L A K E S H O R E G O L D C O R P.
The Big Event
Canadian Mining Expo
May 27/28, 2015
Information included in this presentation relating to the Company's expected production levels, production growth, costs, cash flows, economic returns, exploration
activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning
of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of
1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking
statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable,
including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in
transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects
according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company
makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve
known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different
from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and
fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking
statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form
and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company’s most recent Annual Report on
Form 40-F and other regulatory filings with the Securities and Exchange Commission.
QUALITY CONTROL
Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. A total of three Quality Control samples consisting of 1
blank, 1 certified standard and 1 reject duplicate are inserted into groups of 20 drill core samples. The blanks and the certified standards are checked to be within
acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been completed using a standard fire assay with a 30-gram aliquot. For
samples that return a value greater than three grams per tonne gold on exploration projects and greater than 10 gpt at the Timmins mine and Thunder Creek underground
project, the remaining pulp is taken and fire assayed with a gravimetric finish. Select zones with visible gold are typically tested by pulp metallic analysis on some projects.
NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is
transported in security-sealed bags for preparation at ALS Chemex Prep Lab located in Timmins, Ontario, and the pulps shipped to ALS Chemex Assay Laboratory in
Vancouver, B.C. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification.
QUALIFIED PERSON
Scientific and technical information related to mine production and reserves contained in this presentation has been reviewed and approved by Natasha Vaz, P.Eng., Vice-
President, Technical Services, who is an employee of Lake Shore Gold Corp., and a “qualified person” as defined by National Instrument 43-101 – Standards of
Disclosure for Mineral Projects (“NI 43-101”).
Scientific and technical information related to resources, drilling and all matters involving mine production geology, as well as exploration drilling, contained in this
presentation, or source material for this presentation, was reviewed and approved by Eric Kallio, P.Geo., Senior Vice-President, Exploration. Mr. Kallio is an employee of
Lake Shore Gold Corp., and is a “qualified person” as defined by NI 43-101.
 Two producing mines and a central mill
in Timmins, Ontario, Canada
• Timmins West Mine
• Bell Creek Mine & Mill
 Large, prospective land position in
Timmins
• Right geology
 Strong organic growth
• Large resource base at operations &
projects, exploration upside
 Employees – 520
 Contractors – 188
 Total annual labour costs: $50 million
 Total investments (Over last 3 years) – $565 million
(2012 – 2014)(1)
 Timmins: $350 million
 Regional (Northern Ontario/Quebec): $115 million
 Rest of Canada/International: $100 million
(1) Geographic split based on estimates
Record production,
lower costs, free cash
flow & profitability,
reduced debt increased
financial strength
Exploration
Development/
Construction
Production
AND REPEAT
Exploration
$700M raised in debt
& equity
Debt included $70M
Senior Secured
Facility with Sprott
Drilling to replace
reserves
Drilling for new
discoveries
Extend mine life,
grow resources
Exploration and
advanced
exploration to
establish deposits
 Record production of 185,600 in 2014
• 38% growth from 2013
 Three consecutive years of meeting or beating guidance
 53,000 oz in Q1/15 – Record quarter
2012 2013 2014 2015
85,700
134,600
160,000 170,000
180,000 180,000
Production (Ounces)(1) 185,600 (Actual)
Guidance Guidance
(1) Contains Forward-looking Information
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2012 2013 2014 2015
1,813
1,139
872
950
950
1,0001,050
(1) Contains Forward-looking Information
(2) Example of Non-GAAP Measure, see Slide
21 for more information
0
100
200
300
400
500
600
700
800
900
1000
2012 2013 2014 2015
966
766
592
675
650
775
Guidance
Guidance 700
Total Cash Costs(US$/oz)(1(2)
All-In Sustaining Costs(US$/oz)(1)(2)
Guidance Guidance  2014 AISC 8% better than target
range (US$950 – US$1,050)
 Q1/15 AISC US$750/oz
23% Improvement in 2014
 2014 cash costs 12% better than
target range (US$675 – US$775)
 Q1/15 cash costs US$510/oz
23% Improvement in 2014
0
10
20
30
40
50
60
70
80
15
34
39
53
67
62
77
Cash & Bullion
($ Millions)
Cash & Bullion of Approx. $77 million at March 31/15
>$60M Growth Since Completing Mill Expansion
 Reduction in Q4/14 reflected early repayment of standby line
0
10
20
30
40
50
60
70
61
52
49
35
31
7
1.5
Senior Secured Debt
($ Millions)
 Repaid $60.0 million of debt since Q3/13
• $30 million related to standby line (fully repaid as of Dec. 31/14)
• $19 million to gold-linked note (@ $3.0M O/S at Mar. 31/15)
• Repaid $44.7M in 2014
(1) Contains forward-looking information
 29% increase in ore reserves (announced March 21, 2015)
 Major new discovery at 144 Gap
 New underground exploration program at Bell Creek
2 Drills Working at
144 Gap Discovery
Record production,
lower costs, free cash
flow & profitability,
reduced debt increased
financial strength
Exploration
Development/
Construction
Production
AND REPEAT
Exploration
Exploration and
advanced
exploration to
establish deposits
$700M raised in debt
& equity
Debt included $70M
Senior Secured
Facility with Sprott
Drilling to replace
reserves
Drilling for new
discoveries
Extend mine life,
grow resources
 Completed Mill expansion during Q3/13
• 3,400 tonnes per day in September ‘13
 Increased production to 51,700 oz in Q4/13
 Significantly improved cash costs and AISC
 Began generating net free cash flow
 Increased cash and bullion from $15M at Sept. 30/13 to
Dec. 31/15
(1) Examples of forward-looking information
 Achieving strong levels of performance
 Achieving strong production growth
 Driving costs lower
 Growing cash rapidly
 Resumed drilling to replace/grow reserves in Jan. 2014
 Commenced drilling for new discoveries in August 2014
(1) Examples of forward-looking information
Timmins
Deposit
Timmins DepositThunder Creek
730 Access Level
270 Access Level
525 Level
650 Level
Timmins West Mine
 Production from 2 deposits
 142,200 oz in 2014
 Reserves grew 4% in 2014
Timmins West Mine
144 Gap Discovery
(Within 500 m of Thunder
Creek)
Future Exploration
Target
Future Exploration
Targets
Gold River Trend
TC–144 Trend
Gold River Project
M&I: 690k tonnes @ 5.3 gpt (117k oz)
Inferred: 5.3M tonnes at 6.1 gpt (1.0M oz)
Timmins
Deposit
Thunder
Creek
144 Gap
Zone
144 North
144
South
N
Shaft
Planned Exploration Drift
Existing Infrastructure
OPENOPEN
OPEN
400m
400m
Current progress – Drift
HWY-14-48
5.37gpt/46.00m
4.06gpt/5.10m
5.76gpt/1.20m
THUNDER
CREEK
DEPOSIT
OPEN 400m OPEN
Planned Exploration Drift
Existing Infrastructure
Current progress – Drift
 Large zone identified
• 400 m x 400 m
• Within 500 m of Thunder
Creek
 $18.0M initial exploration
program in 2015
• 90k m surface drilling
• 30k m U/G drilling
• Exploration drift from
Thunder Creek
 $7.0M added to ’15 program
(May 4th press release)
• 50k m surface drilling
• 10k m U/G drilling
• New surface geophysical
program SW of 144 Gap &
western ext. Gold River
500 m
400 m
144 GAP
ZONE
Timmins West Mine
144 Gap Discovery
(Within 500 m of Thunder
Creek)
Future Exploration
Target
Future Exploration
Targets
Gold River Trend
TC–144 Trend
Gold River Project
M&I: 690k tonnes @ 5.3 gpt (117k oz)
Inferred: 5.3M tonnes at 6.1 gpt (1.0M oz)
Timmins
Deposit
Thunder
Creek
144 Gap
Zone
144 North
144
South
N
Lake Shore Gold in May 2015
 On track for another strong year
 Building cash and financial strength
 Continued progress at 144 Gap Zone
• First resource early in 2016
Last Payment on Senior Secured on May 29, 2015
$70M Fully Repaid from Internally Generated Cash Flow
Cash Operating Costs per Ounce
Cash operating cost per ounce is a Non-GAAP measure. In the gold mining industry, cash operating cost per ounce is a common
performance measure but does not have any standardized meaning. Cash operating costs per ounce are based on ounces sold
and are derived from amounts included in the Consolidated Statements of Comprehensive Loss (Income) and include mine site
operating costs such as mining, processing and administration, but exclude depreciation, depletion and share-based payment
expenses and reclamation costs. The Company discloses cash cost per ounce as it believes this measure provides valuable
assistance to investors and analysts in evaluating the Company’s performance and ability to generate cash flow. This measure
should not be considered in isolation or as a substitute for measures prepared in accordance with GAAP such as total production
costs. A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the years ended
December 31, 2014 and 2013 is set out on page 19 of the Company’s 2014 and fourth quarter of 2014 Management Discussion
& Analysis (“MD&A”). A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the
three months ended March 31, 2015 is set out on page 16 of the Company’s first quarter 2015 2014 MD&A.
All-In Sustaining Costs per Ounce
Effective the second quarter 2013, the Company has adopted a total all-in sustaining cost (“AISC”) performance measure. AISC
is a Non-GAAP measure. The measure is intended to assist readers in evaluating the total costs of producing gold from current
operations. While there is no standardized meaning across the industry for this measure, the Company’s definition conforms to
the AISC definition as set out by the World Gold Council in its guidance note dated June 27, 2013. The Company defines all-in
sustaining cost as the sum of cash costs from mine operations, sustaining capital (capital required to maintain current operations
at existing levels), corporate general and administrative expenses, in-mine exploration expenses and reclamation cost accretion
related to current operations. All-in sustaining cost excludes growth capital, reclamation cost accretion not related to current
operations and interest and other financing costs. A reconciliation of all-in sustaining costs and all-in sustaining cost per ounce to
total production costs for the years ended December 31, 2014 and 2013 is set out on page 20 of the Company’s 2014 and fourth
quarter 2014 MD&A. A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the
three months ended March 31, 2015 is set out on page 17 of the Company’s first quarter 2015 2014 MD&A.
(1) The Company’s MDA”s for the full year and fourth quarter of 2014 and first quarter of 2015 are posted at www.sedar.com and on the Company’s website at www.lsgold.com.

More Related Content

What's hot

First Quarter 2014 Conference Call
First Quarter 2014 Conference CallFirst Quarter 2014 Conference Call
First Quarter 2014 Conference Call
Lake Shore Gold
 
New York Metals & Minerals Investment Conference
New York Metals & Minerals Investment ConferenceNew York Metals & Minerals Investment Conference
New York Metals & Minerals Investment Conference
Lake Shore Gold
 
Fourth Quarter & Full - Year 2013 Conference Call & Webcast
Fourth Quarter & Full - Year 2013 Conference Call & Webcast Fourth Quarter & Full - Year 2013 Conference Call & Webcast
Fourth Quarter & Full - Year 2013 Conference Call & Webcast
Lake Shore Gold
 
Annual General Meeting 2014
Annual General Meeting 2014Annual General Meeting 2014
Annual General Meeting 2014
Lake Shore Gold
 
Denver Gold Forum - September 23, 2013
Denver Gold Forum - September 23, 2013Denver Gold Forum - September 23, 2013
Denver Gold Forum - September 23, 2013
Lake Shore Gold
 
December 10, 2013 Analyst Site Visit
December 10, 2013 Analyst Site VisitDecember 10, 2013 Analyst Site Visit
December 10, 2013 Analyst Site Visit
Lake Shore Gold
 

What's hot (20)

Marketing July 2015
Marketing July 2015Marketing July 2015
Marketing July 2015
 
Third Quarter 2014 Conference Call
Third Quarter 2014 Conference CallThird Quarter 2014 Conference Call
Third Quarter 2014 Conference Call
 
Annual & Special meeting
Annual & Special meetingAnnual & Special meeting
Annual & Special meeting
 
Precious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, SwitzerlandPrecious Metals Summit, Zurich, Switzerland
Precious Metals Summit, Zurich, Switzerland
 
Denver Gold Forum presentation
Denver Gold Forum presentationDenver Gold Forum presentation
Denver Gold Forum presentation
 
First Quarter 2014 Conference Call
First Quarter 2014 Conference CallFirst Quarter 2014 Conference Call
First Quarter 2014 Conference Call
 
New York Metals & Minerals Investment Conference
New York Metals & Minerals Investment ConferenceNew York Metals & Minerals Investment Conference
New York Metals & Minerals Investment Conference
 
TD Securities Site Visit
TD Securities Site VisitTD Securities Site Visit
TD Securities Site Visit
 
Annual General Meeting - ( revised )
Annual General Meeting - ( revised )Annual General Meeting - ( revised )
Annual General Meeting - ( revised )
 
Fourth Quarter & Full - Year 2013 Conference Call & Webcast
Fourth Quarter & Full - Year 2013 Conference Call & Webcast Fourth Quarter & Full - Year 2013 Conference Call & Webcast
Fourth Quarter & Full - Year 2013 Conference Call & Webcast
 
PDAC Presentation, March 7, 2016
PDAC Presentation, March 7, 2016PDAC Presentation, March 7, 2016
PDAC Presentation, March 7, 2016
 
BMO Global Metals and Mining Conference
BMO Global Metals and Mining ConferenceBMO Global Metals and Mining Conference
BMO Global Metals and Mining Conference
 
Annual General Meeting 2014
Annual General Meeting 2014Annual General Meeting 2014
Annual General Meeting 2014
 
2015 and Q4 2015 Financial Results
2015 and Q4 2015 Financial Results2015 and Q4 2015 Financial Results
2015 and Q4 2015 Financial Results
 
Denver Gold Forum - September 23, 2013
Denver Gold Forum - September 23, 2013Denver Gold Forum - September 23, 2013
Denver Gold Forum - September 23, 2013
 
TD Securities Mining Conference
TD Securities Mining ConferenceTD Securities Mining Conference
TD Securities Mining Conference
 
Fourth Quarter 2014 Conference Call
Fourth Quarter 2014 Conference CallFourth Quarter 2014 Conference Call
Fourth Quarter 2014 Conference Call
 
49 North Investor Conference
49 North Investor Conference49 North Investor Conference
49 North Investor Conference
 
December 10, 2013 Analyst Site Visit
December 10, 2013 Analyst Site VisitDecember 10, 2013 Analyst Site Visit
December 10, 2013 Analyst Site Visit
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 

Viewers also liked (10)

Knjizevnost
KnjizevnostKnjizevnost
Knjizevnost
 
7 dampak terburuk saat malas berolahraga pagi
7 dampak terburuk saat malas berolahraga pagi7 dampak terburuk saat malas berolahraga pagi
7 dampak terburuk saat malas berolahraga pagi
 
гришанина н
гришанина нгришанина н
гришанина н
 
Say something rubric
Say something rubricSay something rubric
Say something rubric
 
Evidencia de lectura problemas de tipo aditivo..
Evidencia de lectura problemas de tipo aditivo..Evidencia de lectura problemas de tipo aditivo..
Evidencia de lectura problemas de tipo aditivo..
 
стратегии и техники
стратегии и техникистратегии и техники
стратегии и техники
 
CO2
CO2CO2
CO2
 
7 khasiat buah pisang yang tak pernah di duga
7 khasiat buah pisang yang tak pernah di duga7 khasiat buah pisang yang tak pernah di duga
7 khasiat buah pisang yang tak pernah di duga
 
7 bahaya tidak berkeringat bagi kesehatn tubuh anda
7 bahaya tidak berkeringat bagi kesehatn tubuh anda7 bahaya tidak berkeringat bagi kesehatn tubuh anda
7 bahaya tidak berkeringat bagi kesehatn tubuh anda
 
Portuguese Home Language - 2006
Portuguese Home Language - 2006Portuguese Home Language - 2006
Portuguese Home Language - 2006
 

Similar to Canadian Mines Expo, May 26 28, 2015 ( revised ) (11)

Scotiabank Mining Conference, Dec. 2 2015
Scotiabank Mining Conference, Dec. 2 2015Scotiabank Mining Conference, Dec. 2 2015
Scotiabank Mining Conference, Dec. 2 2015
 
BMO Capital Markets 2014 Global Metals & Mining Conference
BMO Capital Markets 2014 Global Metals & Mining ConferenceBMO Capital Markets 2014 Global Metals & Mining Conference
BMO Capital Markets 2014 Global Metals & Mining Conference
 
Global Resources Investing Conference, Geneva/Zurich, June 25-27, 2014
Global Resources Investing Conference, Geneva/Zurich, June 25-27, 2014Global Resources Investing Conference, Geneva/Zurich, June 25-27, 2014
Global Resources Investing Conference, Geneva/Zurich, June 25-27, 2014
 
Marketing Presentation, July 2014
 Marketing Presentation, July 2014 Marketing Presentation, July 2014
Marketing Presentation, July 2014
 
Marketing Presentation
Marketing PresentationMarketing Presentation
Marketing Presentation
 
Marketing Presentation, November 2013
Marketing Presentation, November 2013Marketing Presentation, November 2013
Marketing Presentation, November 2013
 
2014 Precious Metals Summit
2014 Precious Metals Summit2014 Precious Metals Summit
2014 Precious Metals Summit
 
First Quarter 2013
First Quarter 2013First Quarter 2013
First Quarter 2013
 
Second Quarter 2014 Conference Call
Second Quarter 2014 Conference CallSecond Quarter 2014 Conference Call
Second Quarter 2014 Conference Call
 
Lsg2015 q2 conferencecall_2015-07-30
Lsg2015 q2 conferencecall_2015-07-30Lsg2015 q2 conferencecall_2015-07-30
Lsg2015 q2 conferencecall_2015-07-30
 
Third Quarter 2015 Conference Call
Third Quarter 2015 Conference CallThird Quarter 2015 Conference Call
Third Quarter 2015 Conference Call
 

Recently uploaded

一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
xzxvi5zp
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
sovco
 
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
dyuozua
 
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
dyuozua
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Klinik kandungan
 
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
dyuozua
 
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
dyuozua
 
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
dyuozua
 

Recently uploaded (20)

Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
一比一原版(Massey毕业证书)梅西大学毕业证成绩单原件一模一样
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
 
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
一比一原版(UNITEC毕业证书)UNITEC理工学院毕业证成绩单原件一模一样
 
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)都柏林大学毕业证成绩单原件一模一样
 
abortion pills in Riyadh+966572737505 Cytotec Riyadh
abortion pills in  Riyadh+966572737505    Cytotec Riyadhabortion pills in  Riyadh+966572737505    Cytotec Riyadh
abortion pills in Riyadh+966572737505 Cytotec Riyadh
 
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
一比一原版(QU毕业证书)女王大学毕业证成绩单原件一模一样
 
Teck Sustainability Leadership, April 26, 2024
Teck Sustainability Leadership, April 26, 2024Teck Sustainability Leadership, April 26, 2024
Teck Sustainability Leadership, April 26, 2024
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
一比一原版(VUW毕业证书)惠灵顿维多利亚大学毕业证成绩单原件一模一样
 
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
一比一原版(ArtEZ毕业证书)ArtEZ艺术学院毕业证成绩单原件一模一样
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
一比一原版(YU毕业证书)约克大学毕业证成绩单原件一模一样
 

Canadian Mines Expo, May 26 28, 2015 ( revised )

  • 1. TSX, NYSE MKT: LSG Lake Shore Gold TSX: LSG NYSE MKT: LSG 1 L A K E S H O R E G O L D C O R P. The Big Event Canadian Mining Expo May 27/28, 2015
  • 2. Information included in this presentation relating to the Company's expected production levels, production growth, costs, cash flows, economic returns, exploration activities, potential for increasing resources, project expenditures and business plans are "forward-looking statements" or "forward-looking information" within the meaning of certain securities laws, including under the provisions of Canadian provincial securities laws and under the United States Private Securities Litigation Reform Act of 1995 and are referred to herein as "forward-looking statements." The Company does not intend, and does not assume any obligation, to update these forward-looking statements. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable, including that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts, labour disturbances, interruption in transportation or utilities, or adverse weather conditions, that there are no material unanticipated variations in budgeted costs, that contractors will complete projects according to schedule, and that actual mineralization on properties will be consistent with models and will not be less than identified mineral reserves. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. In particular, delays in development or mining and fluctuations in the price of gold or in currency markets could prevent the Company from achieving its targets. Readers should not place undue reliance on forward-looking statements. More information about risks and uncertainties affecting the Company and its business is available in the Company's most recent Annual Information Form and other regulatory filings with the Canadian Securities Administrators, which are posted on sedar at www.sedar.com, or the Company’s most recent Annual Report on Form 40-F and other regulatory filings with the Securities and Exchange Commission. QUALITY CONTROL Lake Shore Gold has a quality control program to ensure best practices in the sampling and analysis of drill core. A total of three Quality Control samples consisting of 1 blank, 1 certified standard and 1 reject duplicate are inserted into groups of 20 drill core samples. The blanks and the certified standards are checked to be within acceptable limits prior to being accepted into the GEMS SQL database. Routine assays have been completed using a standard fire assay with a 30-gram aliquot. For samples that return a value greater than three grams per tonne gold on exploration projects and greater than 10 gpt at the Timmins mine and Thunder Creek underground project, the remaining pulp is taken and fire assayed with a gravimetric finish. Select zones with visible gold are typically tested by pulp metallic analysis on some projects. NQ size drill core is saw cut and half the drill core is sampled in standard intervals. The remaining half of the core is stored in a secure location. The drill core is transported in security-sealed bags for preparation at ALS Chemex Prep Lab located in Timmins, Ontario, and the pulps shipped to ALS Chemex Assay Laboratory in Vancouver, B.C. ALS Chemex is an ISO 9001-2000 registered laboratory preparing for ISO 17025 certification. QUALIFIED PERSON Scientific and technical information related to mine production and reserves contained in this presentation has been reviewed and approved by Natasha Vaz, P.Eng., Vice- President, Technical Services, who is an employee of Lake Shore Gold Corp., and a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Scientific and technical information related to resources, drilling and all matters involving mine production geology, as well as exploration drilling, contained in this presentation, or source material for this presentation, was reviewed and approved by Eric Kallio, P.Geo., Senior Vice-President, Exploration. Mr. Kallio is an employee of Lake Shore Gold Corp., and is a “qualified person” as defined by NI 43-101.
  • 3.  Two producing mines and a central mill in Timmins, Ontario, Canada • Timmins West Mine • Bell Creek Mine & Mill  Large, prospective land position in Timmins • Right geology  Strong organic growth • Large resource base at operations & projects, exploration upside
  • 4.  Employees – 520  Contractors – 188  Total annual labour costs: $50 million  Total investments (Over last 3 years) – $565 million (2012 – 2014)(1)  Timmins: $350 million  Regional (Northern Ontario/Quebec): $115 million  Rest of Canada/International: $100 million (1) Geographic split based on estimates
  • 5. Record production, lower costs, free cash flow & profitability, reduced debt increased financial strength Exploration Development/ Construction Production AND REPEAT Exploration $700M raised in debt & equity Debt included $70M Senior Secured Facility with Sprott Drilling to replace reserves Drilling for new discoveries Extend mine life, grow resources Exploration and advanced exploration to establish deposits
  • 6.  Record production of 185,600 in 2014 • 38% growth from 2013  Three consecutive years of meeting or beating guidance  53,000 oz in Q1/15 – Record quarter 2012 2013 2014 2015 85,700 134,600 160,000 170,000 180,000 180,000 Production (Ounces)(1) 185,600 (Actual) Guidance Guidance (1) Contains Forward-looking Information
  • 7. 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2012 2013 2014 2015 1,813 1,139 872 950 950 1,0001,050 (1) Contains Forward-looking Information (2) Example of Non-GAAP Measure, see Slide 21 for more information 0 100 200 300 400 500 600 700 800 900 1000 2012 2013 2014 2015 966 766 592 675 650 775 Guidance Guidance 700 Total Cash Costs(US$/oz)(1(2) All-In Sustaining Costs(US$/oz)(1)(2) Guidance Guidance  2014 AISC 8% better than target range (US$950 – US$1,050)  Q1/15 AISC US$750/oz 23% Improvement in 2014  2014 cash costs 12% better than target range (US$675 – US$775)  Q1/15 cash costs US$510/oz 23% Improvement in 2014
  • 8. 0 10 20 30 40 50 60 70 80 15 34 39 53 67 62 77 Cash & Bullion ($ Millions) Cash & Bullion of Approx. $77 million at March 31/15 >$60M Growth Since Completing Mill Expansion  Reduction in Q4/14 reflected early repayment of standby line
  • 9. 0 10 20 30 40 50 60 70 61 52 49 35 31 7 1.5 Senior Secured Debt ($ Millions)  Repaid $60.0 million of debt since Q3/13 • $30 million related to standby line (fully repaid as of Dec. 31/14) • $19 million to gold-linked note (@ $3.0M O/S at Mar. 31/15) • Repaid $44.7M in 2014 (1) Contains forward-looking information
  • 10.  29% increase in ore reserves (announced March 21, 2015)  Major new discovery at 144 Gap  New underground exploration program at Bell Creek 2 Drills Working at 144 Gap Discovery
  • 11. Record production, lower costs, free cash flow & profitability, reduced debt increased financial strength Exploration Development/ Construction Production AND REPEAT Exploration Exploration and advanced exploration to establish deposits $700M raised in debt & equity Debt included $70M Senior Secured Facility with Sprott Drilling to replace reserves Drilling for new discoveries Extend mine life, grow resources
  • 12.  Completed Mill expansion during Q3/13 • 3,400 tonnes per day in September ‘13  Increased production to 51,700 oz in Q4/13  Significantly improved cash costs and AISC  Began generating net free cash flow  Increased cash and bullion from $15M at Sept. 30/13 to Dec. 31/15 (1) Examples of forward-looking information
  • 13.  Achieving strong levels of performance  Achieving strong production growth  Driving costs lower  Growing cash rapidly  Resumed drilling to replace/grow reserves in Jan. 2014  Commenced drilling for new discoveries in August 2014 (1) Examples of forward-looking information
  • 14. Timmins Deposit Timmins DepositThunder Creek 730 Access Level 270 Access Level 525 Level 650 Level Timmins West Mine  Production from 2 deposits  142,200 oz in 2014  Reserves grew 4% in 2014
  • 15. Timmins West Mine 144 Gap Discovery (Within 500 m of Thunder Creek) Future Exploration Target Future Exploration Targets Gold River Trend TC–144 Trend Gold River Project M&I: 690k tonnes @ 5.3 gpt (117k oz) Inferred: 5.3M tonnes at 6.1 gpt (1.0M oz) Timmins Deposit Thunder Creek 144 Gap Zone 144 North 144 South N
  • 16. Shaft Planned Exploration Drift Existing Infrastructure OPENOPEN OPEN 400m 400m Current progress – Drift
  • 17. HWY-14-48 5.37gpt/46.00m 4.06gpt/5.10m 5.76gpt/1.20m THUNDER CREEK DEPOSIT OPEN 400m OPEN Planned Exploration Drift Existing Infrastructure Current progress – Drift
  • 18.  Large zone identified • 400 m x 400 m • Within 500 m of Thunder Creek  $18.0M initial exploration program in 2015 • 90k m surface drilling • 30k m U/G drilling • Exploration drift from Thunder Creek  $7.0M added to ’15 program (May 4th press release) • 50k m surface drilling • 10k m U/G drilling • New surface geophysical program SW of 144 Gap & western ext. Gold River 500 m 400 m 144 GAP ZONE
  • 19. Timmins West Mine 144 Gap Discovery (Within 500 m of Thunder Creek) Future Exploration Target Future Exploration Targets Gold River Trend TC–144 Trend Gold River Project M&I: 690k tonnes @ 5.3 gpt (117k oz) Inferred: 5.3M tonnes at 6.1 gpt (1.0M oz) Timmins Deposit Thunder Creek 144 Gap Zone 144 North 144 South N
  • 20. Lake Shore Gold in May 2015  On track for another strong year  Building cash and financial strength  Continued progress at 144 Gap Zone • First resource early in 2016 Last Payment on Senior Secured on May 29, 2015 $70M Fully Repaid from Internally Generated Cash Flow
  • 21. Cash Operating Costs per Ounce Cash operating cost per ounce is a Non-GAAP measure. In the gold mining industry, cash operating cost per ounce is a common performance measure but does not have any standardized meaning. Cash operating costs per ounce are based on ounces sold and are derived from amounts included in the Consolidated Statements of Comprehensive Loss (Income) and include mine site operating costs such as mining, processing and administration, but exclude depreciation, depletion and share-based payment expenses and reclamation costs. The Company discloses cash cost per ounce as it believes this measure provides valuable assistance to investors and analysts in evaluating the Company’s performance and ability to generate cash flow. This measure should not be considered in isolation or as a substitute for measures prepared in accordance with GAAP such as total production costs. A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the years ended December 31, 2014 and 2013 is set out on page 19 of the Company’s 2014 and fourth quarter of 2014 Management Discussion & Analysis (“MD&A”). A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the three months ended March 31, 2015 is set out on page 16 of the Company’s first quarter 2015 2014 MD&A. All-In Sustaining Costs per Ounce Effective the second quarter 2013, the Company has adopted a total all-in sustaining cost (“AISC”) performance measure. AISC is a Non-GAAP measure. The measure is intended to assist readers in evaluating the total costs of producing gold from current operations. While there is no standardized meaning across the industry for this measure, the Company’s definition conforms to the AISC definition as set out by the World Gold Council in its guidance note dated June 27, 2013. The Company defines all-in sustaining cost as the sum of cash costs from mine operations, sustaining capital (capital required to maintain current operations at existing levels), corporate general and administrative expenses, in-mine exploration expenses and reclamation cost accretion related to current operations. All-in sustaining cost excludes growth capital, reclamation cost accretion not related to current operations and interest and other financing costs. A reconciliation of all-in sustaining costs and all-in sustaining cost per ounce to total production costs for the years ended December 31, 2014 and 2013 is set out on page 20 of the Company’s 2014 and fourth quarter 2014 MD&A. A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the three months ended March 31, 2015 is set out on page 17 of the Company’s first quarter 2015 2014 MD&A. (1) The Company’s MDA”s for the full year and fourth quarter of 2014 and first quarter of 2015 are posted at www.sedar.com and on the Company’s website at www.lsgold.com.