Make to Order in SAP ERP
Applies to:
SAP ECC 6.0. For more information, visit the Enterprise Resource Planning homepage.
Summary
This document shall help consultants in the cross functional areas like Sales and Distribution, Production
planning and Materials Management. It is prepared to suits for Indian Make to Order Business Scenario. It
explains the various activities like Sales, Planning, External procurement, Subcontracting, Production &
Distribution.
Author: Appala Raju P
Company: Larsen & Toubro Infotech Ltd.,
Created on: 01 October 2009
Author Bio
P. AppalaRaju is now an employee of Larsen & Toubro Infotech Ltd. He has total 10 years
of experience, out of which near about 2 years experience in the area of SAP Consulting in
Procure to Pay process. He has worked various business segments like Procurement,
Design & Drawing and Plant maintenance in Engineering and Process sectors as part of
Domain experience.
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 2
Table of Contents
Introduction .........................................................................................................................................................3
Make-to-Order.................................................................................................................................................3
Make-to-Stock.................................................................................................................................................3
MTO Business Scenario - Diagrammatical Representation ...........................................................................3
Major Steps.....................................................................................................................................................4
Bill of Materials................................................................................................................................................4
Steps in SAP.......................................................................................................................................................5
Create Materials..............................................................................................................................................6
CIN Master data..............................................................................................................................................7
Create Bill of Material (BOM) ..........................................................................................................................8
Create Routing to Finished material ...............................................................................................................9
Create Sale Order.........................................................................................................................................10
Run MRP for Sale Order...............................................................................................................................10
View the Planned Orders Created ................................................................................................................11
Convert “Component” Planned Order to PR.................................................................................................12
Convert Semi Finished Planned Order to PR ...............................................................................................13
Convert “Component” PR into PO ................................................................................................................14
Goods Receipt for Components....................................................................................................................15
View the Stock (sale order stock) .................................................................................................................16
Create Subcontract PO with Reference to Semi Finished PR......................................................................17
Maintain Storage Location to the Subcontractor...........................................................................................17
Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)......................................18
Stock Overview .............................................................................................................................................19
Create Challan ..............................................................................................................................................20
Receive Goods (semi finished) from Subcontractor .....................................................................................21
View the Stock of Components after Goods Receipt....................................................................................21
View the Stock of Semi-Finished after Goods Receipt.................................................................................22
Reconciliation of Challan...............................................................................................................................23
Complete Challan..........................................................................................................................................23
Convert Finished Material Planned Order to Production Order....................................................................24
Goods Issue to the Production......................................................................................................................25
Confirmation of Production Order .................................................................................................................26
Goods Receipt Against Production Order.....................................................................................................27
Order Settlement for Production Order.........................................................................................................28
Delivery of Finished Products .......................................................................................................................29
Related Content................................................................................................................................................30
Disclaimer and Liability Notice..........................................................................................................................31
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 3
Introduction
Traditional production systems produce products and stock those as inventory until they are sold (make to
stock). In order to reduce inventory and increase the level of customization, some firms have designed their
production systems to produce a product only after it is ordered. Such systems are referred to as make-to-
order. Make-to-order systems are not appropriate for all types of products, and the make-to-order versus
make-to-stock decision must be weighted carefully.
Make-to-Order
Make-to-order production is a process in which a product is individually manufactured for a particular
customer. Stock keeping is not usually carried out for products that are made to order. The primary benefits
of this process are the ability to track the progress for the sales order and the flexibility to offer to the
customer the products to meet their specific requirements. The benefit also lies in tracking the costs incurred
in the servicing of the sales order in the manufacturing of the goods and the ability of arrive at a profitability
of the sales order.
This Business Scenario Map shows how enterprises work together to complete a make to order scenario.
The planning and manufacturing process is initiated after receiving the sales orders from the customer..
There is a constant link between the sales order and the production order. This leads to the tracking of the
progress on the customer order. The material stock is seen as customer stock.
Make-to-Stock
In make-to-stock production scenario stock is produced independently of orders because you want to provide
your customers immediately with goods from that stock later on. You might even want to produce goods
without having sales orders, if you expect that there might be customer demand in the future. This means
that make-to-stock strategies can support a very close customer-vendor relationship because your objective
here is to provide your customers with goods from your stock as quickly as possible.
MTO Business Scenario - Diagrammatical Representation
S1, S2 & S3: Storage location for Raw material, Semi finished material & final products respectively
SL: Storage Location for Subcontracting Vendor
Sale Order
Final Prod
Customer
SL
Production
Vendor
Subcontractor
PLANT PO
Components
S1
Semi Finished
S2
S3
MRP1
2
6
4
5
3
Components
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 4
Major Steps
1 - Sales activity: Sales order is created with reference to customer order (customer PO)
2 - Planning activity: Planned orders are generated as output of Material Requirement Planning (MRP)
With reference to Sales order
3 - Ext. procurement: Required components procured externally using purchase order (PO)
4 - Subcontracting: Procured components send to the subcontracting vendor & received semi finished
product
5 - Production: Semi finished product processed internally and gives output as final
product/Assembly
6 - Delivery activity: Delivers final product/Assembly to the customer against Sale order.
Bill of Materials
Sales
Subcontracting
External Proc
- Components (comp.1 & comp. 2) procured externally.
- Semi finished material received from subcontracting vendor by providing components
- Assembly will be available for sales after processing semi finished material internally in
production department.
Assembly
Semi finished
Comp. 1 Comp. 2
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 5
Steps in SAP
Create materials with required views - MM01
Maintain CIN master data - J1ID
Create Bill of Materials (BOM) - CS01
Create Routing to Finished material - CA01
Create sale order - VA01
Run MRP - MD50
View the planned orders created - MD04
Convert component planned order to PR (PR will show a/c assgn cat as M) – MD04
Convert semi finished planned order to PR (PR will show a/c assgt cat “M” & item cat. “L”) – MD04
Convert component PR into PO for external procurement - ME21N
Goods receipt with reference to sale order - MIGO
View the stock (sale order stock) - MMBE
Create subcontract PO with reference to semi finished PR - ME21N
Maintain storage location to the subcontractor - SPRO
Transfer goods to Subcontractor (movement type 311 +E) - MB1B / MIGO
Stock will be updated Subcontract storage location under Sale order stock - MMBE
Create challan - J1IFQ
Receive goods from Subcontractor with movt type 101 (543 will be taken to the component &
subcontractor storage location to be entered) - MIGO
Reconciliation of challan – J1IFQ
Complete challan – J1IF13
Convert finished material planned order to production order - MD04
Goods issue to the production with movement type 261 - MB1A / MIGO
Confirmation of Production order - CO15
Goods receipt against Production order with movement type 101 - MB31/MIGO
Order settlement for Production order - KO88
Delivery of Finished products - VL01N
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 6
Create Materials
Required views & important fields mentioned for each view
VALVE100 - Finished material, material type ZHAW (for sale order)
Views: Basic data1(div & mat gr), Sales, MRP1, MRP2 (proc type E), MRP3 (Strategy group 20), MRP4
(individual/collec _ ), Work scheduling, General Plant data/storage, Accounting , Costing
Key Point: Maintain Strategy Group as “20” in MRP3 view
Note: No purchasing view available for material type FERT/ZHAW
VALVESEMI100 - Semi finished material, material type HALB (for subcontracting)
Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (Sp. procurement as 30 & proc type X) MRP3
(consumption mode 2, availability check 02), MRP4 (individual/collec. _), Work scheduling, Plant
data/storage, Accounting, Costing & No sales views
Key Point: Maintain Special procurement as “30” in MRP2 view
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 7
VALVECOMP - Raw material/component (material type ROH)
Views: Basic dta1 (material group), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2,
availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views
VALVECOMP1 - Raw material/component (material type ROH)
Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability
check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views
CIN Master data
Use transaction code: J1ID
Maintain material chapter ID combination to the component & semi finished material.
Select Subcontract check box to the components
Maintain assessable value to the components
Components: - VALVECOMP & VALVECOMP1
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 8
Semi finished material: - VALVESEMI100
Finished material: - VALVE100
Components: VALVECOMP & VALVECOMP1
Create Bill of Material (BOM)
Use transaction code CS01
BOM1: VALVE100 – VALVESEMI100,
BOM2: VALVESEMI100 – VALVECOMP, VALVECOMP1
Key Point: Maintain item category as “L”
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 9
Create Routing to Finished material
Use transaction code CA01
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 10
Create Sale Order
Use transaction code VA01
Run MRP for Sale Order
Use transaction code MD50
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 11
View the Planned Orders Created
Use transaction code MD04
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 12
Note:
Total number of planned orders created = 4
Planned order 1 for VALVECOMP (component)
Planned order 2 for VALVECOMP1 (component)
Planned order 3 for VALVESEMI100 (semifinished/subcontacting material)
Planned order 4 for VALVE100 (assembly/final product)
Convert “Component” Planned Order to PR
Use transaction code MD04 (Created PR contains a/c assignment category as M)
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 13
Convert Semi Finished Planned Order to PR
Use transaction code MD04 (Created PR contains a/c assignment cat as M & item cat as L)
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 14
Convert “Component” PR into PO
Use transaction code ME21N for external procurement.
PO for material VALVECOMP
PO for material VALVECOMP1
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 15
Goods Receipt for Components
Use transaction code MIGO
Note the sale order number in item details in “where” tab
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 16
View the Stock (sale order stock)
Use transaction code MMBE
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 17
Create Subcontract PO with Reference to Semi Finished PR
Maintain Storage Location to the Subcontractor
Use transaction code SPRO
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 18
Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)
Use transaction code MB1B with movement type 311 +E
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 19
Stock Overview
Stock will be updated at subcontractor storage location under sale order stock.
Transaction code MMBE
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 20
Create Challan
Use transaction code J1IF01
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 21
Receive Goods (semi finished) from Subcontractor
Use transaction code MIGO, with movement type 101 (543 will be taken to components), Subcontractor
storage location to be entered.
View the Stock of Components after Goods Receipt
Stock of componets will be consumed at subcontracting storage location when semifinished goods received
from subcontracting vendor.
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 22
View the Stock of Semi-Finished after Goods Receipt
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 23
Reconciliation of Challan
Use transaction code J1IFQ
Complete Challan
Use transaction code J1IF13
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 24
Convert Finished Material Planned Order to Production Order
From planned order to Production order, transaction code MD04
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 25
Note that planned order (000011696) converted as production order (00000100591)
Goods Issue to the Production
Use Transaction code MB1A
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 26
Confirmation of Production Order
Use Transaction code CO15
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 27
Goods Receipt Against Production Order
Use Transaction code MB31 / MIGO with movement type 101
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 28
Order Settlement for Production Order
Use Transaction code KO88
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 29
Delivery of Finished Products
Use Transaction code VL01N
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 30
Related Content
For more information, visit the Enterprise Resource Planning homepage.
https://forums.sdn.sap.com/thread.jspa?messageID=7729276
https://forums.sdn.sap.com/thread.jspa?messageID=7742000
https://forums.sdn.sap.com/thread.jspa?messageID=7742915
Make to Order in SAP ERP
SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com
© 2009 SAP AG 31
Disclaimer and Liability Notice
This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not
supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade.
SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document,
and anyone using these methods does so at his/her own risk.
SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or
code sample, including any liability resulting from incompatibility between the content within this document and the materials and
services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this
document.

More Related Content

What's hot

Currency conversion in bi 7.0
Currency conversion in bi 7.0Currency conversion in bi 7.0
Currency conversion in bi 7.0
gireesho
 
How to run v3 job
How to run v3 jobHow to run v3 job
How to run v3 job
Anil Kumar
 
Customer exit variables in sap
Customer exit variables in sapCustomer exit variables in sap
Customer exit variables in sap
saborhade
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
walldorf_share
 
Sap sd-srinivas-naidu
Sap sd-srinivas-naiduSap sd-srinivas-naidu
Sap sd-srinivas-naidu
aawara88
 
Pacmp
PacmpPacmp
MS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_PictMS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_Pict
Munir Solkar
 
Sap sd notes
Sap sd notesSap sd notes
Sap sd notes
Mohit2385
 
Sudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print SampleSudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print Sample
Sudheer Reddy Himmathrao
 
SAP SD Training
SAP SD Training SAP SD Training
SAP SD Training
SAP SD Training By Praveen
 
Global Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and ConfigurationGlobal Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and Configuration
Sandeep Pradhan
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
ranganv72
 
63556309 sap
63556309 sap63556309 sap
63556309 sap
vinay kumar
 
Version 9 sales order to cash
Version 9 sales order to cashVersion 9 sales order to cash
Version 9 sales order to cash
kmussel
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
Mithun Roy
 
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP
 
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
Interview Mocha
 
Chandan Personal Profile
Chandan Personal ProfileChandan Personal Profile
Chandan Personal Profile
Chandan Kumar
 

What's hot (18)

Currency conversion in bi 7.0
Currency conversion in bi 7.0Currency conversion in bi 7.0
Currency conversion in bi 7.0
 
How to run v3 job
How to run v3 jobHow to run v3 job
How to run v3 job
 
Customer exit variables in sap
Customer exit variables in sapCustomer exit variables in sap
Customer exit variables in sap
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
 
Sap sd-srinivas-naidu
Sap sd-srinivas-naiduSap sd-srinivas-naidu
Sap sd-srinivas-naidu
 
Pacmp
PacmpPacmp
Pacmp
 
MS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_PictMS_SAP_ABAP_WDA_2016_Pict
MS_SAP_ABAP_WDA_2016_Pict
 
Sap sd notes
Sap sd notesSap sd notes
Sap sd notes
 
Sudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print SampleSudheer Reddy Business Blue Print Sample
Sudheer Reddy Business Blue Print Sample
 
SAP SD Training
SAP SD Training SAP SD Training
SAP SD Training
 
Global Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and ConfigurationGlobal Available to Promise with SAP: Functionality and Configuration
Global Available to Promise with SAP: Functionality and Configuration
 
Blueprint process questions_ics
Blueprint process questions_icsBlueprint process questions_ics
Blueprint process questions_ics
 
63556309 sap
63556309 sap63556309 sap
63556309 sap
 
Version 9 sales order to cash
Version 9 sales order to cashVersion 9 sales order to cash
Version 9 sales order to cash
 
Copa configuration
Copa configurationCopa configuration
Copa configuration
 
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
Roadmap ERP - A Study on ERP Software for Industrial Equipment and Machine Ma...
 
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
SAP Interview Questions for Experienced to Assess & Hire SAP Specialists_Part 2
 
Chandan Personal Profile
Chandan Personal ProfileChandan Personal Profile
Chandan Personal Profile
 

Similar to Make to order process with inventory checking

SAP PR released
SAP PR releasedSAP PR released
SAP PR released
piwal123
 
dokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdfdokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdf
harper34
 
Asset purchase
Asset purchaseAsset purchase
Asset purchase
suryanarayana tata
 
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdfdokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
harper34
 
Sap crm integration scenarios a high level approach
Sap crm integration scenarios   a high level approachSap crm integration scenarios   a high level approach
Sap crm integration scenarios a high level approach
Abhiram Reddy Basani
 
Sdbusinessblueprint
SdbusinessblueprintSdbusinessblueprint
Sdbusinessblueprint
cecileekove
 
SAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales TemplateSAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales Template
Aditya Pandey
 
Sap sd bbp template
Sap sd bbp templateSap sd bbp template
Sap sd bbp template
Igor Mihovilovi?
 
Best Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and ServiceBest Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and Service
FindWhitePapers
 
Supply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global EconomySupply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global Economy
FindWhitePapers
 
Sd availabulity check
Sd availabulity checkSd availabulity check
Sd availabulity check
Muralikrishna Kommineni
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
rambhao
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
Vee De Pee
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
Vikranth Ikkalaki
 
Sample Business Plan
Sample Business PlanSample Business Plan
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflows
Hicham Khallouki
 
Conv op1909
Conv op1909Conv op1909
Conv op1909
Lokesh Modem
 
Crystal Report
Crystal ReportCrystal Report
Crystal Report
Bapem Sanggau
 
Master guide1611
Master guide1611Master guide1611
Master guide1611
ram sap
 
SAP BODS Designer PDF
SAP BODS Designer PDFSAP BODS Designer PDF
SAP BODS Designer PDF
chalasani kamesh
 

Similar to Make to order process with inventory checking (20)

SAP PR released
SAP PR releasedSAP PR released
SAP PR released
 
dokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdfdokumen.tips_sap-subcontracting of Project stockspdf
dokumen.tips_sap-subcontracting of Project stockspdf
 
Asset purchase
Asset purchaseAsset purchase
Asset purchase
 
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdfdokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
dokumen.tips_direct-subcontracting-process-sdmmpdf.pdf
 
Sap crm integration scenarios a high level approach
Sap crm integration scenarios   a high level approachSap crm integration scenarios   a high level approach
Sap crm integration scenarios a high level approach
 
Sdbusinessblueprint
SdbusinessblueprintSdbusinessblueprint
Sdbusinessblueprint
 
SAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales TemplateSAP SD Business Blue Print E1 Sales Template
SAP SD Business Blue Print E1 Sales Template
 
Sap sd bbp template
Sap sd bbp templateSap sd bbp template
Sap sd bbp template
 
Best Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and ServiceBest Practices in Complex Equipment Manufacturing Sales, and Service
Best Practices in Complex Equipment Manufacturing Sales, and Service
 
Supply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global EconomySupply Chain Collaboration: The Key to Success in a Global Economy
Supply Chain Collaboration: The Key to Success in a Global Economy
 
Sd availabulity check
Sd availabulity checkSd availabulity check
Sd availabulity check
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
 
Sapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-webSapp catalog-january-march2013-a200931-web
Sapp catalog-january-march2013-a200931-web
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
Sample Business Plan
Sample Business PlanSample Business Plan
Sample Business Plan
 
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflows
 
Conv op1909
Conv op1909Conv op1909
Conv op1909
 
Crystal Report
Crystal ReportCrystal Report
Crystal Report
 
Master guide1611
Master guide1611Master guide1611
Master guide1611
 
SAP BODS Designer PDF
SAP BODS Designer PDFSAP BODS Designer PDF
SAP BODS Designer PDF
 

Recently uploaded

AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
Ajin Abraham
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
DanBrown980551
 
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin..."$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
Fwdays
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
DianaGray10
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
operationspcvita
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
Jakub Marek
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
Pablo Gómez Abajo
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
Pitangent Analytics & Technology Solutions Pvt. Ltd
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Neo4j
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
Tatiana Kojar
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
Jason Packer
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
DanBrown980551
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
MichaelKnudsen27
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
Enterprise Knowledge
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
Ivo Velitchkov
 

Recently uploaded (20)

AppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSFAppSec PNW: Android and iOS Application Security with MobSF
AppSec PNW: Android and iOS Application Security with MobSF
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
 
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin..."$10 thousand per minute of downtime: architecture, queues, streaming and fin...
"$10 thousand per minute of downtime: architecture, queues, streaming and fin...
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
 
The Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptxThe Microsoft 365 Migration Tutorial For Beginner.pptx
The Microsoft 365 Migration Tutorial For Beginner.pptx
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
 
Mutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented ChatbotsMutation Testing for Task-Oriented Chatbots
Mutation Testing for Task-Oriented Chatbots
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
Crafting Excellence: A Comprehensive Guide to iOS Mobile App Development Serv...
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
 
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance PanelsNorthern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
Northern Engraving | Modern Metal Trim, Nameplates and Appliance Panels
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
Skybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoptionSkybuffer SAM4U tool for SAP license adoption
Skybuffer SAM4U tool for SAP license adoption
 
Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024Columbus Data & Analytics Wednesdays - June 2024
Columbus Data & Analytics Wednesdays - June 2024
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
 
Nordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptxNordic Marketo Engage User Group_June 13_ 2024.pptx
Nordic Marketo Engage User Group_June 13_ 2024.pptx
 
Demystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through StorytellingDemystifying Knowledge Management through Storytelling
Demystifying Knowledge Management through Storytelling
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
 

Make to order process with inventory checking

  • 1. SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 1 Make to Order in SAP ERP Applies to: SAP ECC 6.0. For more information, visit the Enterprise Resource Planning homepage. Summary This document shall help consultants in the cross functional areas like Sales and Distribution, Production planning and Materials Management. It is prepared to suits for Indian Make to Order Business Scenario. It explains the various activities like Sales, Planning, External procurement, Subcontracting, Production & Distribution. Author: Appala Raju P Company: Larsen & Toubro Infotech Ltd., Created on: 01 October 2009 Author Bio P. AppalaRaju is now an employee of Larsen & Toubro Infotech Ltd. He has total 10 years of experience, out of which near about 2 years experience in the area of SAP Consulting in Procure to Pay process. He has worked various business segments like Procurement, Design & Drawing and Plant maintenance in Engineering and Process sectors as part of Domain experience.
  • 2. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 2 Table of Contents Introduction .........................................................................................................................................................3 Make-to-Order.................................................................................................................................................3 Make-to-Stock.................................................................................................................................................3 MTO Business Scenario - Diagrammatical Representation ...........................................................................3 Major Steps.....................................................................................................................................................4 Bill of Materials................................................................................................................................................4 Steps in SAP.......................................................................................................................................................5 Create Materials..............................................................................................................................................6 CIN Master data..............................................................................................................................................7 Create Bill of Material (BOM) ..........................................................................................................................8 Create Routing to Finished material ...............................................................................................................9 Create Sale Order.........................................................................................................................................10 Run MRP for Sale Order...............................................................................................................................10 View the Planned Orders Created ................................................................................................................11 Convert “Component” Planned Order to PR.................................................................................................12 Convert Semi Finished Planned Order to PR ...............................................................................................13 Convert “Component” PR into PO ................................................................................................................14 Goods Receipt for Components....................................................................................................................15 View the Stock (sale order stock) .................................................................................................................16 Create Subcontract PO with Reference to Semi Finished PR......................................................................17 Maintain Storage Location to the Subcontractor...........................................................................................17 Transfer Goods/Components to Subcontractor (Subcontractor Storage Location)......................................18 Stock Overview .............................................................................................................................................19 Create Challan ..............................................................................................................................................20 Receive Goods (semi finished) from Subcontractor .....................................................................................21 View the Stock of Components after Goods Receipt....................................................................................21 View the Stock of Semi-Finished after Goods Receipt.................................................................................22 Reconciliation of Challan...............................................................................................................................23 Complete Challan..........................................................................................................................................23 Convert Finished Material Planned Order to Production Order....................................................................24 Goods Issue to the Production......................................................................................................................25 Confirmation of Production Order .................................................................................................................26 Goods Receipt Against Production Order.....................................................................................................27 Order Settlement for Production Order.........................................................................................................28 Delivery of Finished Products .......................................................................................................................29 Related Content................................................................................................................................................30 Disclaimer and Liability Notice..........................................................................................................................31
  • 3. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 3 Introduction Traditional production systems produce products and stock those as inventory until they are sold (make to stock). In order to reduce inventory and increase the level of customization, some firms have designed their production systems to produce a product only after it is ordered. Such systems are referred to as make-to- order. Make-to-order systems are not appropriate for all types of products, and the make-to-order versus make-to-stock decision must be weighted carefully. Make-to-Order Make-to-order production is a process in which a product is individually manufactured for a particular customer. Stock keeping is not usually carried out for products that are made to order. The primary benefits of this process are the ability to track the progress for the sales order and the flexibility to offer to the customer the products to meet their specific requirements. The benefit also lies in tracking the costs incurred in the servicing of the sales order in the manufacturing of the goods and the ability of arrive at a profitability of the sales order. This Business Scenario Map shows how enterprises work together to complete a make to order scenario. The planning and manufacturing process is initiated after receiving the sales orders from the customer.. There is a constant link between the sales order and the production order. This leads to the tracking of the progress on the customer order. The material stock is seen as customer stock. Make-to-Stock In make-to-stock production scenario stock is produced independently of orders because you want to provide your customers immediately with goods from that stock later on. You might even want to produce goods without having sales orders, if you expect that there might be customer demand in the future. This means that make-to-stock strategies can support a very close customer-vendor relationship because your objective here is to provide your customers with goods from your stock as quickly as possible. MTO Business Scenario - Diagrammatical Representation S1, S2 & S3: Storage location for Raw material, Semi finished material & final products respectively SL: Storage Location for Subcontracting Vendor Sale Order Final Prod Customer SL Production Vendor Subcontractor PLANT PO Components S1 Semi Finished S2 S3 MRP1 2 6 4 5 3 Components
  • 4. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 4 Major Steps 1 - Sales activity: Sales order is created with reference to customer order (customer PO) 2 - Planning activity: Planned orders are generated as output of Material Requirement Planning (MRP) With reference to Sales order 3 - Ext. procurement: Required components procured externally using purchase order (PO) 4 - Subcontracting: Procured components send to the subcontracting vendor & received semi finished product 5 - Production: Semi finished product processed internally and gives output as final product/Assembly 6 - Delivery activity: Delivers final product/Assembly to the customer against Sale order. Bill of Materials Sales Subcontracting External Proc - Components (comp.1 & comp. 2) procured externally. - Semi finished material received from subcontracting vendor by providing components - Assembly will be available for sales after processing semi finished material internally in production department. Assembly Semi finished Comp. 1 Comp. 2
  • 5. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 5 Steps in SAP Create materials with required views - MM01 Maintain CIN master data - J1ID Create Bill of Materials (BOM) - CS01 Create Routing to Finished material - CA01 Create sale order - VA01 Run MRP - MD50 View the planned orders created - MD04 Convert component planned order to PR (PR will show a/c assgn cat as M) – MD04 Convert semi finished planned order to PR (PR will show a/c assgt cat “M” & item cat. “L”) – MD04 Convert component PR into PO for external procurement - ME21N Goods receipt with reference to sale order - MIGO View the stock (sale order stock) - MMBE Create subcontract PO with reference to semi finished PR - ME21N Maintain storage location to the subcontractor - SPRO Transfer goods to Subcontractor (movement type 311 +E) - MB1B / MIGO Stock will be updated Subcontract storage location under Sale order stock - MMBE Create challan - J1IFQ Receive goods from Subcontractor with movt type 101 (543 will be taken to the component & subcontractor storage location to be entered) - MIGO Reconciliation of challan – J1IFQ Complete challan – J1IF13 Convert finished material planned order to production order - MD04 Goods issue to the production with movement type 261 - MB1A / MIGO Confirmation of Production order - CO15 Goods receipt against Production order with movement type 101 - MB31/MIGO Order settlement for Production order - KO88 Delivery of Finished products - VL01N
  • 6. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 6 Create Materials Required views & important fields mentioned for each view VALVE100 - Finished material, material type ZHAW (for sale order) Views: Basic data1(div & mat gr), Sales, MRP1, MRP2 (proc type E), MRP3 (Strategy group 20), MRP4 (individual/collec _ ), Work scheduling, General Plant data/storage, Accounting , Costing Key Point: Maintain Strategy Group as “20” in MRP3 view Note: No purchasing view available for material type FERT/ZHAW VALVESEMI100 - Semi finished material, material type HALB (for subcontracting) Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (Sp. procurement as 30 & proc type X) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/collec. _), Work scheduling, Plant data/storage, Accounting, Costing & No sales views Key Point: Maintain Special procurement as “30” in MRP2 view
  • 7. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 7 VALVECOMP - Raw material/component (material type ROH) Views: Basic dta1 (material group), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views VALVECOMP1 - Raw material/component (material type ROH) Views: Basic dta1 (mat gr), Purchasing, MRP1, MRP2 (proc type F) MRP3 (consumption mode 2, availability check 02), MRP4 (individual/colle _), Plant data/stor, Accounting, Costing & No sales views CIN Master data Use transaction code: J1ID Maintain material chapter ID combination to the component & semi finished material. Select Subcontract check box to the components Maintain assessable value to the components Components: - VALVECOMP & VALVECOMP1
  • 8. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 8 Semi finished material: - VALVESEMI100 Finished material: - VALVE100 Components: VALVECOMP & VALVECOMP1 Create Bill of Material (BOM) Use transaction code CS01 BOM1: VALVE100 – VALVESEMI100, BOM2: VALVESEMI100 – VALVECOMP, VALVECOMP1 Key Point: Maintain item category as “L”
  • 9. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 9 Create Routing to Finished material Use transaction code CA01
  • 10. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 10 Create Sale Order Use transaction code VA01 Run MRP for Sale Order Use transaction code MD50
  • 11. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 11 View the Planned Orders Created Use transaction code MD04
  • 12. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 12 Note: Total number of planned orders created = 4 Planned order 1 for VALVECOMP (component) Planned order 2 for VALVECOMP1 (component) Planned order 3 for VALVESEMI100 (semifinished/subcontacting material) Planned order 4 for VALVE100 (assembly/final product) Convert “Component” Planned Order to PR Use transaction code MD04 (Created PR contains a/c assignment category as M)
  • 13. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 13 Convert Semi Finished Planned Order to PR Use transaction code MD04 (Created PR contains a/c assignment cat as M & item cat as L)
  • 14. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 14 Convert “Component” PR into PO Use transaction code ME21N for external procurement. PO for material VALVECOMP PO for material VALVECOMP1
  • 15. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 15 Goods Receipt for Components Use transaction code MIGO Note the sale order number in item details in “where” tab
  • 16. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 16 View the Stock (sale order stock) Use transaction code MMBE
  • 17. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 17 Create Subcontract PO with Reference to Semi Finished PR Maintain Storage Location to the Subcontractor Use transaction code SPRO
  • 18. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 18 Transfer Goods/Components to Subcontractor (Subcontractor Storage Location) Use transaction code MB1B with movement type 311 +E
  • 19. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 19 Stock Overview Stock will be updated at subcontractor storage location under sale order stock. Transaction code MMBE
  • 20. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 20 Create Challan Use transaction code J1IF01
  • 21. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 21 Receive Goods (semi finished) from Subcontractor Use transaction code MIGO, with movement type 101 (543 will be taken to components), Subcontractor storage location to be entered. View the Stock of Components after Goods Receipt Stock of componets will be consumed at subcontracting storage location when semifinished goods received from subcontracting vendor.
  • 22. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 22 View the Stock of Semi-Finished after Goods Receipt
  • 23. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 23 Reconciliation of Challan Use transaction code J1IFQ Complete Challan Use transaction code J1IF13
  • 24. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 24 Convert Finished Material Planned Order to Production Order From planned order to Production order, transaction code MD04
  • 25. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 25 Note that planned order (000011696) converted as production order (00000100591) Goods Issue to the Production Use Transaction code MB1A
  • 26. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 26 Confirmation of Production Order Use Transaction code CO15
  • 27. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 27 Goods Receipt Against Production Order Use Transaction code MB31 / MIGO with movement type 101
  • 28. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 28 Order Settlement for Production Order Use Transaction code KO88
  • 29. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 29 Delivery of Finished Products Use Transaction code VL01N
  • 30. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 30 Related Content For more information, visit the Enterprise Resource Planning homepage. https://forums.sdn.sap.com/thread.jspa?messageID=7729276 https://forums.sdn.sap.com/thread.jspa?messageID=7742000 https://forums.sdn.sap.com/thread.jspa?messageID=7742915
  • 31. Make to Order in SAP ERP SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com © 2009 SAP AG 31 Disclaimer and Liability Notice This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade. SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document, and anyone using these methods does so at his/her own risk. SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or code sample, including any liability resulting from incompatibility between the content within this document and the materials and services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this document.