SlideShare a Scribd company logo
1 of 10
Download to read offline
TECNOLÓGICO NACIONAL DE MEXICO INSTITUTO
TECNOLÓGICO DE TAPACHULA
TEMA:
“Problemas sobre rendimiento”
Nombre
Ramos Muñoz Derek
Germán
19510479
CATEDRÁTICO:
Ing. Roberto Cárdenas Sarmiento
MATERIA:
Maquinaria Pesada y movimiento de tierra
GRADO Y GRUPO:
Cuarto Semestre; Grupo “B” Ing. Civil
27 de Abril del 2021
TRACTOR
1.- Se desea conocer el rendimiento de un tractor con las siguientes características:
Datos
𝐶 = 6 𝑚3
𝐸 = 0.75
𝐹 = 1.25
𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 30.0 𝑚
𝑘𝑚
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0
ℎ
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ
Solución: Primero se calcula el Tiempo Total del Ciclo:
𝑇 =
(2)(10 𝑠𝑒𝑔)
+
60 𝑠𝑒𝑔
(30 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
3000 𝑚/ℎ
(30 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
+
6000 𝑚/𝑠
𝑇 = 0.33 + 0.6 + 0.3
𝑇 = 1.23 𝑚𝑖𝑛
Sustituyendo en la formula
(6 𝑚3)(0.75)(60 𝑚𝑖𝑛)
𝑅 =
(1.23min)(1.25)
= 175.60
𝑚3
ℎ
𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
𝑉 = 175.60
𝑚
3
ℎ
𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 175.60
𝑚
3
𝐶
ℎ
2.- Se desea conocer el rendimiento de un tractor con las siguientes características:
Datos
𝐶 = 6 𝑚3
𝐸 = 0.83
𝐹 = 1.25
𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 100.0 𝑚
𝑘𝑚
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0
ℎ
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ
Solución: Primero se calcula el Tiempo Total del Ciclo:
𝑇 =
(2)(10 𝑠𝑒𝑔)
+
60 𝑠𝑒𝑔
(100 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
3000 𝑚/ℎ
(100 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
+
6000 𝑚/𝑠
𝑇 = 0.33 + 2.00 + 1.00
𝑇 = 3.33 𝑚𝑖𝑛
Sustituyendo en la formula
(6 𝑚3)(0.83)(60 𝑚𝑖𝑛)
𝑅 =
(3.33min)(1.25)
= 71.78𝑚3ℎ e𝑛 𝑏𝑎𝑛𝑐𝑜
3.- Se desea conocer el rendimiento de un tractor con las siguientescaracterísticas:
Datos:
C= 7 m3.
E= 0.80.
F= 1.10.
Vuelta= 30 seg.
Distancia media de transporte= 60.0 m.
Velocidad de ida= 6.0 km/h.
Velocidad de regreso= 7.0 km/h.
Solución:
1.- Calcular el tiempo del ciclo:
𝑇 =
(2)(30𝑠𝑒𝑔)
+
60 𝑠𝑒𝑔
(60𝑚)(60min)
+
6000 𝑚/ℎ
(60𝑚)(60min)
7000 𝑚/ℎ
𝑇 = 1 + 0.6 + 0.51 = 2.11
2.- Sustituyendo en la fórmula:
𝑅 =
(7𝑚3)(0.80)(60min)
(2.11)(1.10)
= 144.76
𝑚3
ℎ
𝑉 = 144.76
𝑚3
ℎ
𝑉 = 71.78
𝑚
3
ℎ
𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 71.78
𝑚
3
𝐶
ℎ
4.- Se desea conocer el rendimiento de un tractor con las siguientes características:
Datos
𝐶 = 6 𝑚3
𝐸 = 0.50
𝐹 = 1.25
𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 45.0 𝑚
𝑘𝑚
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0
ℎ
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ
Solución: Primero se calcula el Tiempo Total del Ciclo:
𝑇 =
(2)(10 𝑠𝑒𝑔)
+
60 𝑠𝑒𝑔
(45 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
3000 𝑚/ℎ
(45 𝑚𝑡𝑠)(60 𝑚𝑖𝑛)
+
6000 𝑚/𝑠
𝑇 = 0.33 + 0.9 + 0.45
𝑇 = 1.68 𝑚𝑖𝑛
Sustituyendo en la formula
(6 𝑚3)(0.80)(60min) 𝑚3
𝑅 =
(1.68 min)(1.25)
= 137.14
ℎ
𝑚3
𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
𝑚3
𝐶
𝑉 = 137.14
ℎ
𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 137.14
ℎ
V=73.95 m3
b/h
MOTOESCREPA
1.- Se desea conocer el rendimiento de una motoescrepa con lossiguientes datos:
Datos:
Distancia media= 262.00 m. Velocidad
de recorrido: 6400.00 m/h.Tipo de
material= Tierra común Factor de
abundamiento= 1.25 Capacidad de la
escrepa= 12 m3.
Eficiencia de la maquina= 65%.
Solución:
1.- Calcular el tiempo fijo.
Extendido 0.50 min
Vueltas (2 x 0.25) 0.50 min
Cambio de velocidades (4 x 0.125) 0.50 min
Tiempo fijo = 3.00 minutos
2.- Calcular el tiempo variable.
𝑅 =
(524)(60𝑚𝑖𝑛)
= 4.91
6400
3.- Calcular el tiempo total.
𝑇 = 3.00 + 4.91 = 7.91 𝑚𝑖𝑛.
4.- Sustituyendo en la ecuación anterior.
(12𝑚3)(0.65)(60min)
(7.91)(1.25)
= 73.95 𝑚3
𝑏
ℎ
Carga 1.50 min
2.- Se desea conocer el rendimiento de una motoescrepa con los siguientes datos:
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 = 200.0 𝑚
𝑚
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 6400.0
ℎ
𝑇𝑖𝑝𝑜 𝑑𝑒 𝑡𝑖𝑒𝑟𝑟𝑎 = 𝑇𝑖𝑒𝑟𝑟𝑎 𝑐𝑜𝑚ú𝑛
𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑎𝑏𝑢𝑛𝑑𝑎𝑚𝑖𝑒𝑛𝑡𝑜 = 1.25
𝐶𝑎𝑝𝑎𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑙𝑎 𝑒𝑠𝑐𝑟𝑒𝑝𝑎 = 11.4 𝑚3
𝐸𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑖𝑎 𝑑𝑒 𝑙𝑎 𝑚𝑎𝑞𝑢𝑖𝑛𝑎 = 70%
Tiempo fijo:
Carga 1.50 minutos.
Extendido 0.50 “
Vueltas (2x 0.25’) -------------------------0.50 “
Cambio de velocidad-(4x0.125’) ------0.50 ”
3.00 minutos de tiempo Fijo
Tiempo de variable
(400.0)(60 ′)
𝑅𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 =
6400.0 𝑚/ℎ
= 3.75 𝑚𝑖𝑛𝑢𝑡𝑜𝑠
Tiempo total=3.0+3.75=6.75 minutos
Sustituyendo en la ecuación tenemos:
𝑉 =
(11.4 𝑚3)(0.70)(60)
(6.75 min)(1.25)
= 56.74
𝑚3
𝐵
ℎ
𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
3.- Se desea conocer el rendimiento de una motoescrepa con los siguientes datos:
𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 = 200.0 𝑚
𝑚
𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 4500.0
ℎ
𝑇𝑖𝑝𝑜 𝑑𝑒 𝑡𝑖𝑒𝑟𝑟𝑎 = 𝑇𝑖𝑒𝑟𝑟𝑎 𝑐𝑜𝑚ú𝑛
𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑎𝑏𝑢𝑛𝑑𝑎𝑚𝑖𝑒𝑛𝑡𝑜 = 1.25
𝐶𝑎𝑝𝑎𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑙𝑎 𝑒𝑠𝑐𝑟𝑒𝑝𝑎 = 12 𝑚3
𝐸𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑖𝑎 𝑑𝑒 𝑙𝑎 𝑚𝑎𝑞𝑢𝑖𝑛𝑎 = 70%
Tiempo fijo:
Carga 1.50 minutos.
Extendido 0.50 “
Vueltas (2x 0.25’) -------------------------0.50 “
Cambio de velocidad-(4x0.125’) ------0.50 ”
3.00 minutos de tiempo Fijo
Tiempo de variable
(400.0)(60 ′)
𝑅𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 =
4500.0 𝑚/ℎ
= 5.33 𝑚𝑖𝑛𝑢𝑡𝑜𝑠
Tiempo total=3.0+5.33=8.33 minutos
Sustituyendo en la ecuación tenemos:
𝑉 =
(12 𝑚3)(0.70)(60)
(8.33 min)(1.25)
= 48.40
𝑚3
𝐵
ℎ
𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
MOTOCONFORMADORA
1.- Se desea rastrear un camino de 8 km de largo, y un ancho de 6 m, conun total de 6
pasadas: tres (3) de estas pasadas con una velocidad de 1.8 km/h; dos
(2) con velocidad de 3.7 km/h, y otra (1) con velocidad de 5 km/h, con una eficienciade
0.60. Determinar el tiempo total de esta operación.
Datos:
L: 8 Km.
E= 0.60
V1= 1.5 Km/h.
V2= 3.7 Km/h.
V3= 5 Km/h.
Solución:
1.- Sustituir datos en la formula.
(3)(8𝑘𝑚) (2)(8𝑘𝑚) (1)(8𝑘𝑚)
𝑇 = (
(0.60)(1.5 𝑘𝑚)
) + (
(0.60)(3.7𝑘𝑚)
) + (
(0.60)(5𝑘𝑚)
)
𝑇 = 26.6666 + 7.2072 + 2.6666 = 36.54 ℎ𝑜𝑟𝑎𝑠.
𝑇 = 36.54 ℎ𝑜𝑟𝑎𝑠.
2.- Se desea rastrear un camino de 7 km de largo, y un ancho de 6.6 m, con un total de
7 pasadas: tres (3) de estas pasadas con una velocidad de 1.9 km/h; dos (2) con
velocidad de 3.8 km/h, y otra de dos (2) con velocidad de 6.5 km/h, conuna eficiencia
de 0.65. Determinar el tiempo total de esta operación.
Datos:
L: 7 Km.
E= 0.65
V1= 1.9 Km/h.
V2= 3.8 Km/h.
V3= 6.5 Km/h.
Solución:
1.- Sustituir datos en la formula.
(3)(7𝑘𝑚) (2)(7𝑘𝑚) (2)(7𝑘𝑚)
𝑇 = (
(0.65)(1.9 𝑘𝑚)
) + (
(0.65)(3.8𝑘𝑚)
) + (
(0.65)(6.5𝑘𝑚)
)
𝑇 = 17.0040 + 5.6680 + 3.3136 = 25.9856 ℎ𝑜𝑟𝑎𝑠.
𝑇 = 25.9856 ℎ𝑜𝑟𝑎𝑠.
3.- Se desea rastrear un camino de 8.5 km de largo, y un ancho de 7.6 m,con un total de
5 pasadas: tres (3) de estas pasadas con una velocidad de 2.3 km/h; una (1) con
velocidad de 4 km/h, y otra de (1) con velocidad de 4.8 km/h, con una eficiencia de
0.75. Determinar el tiempo total de esta operación.
Datos:
L: 8.5 Km.
E= 0.75
V1= 2.3 Km/h.
V2= 4 Km/h.
V3= 4.8 Km/h.
Solución:
1.- Sustituir datos en la formula.
(3)(8.5𝑘𝑚) (1)(8.5𝑘𝑚) (1)(8.5𝑘𝑚)
𝑇 = (
(0.75)(2.3 𝑘𝑚)
) + (
(0.75)(4𝑘𝑚)
) + (
(0.75)(4.8𝑘𝑚)
)
𝑇 = 14.7826 + 2.8333 + 2.3611 = 19.9770 ℎ𝑜𝑟𝑎𝑠.
𝑇 = 19.9770 ℎ𝑜𝑟𝑎𝑠.

More Related Content

What's hot

Identificación manual y visual de muestra de suelos
Identificación manual y visual de muestra de suelosIdentificación manual y visual de muestra de suelos
Identificación manual y visual de muestra de suelosCarlos Yataco
 
04.00 esfuerzos y deformaciones en pavimentos flexibles
04.00 esfuerzos y deformaciones en pavimentos flexibles04.00 esfuerzos y deformaciones en pavimentos flexibles
04.00 esfuerzos y deformaciones en pavimentos flexiblesJuan Soto
 
Compresion simple-y-carga-triaxial
Compresion simple-y-carga-triaxialCompresion simple-y-carga-triaxial
Compresion simple-y-carga-triaxialRicardo Andrés
 
Informe del-ensayo-del-cono-de-arena-densidad-en-campo
Informe del-ensayo-del-cono-de-arena-densidad-en-campoInforme del-ensayo-del-cono-de-arena-densidad-en-campo
Informe del-ensayo-del-cono-de-arena-densidad-en-campoAnghelo Salazar Tello
 
Aplicación rodillo liso vibratorio
Aplicación rodillo liso vibratorioAplicación rodillo liso vibratorio
Aplicación rodillo liso vibratoriodeymer1995
 
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGAL
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGALMÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGAL
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGALEmilio Castillo
 
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdf
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdfMecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdf
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdfEscarlett Mariane
 
ENSAYO DE CORTE DIRECTO
ENSAYO DE CORTE DIRECTOENSAYO DE CORTE DIRECTO
ENSAYO DE CORTE DIRECTOAlexis Apaza
 
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...Emilio Castillo
 
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOS
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOSDETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOS
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOSEmilio Castillo
 
Deflectometría
DeflectometríaDeflectometría
DeflectometríaSieger Lot
 

What's hot (20)

Identificación manual y visual de muestra de suelos
Identificación manual y visual de muestra de suelosIdentificación manual y visual de muestra de suelos
Identificación manual y visual de muestra de suelos
 
04.00 esfuerzos y deformaciones en pavimentos flexibles
04.00 esfuerzos y deformaciones en pavimentos flexibles04.00 esfuerzos y deformaciones en pavimentos flexibles
04.00 esfuerzos y deformaciones en pavimentos flexibles
 
ASTM D1586-11 (SPT)
ASTM D1586-11 (SPT)ASTM D1586-11 (SPT)
ASTM D1586-11 (SPT)
 
1. velocidad
1. velocidad1. velocidad
1. velocidad
 
Compresion simple-y-carga-triaxial
Compresion simple-y-carga-triaxialCompresion simple-y-carga-triaxial
Compresion simple-y-carga-triaxial
 
Informe del-ensayo-del-cono-de-arena-densidad-en-campo
Informe del-ensayo-del-cono-de-arena-densidad-en-campoInforme del-ensayo-del-cono-de-arena-densidad-en-campo
Informe del-ensayo-del-cono-de-arena-densidad-en-campo
 
Motoniveladora
MotoniveladoraMotoniveladora
Motoniveladora
 
Ensayo de corte directo
Ensayo de corte directoEnsayo de corte directo
Ensayo de corte directo
 
Consolidación Unidimensional de los Suelos
Consolidación Unidimensional de los SuelosConsolidación Unidimensional de los Suelos
Consolidación Unidimensional de los Suelos
 
Aplicación rodillo liso vibratorio
Aplicación rodillo liso vibratorioAplicación rodillo liso vibratorio
Aplicación rodillo liso vibratorio
 
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGAL
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGALMÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGAL
MÓDULO 3: ESFUERZOS EN PAVIMENTOS RÍGIDOS - FERNANDO SÁNCHEZ SABOGAL
 
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdf
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdfMecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdf
Mecanica de-suelos-ii-resistencia-al-esfuerzo-cortante-de-los-suelos-pdf
 
ENSAYO DE CORTE DIRECTO
ENSAYO DE CORTE DIRECTOENSAYO DE CORTE DIRECTO
ENSAYO DE CORTE DIRECTO
 
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...
Módulo 2: ESFUERZOS Y DEFORMACIONES EN PAVIMENTOS ASFÁLTICOS - FERNANDO SÁNCH...
 
Ensayo de corte con veleta
Ensayo de corte con veletaEnsayo de corte con veleta
Ensayo de corte con veleta
 
Informe # 3 granulometría
Informe # 3 granulometríaInforme # 3 granulometría
Informe # 3 granulometría
 
14. resistencia del suelo a la máquina
14.  resistencia del suelo a la máquina14.  resistencia del suelo a la máquina
14. resistencia del suelo a la máquina
 
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOS
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOSDETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOS
DETERMINACIÒN Y CÁLCULO DEL ÍNDICE DE RUGOSIDAD INTERNACIONAL DE PAVIMENTOS
 
Ensayo triaxial consolidado drenado (cd)
Ensayo triaxial consolidado drenado (cd)Ensayo triaxial consolidado drenado (cd)
Ensayo triaxial consolidado drenado (cd)
 
Deflectometría
DeflectometríaDeflectometría
Deflectometría
 

Similar to Maquinaria pesada y movimientos de tierras. Problemas de rendimiento

material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems Ashok Kumar
 
EJERCICIOS RESUELTOS DE LOGARITMOS
EJERCICIOS RESUELTOS DE LOGARITMOSEJERCICIOS RESUELTOS DE LOGARITMOS
EJERCICIOS RESUELTOS DE LOGARITMOSADRIANULLOAP
 
vibration of machines and structures
vibration of machines and structuresvibration of machines and structures
vibration of machines and structuresAniruddhsinh Barad
 
Solutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbelerSolutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbelertable3252
 
Stiffness matrix method for beam , examples ce525
Stiffness  matrix method for beam , examples   ce525Stiffness  matrix method for beam , examples   ce525
Stiffness matrix method for beam , examples ce525KAMARAN SHEKHA
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)SAJJAD KHUDHUR ABBAS
 
Episode 5 liquid solid separation horizontal diaphragm filter press
Episode 5   liquid solid separation horizontal diaphragm filter pressEpisode 5   liquid solid separation horizontal diaphragm filter press
Episode 5 liquid solid separation horizontal diaphragm filter pressSAJJAD KHUDHUR ABBAS
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGEpisode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGSAJJAD KHUDHUR ABBAS
 
Trigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualTrigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualbrakket
 
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)Bobby Canja
 
Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9Cleophas Rwemera
 
Vehicle dynamics final project
Vehicle dynamics final project  Vehicle dynamics final project
Vehicle dynamics final project Mohammad Molani
 
Range estimation of Battery operated vehicles using MATLAB
Range estimation of Battery operated vehicles using MATLABRange estimation of Battery operated vehicles using MATLAB
Range estimation of Battery operated vehicles using MATLABVivek Bakul Maru
 
Train related all important math & solution[www.itmona.com]
Train related all important math & solution[www.itmona.com]Train related all important math & solution[www.itmona.com]
Train related all important math & solution[www.itmona.com]Itmona
 

Similar to Maquinaria pesada y movimientos de tierras. Problemas de rendimiento (20)

Trabajo de dinamica
Trabajo de dinamicaTrabajo de dinamica
Trabajo de dinamica
 
project designa.docx
project designa.docxproject designa.docx
project designa.docx
 
material handling in mines numerical problems
material handling in mines numerical problems material handling in mines numerical problems
material handling in mines numerical problems
 
EJERCICIOS RESUELTOS DE LOGARITMOS
EJERCICIOS RESUELTOS DE LOGARITMOSEJERCICIOS RESUELTOS DE LOGARITMOS
EJERCICIOS RESUELTOS DE LOGARITMOS
 
vibration of machines and structures
vibration of machines and structuresvibration of machines and structures
vibration of machines and structures
 
Solutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbelerSolutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbeler
 
Stiffness matrix method for beam , examples ce525
Stiffness  matrix method for beam , examples   ce525Stiffness  matrix method for beam , examples   ce525
Stiffness matrix method for beam , examples ce525
 
Traction Mechanics
Traction MechanicsTraction Mechanics
Traction Mechanics
 
Machine design-2
Machine design-2Machine design-2
Machine design-2
 
Maths book2 Text book answer
Maths book2 Text book answerMaths book2 Text book answer
Maths book2 Text book answer
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING (Part 2)
 
Episode 5 liquid solid separation horizontal diaphragm filter press
Episode 5   liquid solid separation horizontal diaphragm filter pressEpisode 5   liquid solid separation horizontal diaphragm filter press
Episode 5 liquid solid separation horizontal diaphragm filter press
 
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYINGEpisode 40 :  DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
Episode 40 : DESIGN EXAMPLE – DILUTE PHASE PNEUMATIC CONVEYING
 
Trigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manualTrigonometry a unit circle approach 10th edition sullivan solutions manual
Trigonometry a unit circle approach 10th edition sullivan solutions manual
 
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)
Filtration of Liquids - Chapter 4 solution (Particle Technology by Holdich)
 
Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9Chapter 6-powerpoint-1224302877703008-9
Chapter 6-powerpoint-1224302877703008-9
 
Vehicle dynamics final project
Vehicle dynamics final project  Vehicle dynamics final project
Vehicle dynamics final project
 
Examen termo final
Examen termo finalExamen termo final
Examen termo final
 
Range estimation of Battery operated vehicles using MATLAB
Range estimation of Battery operated vehicles using MATLABRange estimation of Battery operated vehicles using MATLAB
Range estimation of Battery operated vehicles using MATLAB
 
Train related all important math & solution[www.itmona.com]
Train related all important math & solution[www.itmona.com]Train related all important math & solution[www.itmona.com]
Train related all important math & solution[www.itmona.com]
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...manju garg
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257subhasishdas79
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsmeharikiros2
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessorAshwiniTodkar4
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 

Recently uploaded (20)

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 

Maquinaria pesada y movimientos de tierras. Problemas de rendimiento

  • 1. TECNOLÓGICO NACIONAL DE MEXICO INSTITUTO TECNOLÓGICO DE TAPACHULA TEMA: “Problemas sobre rendimiento” Nombre Ramos Muñoz Derek Germán 19510479 CATEDRÁTICO: Ing. Roberto Cárdenas Sarmiento MATERIA: Maquinaria Pesada y movimiento de tierra GRADO Y GRUPO: Cuarto Semestre; Grupo “B” Ing. Civil 27 de Abril del 2021
  • 2. TRACTOR 1.- Se desea conocer el rendimiento de un tractor con las siguientes características: Datos 𝐶 = 6 𝑚3 𝐸 = 0.75 𝐹 = 1.25 𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 30.0 𝑚 𝑘𝑚 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0 ℎ 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ Solución: Primero se calcula el Tiempo Total del Ciclo: 𝑇 = (2)(10 𝑠𝑒𝑔) + 60 𝑠𝑒𝑔 (30 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) 3000 𝑚/ℎ (30 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) + 6000 𝑚/𝑠 𝑇 = 0.33 + 0.6 + 0.3 𝑇 = 1.23 𝑚𝑖𝑛 Sustituyendo en la formula (6 𝑚3)(0.75)(60 𝑚𝑖𝑛) 𝑅 = (1.23min)(1.25) = 175.60 𝑚3 ℎ 𝑒𝑛 𝑏𝑎𝑛𝑐𝑜 𝑉 = 175.60 𝑚 3 ℎ 𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 175.60 𝑚 3 𝐶 ℎ 2.- Se desea conocer el rendimiento de un tractor con las siguientes características: Datos 𝐶 = 6 𝑚3 𝐸 = 0.83 𝐹 = 1.25 𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 100.0 𝑚 𝑘𝑚 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0 ℎ 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ
  • 3. Solución: Primero se calcula el Tiempo Total del Ciclo: 𝑇 = (2)(10 𝑠𝑒𝑔) + 60 𝑠𝑒𝑔 (100 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) 3000 𝑚/ℎ (100 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) + 6000 𝑚/𝑠 𝑇 = 0.33 + 2.00 + 1.00 𝑇 = 3.33 𝑚𝑖𝑛 Sustituyendo en la formula (6 𝑚3)(0.83)(60 𝑚𝑖𝑛) 𝑅 = (3.33min)(1.25) = 71.78𝑚3ℎ e𝑛 𝑏𝑎𝑛𝑐𝑜 3.- Se desea conocer el rendimiento de un tractor con las siguientescaracterísticas: Datos: C= 7 m3. E= 0.80. F= 1.10. Vuelta= 30 seg. Distancia media de transporte= 60.0 m. Velocidad de ida= 6.0 km/h. Velocidad de regreso= 7.0 km/h. Solución: 1.- Calcular el tiempo del ciclo: 𝑇 = (2)(30𝑠𝑒𝑔) + 60 𝑠𝑒𝑔 (60𝑚)(60min) + 6000 𝑚/ℎ (60𝑚)(60min) 7000 𝑚/ℎ 𝑇 = 1 + 0.6 + 0.51 = 2.11 2.- Sustituyendo en la fórmula: 𝑅 = (7𝑚3)(0.80)(60min) (2.11)(1.10) = 144.76 𝑚3 ℎ 𝑉 = 144.76 𝑚3 ℎ
  • 4. 𝑉 = 71.78 𝑚 3 ℎ 𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 71.78 𝑚 3 𝐶 ℎ 4.- Se desea conocer el rendimiento de un tractor con las siguientes características: Datos 𝐶 = 6 𝑚3 𝐸 = 0.50 𝐹 = 1.25 𝑉𝑢𝑒𝑙𝑡𝑎 = 10 𝑠𝑒𝑔 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒 𝑡𝑟𝑎𝑛𝑠𝑝𝑜𝑟𝑡𝑒 = 45.0 𝑚 𝑘𝑚 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑖𝑑𝑎 = 3.0 ℎ 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑔𝑟𝑒𝑠𝑜 = 6.0 𝑘𝑚/ℎ Solución: Primero se calcula el Tiempo Total del Ciclo: 𝑇 = (2)(10 𝑠𝑒𝑔) + 60 𝑠𝑒𝑔 (45 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) 3000 𝑚/ℎ (45 𝑚𝑡𝑠)(60 𝑚𝑖𝑛) + 6000 𝑚/𝑠 𝑇 = 0.33 + 0.9 + 0.45 𝑇 = 1.68 𝑚𝑖𝑛 Sustituyendo en la formula (6 𝑚3)(0.80)(60min) 𝑚3 𝑅 = (1.68 min)(1.25) = 137.14 ℎ 𝑚3 𝑒𝑛 𝑏𝑎𝑛𝑐𝑜 𝑚3 𝐶 𝑉 = 137.14 ℎ 𝑐𝑜𝑚𝑝𝑎𝑐𝑡𝑜 𝑉 = 137.14 ℎ
  • 5. V=73.95 m3 b/h MOTOESCREPA 1.- Se desea conocer el rendimiento de una motoescrepa con lossiguientes datos: Datos: Distancia media= 262.00 m. Velocidad de recorrido: 6400.00 m/h.Tipo de material= Tierra común Factor de abundamiento= 1.25 Capacidad de la escrepa= 12 m3. Eficiencia de la maquina= 65%. Solución: 1.- Calcular el tiempo fijo. Extendido 0.50 min Vueltas (2 x 0.25) 0.50 min Cambio de velocidades (4 x 0.125) 0.50 min Tiempo fijo = 3.00 minutos 2.- Calcular el tiempo variable. 𝑅 = (524)(60𝑚𝑖𝑛) = 4.91 6400 3.- Calcular el tiempo total. 𝑇 = 3.00 + 4.91 = 7.91 𝑚𝑖𝑛. 4.- Sustituyendo en la ecuación anterior. (12𝑚3)(0.65)(60min) (7.91)(1.25) = 73.95 𝑚3 𝑏 ℎ Carga 1.50 min
  • 6. 2.- Se desea conocer el rendimiento de una motoescrepa con los siguientes datos: 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 = 200.0 𝑚 𝑚 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 6400.0 ℎ 𝑇𝑖𝑝𝑜 𝑑𝑒 𝑡𝑖𝑒𝑟𝑟𝑎 = 𝑇𝑖𝑒𝑟𝑟𝑎 𝑐𝑜𝑚ú𝑛 𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑎𝑏𝑢𝑛𝑑𝑎𝑚𝑖𝑒𝑛𝑡𝑜 = 1.25 𝐶𝑎𝑝𝑎𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑙𝑎 𝑒𝑠𝑐𝑟𝑒𝑝𝑎 = 11.4 𝑚3 𝐸𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑖𝑎 𝑑𝑒 𝑙𝑎 𝑚𝑎𝑞𝑢𝑖𝑛𝑎 = 70% Tiempo fijo: Carga 1.50 minutos. Extendido 0.50 “ Vueltas (2x 0.25’) -------------------------0.50 “ Cambio de velocidad-(4x0.125’) ------0.50 ” 3.00 minutos de tiempo Fijo Tiempo de variable (400.0)(60 ′) 𝑅𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 6400.0 𝑚/ℎ = 3.75 𝑚𝑖𝑛𝑢𝑡𝑜𝑠 Tiempo total=3.0+3.75=6.75 minutos Sustituyendo en la ecuación tenemos: 𝑉 = (11.4 𝑚3)(0.70)(60) (6.75 min)(1.25) = 56.74 𝑚3 𝐵 ℎ 𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
  • 7. 3.- Se desea conocer el rendimiento de una motoescrepa con los siguientes datos: 𝐷𝑖𝑠𝑡𝑎𝑛𝑐𝑖𝑎 𝑚𝑒𝑑𝑖𝑎 = 200.0 𝑚 𝑚 𝑉𝑒𝑙𝑜𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑟𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 4500.0 ℎ 𝑇𝑖𝑝𝑜 𝑑𝑒 𝑡𝑖𝑒𝑟𝑟𝑎 = 𝑇𝑖𝑒𝑟𝑟𝑎 𝑐𝑜𝑚ú𝑛 𝐹𝑎𝑐𝑡𝑜𝑟 𝑑𝑒 𝑎𝑏𝑢𝑛𝑑𝑎𝑚𝑖𝑒𝑛𝑡𝑜 = 1.25 𝐶𝑎𝑝𝑎𝑐𝑖𝑑𝑎𝑑 𝑑𝑒 𝑙𝑎 𝑒𝑠𝑐𝑟𝑒𝑝𝑎 = 12 𝑚3 𝐸𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑖𝑎 𝑑𝑒 𝑙𝑎 𝑚𝑎𝑞𝑢𝑖𝑛𝑎 = 70% Tiempo fijo: Carga 1.50 minutos. Extendido 0.50 “ Vueltas (2x 0.25’) -------------------------0.50 “ Cambio de velocidad-(4x0.125’) ------0.50 ” 3.00 minutos de tiempo Fijo Tiempo de variable (400.0)(60 ′) 𝑅𝑒𝑐𝑜𝑟𝑟𝑖𝑑𝑜 = 4500.0 𝑚/ℎ = 5.33 𝑚𝑖𝑛𝑢𝑡𝑜𝑠 Tiempo total=3.0+5.33=8.33 minutos Sustituyendo en la ecuación tenemos: 𝑉 = (12 𝑚3)(0.70)(60) (8.33 min)(1.25) = 48.40 𝑚3 𝐵 ℎ 𝑒𝑛 𝑏𝑎𝑛𝑐𝑜
  • 8. MOTOCONFORMADORA 1.- Se desea rastrear un camino de 8 km de largo, y un ancho de 6 m, conun total de 6 pasadas: tres (3) de estas pasadas con una velocidad de 1.8 km/h; dos (2) con velocidad de 3.7 km/h, y otra (1) con velocidad de 5 km/h, con una eficienciade 0.60. Determinar el tiempo total de esta operación. Datos: L: 8 Km. E= 0.60 V1= 1.5 Km/h. V2= 3.7 Km/h. V3= 5 Km/h. Solución: 1.- Sustituir datos en la formula. (3)(8𝑘𝑚) (2)(8𝑘𝑚) (1)(8𝑘𝑚) 𝑇 = ( (0.60)(1.5 𝑘𝑚) ) + ( (0.60)(3.7𝑘𝑚) ) + ( (0.60)(5𝑘𝑚) ) 𝑇 = 26.6666 + 7.2072 + 2.6666 = 36.54 ℎ𝑜𝑟𝑎𝑠. 𝑇 = 36.54 ℎ𝑜𝑟𝑎𝑠.
  • 9. 2.- Se desea rastrear un camino de 7 km de largo, y un ancho de 6.6 m, con un total de 7 pasadas: tres (3) de estas pasadas con una velocidad de 1.9 km/h; dos (2) con velocidad de 3.8 km/h, y otra de dos (2) con velocidad de 6.5 km/h, conuna eficiencia de 0.65. Determinar el tiempo total de esta operación. Datos: L: 7 Km. E= 0.65 V1= 1.9 Km/h. V2= 3.8 Km/h. V3= 6.5 Km/h. Solución: 1.- Sustituir datos en la formula. (3)(7𝑘𝑚) (2)(7𝑘𝑚) (2)(7𝑘𝑚) 𝑇 = ( (0.65)(1.9 𝑘𝑚) ) + ( (0.65)(3.8𝑘𝑚) ) + ( (0.65)(6.5𝑘𝑚) ) 𝑇 = 17.0040 + 5.6680 + 3.3136 = 25.9856 ℎ𝑜𝑟𝑎𝑠. 𝑇 = 25.9856 ℎ𝑜𝑟𝑎𝑠.
  • 10. 3.- Se desea rastrear un camino de 8.5 km de largo, y un ancho de 7.6 m,con un total de 5 pasadas: tres (3) de estas pasadas con una velocidad de 2.3 km/h; una (1) con velocidad de 4 km/h, y otra de (1) con velocidad de 4.8 km/h, con una eficiencia de 0.75. Determinar el tiempo total de esta operación. Datos: L: 8.5 Km. E= 0.75 V1= 2.3 Km/h. V2= 4 Km/h. V3= 4.8 Km/h. Solución: 1.- Sustituir datos en la formula. (3)(8.5𝑘𝑚) (1)(8.5𝑘𝑚) (1)(8.5𝑘𝑚) 𝑇 = ( (0.75)(2.3 𝑘𝑚) ) + ( (0.75)(4𝑘𝑚) ) + ( (0.75)(4.8𝑘𝑚) ) 𝑇 = 14.7826 + 2.8333 + 2.3611 = 19.9770 ℎ𝑜𝑟𝑎𝑠. 𝑇 = 19.9770 ℎ𝑜𝑟𝑎𝑠.