SlideShare a Scribd company logo
Profile Summary
 Performance-driven professional with over 3 decades of experience in Strategic Power Supply Management, Project
Management and People Management
 Directing productive cross-functional teams using interactive and motivational leadership that spurs people to
willingly give excellent results
 Swiftly completing MRT, LRT, POWER RAIL, LIM RAIL and Rail Power Supply Projects with competent
skills and ensuring on time deliverables within pre-set cost parameters
 Expertise in design verification of engineering drawings, electrical layouts, earthing layouts, sectioning, schematics
and other technical documents submitted by system subcontractor
 Skilled in identifying the technical issues during the installation, testing and commissioning of subsystem
equipment/ works and to respond/resolve to maintain the project schedule
 Pivotal in identifying underlying risks, deficiencies, and opportunities that others missed
 Adept in cable trenching, deep-sea ground, cable termination, cable testing & commissioning at power station
 Acknowledged for monitoring business in new and growth areas and motivating people to perform beyond their
normal past established skills/ levels
 An enterprising leader with skills in leading personnel towards accomplishment of common goals
Soft Skills Key Skills
Education
 2012: Advance in Security Supervisor (Full Advance in Security
Supervisor & Full Security Supervisor Certificate)
 2009: Certificate in Building Construction Supervisors Safety from
Building & Construction Authority
 2009: Advance Diploma in Power System Engineering from Singapore
Polytechnic
 2000: Certificate of Underground Services Detection from Singapore
Power Training Institute
 1976: GCE ‘O’ Levels from Serangoon Secondary School
Career Timeline (2005 to till date)
Strategic Planning
Power Supply Management
Energy Conservation
Project Management
Stakeholder Management
Cable Testing & Commissioning
Budgeting & Cost Control
Training & Development
Performance Management
Team Building & Leadership
Trident Electro
Mechanical Contracting
Co. (TEMCo), Qatar
COLAS RAIL AISA
Sdn Bhd.
POH Haut Heng
Co. Ltd., Singapore
LOGANATHAN
Senior Level Assignments
Power Supply Management/ Project Management
Industry Preference: Power; Location Preference: Dubai/ Malaysia/ Qatar
logan_veera@yahoo.com +65 90493958, +60 187848173
RMTC, Systra Rail
KSA, Riyadh
Motivational Leader
Change Agent Thinker
Collaborator Planner
Communicator
2012-2013 2013-2013 2013-2017 2017-20182005-2012
Alstom Transport
Pte. Ltd., Singapore
Work Experience
Jul’17 to Apr’18 with RMTC, Systra Rail KSA, Riyadh
Senior System Superintendent
Project: Riyadh Metro Transportation Project, Saudi Arabia
Client: ADA (Arriyadh Development Authority)
Role:
 Instituting & executing strategies, making high-stakes decisions and overcoming complex business challenges using
experience-backed judgment, strong work ethics and irreproachable integrity
 Creating and sustaining a dynamic environment that fosters the development opportunities and motivates the high
performance amongst the team members
 Developing project baselines and controlling them with respect to resource deployment, time overruns and quality
compliance to ensure satisfactory execution of projects
 Collaborating with stakeholders while keeping them informed of progress and issues in order to manage expectations
on all project requirements and deliverables
 Performing as a part of a team of Senior System Superintendent ensuring the adherence of the project to client
requirements as well as preset quality standards with regards to installation, inspection and testing and commissioning
of subsystem equipment/works.
 Making sure that all actions are performed according to the guidelines and regulations of the project (drawings,
standards, method statements and so on)
 Monitoring all site installations and inspections of Subsystem works as MV/LV equipment and cables, signaling &
telecom equipment and cables, OCC installations electrical track works, earthing and bonding woks etc. as per
approved design, layouts and methods
 Managing quality control and quality assurance, review field measurements and interfacing with other departments
such as Track works, Signaling, Telecommunication and OCC/SCADA
 Facilitating inspection of the subsystem installation works as per the ITP (Inspection and Test Plan), identify any
discrepancies and generate the Non-Conformance Report
 Ensuring effective preparation of weekly reports and other project related reports
 Review and preparation of ‘As-Built’ drawings for subsystem installation
 Attending the weekly/ monthly meeting with the Contractor as required by the Lead Manager or Resident Engineer
Power for progress review of system activities
May’13 to Jun’17 with COLAS RAIL AISA Sdn Bhd.
Power Supply Project Superintendent
Project: Kelanajaya (KLJ) Lineex Tension Project
Client: Syarikat Prasarana Negara Berhad
Role:
 Ensured data flow and saved cost by managing main line cables, trackside switch, traction power sub-stations
(TPSS) equipment’s, Stations & Station Sub-Stations (SSS) equipment’s & Gombak depot compressed air system
 Protected personnel & processes in order to control subang depot cables, switchgear, Subang depot train wash plant
while testing 33KV & 750 DC cables services electrical activities based on overall project schedule
 Made sure effective maintenance of equipment and facilities satisfactory operating condition by ensuring smooth
implementation of electrical works
 Stayed up to date with new techniques & methods by involving in progress and coordination meeting as well as
leading testing and commissioning activities
 Enhanced operational resilience to unforeseen incidents by offering technical assurance during project sourcing,
manufacturing, construction and commissioning
Previous Work Experience
Feb’13 to Apr’13 with POH Haut Heng Co. Ltd., Singapore
Project Supervisor & Coordinator
Oct’12 to Feb’13 with Trident Electro Mechanical Contracting Co. (TEMCo), Qatar
Project Coordinator Engineer
May’05 to Sep’12 with Alstom Transport Pte. Ltd., Singapore
Assistant Engineer
2003 to 2005 with Furukawa Electric Co.Ltd., Singapore
Project Engineer
2000 to 2003 with Meiden Singapore Ptd Ltd., Singapore
Supervisor
1999 to 2000 with Koncar Fareast LTD., Overseas & Singapore
Project Engineer & Cable Jointer
1997 to 1999 as Self Employed
1994 to 1997 with Alstom Power Pte Ltd. / AEG Ptd Ltd., Singapore & Overseas
Project Engineer
1992 to 1994 with Furukawa Electric Co.Ltd., Singapore
Project Supervisor
1990 to 1992 with Mitsubishi Construction Co. Ltd., Singapore
Supervisor
1989 to 1990 with Cable Pirelli (UK) Ltd., Singapore
Supervisor
1987 to 1989 with Hitachi Electric Co. Ltd., Singapore
Project Supervisor
1979 to 1987 with Kumar Contractor Ptd. Ltd., Singapore
Chief Supervisor
1976 to 1979 with Singapore Telecom Ltd., Singapore
Supervisor
1975 to 1976 with Singapore Salvage Engineering Ptd. Ltd., Singapore & Overseas
Supervisor & Salvage Diver
1973 to 1975 with BICC LTD., Singapore & Overseas
Foreman
1972 to 1973 with Sumitomo Electric (S) Pte Ltd., Singapore
Cable Layer
Extracurricular Activities & Achievements
 Darts -playing for clubs: 1996 –2011
 Cycling Manager -Club Team Director, Rill Cycling Team: 1979 1982
 Sea Games & 1980 Asian Championship
 Cycling Represented Singapore at 1977 to 1979 Asian Games, 1977 –1982
Personal Details
Date of Birth: 4th
September 1958
Nationality: Singaporean
Contact Address: Block 173, Ang Mo Kio Avenue 4, # 08-715 Singapore (560173)
Languages Known: English, Tamil, Chinese Hokkien, Bahasa Malaysia, Bahasa Indonesia and Sample Thai
NRIC: S-1322743-H

More Related Content

What's hot

BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
Anil Kumar
 
Aleem Ashraf CV
Aleem Ashraf CV Aleem Ashraf CV
Aleem Ashraf CV
Aleem Ashraf
 
CV1
CV1CV1
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
Viswambhar Murahu Pal
 
CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5
BC Tan
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
Govindarajan T S
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
Sally Al-Gazzar
 
Abrar Haidar Tasneem
Abrar Haidar TasneemAbrar Haidar Tasneem
Abrar Haidar Tasneem
ABRAR TASNEEM
 
JAMES READ - CV 2014
JAMES READ - CV 2014JAMES READ - CV 2014
JAMES READ - CV 2014
James Read
 
cv
cvcv
cv
luroha
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
Balamurugan chandramohan
 
Mukhtar ahmad cv
Mukhtar ahmad cvMukhtar ahmad cv
Mukhtar ahmad cv
Mukhtar Ahmad
 
CV 2015
CV 2015CV 2015
Resume_Sameer-1 -Simens
Resume_Sameer-1 -SimensResume_Sameer-1 -Simens
Resume_Sameer-1 -Simens
sameer kamble
 
abhi updated
abhi updatedabhi updated
abhi updated
Abhishek sarkar
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
Abhishek Parihar
 
Dhiru singh
Dhiru singhDhiru singh
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
Rabi Kumar Purohita
 

What's hot (18)

BALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUMEBALAKRISHNAN ANIL KUMAR RESUME
BALAKRISHNAN ANIL KUMAR RESUME
 
Aleem Ashraf CV
Aleem Ashraf CV Aleem Ashraf CV
Aleem Ashraf CV
 
CV1
CV1CV1
CV1
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5CV -TBC (Rail Specialist) V5
CV -TBC (Rail Specialist) V5
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Abrar Haidar Tasneem
Abrar Haidar TasneemAbrar Haidar Tasneem
Abrar Haidar Tasneem
 
JAMES READ - CV 2014
JAMES READ - CV 2014JAMES READ - CV 2014
JAMES READ - CV 2014
 
cv
cvcv
cv
 
Bala electl engineer-cv
Bala electl engineer-cvBala electl engineer-cv
Bala electl engineer-cv
 
Mukhtar ahmad cv
Mukhtar ahmad cvMukhtar ahmad cv
Mukhtar ahmad cv
 
CV 2015
CV 2015CV 2015
CV 2015
 
Resume_Sameer-1 -Simens
Resume_Sameer-1 -SimensResume_Sameer-1 -Simens
Resume_Sameer-1 -Simens
 
abhi updated
abhi updatedabhi updated
abhi updated
 
CV_Abhishek singh Parihar
CV_Abhishek singh PariharCV_Abhishek singh Parihar
CV_Abhishek singh Parihar
 
Dhiru singh
Dhiru singhDhiru singh
Dhiru singh
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 

Similar to Loganathan, senior level assignments.

CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
Imran Asghar
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
Sayan Ml
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
Raza Khan
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAY
sultan said
 
Shree_Resume
Shree_ResumeShree_Resume
Shree_Resume
Shree Deshpande
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
Saleem MD
 
Nagendra(2)
Nagendra(2)Nagendra(2)
Nagendra(2)
nagendra moram
 
C.v msword new
C.v msword   newC.v msword   new
C.v msword new
rizwanfaha
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Engr.Arsalan .
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
Mochammad Anis
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
JAMESKUTTY YOHANNAN
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
kami88
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
Santosh Singh
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
sudarsan boopathi
 
CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16
Arun R
 
CV_Magesh
CV_MageshCV_Magesh
CV_Magesh
magesh velu
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
Chandramouli Tadepalli
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
RAJESAHEB PATIL
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
Ravi Ranjan
 
Mohsen sharghi english cv apr. 2016
Mohsen sharghi english cv  apr. 2016Mohsen sharghi english cv  apr. 2016
Mohsen sharghi english cv apr. 2016
Mohsen Sharghi
 

Similar to Loganathan, senior level assignments. (20)

CV imran-Asghar
CV imran-AsgharCV imran-Asghar
CV imran-Asghar
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAY
 
Shree_Resume
Shree_ResumeShree_Resume
Shree_Resume
 
MDS CV 24.9.16
MDS CV 24.9.16MDS CV 24.9.16
MDS CV 24.9.16
 
Nagendra(2)
Nagendra(2)Nagendra(2)
Nagendra(2)
 
C.v msword new
C.v msword   newC.v msword   new
C.v msword new
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
M.Kamran Resume
M.Kamran ResumeM.Kamran Resume
M.Kamran Resume
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16
 
CV_Magesh
CV_MageshCV_Magesh
CV_Magesh
 
T.Chandramouli _ Resume
T.Chandramouli _ ResumeT.Chandramouli _ Resume
T.Chandramouli _ Resume
 
RAJ PATIL
RAJ PATILRAJ PATIL
RAJ PATIL
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
Mohsen sharghi english cv apr. 2016
Mohsen sharghi english cv  apr. 2016Mohsen sharghi english cv  apr. 2016
Mohsen sharghi english cv apr. 2016
 

Recently uploaded

ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 

Recently uploaded (20)

ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 

Loganathan, senior level assignments.

  • 1. Profile Summary  Performance-driven professional with over 3 decades of experience in Strategic Power Supply Management, Project Management and People Management  Directing productive cross-functional teams using interactive and motivational leadership that spurs people to willingly give excellent results  Swiftly completing MRT, LRT, POWER RAIL, LIM RAIL and Rail Power Supply Projects with competent skills and ensuring on time deliverables within pre-set cost parameters  Expertise in design verification of engineering drawings, electrical layouts, earthing layouts, sectioning, schematics and other technical documents submitted by system subcontractor  Skilled in identifying the technical issues during the installation, testing and commissioning of subsystem equipment/ works and to respond/resolve to maintain the project schedule  Pivotal in identifying underlying risks, deficiencies, and opportunities that others missed  Adept in cable trenching, deep-sea ground, cable termination, cable testing & commissioning at power station  Acknowledged for monitoring business in new and growth areas and motivating people to perform beyond their normal past established skills/ levels  An enterprising leader with skills in leading personnel towards accomplishment of common goals Soft Skills Key Skills Education  2012: Advance in Security Supervisor (Full Advance in Security Supervisor & Full Security Supervisor Certificate)  2009: Certificate in Building Construction Supervisors Safety from Building & Construction Authority  2009: Advance Diploma in Power System Engineering from Singapore Polytechnic  2000: Certificate of Underground Services Detection from Singapore Power Training Institute  1976: GCE ‘O’ Levels from Serangoon Secondary School Career Timeline (2005 to till date) Strategic Planning Power Supply Management Energy Conservation Project Management Stakeholder Management Cable Testing & Commissioning Budgeting & Cost Control Training & Development Performance Management Team Building & Leadership Trident Electro Mechanical Contracting Co. (TEMCo), Qatar COLAS RAIL AISA Sdn Bhd. POH Haut Heng Co. Ltd., Singapore LOGANATHAN Senior Level Assignments Power Supply Management/ Project Management Industry Preference: Power; Location Preference: Dubai/ Malaysia/ Qatar logan_veera@yahoo.com +65 90493958, +60 187848173 RMTC, Systra Rail KSA, Riyadh Motivational Leader Change Agent Thinker Collaborator Planner Communicator 2012-2013 2013-2013 2013-2017 2017-20182005-2012 Alstom Transport Pte. Ltd., Singapore
  • 2. Work Experience Jul’17 to Apr’18 with RMTC, Systra Rail KSA, Riyadh Senior System Superintendent Project: Riyadh Metro Transportation Project, Saudi Arabia Client: ADA (Arriyadh Development Authority) Role:  Instituting & executing strategies, making high-stakes decisions and overcoming complex business challenges using experience-backed judgment, strong work ethics and irreproachable integrity  Creating and sustaining a dynamic environment that fosters the development opportunities and motivates the high performance amongst the team members  Developing project baselines and controlling them with respect to resource deployment, time overruns and quality compliance to ensure satisfactory execution of projects  Collaborating with stakeholders while keeping them informed of progress and issues in order to manage expectations on all project requirements and deliverables  Performing as a part of a team of Senior System Superintendent ensuring the adherence of the project to client requirements as well as preset quality standards with regards to installation, inspection and testing and commissioning of subsystem equipment/works.  Making sure that all actions are performed according to the guidelines and regulations of the project (drawings, standards, method statements and so on)  Monitoring all site installations and inspections of Subsystem works as MV/LV equipment and cables, signaling & telecom equipment and cables, OCC installations electrical track works, earthing and bonding woks etc. as per approved design, layouts and methods  Managing quality control and quality assurance, review field measurements and interfacing with other departments such as Track works, Signaling, Telecommunication and OCC/SCADA  Facilitating inspection of the subsystem installation works as per the ITP (Inspection and Test Plan), identify any discrepancies and generate the Non-Conformance Report  Ensuring effective preparation of weekly reports and other project related reports  Review and preparation of ‘As-Built’ drawings for subsystem installation  Attending the weekly/ monthly meeting with the Contractor as required by the Lead Manager or Resident Engineer Power for progress review of system activities May’13 to Jun’17 with COLAS RAIL AISA Sdn Bhd. Power Supply Project Superintendent Project: Kelanajaya (KLJ) Lineex Tension Project Client: Syarikat Prasarana Negara Berhad Role:  Ensured data flow and saved cost by managing main line cables, trackside switch, traction power sub-stations (TPSS) equipment’s, Stations & Station Sub-Stations (SSS) equipment’s & Gombak depot compressed air system  Protected personnel & processes in order to control subang depot cables, switchgear, Subang depot train wash plant while testing 33KV & 750 DC cables services electrical activities based on overall project schedule  Made sure effective maintenance of equipment and facilities satisfactory operating condition by ensuring smooth implementation of electrical works  Stayed up to date with new techniques & methods by involving in progress and coordination meeting as well as leading testing and commissioning activities  Enhanced operational resilience to unforeseen incidents by offering technical assurance during project sourcing, manufacturing, construction and commissioning Previous Work Experience Feb’13 to Apr’13 with POH Haut Heng Co. Ltd., Singapore Project Supervisor & Coordinator Oct’12 to Feb’13 with Trident Electro Mechanical Contracting Co. (TEMCo), Qatar Project Coordinator Engineer May’05 to Sep’12 with Alstom Transport Pte. Ltd., Singapore Assistant Engineer 2003 to 2005 with Furukawa Electric Co.Ltd., Singapore Project Engineer 2000 to 2003 with Meiden Singapore Ptd Ltd., Singapore Supervisor 1999 to 2000 with Koncar Fareast LTD., Overseas & Singapore Project Engineer & Cable Jointer
  • 3. 1997 to 1999 as Self Employed 1994 to 1997 with Alstom Power Pte Ltd. / AEG Ptd Ltd., Singapore & Overseas Project Engineer 1992 to 1994 with Furukawa Electric Co.Ltd., Singapore Project Supervisor 1990 to 1992 with Mitsubishi Construction Co. Ltd., Singapore Supervisor 1989 to 1990 with Cable Pirelli (UK) Ltd., Singapore Supervisor 1987 to 1989 with Hitachi Electric Co. Ltd., Singapore Project Supervisor 1979 to 1987 with Kumar Contractor Ptd. Ltd., Singapore Chief Supervisor 1976 to 1979 with Singapore Telecom Ltd., Singapore Supervisor 1975 to 1976 with Singapore Salvage Engineering Ptd. Ltd., Singapore & Overseas Supervisor & Salvage Diver 1973 to 1975 with BICC LTD., Singapore & Overseas Foreman 1972 to 1973 with Sumitomo Electric (S) Pte Ltd., Singapore Cable Layer Extracurricular Activities & Achievements  Darts -playing for clubs: 1996 –2011  Cycling Manager -Club Team Director, Rill Cycling Team: 1979 1982  Sea Games & 1980 Asian Championship  Cycling Represented Singapore at 1977 to 1979 Asian Games, 1977 –1982 Personal Details Date of Birth: 4th September 1958 Nationality: Singaporean Contact Address: Block 173, Ang Mo Kio Avenue 4, # 08-715 Singapore (560173) Languages Known: English, Tamil, Chinese Hokkien, Bahasa Malaysia, Bahasa Indonesia and Sample Thai NRIC: S-1322743-H