SlideShare a Scribd company logo
Curriculum Vitae
© European Union, 2010-2016 | http://europass.cedef op.europa.eu
ASSOCIATE ENGINEER (CIVIL)
PERSONAL INFORMATION Syed Waqar Ali Shah
Muzaffarabad,Azad Kashmir (Pakistan) (SaudiArabia)
00923129061646 00966591314778
waqar_ak92@yahoo.com swaqarshah@systra.com
Experience (7 Years’ experience in Tunnelling and Construction)
PREFERREDJOB Supervision
WORK EXPERIENCE
May2015 - Present Tunnel Inspector (RMTC, Saudi Arabia)
RMTC (Riyadh Metro Transit Consultant). A joint venture between SYSTRA,
PARSON & EGIS.
January2014 –May2015 Associate Engineer
NeelumJhelumConsultant.Ajoint venture between (MWH“USA”,
Norplan “Norway” Nespak “Pakistan”, ACE “Pakistan”, NDC“Pakistan”)
Neelum Jhelum hydropower projectis underconstructionin order to meettheneeds of
the power.Theprojectis locatedin thelower Himalayas;itenvisages thediversionof
Neelum riverwater througha tunnelout-fallingintoJhelum River. Neelum Jhelum Hydro
Electric Project Muzaffarabad, Azad Kashmir (contract value Rs. 274.882 Billion).
The total length of head race tunnel was about 48 km. A 19.54 km stretch of the
tunnel from the Nauseri site was constructed as a twin tunnel systemeach with
cross sectionalarea ranging from 52-58m2. The remaining headrace tunnel down
to the surge chamber was a single tunnel having cross sectionalarea 100m2
approximately. The tunnelportion to be excavated with TBM will be shortcrete
lined with a concrete invert while the drill and last portion of the tunnel will have
full face concrete lining. The tunnelcrosses underthe Jhelum River at EI. 602.0,
approximately 180m below Riverbed. The tunnelwas accessed by 8 construction
Adits for removal of excavated spoil. The Surge Chamber consist of341m high
riser shaft and 820m long surge tunnel, four steel lined Penstock tunnels 118 m
long and having 3.8 m internal diameter will also be constructed.The underground
power Station will have four units with a total capacity of 969 MW.
RESPONSIBILITIES:
 Supervisionofconcretelininginheadraceandtwin tunnelas per specification
and design.
 Monitor the dailyprogress ofwork withthe reference ofapproved work
schedule.
 SupervisionofRollerCompactedConcrete inAccessTunnelas perITP and
Specification.
 Site monitoring and preparingprogressformatinMS Excel for differentsite
activities such as excavationand concreteetc.
Curriculum Vitae
© European Union, 2010-2016 | http://europass.cedef op.europa.eu
September2012– Jan2014
2009 – Sep2012
Junior Engineer
Chinese GroupCGGC-CMEC (GezhoubaGroup and China National
Machinery Import and Export Corpor,Muzaffarabad (Pakistan)
Junior Engineer on Neelum Jhelum Hydro Electric Project Muzaffarabad, Azad
Kashmir (contract value Rs. 274.882 Billion). The total length of head race tunnel
was about 48 km. A 19.54 km stretch of the tunnel from the Nauseri site was
constructed as a twin tunnelsystemeach with cross sectional area ranging from
52-58m2. The remaining headrace tunnel down to the surge chamber was a single
tunnel having cross sectional area 100m2 approximately. The tunnelportion to be
excavated with TBM will be shortcrete lined with a concrete invert while the drill
and last portion of the tunnel will have full face concrete lining. The tunnel
crosses underthe Jhelum River at EI. 602.0, approximately 180m below Riverbed.
The tunnel was accessed by 8 construction Adits for removal of excavated spoil.
The Surge Chamber consist of 341m high riser shaft and 820m long surge tunnel,
four steellined Penstock tunnels 118 m long and having 3.8 m internal diameter
will also be constructed.The underground power Station will have four units with
a total capacity of 969 MW.
Responsibilities in the project include Excavation (D & B) for tunnels and power
house cavern,
 Supervision of blasting works,Supervision of rock support with
Lattice Girders, Shotcrete Ribs, Rock bolts (Expansion shell end
anchored rock bolts, resin anchored rock bolts, Fully cement grouted
rock bolts ) and Shotcreeting (Fibre reinforced shotcreeting,
shotcreeting with wire mesh), Grouting, Probing.
 Supervision of Rock support Evaluation,
 TunnelExcavationthroughDrill& BlastMethod(mucking andscaling).
 SupervisionofreinforcedShotCrete(Plain& Fiber) and ShotCretebondand
thicknessTestfor assurance ofqualityofwork.
 SupervisionofDrilling& Groutingofsystematic Rock Bolts (Dia 25mm,length
4m,5m,7m).
 Supervisionof10m RockAnchors for junctionarea inTBMChamber 1&2and
their pullouttestfor installed bearingstrength.
 SupervisionofinstallationofweldedwirefabricmeshreinforcedRibs and
Lattice Girder.
 Supervisetemporaryconstructionofbuildingwork atsite.
 Documentation ofwork(sitediaries,dailyprogressreport,confirmationsheets,
shiftreports etc.) doneatsite.
Tunnel Inspector
Chinese Group CGGC-CMEC(Gezhouba Group and China National
Machinery Import and Export Corpor,Muzaffarabad (Pakistan)
The major responsibilities during my working are listed below.
 Supervise the TBM junction.
 Supervise the assembling of TBM.
 SuperviseTunnelExcavationthroughDrill& BlastMethod(mucking & scaling)
 SupervisionofShotCretereinforcedatthe face or behindthe face (Plain&
Fibre) and shotCretebondtestand thickness test.
 Supervisionofdrillingrock bolts andgroutingrockbolts (dia.25mm,
length.4m/5m/7m/10m anchors)andtheirtubetestandpull testfor their
strengthandspillingbolts,canopypipes,alsoadditionalsupportlikes steel ribs,
lattice girder and steelstraps.
 Conductthemapping throughgeologistand passthe tunnelsupportto the
tunnelforeman.
Curriculum Vitae
© European Union, 2010-2016 | http://europass.cedef op.europa.eu
 Preparation ofrequestsheets and submittedto consultantbeforethe activity
startandshiftreports ofworkdoneduringshift.
 MaintainGoodcoordinationbetweenconsultantandcontractor.
 Site monitoringandpreparingprogressformatinMS Excel for differentsite
activities such as excavationand concreteetc.
 MaintainGoodcoordinationbetweenconsultantandcontractor.
EDUCATION:
2006-2009
2011-2013
2003-2005
BSc. (Statistics, Geography,Economics)
AJK UniversityAzad Kashmir,Muzaffarabad
Diploma of Associate Engineering(civilstructure)
KashmirPolyTechnical InstituteMuzaffarabad.(KPK BoardPeshawar)
F.Sc (Statistic, Economic, Computer)
Tech Era ScienceCollege,Muzaffarabad (Pakistan)
Mother tongue(s) Urdu
Other language(s) UNDERSTANDING SPEAKING WRITING
Listening Reading Spoken interaction Spoken production
English A1 A2 A1 A2 B2
Chinese A 2 A 2
Levels: A1/A2:Basicuser - B1/B2: Independentuser - C1/C2:Proficientuser
CommonEuropeanFrameworkofReferencefor Languages
Communicationskills very good communication skills andsolvingproblems,as working throughoutwith
foreigners
(ChineseatCGGC)
(NJC atWAPDA)
Organizational/managerial
skills
1st Aid Training,ABCD Training,Disaster and ManagementTraining by Turkish
Red Crescentin Pakistan.Safety and Managementat TBM for Pakistani Staff.
CAPT., for Concrete lining & Grouting Team.
Computer skills Assemblylanguage,Computer Hardware & Software Installation,MS Office,
Research Methodology.
Job-related skills Supervisionof differentStructuralElement,GoodManagerial Skills,Team Player,Time
ManagementSkills,Havinggood TechnicalKnowledgeofthe Concreteand Tunnel.

More Related Content

Similar to Syed Waqar Ali Shah

JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
Jundee Mar Tejedo
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
 
cv1
cv1cv1
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
Zachary Maddox
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
Javad Akhtar
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
Mohd Ghufran Yusuf
 
Numerical simulation and optimization of pile design
Numerical simulation and optimization of pile designNumerical simulation and optimization of pile design
Numerical simulation and optimization of pile design
IRJET Journal
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
Aamir Javed
 
20320140502009
2032014050200920320140502009
20320140502009
IAEME Publication
 
20320140502009
2032014050200920320140502009
20320140502009
IAEME Publication
 
Invention Catalogue Pictures
Invention Catalogue  PicturesInvention Catalogue  Pictures
Invention Catalogue Pictures
Mehdi Afshar
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
Mohd Izudin Ghazali
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
Aditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
Aditya Mane
 
Tunnel Presentation (1).pptx
Tunnel Presentation (1).pptxTunnel Presentation (1).pptx
Tunnel Presentation (1).pptx
seifelsaie2
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
Rajib Ali
 
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
GLA University
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
MUDASSAR AFZAL
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Noor Wali Khan
 
The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital
T.Y. Lin International
 

Similar to Syed Waqar Ali Shah (20)

JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
cv1
cv1cv1
cv1
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Numerical simulation and optimization of pile design
Numerical simulation and optimization of pile designNumerical simulation and optimization of pile design
Numerical simulation and optimization of pile design
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
20320140502009
2032014050200920320140502009
20320140502009
 
20320140502009
2032014050200920320140502009
20320140502009
 
Invention Catalogue Pictures
Invention Catalogue  PicturesInvention Catalogue  Pictures
Invention Catalogue Pictures
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Tunnel Presentation (1).pptx
Tunnel Presentation (1).pptxTunnel Presentation (1).pptx
Tunnel Presentation (1).pptx
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE &  NON DESTRUCTIVE TE...
ANALYSIS AND DESIGN OF RAILWAY STEEL AND COCRETE BRIDGE & NON DESTRUCTIVE TE...
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital The Singapore Engineer Aug 2014: National University Hospital
The Singapore Engineer Aug 2014: National University Hospital
 

Recently uploaded

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
TeluguBadi
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
CE19KaushlendraKumar
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
DharmaBanothu
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
ijaia
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
ijseajournal
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
AnasAhmadNoor
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 

Recently uploaded (20)

Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Unit -II Spectroscopy - EC I B.Tech.pdf
Unit -II Spectroscopy - EC  I B.Tech.pdfUnit -II Spectroscopy - EC  I B.Tech.pdf
Unit -II Spectroscopy - EC I B.Tech.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Bituminous road construction project based learning report
Bituminous road construction project based learning reportBituminous road construction project based learning report
Bituminous road construction project based learning report
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...This study Examines the Effectiveness of Talent Procurement through the Imple...
This study Examines the Effectiveness of Talent Procurement through the Imple...
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...Call For Paper -3rd International Conference on Artificial Intelligence Advan...
Call For Paper -3rd International Conference on Artificial Intelligence Advan...
 
P5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civilP5 Working Drawings.pdf floor plan, civil
P5 Working Drawings.pdf floor plan, civil
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 

Syed Waqar Ali Shah

  • 1. Curriculum Vitae © European Union, 2010-2016 | http://europass.cedef op.europa.eu ASSOCIATE ENGINEER (CIVIL) PERSONAL INFORMATION Syed Waqar Ali Shah Muzaffarabad,Azad Kashmir (Pakistan) (SaudiArabia) 00923129061646 00966591314778 waqar_ak92@yahoo.com swaqarshah@systra.com Experience (7 Years’ experience in Tunnelling and Construction) PREFERREDJOB Supervision WORK EXPERIENCE May2015 - Present Tunnel Inspector (RMTC, Saudi Arabia) RMTC (Riyadh Metro Transit Consultant). A joint venture between SYSTRA, PARSON & EGIS. January2014 –May2015 Associate Engineer NeelumJhelumConsultant.Ajoint venture between (MWH“USA”, Norplan “Norway” Nespak “Pakistan”, ACE “Pakistan”, NDC“Pakistan”) Neelum Jhelum hydropower projectis underconstructionin order to meettheneeds of the power.Theprojectis locatedin thelower Himalayas;itenvisages thediversionof Neelum riverwater througha tunnelout-fallingintoJhelum River. Neelum Jhelum Hydro Electric Project Muzaffarabad, Azad Kashmir (contract value Rs. 274.882 Billion). The total length of head race tunnel was about 48 km. A 19.54 km stretch of the tunnel from the Nauseri site was constructed as a twin tunnel systemeach with cross sectionalarea ranging from 52-58m2. The remaining headrace tunnel down to the surge chamber was a single tunnel having cross sectionalarea 100m2 approximately. The tunnelportion to be excavated with TBM will be shortcrete lined with a concrete invert while the drill and last portion of the tunnel will have full face concrete lining. The tunnelcrosses underthe Jhelum River at EI. 602.0, approximately 180m below Riverbed. The tunnelwas accessed by 8 construction Adits for removal of excavated spoil. The Surge Chamber consist of341m high riser shaft and 820m long surge tunnel, four steel lined Penstock tunnels 118 m long and having 3.8 m internal diameter will also be constructed.The underground power Station will have four units with a total capacity of 969 MW. RESPONSIBILITIES:  Supervisionofconcretelininginheadraceandtwin tunnelas per specification and design.  Monitor the dailyprogress ofwork withthe reference ofapproved work schedule.  SupervisionofRollerCompactedConcrete inAccessTunnelas perITP and Specification.  Site monitoring and preparingprogressformatinMS Excel for differentsite activities such as excavationand concreteetc.
  • 2. Curriculum Vitae © European Union, 2010-2016 | http://europass.cedef op.europa.eu September2012– Jan2014 2009 – Sep2012 Junior Engineer Chinese GroupCGGC-CMEC (GezhoubaGroup and China National Machinery Import and Export Corpor,Muzaffarabad (Pakistan) Junior Engineer on Neelum Jhelum Hydro Electric Project Muzaffarabad, Azad Kashmir (contract value Rs. 274.882 Billion). The total length of head race tunnel was about 48 km. A 19.54 km stretch of the tunnel from the Nauseri site was constructed as a twin tunnelsystemeach with cross sectional area ranging from 52-58m2. The remaining headrace tunnel down to the surge chamber was a single tunnel having cross sectional area 100m2 approximately. The tunnelportion to be excavated with TBM will be shortcrete lined with a concrete invert while the drill and last portion of the tunnel will have full face concrete lining. The tunnel crosses underthe Jhelum River at EI. 602.0, approximately 180m below Riverbed. The tunnel was accessed by 8 construction Adits for removal of excavated spoil. The Surge Chamber consist of 341m high riser shaft and 820m long surge tunnel, four steellined Penstock tunnels 118 m long and having 3.8 m internal diameter will also be constructed.The underground power Station will have four units with a total capacity of 969 MW. Responsibilities in the project include Excavation (D & B) for tunnels and power house cavern,  Supervision of blasting works,Supervision of rock support with Lattice Girders, Shotcrete Ribs, Rock bolts (Expansion shell end anchored rock bolts, resin anchored rock bolts, Fully cement grouted rock bolts ) and Shotcreeting (Fibre reinforced shotcreeting, shotcreeting with wire mesh), Grouting, Probing.  Supervision of Rock support Evaluation,  TunnelExcavationthroughDrill& BlastMethod(mucking andscaling).  SupervisionofreinforcedShotCrete(Plain& Fiber) and ShotCretebondand thicknessTestfor assurance ofqualityofwork.  SupervisionofDrilling& Groutingofsystematic Rock Bolts (Dia 25mm,length 4m,5m,7m).  Supervisionof10m RockAnchors for junctionarea inTBMChamber 1&2and their pullouttestfor installed bearingstrength.  SupervisionofinstallationofweldedwirefabricmeshreinforcedRibs and Lattice Girder.  Supervisetemporaryconstructionofbuildingwork atsite.  Documentation ofwork(sitediaries,dailyprogressreport,confirmationsheets, shiftreports etc.) doneatsite. Tunnel Inspector Chinese Group CGGC-CMEC(Gezhouba Group and China National Machinery Import and Export Corpor,Muzaffarabad (Pakistan) The major responsibilities during my working are listed below.  Supervise the TBM junction.  Supervise the assembling of TBM.  SuperviseTunnelExcavationthroughDrill& BlastMethod(mucking & scaling)  SupervisionofShotCretereinforcedatthe face or behindthe face (Plain& Fibre) and shotCretebondtestand thickness test.  Supervisionofdrillingrock bolts andgroutingrockbolts (dia.25mm, length.4m/5m/7m/10m anchors)andtheirtubetestandpull testfor their strengthandspillingbolts,canopypipes,alsoadditionalsupportlikes steel ribs, lattice girder and steelstraps.  Conductthemapping throughgeologistand passthe tunnelsupportto the tunnelforeman.
  • 3. Curriculum Vitae © European Union, 2010-2016 | http://europass.cedef op.europa.eu  Preparation ofrequestsheets and submittedto consultantbeforethe activity startandshiftreports ofworkdoneduringshift.  MaintainGoodcoordinationbetweenconsultantandcontractor.  Site monitoringandpreparingprogressformatinMS Excel for differentsite activities such as excavationand concreteetc.  MaintainGoodcoordinationbetweenconsultantandcontractor. EDUCATION: 2006-2009 2011-2013 2003-2005 BSc. (Statistics, Geography,Economics) AJK UniversityAzad Kashmir,Muzaffarabad Diploma of Associate Engineering(civilstructure) KashmirPolyTechnical InstituteMuzaffarabad.(KPK BoardPeshawar) F.Sc (Statistic, Economic, Computer) Tech Era ScienceCollege,Muzaffarabad (Pakistan) Mother tongue(s) Urdu Other language(s) UNDERSTANDING SPEAKING WRITING Listening Reading Spoken interaction Spoken production English A1 A2 A1 A2 B2 Chinese A 2 A 2 Levels: A1/A2:Basicuser - B1/B2: Independentuser - C1/C2:Proficientuser CommonEuropeanFrameworkofReferencefor Languages Communicationskills very good communication skills andsolvingproblems,as working throughoutwith foreigners (ChineseatCGGC) (NJC atWAPDA) Organizational/managerial skills 1st Aid Training,ABCD Training,Disaster and ManagementTraining by Turkish Red Crescentin Pakistan.Safety and Managementat TBM for Pakistani Staff. CAPT., for Concrete lining & Grouting Team. Computer skills Assemblylanguage,Computer Hardware & Software Installation,MS Office, Research Methodology. Job-related skills Supervisionof differentStructuralElement,GoodManagerial Skills,Team Player,Time ManagementSkills,Havinggood TechnicalKnowledgeofthe Concreteand Tunnel.