The Meadowridge Capital Improvement Project document outlines upgrades needed to the storm water system in the Meadowridge area. It identifies localized stream erosion at specific locations that have exceeded standards. The proposed upgrades include replacing failing pipes on Ivygate Lane, upgrading systems on Meadowridge Drive and All Saints Lane to increase capacity and reduce flooding, and adding bank stabilization behind a property to reduce erosion. It concludes by outlining the next steps of design, permitting, easement acquisition, and bid and construction phases.