A Critique of the Proposed National Education Policy Reform
Maintanence
1. Lighting
Firstly carry out a visual check. You must make sure all of the following is in
order:
All ten CCT Fresnels in the rig. CCT Fresnels are found in the back off
the hall to the right.
That all lights a gel frame with a gel inside. Gel frames are found in the
back of hall, hung on the wall to the right. Gels are found in the back of
the hall in a draw to the right. Gels must be cut to fit light and slotted in at
the top.
All of the lights must be placed together correctly. Forexample the lamp
tray must be attached to the bottomof the light correctly.
The safety chain must be attached the the rig properly.
The G clamp must be attached with the light going under.
All plug must be in the socket fully and correctly as if they aren't and is
turned on it my be unsafe.
Sound
When setting up the you must ensure this is all in place:
That all cables are plugged into where they are needed. For example:
The kettle leads must be plugged into the speakers and desk.
The output of the speakers must be plugged into input of the desk.
The laptop must be plugged into the mains.
The mini jack must plugged into the laptop from the sound desk.
(All cables can be found in the technician’s office at the back of the hall
in labeled boxes.)
Projection
For the projection ensure all appropriate cables are plugged in. For
example the VGA must be plugged into the laptop.