The document summarizes a simulation project conducted by Britvic Soft Drinks to model operations at their Leeds factory and warehouse after installing a new high-speed PET production line and expanding warehouse capacity. The simulation aimed to answer questions about vehicle traffic, gate throughput, trailer parking needs, loading bay requirements, forklift needs, and warehouse flows. Key learnings included identifying pinch points in traffic flows and validating the number of trailer parking spaces and loading bays needed. Next steps involve further enhancing the Leeds model with additional production line and automation details and developing models for other Britvic sites.