System for 116. Modern railway station platform 117. Advanced Traffic Violation Control and penalty system with Web Server
  • 24.
    118. An EfficientSmart Irrigation System for solar system by using GSM 119. Analysis and Testing of Dual Axis Solar Tracker For a Standalone PDV System 120. Anti-Theft technology of museum cultural relics based on internet of things 121. ATM Terminal Design Is Based On fingerprint recognition 122. Automated smart sericulture for enhancement of silk production using embedded system 123. Automatic Fault Detection and Location of Transmission Lines using IOT 124. Automatic gas cylinder booking over IOT 125. Automatic Pathway for Emergency Vehicle 126. Automatic waste segregation system 127. Automation of Floor Cleaning Robot 128. Bird Feeder and Poultry Conditioning monitoring using Embedded system 129. Design & Implementation of IOT Based smart helmet for Road Accident Detection 130. Design and Development Of Agri-Bot For 131. Automatic ploughing, seeding and watering 132. Design and implementation of a vehicle to vehicle communication system using Li-Fi Technology 133. Design of a Monitoring System Using Pill Bottle Mounted
  • 25.
    Wireless Sensors 134. Designof Piezoelectricity Harvester using footwear 135. Design of wind power generation system using IOT 136. Disinfecting Robot with Ultraviolet Lights 137. Dual Axis Solar Tracking System with weather monitoring 138. Embedded Based Vehicle Speed Control system using Wireless Technology 139. Finger print based door open system 140. Fingerprint based exam hall authentication 141. Forest Monitoring By Hierarchical wireless sensor Network 142. Garbage collector robot 143. Garbage Monitoring system using GSM 144. Gesture Vocalizer for Dumb People 145. Health Care System for Home Quarantine People 146. Heart Attack and Alcohol Detection Sensor Monitoring in Smart Transportation System using Internet of Things 147. Heart Attack Detection by Heartbeat Sensing using IOT 148. Integrated solar food drying system 149. Intelligent Monitoring System for NICU (Neonatal Intensive Care Unit) 150. Intelligent Traffic Signal Control System for ambulance Using IOT
  • 26.
    151. IOT basedOrganic Farming by using aquaponics Method 152. IOT Based Smart Helmets for construction workers 153. IOT Based Smart Multi Application surveillance robot 154. IOT Based Smart Museum using Bluetooth low energy 155. IOT based Smart Road intelligent highways with Monitoring Messages 156. IOT Based Street Lighting And traffic management System 157. IOT: A Novel Strategy for Biometric Voting system 158. IOT-BBMS: Internet Of Things-Based baby monitoring System For Smart Cradle 159. IOT-Enabled Shipping Container with environmental Monitoring and Location Tracking 160. Junction street light system automatic control Using renewable energy resource 161. Low Cost Robotic Agent Design for Disabled and Covid- 19 Affected people 162. Low power Smart Vehicle Tracking, Monitoring, Collision avoidance and Antitheft System 163. Medicine Reminder and Monitoring System for secure Health using IOT 164. Microcontroller based greenhouse monitoring and controlling system 165. Mobile Alarm for gas leak Detection
  • 27.
    166. Monitoring &Controlling of Substation using IOT in Distribution Power Grid 167. Multi-Functional Blind Stick for visually impaired People 168. Novel wearable sensor device for continuous monitoring of cardiac activity during sleep 169. Patient Monitoring System for Home quarantine people 170. Poultry Monitoring and Controlling System 171. Renewable Energy Based Wireless power transfer 172. RFID and GPS Combination Approach Implementation in Fisher Boat Tracking System 173. RFID Based Attendance System With automatic door Unit 174. Robotic Arm for inspection, cleaning and painting of tanks on ships to save on time, cost And avoid accidents 175. School Zone Alert with Announcements 176. Secure Fingerprint Bank Locker With image capture 177. Smart Bag for Women Safety 178. Smart Healthcare Patient Data Privacy and security system using IOT 179. Smart Helmet with Accident Detection 180. Smart Management of Street lights for energy conservation using IOT 181. Smart solar grass cutter with lawn coverage 182. Smart speaking glove 183. Smart Speed Setter and Calibrator for speed control
  • 28.
    devices 184. Smart WasteManagement System using NODEMCU 185. Smart water controller in metro water supply lines 186. SMS based Voting System 187. Social Distancing & Monitoring Robot for queue 188. Solar Based Automatic Irrigation Robot for farm monitoring 189. Solar Dryer Alarm for the safety of food 190. Solar panel with sun position tracking 191. Solar Powered Automated Multi-tasking agricultural Robot 192. The high security smart helmet using internet of things 193. The Smart Mailbox with Motion controlled security Camera 194. Three Phase Fault Analysis with Auto Reset for Temporary Fault and Trip for Permanent Fault 195. Tongue controlled speaking robot for paralyzed/physically handicapped persons 196. Transmission of Data Using Li-Fi 197. Tripping Mechanism of Over Voltage and under voltage System 198. Ultrasonic Spectacles and Waist-belt for visually impaired and Blind Persons 199. UV sterilization robot
  • 29.
    200. Vehicle andlicense authentication using fingerprint 201. Vehicle black box system With IOT 202. Vehicle Theft Detector with Remote engine locking 203. Voice Control 230v Lamp Dimmer with 10 Level of Intensity Control Using Android App 204. Voice controlled car using Arduino 205. Driver behavior monitoring and warning with dangerous driving detection based on the internet of vehicles 206. IOT based real-time remote patient monitoring system 207. IOT based smart factory management system 208. Smart pothole detector 209. Smart farming system using IOT for efficient crop growth 210. Surveillance monitoring using esp32 211. Creating artificial environment for high productivity of plants and monitoring using IOT 212. Arduino Uno based water quality monitoring and flood alerting system using IOT 213. Air quality monitoring system 214. Electrical multipurpose agriculture vehicle 215. Smart solution to prevent the fast spread of covid-19 in workplaces 216. Password based door locking system using Arduino 217. Design of smart and automated seed sowing and grass cutting rover
  • 30.
    218. Ultraviolet sanitizationmachine 219. E-thaap-automatic temperature measuring device 220. Smart public transport 221. Pet care unit- an automated feeding system using Bluetooth module 222. Detection of gas level, leakage and booking using IOT 223. Design of microcontroller based agri-bot and robotic hand 224. Application of real time clock (RTC timer) in the streetlight management using IOT 225. Automobile reverse wheel locking system 226. IOT based automated fuel station using RFID 227. Multipurpose robot 228. Railway track crack detection mechanism 229. Prevention of railway accidents by automatic gate control using IOT 230. IOT based industrial monitoring system using Arduino 231. Vehicle accident alert system using GSM, GPS and MEMS 232. Advanced billing smart meter for electricity, water, and gas using GSM 233. Digital notice board using IOT 234. Eye blinking monitoring system for vehicle accident prevention 235. Microcontroller based design and development of a real time body temperature and heart rate monitoring system
  • 31.
    236. Smart shoppingtrolley using RFID reader and NODE MCU 237. Solar air process heating systems for drying of agricultural products 238. Design and implementation of modernization of agriculture and crop protection using IOT 239. Harvesting solar energy using dual axis solar tracker with added real-time monitoring through GSM 240. License based vehicle ignition system 2 241. Design and implementation of low cost IOT based smart refrigerator 242. Solar based robotic arm using microcontroller 243. A literature survey on: walking aid stick for visually challenged people 244. Analysis and designing of IOT based smart helmet 245. Development of automated hydroponic system for smart agriculture 246. Automated bottle filling machine 247. Rash driving detection system on highway 248. IOT based automated hydroponic system 249. IOT based smart kitchen 250. Bridge health monitoring system using IOT 251. Design of automatic motorbike stand slider 252. Smart wheelchair with medicine reminder and autopilot
  • 32.
    system 253. An EmbeddedSystem Based Monitoring System For Industries By Interfacing Sensors with IOT environment 254. Real time agriculture environment for social moderation of Indian agriculture system using ZIGBEE technology 255. Smart Trash Container for Smart Homes and Cities –Real time concept 256. Automated Irrigation System In Agriculture Using Wireless sensor technology 257. A survey of wireless communications and propagation modeling in underground mines 258. Automated phone of diabetes patients readings / consultant monitoring via the web 259. Robot Position Estimation On A RFID-Tag System In Smart Floor for Industries 260. The Design And Implementation Of Intelligent Campus security tracking System Based On RFID and ZIGBEE 261. Data Acquisition System Of Energy Meter With wireless communication For Smart metering application 262. Real time paddy crop field monitoring using ZIGBEE network 263. Search And Rescue Robot For Victims Of Earthquake And other natural Calamities With remote virtual 264. WIFI Based Communication And Localization Of An Autonomous Mobile Robot For refinery inspection
  • 33.
    265. Reliability OfAn Embedded Surveillance System With security approach 266. A Remote Measurement And Control System For Greenhouse based on GSM-SMS 267. A ZIGBEE-based wearable physiological parameters monitoring system 268. Industrial parameter monitoring system using can 269. Design and implementation of an embedded home surveillance system with ultra-low alert power 270. Distributed remote temperature monitoring and acquisition system based on can bus 271. Collide information capturing for vehicle using GSM, GPS, and MEMS technology 272. Security integrated system based on wireless access protocol for industrial applications with sms alert system using GSM modem 273. ZIGBEE based industrial automation 274. Construction Of Central Control Unit For Irrigation Water Pumps. Cost Effective Method To Control Entire Villager’s water pumps 275. With user level authentication 276. Implementation of hi-tech agricultural solar fence security with 277. Soil Humidity Based Automatic Irrigation and Voice Announcement Alert On PIR Live Human Detection.
  • 34.
    278. Remote-control systemof high efficiency and intelligent street lighting using a ZIGBEE network of devices and sensors 279. Automated control system for air pollution detection in vehicles 280. Lobot: low-cost, self-contained localization of small-sized ground 281. Robotic vehicles 282. Vehicle health monitoring system using can 283. Design of vehicle bus data acquisition and fault diagnosis system using can. 284. Safe driving using mobile phones 285. Reservation based vehicle parking system using GSM and RFID 286. Technology 287. Multi-functional monitoring system 288. Multi-level anti-Theft Security System Using GSM Technology 289. Design of vehicle bus data acquisition and fault diagnosis system using can 290. A design of wireless intelligent control system for service robots 291. Real time paddy crop field monitoring using ZIGBEE network 292. Guard Alert, monitoring and reporting system with GSM
  • 35.
    technology 293. Development ongas leak detection and location system based on wireless sensor networks 294. Design of a wireless medical monitoring system 295. A ZIGBEE based smart sensing platform for monitoring environmental parameters 296. Design of vehicle positioning system based on arm 297. Design And Implementation Of an Embedded Home Surveillance System With Ultra-Low Alert Power 298. The design and implementation of a teacher-student interaction system based on ZIGBEE and RFID 299. Secured wireless communication for industrial automation and control 300. Design & development of GSM based vehicle theft control system 301. A remote sleep monitoring medical alarm system 302. The system of wireless smart house based on GSM and ZIGBEE 303. Role of wireless sensor networks in forest fire prevention 304. Temperature Monitoring In Wireless Sensor network Using ZIGBEE Transceiver Module 305. Mobile monitoring system for smart home 306. Automatic toll collection with complex security system 307. Intelligent wireless mobile patient monitoring system
  • 36.
    308. Automatic powermeter reading system using GSM network 309. Next generation ad-hoc wireless chatting system using touch screen 310. Traffic density analyzer cum signal system for metro cities using GSM technology. 311. Collide information capturing for vehicle using GSM, GPS and MEMS. 312. An intelligent road traffic control system for ambulance using RF 313. Mobile monitoring for smart home using GSM technology 314. ZIGBEE based smart meter reading system 315. Multi sensor Robot Using ZIGBEE. 316. Orchid soil moisture monitoring system based on GSM technology 317. ATM security system using GSM & MEMS technology. 318. A remote home security system based on wireless sensor network and GSM technology. 319. Wireless electronic notice board with multi point receivers using ZIGBEE communication system. 320. System using real time agriculture environment for social moderation of Indian agriculture ZIGBEE technology 321. Industrial automation using can protocol 322. GSM based wireless home appliances monitoring &control system
  • 37.
    323. Remote noticeboard implementation using GSM communication 324. Remote parent care system using RFID& GSM technology 325. Measurement of agriculture applications using ZIGBEE 326. Weather Station Design Using ZIGBEE 327. Biometric identification for ballot mark recognition. 328. A remote measurement and control system for greenhouse based on GSM-sms. 329. RFID bank ATM system (draft generating) and ATM device controlling 330. GSM & GPS technology based accident detection system and release airbags. 331. GSM based advanced security system for banks 332. based patient monitoring system 333. Security integrated system based on wireless access protocol for industrial applications with sms alert system using GSM modem 334. RFID based license management system. 335. Authenticated remote operated device management using GSM technology 336. Barcode access Control Security System 337. Artificial vision systems for the blind using ultra sonic waves 338. Wireless design of low cost irrigation system using
  • 38.
    ZIGBEE technology 339. AnEmbedded Robotic Wheel chair Control Architecture With Reactive Navigations 340. Movement based voice enabled device switching and basic needs for physically challenged 341. GSM Based Home Automation with Voice System 342. Sms based electing system 343. Weather station design using GSM 344. RFID based access control system 345. Elegant ticketing system for buses 346. High temperature alert to doctor using GSM modem 347. Automatic railway gate control 348. Finger print based highly authentication system 349. Implementation of energy management structure for street light control system using GSM technology 350. Security for industrial with alert system using pressure and temperature sensor 351. Sensors Based Industrial Fault Monitoring and Controlling using GSM 352. Biometric recognition system based digital voting system 353. Land mine detectors with automatic indication using GPS and GSM 354. Finger Print Based ATM Authentication & Money management System
  • 39.
    355. GSM baseddata acquisition system 356. Mobile spy robot using wireless webcam 357. Low cost GSM based home automation with voice system 358. Finger print based bank and locker system for modern secured banks 359. MEMS based wheel chair 360. Robust and efficient password-authenticated key agreement using smart cards for campus management 361. Automated system for fault analysis in industry using GSM technology 362. ZIGBEE wireless vehicular identification and authentication system 363. WSN based intelligent train security system and auto controlling 364. Touch screen based advanced menu display and ordering system for restaurants. 365. RFID and GSM based child tracking system 366. Finger print based physical access control vehicle immobilizer 367. Tsunami detection system using GSM and MEMS Technology 368. Can base accident avoidance system 369. GSM based traffic signal preemption for ambulance 370. Touchscreen and ZIGBEE device controlling
  • 40.
    371. Advanced librarymanagement and guiding system using RFID and touch screen. 372. GPS based automatic station name announcement system with bomb detection 373. Password based circuit breaker using 8051 microcontroller 374. Car to car communication based on GPS and Wi-Fi
  • 41.