4/4: Material Requirements Planning
• Dependent inventory model
• For in-house inventory planning
Requirements of MRP
• Master production schedule
– when to make what
• Bill of Materials: how to make the product
• Lead times
– how long it takes to get various components
• Inventory availability
• Scheduled receipts & on-hand inventory
Master Production Schedule
• Tells us what is required to meet the production
plan.
• Statement of what is to be produced, NOT a
forecast of demand.
Gross requirements per day
4 5 6 7 8
100 150 100 180
Bill of Materials
• A list of quantities of components, ingredients,
or materials to make a final product.
• Provides the product structure.
EX: A “Blast ‘em, dude” audio kit (A) is made of 2
small tweeter boxes (B) and 3 large woofer boxes (C).
Each tweeter is made of two speakers (D) and two
shipping boxes (E). Each woofer consists of two
boosters (F) and two shipping boxes (E). Each booster is
made of a circuit board (G) and a speaker (D).
EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small
tweeter boxes (B) and 3 large woofer boxes (C). Each
tweeter is made of two speakers (D) and two shipping
boxes (E). Each woofer consists of two boosters (F) and
two shipping boxes (E). Each booster is made of a circuit
board (G) and a speaker (D).
A
2B 3C
EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small
tweeter boxes (B) and 3 large woofer boxes (C). Each
tweeter is made of two speakers (D) and two shipping
boxes (E). Each woofer consists of two boosters (F) and
two shipping boxes (E). Each booster is made of a circuit
board (G) and a speaker (D).
A
2B 3C
2D 2E
EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small
tweeter boxes (B) and 3 large woofer boxes (C). Each
tweeter is made of two speakers (D) and two shipping
boxes (E). Each woofer consists of two boosters (F) and
two shipping boxes (E). Each booster is made of a circuit
board (G) and a speaker (D).
A
2B 3C
2D 2E 2F 2E
EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small
tweeter boxes (B) and 3 large woofer boxes (C). Each
tweeter is made of two speakers (D) and two shipping
boxes (E). Each woofer consists of two boosters (F) and
two shipping boxes (E). Each booster is made of one
circuit board (G) and one speaker (D).
A
2B 3C
2D 2E 2F 2E
G D
EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small
tweeter boxes (B) and 3 large woofer boxes (C). Each
tweeter is made of two speakers (D) and two shipping
boxes (E). Each woofer consists of two boosters (F) and
two shipping boxes (E). Each booster is made of one circuit
board (G) and one speaker (D).
A
2B 3C
2D 2E 2F 2E
G D
Note that the numbers
here are only relevant
to the level above them!
A
2B 3C
2D 2E 2F 2E
G D
“Exploded” Product Structure
• Items above a level are PARENTS;
• Items below a level are COMPONENTS or
CHILDREN.
A
2B 3C
2D 2E 2F 2E
G D
Level 0
level 1
level 2
level 3
Exploded Product Structure: 4 levels.
Lead times
• Time required to acquire (purchase, produce, or
assemble) an item.
• Manufactured part: lead time made of move,
setup, and assembly or run times for each
component.
• Purchased part: lead time made of difference
between when part is ordered and when it is
received.
A
2B 3C
2D 2E 2F 2E
G D
Lead times
A 1 wk.
B 2
C 1
D 1
E 2
F 3
G 2
Time-Phased Product Structure
• Rotate BOM below and reflect
lead times with time as the X axis.
A
2B
3C
2D
2E
2F
2E
G
D
Lead times
A 1 wk.
B 2
C 1
D 1
E 2
F 3
G 2
8 7 6 5 4 3 2 1 0
Time-Phased Product Structure
• Rotate BOM
and reflect lead
times on X axis.
Gross Material Requirements
• Assume we need 50 “Blast ‘em, dude” speaker
kits in eight weeks.
• We need to calculate when and how many of
each component we need to start making.
Go to spreadsheet
Lot sizing
• lot-for-lot (L4L): order exactly the amount you
want.
• Lot size required: order in certain amounts (ex. a
dozen eggs).
Scheduled Receipts &
On-Hand Inventory
• Scheduled Receipts:
– Units (of any component) that you have
already scheduled to come in at a particular
time.
• On-Hand Inventory
– Units (of any component) that you already
have in stock (at the beginning).
Gross Req. vs. Net Req.
• Gross required is the total amount of a
component you need.
• Net required is (Gross)
- (On-hand inventory)
- (Scheduled receipts)
Planned Order Receipts & Releases
• Planned Order Receipts:
–When you PLAN to RECEIVE what you
ORDERED.
• Planned Order Releases:
–When you PLAN to RELEASE what in
an ORDER.
MRP: What you need to know
• Master Schedule
• Bill of Materials
• Lead times
• Lot sizes
• Scheduled receipts & on-hand inventory
Group Exercise:Create an MRP
• You make the PalmPointer, a handy PDA. You have received an
order for 200 units to be shipped in 12 hours. A PalmPointer is
made of a LCD screen, 4 buttons, 1 toggle button, and a
motherboard. The motherboard is made of 3 processors, 2 clock
batteries, and a circuit board. Assembly time for the assemblies
are as follows: All parts are L4L except the batteries, which must
be ordered in packs of 40. You already have 50 motherboards and
100 processors.
– PalmPointer 2 hours LCD screen 1
– buttons 2 toggle button 3
– motherboard 6 processors 2
– batteries 1 circuit board 3
• Create an MRP schedule to determine when to begin
assembling each component. Go back to spreadsheet
Homework due 4/11
• Download handout at
http://adbook.net/teach022/305/hmwk4-4.xls
• There are two problems to be answered.
• Print out problems and turn in ON PAPER – no
email submissions.

More Related Content

Viewers also liked

Upgrading migration and moving house
Upgrading migration and moving houseUpgrading migration and moving house
Upgrading migration and moving house
Will Hall
 
Bad Quality Legal Services? Recovering Damages (in Russian)
Bad Quality Legal Services? Recovering Damages (in Russian)Bad Quality Legal Services? Recovering Damages (in Russian)
Bad Quality Legal Services? Recovering Damages (in Russian)
Lidings Law Firm
 
Twinity Overview - Conference Slides 250310
Twinity Overview - Conference Slides 250310Twinity Overview - Conference Slides 250310
Twinity Overview - Conference Slides 250310Twinity
 
Drupal 7 migration
Drupal 7 migrationDrupal 7 migration
Drupal 7 migration
Will Hall
 
Open Source Content Management Systems for Small and Medium Businesses, Chari...
Open Source Content Management Systems for Small and Medium Businesses, Chari...Open Source Content Management Systems for Small and Medium Businesses, Chari...
Open Source Content Management Systems for Small and Medium Businesses, Chari...
Will Hall
 
Establishing a business entity in russia
Establishing a business entity in russiaEstablishing a business entity in russia
Establishing a business entity in russia
Lidings Law Firm
 
Wordpress Up and Running
Wordpress Up and RunningWordpress Up and Running
Wordpress Up and Running
Will Hall
 
Migration to Drupal
Migration to DrupalMigration to Drupal
Migration to Drupal
Will Hall
 
Things i wish i knew about drupal commerce
Things i wish i knew about drupal commerceThings i wish i knew about drupal commerce
Things i wish i knew about drupal commerce
Will Hall
 

Viewers also liked (11)

Upgrading migration and moving house
Upgrading migration and moving houseUpgrading migration and moving house
Upgrading migration and moving house
 
dsddssds
dsddssdsdsddssds
dsddssds
 
Bad Quality Legal Services? Recovering Damages (in Russian)
Bad Quality Legal Services? Recovering Damages (in Russian)Bad Quality Legal Services? Recovering Damages (in Russian)
Bad Quality Legal Services? Recovering Damages (in Russian)
 
Lerning annex
Lerning annexLerning annex
Lerning annex
 
Twinity Overview - Conference Slides 250310
Twinity Overview - Conference Slides 250310Twinity Overview - Conference Slides 250310
Twinity Overview - Conference Slides 250310
 
Drupal 7 migration
Drupal 7 migrationDrupal 7 migration
Drupal 7 migration
 
Open Source Content Management Systems for Small and Medium Businesses, Chari...
Open Source Content Management Systems for Small and Medium Businesses, Chari...Open Source Content Management Systems for Small and Medium Businesses, Chari...
Open Source Content Management Systems for Small and Medium Businesses, Chari...
 
Establishing a business entity in russia
Establishing a business entity in russiaEstablishing a business entity in russia
Establishing a business entity in russia
 
Wordpress Up and Running
Wordpress Up and RunningWordpress Up and Running
Wordpress Up and Running
 
Migration to Drupal
Migration to DrupalMigration to Drupal
Migration to Drupal
 
Things i wish i knew about drupal commerce
Things i wish i knew about drupal commerceThings i wish i knew about drupal commerce
Things i wish i knew about drupal commerce
 

Similar to 4 4

Cool cubes tutorial
Cool cubes tutorialCool cubes tutorial
Cool cubes tutorial
IvanFarhan2
 
Introducción al Planeamiento agregado - Teoría y ejemplo
Introducción al Planeamiento agregado - Teoría y ejemploIntroducción al Planeamiento agregado - Teoría y ejemplo
Introducción al Planeamiento agregado - Teoría y ejemplo
Jairo
 
Mail repository tutorial
Mail repository tutorialMail repository tutorial
Mail repository tutorial
IvanFarhan2
 
Material requirement planning Q&A
Material requirement planning  Q&AMaterial requirement planning  Q&A
Material requirement planning Q&A
Mahmoud Eltaweel
 
Dutch country clock_tutorial
Dutch country clock_tutorialDutch country clock_tutorial
Dutch country clock_tutorial
FarhanAhmed866812
 
Dutch country clock
Dutch country clockDutch country clock
Dutch country clock
IvanFarhan2
 
De2 user manual
De2 user manualDe2 user manual
De2 user manual
dinadesriany
 
Computer Hardware | 3B
Computer Hardware | 3BComputer Hardware | 3B
Computer Hardware | 3B
CMDLMS
 
Computer Hardware - Lecture B
Computer Hardware - Lecture BComputer Hardware - Lecture B
Computer Hardware - Lecture B
CMDLearning
 
Mrp
MrpMrp

Similar to 4 4 (11)

Cool cubes tutorial
Cool cubes tutorialCool cubes tutorial
Cool cubes tutorial
 
Introducción al Planeamiento agregado - Teoría y ejemplo
Introducción al Planeamiento agregado - Teoría y ejemploIntroducción al Planeamiento agregado - Teoría y ejemplo
Introducción al Planeamiento agregado - Teoría y ejemplo
 
Mail repository tutorial
Mail repository tutorialMail repository tutorial
Mail repository tutorial
 
Material requirement planning Q&A
Material requirement planning  Q&AMaterial requirement planning  Q&A
Material requirement planning Q&A
 
Dutch country clock_tutorial
Dutch country clock_tutorialDutch country clock_tutorial
Dutch country clock_tutorial
 
Dutch country clock
Dutch country clockDutch country clock
Dutch country clock
 
De2 user manual
De2 user manualDe2 user manual
De2 user manual
 
Computer Hardware | 3B
Computer Hardware | 3BComputer Hardware | 3B
Computer Hardware | 3B
 
Computer Hardware - Lecture B
Computer Hardware - Lecture BComputer Hardware - Lecture B
Computer Hardware - Lecture B
 
Mrp
MrpMrp
Mrp
 
Mrp
MrpMrp
Mrp
 

Recently uploaded

PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
PrabhjeetSingh219035
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
PlanitIsrael
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
cy0krjxt
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Mansi Shah
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
M. A. Architect
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
Confidence Ago
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
aaryangarg12
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
taqyed
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
h7j5io0
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
farazahmadas6
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 

Recently uploaded (20)

PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
vernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdfvernacular architecture in response to climate.pdf
vernacular architecture in response to climate.pdf
 
Top Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdfTop Israeli Products and Brands - Plan it israel.pdf
Top Israeli Products and Brands - Plan it israel.pdf
 
RTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,DRTUYUIJKLDSADAGHBDJNKSMAL,D
RTUYUIJKLDSADAGHBDJNKSMAL,D
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
Between Filth and Fortune- Urban Cattle Foraging Realities by Devi S Nair, An...
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Mohannad Abdullah portfolio _ V2 _22-24
Mohannad Abdullah  portfolio _ V2 _22-24Mohannad Abdullah  portfolio _ V2 _22-24
Mohannad Abdullah portfolio _ V2 _22-24
 
Book Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for DesignersBook Formatting: Quality Control Checks for Designers
Book Formatting: Quality Control Checks for Designers
 
Transforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting ProfitabilityTransforming Brand Perception and Boosting Profitability
Transforming Brand Perception and Boosting Profitability
 
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理一比一原版(毕业证)长崎大学毕业证成绩单如何办理
一比一原版(毕业证)长崎大学毕业证成绩单如何办理
 
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
一比一原版(BU毕业证书)伯恩茅斯大学毕业证成绩单如何办理
 
projectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdfprojectreportnew-170307082323 nnnnnn(1).pdf
projectreportnew-170307082323 nnnnnn(1).pdf
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 

4 4

  • 1. 4/4: Material Requirements Planning • Dependent inventory model • For in-house inventory planning
  • 2. Requirements of MRP • Master production schedule – when to make what • Bill of Materials: how to make the product • Lead times – how long it takes to get various components • Inventory availability • Scheduled receipts & on-hand inventory
  • 3. Master Production Schedule • Tells us what is required to meet the production plan. • Statement of what is to be produced, NOT a forecast of demand. Gross requirements per day 4 5 6 7 8 100 150 100 180
  • 4. Bill of Materials • A list of quantities of components, ingredients, or materials to make a final product. • Provides the product structure. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D).
  • 5. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C
  • 6. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D 2E
  • 7. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of a circuit board (G) and a speaker (D). A 2B 3C 2D 2E 2F 2E
  • 8. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). A 2B 3C 2D 2E 2F 2E G D
  • 9. EX: A “Blast ‘em, dude” audio kit (A) is made of 2 small tweeter boxes (B) and 3 large woofer boxes (C). Each tweeter is made of two speakers (D) and two shipping boxes (E). Each woofer consists of two boosters (F) and two shipping boxes (E). Each booster is made of one circuit board (G) and one speaker (D). A 2B 3C 2D 2E 2F 2E G D Note that the numbers here are only relevant to the level above them!
  • 10. A 2B 3C 2D 2E 2F 2E G D “Exploded” Product Structure • Items above a level are PARENTS; • Items below a level are COMPONENTS or CHILDREN.
  • 11. A 2B 3C 2D 2E 2F 2E G D Level 0 level 1 level 2 level 3 Exploded Product Structure: 4 levels.
  • 12. Lead times • Time required to acquire (purchase, produce, or assemble) an item. • Manufactured part: lead time made of move, setup, and assembly or run times for each component. • Purchased part: lead time made of difference between when part is ordered and when it is received.
  • 13. A 2B 3C 2D 2E 2F 2E G D Lead times A 1 wk. B 2 C 1 D 1 E 2 F 3 G 2 Time-Phased Product Structure • Rotate BOM below and reflect lead times with time as the X axis.
  • 14. A 2B 3C 2D 2E 2F 2E G D Lead times A 1 wk. B 2 C 1 D 1 E 2 F 3 G 2 8 7 6 5 4 3 2 1 0 Time-Phased Product Structure • Rotate BOM and reflect lead times on X axis.
  • 15. Gross Material Requirements • Assume we need 50 “Blast ‘em, dude” speaker kits in eight weeks. • We need to calculate when and how many of each component we need to start making. Go to spreadsheet
  • 16. Lot sizing • lot-for-lot (L4L): order exactly the amount you want. • Lot size required: order in certain amounts (ex. a dozen eggs).
  • 17. Scheduled Receipts & On-Hand Inventory • Scheduled Receipts: – Units (of any component) that you have already scheduled to come in at a particular time. • On-Hand Inventory – Units (of any component) that you already have in stock (at the beginning).
  • 18. Gross Req. vs. Net Req. • Gross required is the total amount of a component you need. • Net required is (Gross) - (On-hand inventory) - (Scheduled receipts)
  • 19. Planned Order Receipts & Releases • Planned Order Receipts: –When you PLAN to RECEIVE what you ORDERED. • Planned Order Releases: –When you PLAN to RELEASE what in an ORDER.
  • 20. MRP: What you need to know • Master Schedule • Bill of Materials • Lead times • Lot sizes • Scheduled receipts & on-hand inventory
  • 21. Group Exercise:Create an MRP • You make the PalmPointer, a handy PDA. You have received an order for 200 units to be shipped in 12 hours. A PalmPointer is made of a LCD screen, 4 buttons, 1 toggle button, and a motherboard. The motherboard is made of 3 processors, 2 clock batteries, and a circuit board. Assembly time for the assemblies are as follows: All parts are L4L except the batteries, which must be ordered in packs of 40. You already have 50 motherboards and 100 processors. – PalmPointer 2 hours LCD screen 1 – buttons 2 toggle button 3 – motherboard 6 processors 2 – batteries 1 circuit board 3 • Create an MRP schedule to determine when to begin assembling each component. Go back to spreadsheet
  • 22. Homework due 4/11 • Download handout at http://adbook.net/teach022/305/hmwk4-4.xls • There are two problems to be answered. • Print out problems and turn in ON PAPER – no email submissions.