Callum Black has over 4 years of experience designing and managing complex temporary works structures for projects involving bridge repairs, building repairs and additions, and facade retention. His portfolio includes designs using scaffolding, propping, and hanging scaffolds to overcome site constraints and allow construction work while keeping areas open. He has expertise in considering buildability, cost, and engineered solutions for temporary structures.
Yorkshire Sculpture Park was founded in 1977 within the grounds of the 18C Bretton Hall Estate. It was the country’s first dedicated public sculpture park and now attracts around 300,000 visitors a year.
Yorkshire Sculpture Park was founded in 1977 within the grounds of the 18C Bretton Hall Estate. It was the country’s first dedicated public sculpture park and now attracts around 300,000 visitors a year.
Second appeal under RTI Act 2005 against Department of legal affairs dated 3....Om Prakash Poddar
Second Appeal under RTI Act 2005 filed before Central Information Commission (CIC), New Delhi upon refusal to supply information by First Appellate Authority Department of Legal Affairs, Ministry of Law & Justice, Government of India & Law Department, Government of Bihar vide diary no. 183721 dated 03.11.2016
La Seguridad Social es la entidad pública encargada de gestionar y pagar las pensiones públicas de jubilación en España. Nació en 1900, año en que se creó el primer seguro social en España, a través de la Ley de Accidentes de Trabajo. Desde entonces ha sufrido variaciones.
The Signature - The Grandest Location in Quezon CityFilinvestLandInc
The Signature of Green-changing the landscape of the New Chinatown• With over 6,000 square meters of amenities and green spaces• The only residential development with a 50-meter Olympic-sized pool• A first of its kind premiere residential enclave.
FOR MORE INFO, PLEASE CONTACT:
+63 (917) 764-3618 ; ece.filinvest@gmail.com
Chalcroft Special Projects have experienced understanding of security critical sectors including broadcast, satellite and media, radar and microwave, telecommunications, renewables and utilities. Chalcroft Special Projects have the engineering skills, design resource, security procedures and management experience to undertake the challenging construction projects demanded by new technology. Projects include new build, civils works, electrical and structural engineering, refurbishment and maintenance. Services include: site surveys and feasibility studies; geotechnical reports and surveys; structural design and drawings; turnkey build and commissioning; maintenance and security works; refurbishment of buildings and offices; programme and project management; mechanical and electrical installations.
the presentation gives a brief description about the architectural and engineering design and the construction methodologies applied and some statistical and engineering data
1. Callum Black
Project Portfolio
Profile Overview:
Over the past 4 years I have been able to work on some exciting, complex temporary works
structures. Varying in complexity, each project in this portfolio represents typical components used
in innovative ways to overcome issues on site. Whether it is site access, or propping, I have unique
experience in designs and management of superstructure temporary works.
Within each of the shown engineered solutions, there has been the consideration of build ability
and cost, leading to the final design that was consequently installed.
Contact:Callum Black Mobile: 07980133670 Email: cblack1@hotmail.co.uk
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
2. Project Portfolio - Callum Black
Scaffolding
Project Name: Bridge Parapet Encapsulation
Location: Torquay Rail Station
Description: Encapsulation of parapet to facilitate grit blast repairs over low speed rail line. It was
required to keep the existing, narrow and weak, bridge open during the works, therefore it was
decided that using Haki 750 beams would be the best approach to this project.
Client: Bam Nuttall Ltd
Involvement: Design, Bill of Quantities
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
3. Project Name: Bridge Parapet Encapsulation
Location: Bitton Road Rail Bridge, Keynsham
Description: Encapsulation of parapet over high speed train line to facilitate bridge repair works.
The structure was built as an up and over scaffold, reducing possession work and allowing the
existing road to stay open at the same time.
Client: BAM Nuttall
Involvement: Design, Bill of Quantities
!
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
4. Project Name: Handrail Adjustment
Location: Avonmouth M5 Bridge
Description: Support existing handrail to allow platform to be raised to the underside of the
Avonmouth M5 bridge. The structure was required to be initially built off a cherry picker therefore
there was a high importance of the build ability of the structure.
Client: Four Tees
Involvement: Design, Bill of Quantities
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
5. Project Name: Public Access Staircase
Location: Oxford Museum of History or Science
Description: Allow public access staircase within confined space. The staircase was limited to
foundation locations, therefore the structure was built top down, hanging from Haki 450 beams and
Layher Public Access staircase and All-round Scaffold.
Client: Oxford University
Involvement: Design, Bill of Quantities, Project Management, Valuations
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
6. Project Name: Access for Ceiling works repairs.
Location: Private Estate
Description: Scaffold to facilitate repair works to ceiling and dome, while ensuring a minimal foot
print and existing staircase stays open. This used various components including but not limited to
Layher, RMD Sgperslim and Haki Beams.
Client: Private
Involvement: Design, Bill of Quantities, Project Management
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
7. Heavy duty propping
Project Name: Pro Cathedral, Basement opening
Location: Pro Cathedral, Bristol
Description: RMD Megashor was used for propping a 500kN/m unfactored load to facilitate a new
structural opening at ground floor.
Client: Vinci
Involvement: Design, Bill of Quantities, Project Management
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
8. Project Name: Bristol North Baths
Location: Bristol
Description: Horizontal support to a party wall to allow installation of new foundations near footing
of existing wall. RMD Superslim was used to resist the horizontal loads and transmitted the load back
into new temporary concrete foundations.
Client: Chatsworth House
Involvement: Design, Bill of Quantities, Project Management
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
9. Project Name: Pro Cathedral, Level One Opening
Location: Pro Cathedral, Bristol
Description: RMD Superslim was use in a Seesaw propping method due to it being impractical to go
to ground. Unfactored loads of 270kN/m meant that RMD Superslim suited these loads but were close
to the limit. The new structural opening was for access for the new extension.
Client: Vinci
Involvement: Design, Bill of Quantities, Project Management
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
10. Project Name: Tesco Yeovil
Location: Yeovil
Description: RMD Superslim Soldiers to support rear gable wall to facilitate installation of new steel
frame. Due to new foundations for the steel frame, it was required to have a larger clear gap than
usual, therefore RMD Superslim needles were used with stabilising RMD Superslim rakers.
Client: ISG Retail
Involvement: Design, Bill of Quantities, Project Management
!
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16
11. Project Name: 1-3 James St. West
Location: 1-3 James St. West, Bath
Description: Facade Retention to existing building to facilitate demolition of first floor slab and allow
installation of new steel frame. Large 1 tonne concrete blocks were used on the RMD Superslim
elevation as the only space for the facade retention was the existing pavement. A scaffold tube and
fitting solution was more suitable on the other elevations due to more space being made available.
Client: Ikon Construction
Involvement: Estimating, Design, Bill of Quantities, Project Management, Valuations
Callum Black Temporary Works Portfolio
cblack1@hotmail.co.uk Doc Issued: 18/07/16