SlideShare a Scribd company logo
Nagadevan Govindan
Instrument Engineer
14 Sendamizer Street
Vadamangalam Pondicherry 605102
nagadeva82@gmail.com
+919585898443
https://www.linkedin.com/in/nagadevan
http://nagxp.blogspot.in
http://insatc.blogspot.in
OBJECTIVE
● To Be Work In
Reputed Corporate Where I have Utilize My Skills and Knowledge’s of
Mutual Profit
SUMMRY
● Instrument Engineer
With 8 Years of Experiences Including Manufacturing Construction services
which Comprises Industrial Mechanical Instrument Electrical Facility
Health Safety Field
EXPERIENCE
Nakashy Control and Project Services P Ltd | Chennai, Tamil Nadu, India | May 2014
– Present
Project: 1.2 MTPA PALLET PLANT DONIMALAI
Client: NMDC DONIMALAI
Contractor: TATA Projects Ltd.
Sub-contractor: BHEL ISG BANGLORE
INSTRUMENT ENGINEER cum SAFETY OFFICER
(18 Months)
INSTRUMENT ENGINEER
● Interpret the Design
Of •Plant Drawing, Equipment Layout •Circuit Drawing •Single Line Diagram
(SLD) •PID and Hook up Drawing •Analyzer System and Specifications for
the Proper Quantity take off as per Requirement
● Electrical Instrument Engineered
By •Cable Laying (HT Cable, LT Cable, Control Cable, Instrument Cable)
•Performs Quantitative Measurements of Erected Equipments, Materials
•Resolves Site Oriented Engineering Differentiation by Consultant
•Installation of Engineering Equipment (Electrical and Instrument such as
MCC PCC HTMCC PDP APFC RIO Transformer Transmitter LCS CJB Lights)
● Site Managed
By •Allocate Task to the Technicians (Electrical Technician Instrument
Technician Fitter Welder Fabricator )and Follow Up •Supports and
Supervise of Technicians to Commissions Protocol for Client Site
Requirement • Daily Site Progress Report to Management with Associated
status •Maintain Stocks on Store toward Trade Consumables (Electrical
Instrument Mechanical), Trade Tools-Machine, Project Equipments-
Materials-Cables
● Instrumentation Automation Compliances
By •Process Instrument-Equipment (Smart Transmitters, Actuators, Valves)
Calibrations Commissioning as per Protocol(HART, WirelessHART, Foundation
Field bus H1 and Profibus PA) Specification Through calibrator-
Communicator •Integrating Smart Instruments by up Keeping EDDL
(Electronic Device Description) Language
SAFETY OFFICER
● Inspect Monitor Controls
Of High-Risk Activities Like •Excavations •Scaffold •Lifting Machines
•Lifting Tackles •Portable Electrical Tools •Hazardous Chemicals
•Confined Space •Hot Works As Per the Checklist-Specification-standard
● Safety Managed
By •Tool Box talks •Preparing Emergency Evacuation Plans •Process
Monitors Work Permit Systems •Instructs Monitors Safe Good Work Practices
•Follows Company Safety Plan, Fire Fighting Plan, Emergency Evacuation
Plan •Accident Investigations Corrective Actions Mitigations •
Arrangements Monitors of Personal Protective Equipment •Hazard
Identifications, Risk analysis, Risk assessment and Job Safety Analysis
•HSE Performance Data Of Collections, Stores, Analyzes, Tracks, And
Reports
Swathi Organics and Specialties P Ltd | CIN: U24294TN1994PTC027261 | Pondicherry,
India | October 2011 – May 2014
Client 1: Huntsman International (India) Pvt Ltd
Client 2: BASF INDIA LIMITED
Client 3: Jintex India Co Pvt Ltd
DESIGN: EHS Executive (31 Months)
ENVIRONMENT HEALTH SAFETY
 Value Added to Facility HSE Standard-Amendment to Industry Compliances Which
Comprises Of QMS OHSAS EMS
● Liaisons Compliances
Of Hazardous Chemical Storage, Hazardous Waste Management, Third Party
Inspections Certificates’ Into Hoist/Lift, Boiler, Air Consent, Water
Consent, stack Emission, Noise Emission As per Indian SHE Standard such
as MSIHC RULE, Factory act 1948 and Amendment, Pollution Control Act,
MoEF Act
● Maintains External Audit Recommendations
By way of Good Practice Which Comprises Fire Protection/Fighting,
Manufactures, Company HSE Policies, Change Managements
● Risk Managed by
•Identifies Critical Assets •Conduct Risk Assessment Fire •Protect
Critical Assets by Alarms Values Detectors Response-Equipments Processes
Log-Books Commissioning-Data’s •Executing Preventative Maintenances
•Arranging Performance-based Maintenances in Manufacturing Facility
● Prepares Maintains HSE Documents
Such As Standard Operating Procedure-Operating Procedures-SOP-MSDS-SDS-
Emergency Evacuation Plans Of Storages, Equipments, Materials,
Operations, Facilities, Equipment Maintenances, Facilities
● Waste Reduced
By Recycling, Avoid, Minimize, Reuse, Recycle, Recover, Proper Dispose As
per Specification Guidance
● Hazardous Materials Managed
By •Isolations •Hazardous Display •Safety–Facility Parameter
Arrangement •Periodic Inspection • Prevention Arrangements Of Asbestos
Containing Materials (ACM), Synthetic Mineral Fibers (SMF),
Polychlorinated Biphenyl Compounds (PCBs), Ozone Depleting Substances
(ODS) As Per Industry-Standard Specification
● Emergency Facilitated
by •Preparing Emergency Management Plans •Prepares Display’s Evacuation
floor plans •Display’s Clear signage •Prepares Display’s Emergency
contact list •Displaying Emergency Control Organization •Preparing
Evacuation procedures •Prepares Display’s Site-floor plans At Chemical
Manufacture Environment
MAINTENANCES
● Lighting and Visual Environment Improvements
By •Fixing Leaks •Unblocking Vents and Diffusers •Replacing Flickering
Lights •Isolate Machines with High Emission with Proof Enclosure
● Water Systemized
By •Monitor Consumption •Report Performance by Install Flow Controllers
on Existing Taps • Installing Sensor Taps •Water Conservation Initiatives
(common areas) by Through Overflow, Leaks, Evaporation, Bleed, Drift
•Water Conservation initiatives (grounds) by Mulch after Sunset
FACILITY ADMINISTRATION
● Facility Activated
Such as Cleaning, Security, Plumbing, Electrical, HVAC, Pest Control,
Hygiene, in High Raise Building
● Cost Saves Through
•Professional Procurements •Service Delivery performance Measurements
•Competent and Experienced Personal Deployments •Purchasing Sustainable
Products and Materials •Energy Efficient designs •Technologies that
Will Manages Operate and Maintains •Asset Selections Procurements and
Deployments as per Availability
● Building Documentations
By Prepares Arranges Stores Distributes of •Building Manuals •Drawings
•Complete set of Maintenance Manuals Including as Installed Drawings
•Schematics of all Air, Water, Power, Gas and Hydraulics Systems •Asset
Register •Metering-Measurement Registers •Building Management Systems
(BMS) •Registers and Documents of Chillers, Heating, Condenser Water
•OH&S Registers and Documents •Chemical Industry Related Certifications
•Register of Switchboards with All Connected Loads
NCR Corporation (I) Pvt ltd | puducherry, India | November 2010 - October 2011
MANUFACTURE SERVICES (11 Months)
MANUFACTURING AND PRODUCTIONS
● Improvement and Escalate Manufacture Facility
Through Supplier Coordination, Employee Deploying, System Maintenance.
This comprises Of Test system, Electrical Utility, Generic Computing
System and Trades
● Raised Production Capacity
Through Participating Lean Manufacturing, 6-Sigma Implementation
Continual Improvements, Kaizen [Change for the Better], Change
Management, Equipment, Machine, System Erection in Production Line
FACILITIES
● Operated Maintained Utility Units
By Air (Compressed, Cooled) Equipment, Electrical Powers (Raw, UPS),
Water Supply System (Raw, DM, RO) of Strict Health Safety Compliance
Procedure for 400 Employees
● Executed Planned ( routine maintenance) and unplanned ( breakdowns)
Maintenances
By •Allocate Resources by Trained and Experienced Professionals to Carry
Out Maintenance Activities •Associated Maintenance Monitoring •
Organizing O&M Manuals, As Built Drawings, Related Documents
● Contractor Managed
By •Contractor Registration •Insurance Certificates •Task Monitors
• Feedback Reports To Managements
MAINTENANCES
● Cooperated Planned Maintenances
Includes •Air Handling Units (AHU) •Boilers •Building Management System
•Chiller System, Cooling Towers •Fire Systems •Humidification and
Dehumidification •HVAC •Lightings •Pumps and Fans •Packaged HVAC Systems
•Power Factor Correction System •Safety Controls In CMM Level Industry
● Record Keeps
Of •Inspections •Tests •Action Taken to Rectify any Faults Including the
Date they were Rectified •Cost of any Rectification Works
FREE LANCER | Pondicherry - Tamil Nadu, India
FREE LANCER (28 Months)
SRI ARAVINDAR ENGINEERING COLLEGE (2008), Pondicherry, India
 Compliances of Engineering Laboratory-Workshop
By •Ensures the Availability of Various Machines Equipments and Raw
Material Required to Laboratory -Workshops as per the Curriculum.
•Ensures Arranges the Machines Equipments in the Workshop-Laboratory are
in working Order. •Arrange training to Workshop-Laboratory staff as per
requirement of the Curriculum.
•Repairs and Maintenance of Building, Electrical appliances, Furniture of
the Institute. •Keep Myself updated about the Various Developments in
related industry. •Train the students as per the curriculum.
AVALON TECHNOLOGIES PRIVATE LIMITED (2009) MEPZ, Tambaram, India
INSTECH SYSTEMS & AUTOMATION (1999), HINDUSTAN UNILEVER LTD SITE, Vadamangalam,
Pondicherry, India
VINOD ENGINEERING COMPANY (2000), HINDUSTAN UNILEVER LTD SITE, Vadamangalam,
Pondicherry, India
 Compliances of Instrument Engineering Trade
By •Instrumentation-Equipment Installation (Transmitter, Control Valve,
Panel ), Do Instrument-Impulse Tube (copper steel), Cable Glands and
Termination, Cable Lay, As per Drawing Specification •Process
Instrument-Equipment (Smart Transmitters, Actuators, Valves) Calibrations
Commissioning as per Protocol(HART, WirelessHART, Foundation Field bus H1
and Profibus PA) Specification Through calibrator-Communicator
•Integrating Smart Instruments by up Keeping EDDL (Electronic Device
Description Language) in Instruments •Inspects Operates Maintenances of
Facility Unit (Air, water, Power, Production, Electrical, Manufacture,
Instrumentation) • Key Precise Measurement Practice in (Mechanical,
Electrical, Instrumentation, Process, Electronics, Optical,
Communication, Civil) Measurement Spectrum
EDUCATION
 Pondicherry University-Pondicherry Engineering College| puducherry, India| Aug
2004 - May 2007*
B.Tech, GPA 6.3., Honors: Electronics and Instrumentation Engineering
 DOTE CHENNAI-IGPT College Mahe | Chennai, Tamil Nadu, India | Aug 2001-May
2004
Diploma, GPA 74%, Honors: Electronics and Instrumentation Engineering
 DGET INDIA-GITI Karaikal | puducherry, India | Aug 1997 - Jul 1999
TRADE, GPA 87%, Honors: Instrumentation Mechanical Engineering
 Annamalai University-Chemical Engineering| Chidambaram, Tamil Nadu, India| Jun
2013-May 2014
Diploma, GPA 68%, Honors: Industrial Safety Engineering
TRAINING
 NSIC Technical Service | Chennai, Tamil Nadu, India | Dec 2009- Feb 2010
Honors: PLC, DCS, Electrical Control Engineering
 NCR CORPORATION (I) PVT LTD | puducherry, India | Dec 2010- Oct 2011
Honors: Manufacturing Service Engineering
 GEIGLE SAFETY GROUP INC | USA | May 2014
Honors: •OSH 132 HOUR General Industries •OSH 233 HOUR Oil And Gas •OSH
192 HOUR Construction
 ADDISION & CO | Chennai, Tamil Nadu, India | Apr 2000-Apr 2001
Honors: Instrumentation Mechanical Engineering
SKILLS
● Electrical Instrument Erection, Engineering Equipment Installation, Cable
Laying, Calibration, Commissioning
● Indian HSE Compliances Such As Factory Act 1948, MSIHC Rule, MoEF Act,
Pollution Control Board Act, Inspector of Factory Act, HIRA, JHA Unsafe Acts,
Unsafe Conditions, Hazid Hazop, Gap Analysis
AFFILIATIONS
Member http://www.citehr.com | Member http://www.instreng.com | Member http://www.eng-
tips.com Member http://www.globalspec.com | http://www.ourinstrumentationgroup.com
http://instrumentationportal.com | http://www.controlandinstrumentation.com
PERSONAL DETAILS
•Father’s Name: Mr.Govindan
•Date of Birth: 06-05-1982
•Gender: Male
•Languages Known: Tamil English
•Nationality: Indian
•PassportNo: J1468851 (valid21.10.2020)
•Marital Status: Single
•Interest: Browsing, Snapping
•Mobile No: +91-9585898443
•Email ID: nagadeva82@gmail.com
•PAN: AILPN9826C
•UIN: 309417105898
•ESI No: 51-16688248
•Permanent Address: 14 Sendamizer Street Vadamangalam Puducherry 605 102
•BANK ACCOUNT NO: 502564660-INDIAN BANK VILLIANUR IFSC Code IDBI 000 022
OTHER DETAILS
•References 1: Nakashy Control and Project Services P Ltd Chennai, Senior Engineer:
+91-9176610826. •References 2: Swathi Organics and Specialties P Ltd Pondicherry,
Director: +91-9840467737 •Current Salary (CTC): 20,000 INR/Month •Expected Salary:
24,000 INR/Month in India •Notice Period: 1 Week
KEYWORDS
PLC SCADA PROJECT SUPPORT MANUFACTURING ENGINEERING,B ELECTRONICS AND INSTRUMENTATION
SITE ENGINEER ELECTRICAL INSTRUMENT ERECTION FIELD ENGINEER SAFETY AUDIT HSE OSHA
INDUSTRIAL SAFETY INDIAN EHS STANDARD COMPLIANCE EHS HSE INSPECTOR HSE OFFICER SAFETY
OFFICER HSE IMPLEMENTATION QMS EMS SMS FACILITY

More Related Content

What's hot

Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instruments
Sanathoiba Singha
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
Raja P
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
KhushbooKunkulol
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMohammed Kaleemuddin
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimation
Raja P
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11Eric
 
Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3
PAAVAI ENGINEERING COLLEGE
 
Equipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarEquipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak Kumar
Deepak Kumar
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revision
pi
 
Mi audit checklist
Mi audit checklistMi audit checklist
Mi audit checklist
Nor Dalalina Musa
 
An approach on pharmaceuticals qualification
An approach on pharmaceuticals qualificationAn approach on pharmaceuticals qualification
An approach on pharmaceuticals qualification
Dewan Sumsuzzman
 
Session 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial AutomationSession 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial Automation
VidyaIA
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical device
Nahri Musyrif
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116
Somnath Banerjee
 

What's hot (20)

Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instruments
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
Tangella Nanibabu CV
Tangella Nanibabu CVTangella Nanibabu CV
Tangella Nanibabu CV
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimation
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Cb12e basic ppt ch11
Cb12e basic ppt ch11Cb12e basic ppt ch11
Cb12e basic ppt ch11
 
BQ-RTPT 2012
BQ-RTPT 2012BQ-RTPT 2012
BQ-RTPT 2012
 
Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3
 
Equipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarEquipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak Kumar
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Analytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revisionAnalytical Instrument Qualification - USP chapter 1058 revision
Analytical Instrument Qualification - USP chapter 1058 revision
 
Mi audit checklist
Mi audit checklistMi audit checklist
Mi audit checklist
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
An approach on pharmaceuticals qualification
An approach on pharmaceuticals qualificationAn approach on pharmaceuticals qualification
An approach on pharmaceuticals qualification
 
Session 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial AutomationSession 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial Automation
 
Equipment qualification of medical device
Equipment qualification of medical deviceEquipment qualification of medical device
Equipment qualification of medical device
 
1 5 equipment-qualification
1 5 equipment-qualification1 5 equipment-qualification
1 5 equipment-qualification
 
Qualification validation ppt_171116
Qualification validation ppt_171116Qualification validation ppt_171116
Qualification validation ppt_171116
 

Similar to Instrument engineer resume

Facility inspector resume
Facility inspector resumeFacility inspector resume
Facility inspector resume
Nagadevan Govindan
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
NikitaSahu39
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
sachin tagalpallewar
 
K PRAJIN RESUME - 2015
K PRAJIN  RESUME - 2015K PRAJIN  RESUME - 2015
K PRAJIN RESUME - 2015PRAJIN K
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali CurrentIrfan Ali
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
shri1984
 
Vinay Panchal CV SAFETY 2015
Vinay Panchal CV SAFETY 2015Vinay Panchal CV SAFETY 2015
Vinay Panchal CV SAFETY 2015Vinay Panchal
 

Similar to Instrument engineer resume (20)

Facility inspector resume
Facility inspector resumeFacility inspector resume
Facility inspector resume
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
VENKATESAN RESUME
VENKATESAN RESUMEVENKATESAN RESUME
VENKATESAN RESUME
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
 
vijay cv
vijay cvvijay cv
vijay cv
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Lavakumar
LavakumarLavakumar
Lavakumar
 
K PRAJIN RESUME - 2015
K PRAJIN  RESUME - 2015K PRAJIN  RESUME - 2015
K PRAJIN RESUME - 2015
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Resume
ResumeResume
Resume
 
Irfan Ali Current
Irfan Ali CurrentIrfan Ali Current
Irfan Ali Current
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Nithya resume
Nithya resumeNithya resume
Nithya resume
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
new
newnew
new
 
RESUME_SIVA
RESUME_SIVARESUME_SIVA
RESUME_SIVA
 
Shriraam Madanagopal Internship Report
Shriraam Madanagopal Internship ReportShriraam Madanagopal Internship Report
Shriraam Madanagopal Internship Report
 
Vinay Panchal CV SAFETY 2015
Vinay Panchal CV SAFETY 2015Vinay Panchal CV SAFETY 2015
Vinay Panchal CV SAFETY 2015
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 

Instrument engineer resume

  • 1. Nagadevan Govindan Instrument Engineer 14 Sendamizer Street Vadamangalam Pondicherry 605102 nagadeva82@gmail.com +919585898443 https://www.linkedin.com/in/nagadevan http://nagxp.blogspot.in http://insatc.blogspot.in OBJECTIVE ● To Be Work In Reputed Corporate Where I have Utilize My Skills and Knowledge’s of Mutual Profit SUMMRY ● Instrument Engineer With 8 Years of Experiences Including Manufacturing Construction services which Comprises Industrial Mechanical Instrument Electrical Facility Health Safety Field EXPERIENCE Nakashy Control and Project Services P Ltd | Chennai, Tamil Nadu, India | May 2014 – Present Project: 1.2 MTPA PALLET PLANT DONIMALAI Client: NMDC DONIMALAI Contractor: TATA Projects Ltd. Sub-contractor: BHEL ISG BANGLORE INSTRUMENT ENGINEER cum SAFETY OFFICER (18 Months) INSTRUMENT ENGINEER ● Interpret the Design Of •Plant Drawing, Equipment Layout •Circuit Drawing •Single Line Diagram (SLD) •PID and Hook up Drawing •Analyzer System and Specifications for the Proper Quantity take off as per Requirement ● Electrical Instrument Engineered By •Cable Laying (HT Cable, LT Cable, Control Cable, Instrument Cable) •Performs Quantitative Measurements of Erected Equipments, Materials •Resolves Site Oriented Engineering Differentiation by Consultant •Installation of Engineering Equipment (Electrical and Instrument such as MCC PCC HTMCC PDP APFC RIO Transformer Transmitter LCS CJB Lights) ● Site Managed By •Allocate Task to the Technicians (Electrical Technician Instrument Technician Fitter Welder Fabricator )and Follow Up •Supports and Supervise of Technicians to Commissions Protocol for Client Site Requirement • Daily Site Progress Report to Management with Associated status •Maintain Stocks on Store toward Trade Consumables (Electrical Instrument Mechanical), Trade Tools-Machine, Project Equipments- Materials-Cables ● Instrumentation Automation Compliances By •Process Instrument-Equipment (Smart Transmitters, Actuators, Valves) Calibrations Commissioning as per Protocol(HART, WirelessHART, Foundation Field bus H1 and Profibus PA) Specification Through calibrator- Communicator •Integrating Smart Instruments by up Keeping EDDL (Electronic Device Description) Language
  • 2. SAFETY OFFICER ● Inspect Monitor Controls Of High-Risk Activities Like •Excavations •Scaffold •Lifting Machines •Lifting Tackles •Portable Electrical Tools •Hazardous Chemicals •Confined Space •Hot Works As Per the Checklist-Specification-standard ● Safety Managed By •Tool Box talks •Preparing Emergency Evacuation Plans •Process Monitors Work Permit Systems •Instructs Monitors Safe Good Work Practices •Follows Company Safety Plan, Fire Fighting Plan, Emergency Evacuation Plan •Accident Investigations Corrective Actions Mitigations • Arrangements Monitors of Personal Protective Equipment •Hazard Identifications, Risk analysis, Risk assessment and Job Safety Analysis •HSE Performance Data Of Collections, Stores, Analyzes, Tracks, And Reports Swathi Organics and Specialties P Ltd | CIN: U24294TN1994PTC027261 | Pondicherry, India | October 2011 – May 2014 Client 1: Huntsman International (India) Pvt Ltd Client 2: BASF INDIA LIMITED Client 3: Jintex India Co Pvt Ltd DESIGN: EHS Executive (31 Months) ENVIRONMENT HEALTH SAFETY  Value Added to Facility HSE Standard-Amendment to Industry Compliances Which Comprises Of QMS OHSAS EMS ● Liaisons Compliances Of Hazardous Chemical Storage, Hazardous Waste Management, Third Party Inspections Certificates’ Into Hoist/Lift, Boiler, Air Consent, Water Consent, stack Emission, Noise Emission As per Indian SHE Standard such as MSIHC RULE, Factory act 1948 and Amendment, Pollution Control Act, MoEF Act ● Maintains External Audit Recommendations By way of Good Practice Which Comprises Fire Protection/Fighting, Manufactures, Company HSE Policies, Change Managements ● Risk Managed by •Identifies Critical Assets •Conduct Risk Assessment Fire •Protect Critical Assets by Alarms Values Detectors Response-Equipments Processes Log-Books Commissioning-Data’s •Executing Preventative Maintenances •Arranging Performance-based Maintenances in Manufacturing Facility ● Prepares Maintains HSE Documents Such As Standard Operating Procedure-Operating Procedures-SOP-MSDS-SDS- Emergency Evacuation Plans Of Storages, Equipments, Materials, Operations, Facilities, Equipment Maintenances, Facilities ● Waste Reduced By Recycling, Avoid, Minimize, Reuse, Recycle, Recover, Proper Dispose As per Specification Guidance ● Hazardous Materials Managed By •Isolations •Hazardous Display •Safety–Facility Parameter Arrangement •Periodic Inspection • Prevention Arrangements Of Asbestos Containing Materials (ACM), Synthetic Mineral Fibers (SMF), Polychlorinated Biphenyl Compounds (PCBs), Ozone Depleting Substances (ODS) As Per Industry-Standard Specification ● Emergency Facilitated by •Preparing Emergency Management Plans •Prepares Display’s Evacuation floor plans •Display’s Clear signage •Prepares Display’s Emergency contact list •Displaying Emergency Control Organization •Preparing Evacuation procedures •Prepares Display’s Site-floor plans At Chemical Manufacture Environment
  • 3. MAINTENANCES ● Lighting and Visual Environment Improvements By •Fixing Leaks •Unblocking Vents and Diffusers •Replacing Flickering Lights •Isolate Machines with High Emission with Proof Enclosure ● Water Systemized By •Monitor Consumption •Report Performance by Install Flow Controllers on Existing Taps • Installing Sensor Taps •Water Conservation Initiatives (common areas) by Through Overflow, Leaks, Evaporation, Bleed, Drift •Water Conservation initiatives (grounds) by Mulch after Sunset FACILITY ADMINISTRATION ● Facility Activated Such as Cleaning, Security, Plumbing, Electrical, HVAC, Pest Control, Hygiene, in High Raise Building ● Cost Saves Through •Professional Procurements •Service Delivery performance Measurements •Competent and Experienced Personal Deployments •Purchasing Sustainable Products and Materials •Energy Efficient designs •Technologies that Will Manages Operate and Maintains •Asset Selections Procurements and Deployments as per Availability ● Building Documentations By Prepares Arranges Stores Distributes of •Building Manuals •Drawings •Complete set of Maintenance Manuals Including as Installed Drawings •Schematics of all Air, Water, Power, Gas and Hydraulics Systems •Asset Register •Metering-Measurement Registers •Building Management Systems (BMS) •Registers and Documents of Chillers, Heating, Condenser Water •OH&S Registers and Documents •Chemical Industry Related Certifications •Register of Switchboards with All Connected Loads NCR Corporation (I) Pvt ltd | puducherry, India | November 2010 - October 2011 MANUFACTURE SERVICES (11 Months) MANUFACTURING AND PRODUCTIONS ● Improvement and Escalate Manufacture Facility Through Supplier Coordination, Employee Deploying, System Maintenance. This comprises Of Test system, Electrical Utility, Generic Computing System and Trades ● Raised Production Capacity Through Participating Lean Manufacturing, 6-Sigma Implementation Continual Improvements, Kaizen [Change for the Better], Change Management, Equipment, Machine, System Erection in Production Line FACILITIES ● Operated Maintained Utility Units By Air (Compressed, Cooled) Equipment, Electrical Powers (Raw, UPS), Water Supply System (Raw, DM, RO) of Strict Health Safety Compliance Procedure for 400 Employees ● Executed Planned ( routine maintenance) and unplanned ( breakdowns) Maintenances By •Allocate Resources by Trained and Experienced Professionals to Carry Out Maintenance Activities •Associated Maintenance Monitoring • Organizing O&M Manuals, As Built Drawings, Related Documents ● Contractor Managed By •Contractor Registration •Insurance Certificates •Task Monitors • Feedback Reports To Managements
  • 4. MAINTENANCES ● Cooperated Planned Maintenances Includes •Air Handling Units (AHU) •Boilers •Building Management System •Chiller System, Cooling Towers •Fire Systems •Humidification and Dehumidification •HVAC •Lightings •Pumps and Fans •Packaged HVAC Systems •Power Factor Correction System •Safety Controls In CMM Level Industry ● Record Keeps Of •Inspections •Tests •Action Taken to Rectify any Faults Including the Date they were Rectified •Cost of any Rectification Works FREE LANCER | Pondicherry - Tamil Nadu, India FREE LANCER (28 Months) SRI ARAVINDAR ENGINEERING COLLEGE (2008), Pondicherry, India  Compliances of Engineering Laboratory-Workshop By •Ensures the Availability of Various Machines Equipments and Raw Material Required to Laboratory -Workshops as per the Curriculum. •Ensures Arranges the Machines Equipments in the Workshop-Laboratory are in working Order. •Arrange training to Workshop-Laboratory staff as per requirement of the Curriculum. •Repairs and Maintenance of Building, Electrical appliances, Furniture of the Institute. •Keep Myself updated about the Various Developments in related industry. •Train the students as per the curriculum. AVALON TECHNOLOGIES PRIVATE LIMITED (2009) MEPZ, Tambaram, India INSTECH SYSTEMS & AUTOMATION (1999), HINDUSTAN UNILEVER LTD SITE, Vadamangalam, Pondicherry, India VINOD ENGINEERING COMPANY (2000), HINDUSTAN UNILEVER LTD SITE, Vadamangalam, Pondicherry, India  Compliances of Instrument Engineering Trade By •Instrumentation-Equipment Installation (Transmitter, Control Valve, Panel ), Do Instrument-Impulse Tube (copper steel), Cable Glands and Termination, Cable Lay, As per Drawing Specification •Process Instrument-Equipment (Smart Transmitters, Actuators, Valves) Calibrations Commissioning as per Protocol(HART, WirelessHART, Foundation Field bus H1 and Profibus PA) Specification Through calibrator-Communicator •Integrating Smart Instruments by up Keeping EDDL (Electronic Device Description Language) in Instruments •Inspects Operates Maintenances of Facility Unit (Air, water, Power, Production, Electrical, Manufacture, Instrumentation) • Key Precise Measurement Practice in (Mechanical, Electrical, Instrumentation, Process, Electronics, Optical, Communication, Civil) Measurement Spectrum EDUCATION  Pondicherry University-Pondicherry Engineering College| puducherry, India| Aug 2004 - May 2007* B.Tech, GPA 6.3., Honors: Electronics and Instrumentation Engineering  DOTE CHENNAI-IGPT College Mahe | Chennai, Tamil Nadu, India | Aug 2001-May 2004 Diploma, GPA 74%, Honors: Electronics and Instrumentation Engineering  DGET INDIA-GITI Karaikal | puducherry, India | Aug 1997 - Jul 1999 TRADE, GPA 87%, Honors: Instrumentation Mechanical Engineering  Annamalai University-Chemical Engineering| Chidambaram, Tamil Nadu, India| Jun 2013-May 2014 Diploma, GPA 68%, Honors: Industrial Safety Engineering
  • 5. TRAINING  NSIC Technical Service | Chennai, Tamil Nadu, India | Dec 2009- Feb 2010 Honors: PLC, DCS, Electrical Control Engineering  NCR CORPORATION (I) PVT LTD | puducherry, India | Dec 2010- Oct 2011 Honors: Manufacturing Service Engineering  GEIGLE SAFETY GROUP INC | USA | May 2014 Honors: •OSH 132 HOUR General Industries •OSH 233 HOUR Oil And Gas •OSH 192 HOUR Construction  ADDISION & CO | Chennai, Tamil Nadu, India | Apr 2000-Apr 2001 Honors: Instrumentation Mechanical Engineering SKILLS ● Electrical Instrument Erection, Engineering Equipment Installation, Cable Laying, Calibration, Commissioning ● Indian HSE Compliances Such As Factory Act 1948, MSIHC Rule, MoEF Act, Pollution Control Board Act, Inspector of Factory Act, HIRA, JHA Unsafe Acts, Unsafe Conditions, Hazid Hazop, Gap Analysis AFFILIATIONS Member http://www.citehr.com | Member http://www.instreng.com | Member http://www.eng- tips.com Member http://www.globalspec.com | http://www.ourinstrumentationgroup.com http://instrumentationportal.com | http://www.controlandinstrumentation.com PERSONAL DETAILS •Father’s Name: Mr.Govindan •Date of Birth: 06-05-1982 •Gender: Male •Languages Known: Tamil English •Nationality: Indian •PassportNo: J1468851 (valid21.10.2020) •Marital Status: Single •Interest: Browsing, Snapping •Mobile No: +91-9585898443 •Email ID: nagadeva82@gmail.com •PAN: AILPN9826C •UIN: 309417105898 •ESI No: 51-16688248 •Permanent Address: 14 Sendamizer Street Vadamangalam Puducherry 605 102 •BANK ACCOUNT NO: 502564660-INDIAN BANK VILLIANUR IFSC Code IDBI 000 022 OTHER DETAILS •References 1: Nakashy Control and Project Services P Ltd Chennai, Senior Engineer: +91-9176610826. •References 2: Swathi Organics and Specialties P Ltd Pondicherry, Director: +91-9840467737 •Current Salary (CTC): 20,000 INR/Month •Expected Salary: 24,000 INR/Month in India •Notice Period: 1 Week KEYWORDS PLC SCADA PROJECT SUPPORT MANUFACTURING ENGINEERING,B ELECTRONICS AND INSTRUMENTATION SITE ENGINEER ELECTRICAL INSTRUMENT ERECTION FIELD ENGINEER SAFETY AUDIT HSE OSHA INDUSTRIAL SAFETY INDIAN EHS STANDARD COMPLIANCE EHS HSE INSPECTOR HSE OFFICER SAFETY OFFICER HSE IMPLEMENTATION QMS EMS SMS FACILITY