• ALL PROJECTS
• Increased focus on Product Development and Innovation
Scope
4/17/2021 2
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Not So Lean PM Experience
• My first PM class – no use for that here
• My first big project – no help
• We just call it …. – no support
• The desire for control – the GANTT chart trap
• The HERO – ambulance management
• Goodyear first attempt – knew about Chrysler CE – academic consultant
• Representing the customer – the strongest wins
• Lead as if you have no power or authority
• Largest functions managing crossfunctional projects .. Lack of collaboration
• “Happy Team” syndrome – compromised products and encouraged team competition
• Stage gate – implemented to kill projects but it created collaboration
• PM Software – EXPENSIVE BAD PROCESS
• Today: Right Organization and PMO – building and learning
4/17/2021 3
©norbert majerus consulting llc 2021
norbert majerus consulting llc
4/17/2021 ©norbert majerus consulting llc 2021 4
norbert majerus consulting llc
What are the Biggest Problems With PM
1. Project is late and/or over budget
2. Project did not deliver
3. Scope and other changes
4. Frustrated and overworked people
5. Too much wasted effort (updates, reviews…)
6. The other project managers
7. Leadership and team members
4/17/2021 5
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Learning PM From Toyota
Not much information about Toyota PM
Use of the Chief Engineer concept
Matrix-like organization
4/17/2021 6
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Principles of Lean Project Management
• Get things right
• Remove Obstacles
• Right Organization
• Proper Change Management
• Keep the Good Things You Already Have
• Enhance traditional PM with lean thinking
• Implement Principles of Lean Project Management
• Understand the principles
• Engage the people who do the work
• Use what works for you
4/17/2021 7
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Lean Project Management
• Get the things right
• Remove Obstacles
• Right Organization
• Proper Change Management
• Keep the Good things You Have
• Enhance Traditional PM with lean thinking
• Implement Principles of Lean Project Management
• Understand the principles
• Engage the people who do the work
• Use what works for you
4/17/2021 8
©norbert majerus consulting llc 2021
norbert majerus consulting llc
From
4/17/2021 9
R&D
Manufacturing
Sales
Distribution
©norbert majerus consulting llc 2021
norbert majerus consulting llc
To
4/17/2021 10
Project 2
Project 1
R&D
Manufacturing
Sales
Distribution
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Matrix
4/17/2021 11
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Lean Project Management
• Get the things right
• Remove Obstacles
• Right Organization
• Proper Change Management
• Keep the Good things You Have
• Enhance Traditional PM with lean thinking
• Implement Principles of Lean Project Management
• Understand the principles
• Engage the people who do the work
• Use what works for you
4/17/2021 12
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Traditional Inspiration
•Working on the right stuff
•Goals/Contract
•Sponsor
•Risk Management
4/17/2021 13
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Goodyear Results
• Before Lean – 50% business cases met
• After transformation: 100%
4/17/2021 14
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Remedies
•Corporate strategy/deployment
•PVA – NPV (common denominator)
•Portfolio Management – projects affect
each other
•STANDARDS
•Alignment
4/17/2021 15
©norbert majerus consulting llc 2021
norbert majerus consulting llc
NPV
Net present value (NPV) is the difference between the
present value of cash inflows and the present value of cash
outflows over a period of time. NPV is used in capital
budgeting to analyze the profitability of a projected
investment or project.
4/17/2021 16
In this equation:
Ct = net cash inflow during the period t
Co = total initial investment costs
r = discount rate, and
t = number of time periods
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Simple Standards
•Goal is the maximum value of the portfolio
•There is only so much market for traditional products
•Take the old product out
•Innovation increases the market (share)
•Diversify and balance (risk)
•Set targets for % revenue from new products
•Portfolio drives AOP (budgets)
•Engage everybody
4/17/2021 17
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Goals
•CONTRACT
•MBO
•Forcing Strategy
•Inspirational Goals
•Catchball
4/17/2021 18
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Catchball
… in a dodge ball
culture
Game
4/17/2021 19
People are accountable to
deliver on agreed goals
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Lean Project Management
•Get the things right
• Remove Obstacles
• Right Organization
• Proper Change Management
•Keep the Good things You Have
• Enhance Traditional PM with lean thinking
•Implement Principles of Lean Project Management
• Understand the principles
• Engage the people who do the work
• Use what works for you
4/17/2021 20
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Principles of Lean Project Management
• Know the cost (Time, Goals, Recources) - Flexible Targets
• Manage for flow and speed – fast is better than slow
• NO Waste
• Agile Risk Management
• Collaboration
• Manage Knowledge - PMO
• Visual Management
• Late start
• Concurrent work
• Standards
• Resource utilization
4/17/2021 21
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Principles of Lean Project Management
• Know the cost of time, goals, recources - Flexible Targets
• Manage for flow and speed – fast is better than slow
• NO Waste
• Agile Risk Management
• Collaboration
• Manage Knowledge - PMO
• Visual Management
• Late start
• Concurrent work
• Standards
• Resource utilization
4/17/2021 22
©norbert majerus consulting llc 2021
norbert majerus consulting llc
This Photo by
Unknown
Author is
licensed
under CC BY-
SA
This Photo by
Unknown
Author is
licensed
under CC BY-
GOALS
TIME
BUDGET
This Photo by Unknown Author is
licensed under CC BY-SA
This Photo by
Unknown
Author is
licensed
under CC BY-
SA
GOALS
TIME
BUDGET
Flexible Management
4/17/2021 23
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Agile CREATION PRINCIPLES
You know nothing about the
product until you start developing it
And it will change every day
norbert majerus consulting llc
Experiment in small steps
Allocate money in agile manner
© Copyright - norbert majerus consulting llc 2021
norbert majerus consulting llc
4/17/2021 26
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Name function
or work to do
TO DO IN PROGRESS DONE
Time Period
Goal, deliverable ….
Quick Learning Cycles – SCRUM, sprints, agile …
• Work in very small steps, FAST – often
time limited steps
• Cross functionally from the beginning
• Retain flexibility through the process –
launch or pivot at any time
4/17/2021
27
©norbert majerus consulting llc 2021
Agile, scrum, scaled agile, sprints …
norbert majerus consulting llc
Agile - but not like this
© Copyright - norbert majerus consulting llc 2021
This Photo by Unknown Author is licensed under CC BY-SA-NC
norbert majerus consulting llc
Agile - but not like this
© Copyright - norbert majerus consulting llc 2021
This Photo by Unknown Author is licensed under CC BY-SA-NC
This Photo by Unknown Author is licensed
under CC BY-NC-ND
norbert majerus consulting llc
Follow the Risk Scale With Critical Questions
This Photo by Unknown Author is licensed under CC BY-SA
© Copyright - norbert majerus consulting llc 2021
Time
Risk
norbert majerus consulting llc
This Photo by Unknown Author is licensed under CC BY-SA
Pivot
Stay the course
Freeze
© Copyright - norbert majerus consulting llc 2021
norbert majerus consulting llc
Time
Risk
START
Launch
© Copyright - norbert majerus consulting llc 2020
Project Risk Assessment
INVEST
Success
assured
norbert majerus consulting llc
Goodyear Iterations
norbert majerus consulting llc
4/17/2021
34
10 Second Rule
10 sec rule
- Notice fast
- Address immediately
- Crossfunctional
- Problem solve if needed ©norbert majerus consulting llc 2021
norbert majerus consulting llc
Knowledge Management
4/17/2021 35
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Matrix
4/17/2021 36
©norbert majerus consulting llc 2021
norbert majerus consulting llc
PMO Function
•Purpose of function
• Support Projects
• Develop/ Manage Knowledge
• Share/educate/coach
•PM’s dual report to technical directors and PM office
4/17/2021 37
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Managing People in a Lean Manner
4/17/2021 38
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Billy Taylor, Director NAT
Manufacturing
Ellis Jones, Plant
Manager Akron
Upside
Down
Leadership
4/17/2021 39
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Leadership
*Inspired by unattributed graph
4/17/2021 40
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Lean Leadership
4/17/2021 41
©norbert majerus consulting llc 2021
norbert majerus consulting llc
MY Story About Corporate Humility
Paul Akers – 2sec Lean
4/17/2021 42
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Evolution of a Servant Leader
We pay you to solve your
problems
Here is the solution – go do it
I ask you questions and coach
you towards MY solution
>> A3 cookie trail
Responsible?
4/17/2021 43
This Photo by Unknown Author is licensed
under CC BY-SA-NC
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Evolution of a Servant Leader
I coach you towards finding
your own solution
Let’s figure this out
together
I agree with your suggestion. You
are responsible - keep me informed
and I will support you
4/17/2021
44
©norbert majerus consulting llc 2021
norbert majerus consulting llc
A Good Lean Project Manager
•Leads with respect and humility
•Aligns the team behind the correct goals
•Removes roadblocks and helps team members
be successful
•Develops team members
4/17/2021 45
©norbert majerus consulting llc 2021
norbert majerus consulting llc
If your project
goes well, you are
not going fast
enough
4/17/2021 46
©norbert majerus consulting llc 2021
norbert majerus consulting llc
Contact Information
• Norbert Majerus
• norbert.majerus@gmail.com
• #330 801 3184
• norbert majerus consulting llc
4/17/2021 47
©norbert majerus consulting llc 2021

More Related Content

Similar to Lean-project-management-lean-driven-innovation.pdf

Similar to Lean-project-management-lean-driven-innovation.pdf (20)

The Zombies of Project Management
The Zombies of Project ManagementThe Zombies of Project Management
The Zombies of Project Management
 
Checklist to Close the Quarter & Year
Checklist to Close the Quarter & YearChecklist to Close the Quarter & Year
Checklist to Close the Quarter & Year
 
20130312 The Zombies of Project Management
20130312 The Zombies of Project Management20130312 The Zombies of Project Management
20130312 The Zombies of Project Management
 
5-STEP PROCESS FOR HANDLING OBJECTIONS
5-STEP PROCESS FOR HANDLING OBJECTIONS5-STEP PROCESS FOR HANDLING OBJECTIONS
5-STEP PROCESS FOR HANDLING OBJECTIONS
 
Accelerate Agile in Times of Uncertainty
Accelerate Agile in Times of UncertaintyAccelerate Agile in Times of Uncertainty
Accelerate Agile in Times of Uncertainty
 
Agile Mindset (عقلية وطرق التفكير في الإدارة الرشيقة للمشاريع)
Agile Mindset (عقلية وطرق التفكير في الإدارة الرشيقة للمشاريع)Agile Mindset (عقلية وطرق التفكير في الإدارة الرشيقة للمشاريع)
Agile Mindset (عقلية وطرق التفكير في الإدارة الرشيقة للمشاريع)
 
Technical debt a Business Perspective
Technical debt a Business PerspectiveTechnical debt a Business Perspective
Technical debt a Business Perspective
 
How we can BUILD.pdf
How we can BUILD.pdfHow we can BUILD.pdf
How we can BUILD.pdf
 
Project Management_1.pdf
Project Management_1.pdfProject Management_1.pdf
Project Management_1.pdf
 
Session 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdfSession 2-Introduction to PPM -b.pdf
Session 2-Introduction to PPM -b.pdf
 
Project Management for Marketers
Project Management for MarketersProject Management for Marketers
Project Management for Marketers
 
Lean Portfolio Strategy Part 3: Epic Management - Take the Exits
Lean Portfolio Strategy Part 3: Epic Management - Take the ExitsLean Portfolio Strategy Part 3: Epic Management - Take the Exits
Lean Portfolio Strategy Part 3: Epic Management - Take the Exits
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
 
Prerequisites for Agility, T4AT 02-12-2021
Prerequisites for Agility, T4AT 02-12-2021Prerequisites for Agility, T4AT 02-12-2021
Prerequisites for Agility, T4AT 02-12-2021
 
Crash Course: Managing Software People And Teams
Crash Course: Managing Software People And TeamsCrash Course: Managing Software People And Teams
Crash Course: Managing Software People And Teams
 
Webinar: Employee ownership transitions versus private equity roll-ups
Webinar: Employee ownership transitions versus private equity roll-upsWebinar: Employee ownership transitions versus private equity roll-ups
Webinar: Employee ownership transitions versus private equity roll-ups
 
Capacity Conquered: Realigning Resources to Respond, React and Recover
Capacity Conquered: Realigning Resources to Respond, React and RecoverCapacity Conquered: Realigning Resources to Respond, React and Recover
Capacity Conquered: Realigning Resources to Respond, React and Recover
 
Magento Live 2014 Customer Expectation Presentation
Magento Live 2014 Customer Expectation PresentationMagento Live 2014 Customer Expectation Presentation
Magento Live 2014 Customer Expectation Presentation
 
Project success post_implementation & management
Project success post_implementation & managementProject success post_implementation & management
Project success post_implementation & management
 
Power of Saying No (By KW3 Consulting)
Power of Saying No (By KW3 Consulting)Power of Saying No (By KW3 Consulting)
Power of Saying No (By KW3 Consulting)
 

More from Adrian Yap (6)

ERP MODULES - Historical development details
ERP MODULES - Historical development detailsERP MODULES - Historical development details
ERP MODULES - Historical development details
 
PM-Risks-and-Constraints.ppt
PM-Risks-and-Constraints.pptPM-Risks-and-Constraints.ppt
PM-Risks-and-Constraints.ppt
 
Product-Risk-Analysis.pdf
Product-Risk-Analysis.pdfProduct-Risk-Analysis.pdf
Product-Risk-Analysis.pdf
 
Issue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptxIssue_Analysis_&_Solution_Proposal.pptx
Issue_Analysis_&_Solution_Proposal.pptx
 
World-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdfWorld-Energy-Investment-2023.pdf
World-Energy-Investment-2023.pdf
 
The internet of things
The internet of thingsThe internet of things
The internet of things
 

Recently uploaded

CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
Kamal Acharya
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
Atif Razi
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdf
AbrahamGadissa
 

Recently uploaded (20)

fluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answerfluid mechanics gate notes . gate all pyqs answer
fluid mechanics gate notes . gate all pyqs answer
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Introduction to Casting Processes in Manufacturing
Introduction to Casting Processes in ManufacturingIntroduction to Casting Processes in Manufacturing
Introduction to Casting Processes in Manufacturing
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

Lean-project-management-lean-driven-innovation.pdf

  • 1. norbert majerus consulting llc Lean – Project Management 13 years experience with LEAN PM in the Goodyear Innovation Centers Norbert Majerus LPPDE 2021 4/17/2021 1 ©norbert majerus consulting llc 2021
  • 2. norbert majerus consulting llc • ALL PROJECTS • Increased focus on Product Development and Innovation Scope 4/17/2021 2 ©norbert majerus consulting llc 2021
  • 3. norbert majerus consulting llc Not So Lean PM Experience • My first PM class – no use for that here • My first big project – no help • We just call it …. – no support • The desire for control – the GANTT chart trap • The HERO – ambulance management • Goodyear first attempt – knew about Chrysler CE – academic consultant • Representing the customer – the strongest wins • Lead as if you have no power or authority • Largest functions managing crossfunctional projects .. Lack of collaboration • “Happy Team” syndrome – compromised products and encouraged team competition • Stage gate – implemented to kill projects but it created collaboration • PM Software – EXPENSIVE BAD PROCESS • Today: Right Organization and PMO – building and learning 4/17/2021 3 ©norbert majerus consulting llc 2021
  • 4. norbert majerus consulting llc 4/17/2021 ©norbert majerus consulting llc 2021 4
  • 5. norbert majerus consulting llc What are the Biggest Problems With PM 1. Project is late and/or over budget 2. Project did not deliver 3. Scope and other changes 4. Frustrated and overworked people 5. Too much wasted effort (updates, reviews…) 6. The other project managers 7. Leadership and team members 4/17/2021 5 ©norbert majerus consulting llc 2021
  • 6. norbert majerus consulting llc Learning PM From Toyota Not much information about Toyota PM Use of the Chief Engineer concept Matrix-like organization 4/17/2021 6 ©norbert majerus consulting llc 2021
  • 7. norbert majerus consulting llc Principles of Lean Project Management • Get things right • Remove Obstacles • Right Organization • Proper Change Management • Keep the Good Things You Already Have • Enhance traditional PM with lean thinking • Implement Principles of Lean Project Management • Understand the principles • Engage the people who do the work • Use what works for you 4/17/2021 7 ©norbert majerus consulting llc 2021
  • 8. norbert majerus consulting llc Lean Project Management • Get the things right • Remove Obstacles • Right Organization • Proper Change Management • Keep the Good things You Have • Enhance Traditional PM with lean thinking • Implement Principles of Lean Project Management • Understand the principles • Engage the people who do the work • Use what works for you 4/17/2021 8 ©norbert majerus consulting llc 2021
  • 9. norbert majerus consulting llc From 4/17/2021 9 R&D Manufacturing Sales Distribution ©norbert majerus consulting llc 2021
  • 10. norbert majerus consulting llc To 4/17/2021 10 Project 2 Project 1 R&D Manufacturing Sales Distribution ©norbert majerus consulting llc 2021
  • 11. norbert majerus consulting llc Matrix 4/17/2021 11 ©norbert majerus consulting llc 2021
  • 12. norbert majerus consulting llc Lean Project Management • Get the things right • Remove Obstacles • Right Organization • Proper Change Management • Keep the Good things You Have • Enhance Traditional PM with lean thinking • Implement Principles of Lean Project Management • Understand the principles • Engage the people who do the work • Use what works for you 4/17/2021 12 ©norbert majerus consulting llc 2021
  • 13. norbert majerus consulting llc Traditional Inspiration •Working on the right stuff •Goals/Contract •Sponsor •Risk Management 4/17/2021 13 ©norbert majerus consulting llc 2021
  • 14. norbert majerus consulting llc Goodyear Results • Before Lean – 50% business cases met • After transformation: 100% 4/17/2021 14 ©norbert majerus consulting llc 2021
  • 15. norbert majerus consulting llc Remedies •Corporate strategy/deployment •PVA – NPV (common denominator) •Portfolio Management – projects affect each other •STANDARDS •Alignment 4/17/2021 15 ©norbert majerus consulting llc 2021
  • 16. norbert majerus consulting llc NPV Net present value (NPV) is the difference between the present value of cash inflows and the present value of cash outflows over a period of time. NPV is used in capital budgeting to analyze the profitability of a projected investment or project. 4/17/2021 16 In this equation: Ct = net cash inflow during the period t Co = total initial investment costs r = discount rate, and t = number of time periods ©norbert majerus consulting llc 2021
  • 17. norbert majerus consulting llc Simple Standards •Goal is the maximum value of the portfolio •There is only so much market for traditional products •Take the old product out •Innovation increases the market (share) •Diversify and balance (risk) •Set targets for % revenue from new products •Portfolio drives AOP (budgets) •Engage everybody 4/17/2021 17 ©norbert majerus consulting llc 2021
  • 18. norbert majerus consulting llc Goals •CONTRACT •MBO •Forcing Strategy •Inspirational Goals •Catchball 4/17/2021 18 ©norbert majerus consulting llc 2021
  • 19. norbert majerus consulting llc Catchball … in a dodge ball culture Game 4/17/2021 19 People are accountable to deliver on agreed goals ©norbert majerus consulting llc 2021
  • 20. norbert majerus consulting llc Lean Project Management •Get the things right • Remove Obstacles • Right Organization • Proper Change Management •Keep the Good things You Have • Enhance Traditional PM with lean thinking •Implement Principles of Lean Project Management • Understand the principles • Engage the people who do the work • Use what works for you 4/17/2021 20 ©norbert majerus consulting llc 2021
  • 21. norbert majerus consulting llc Principles of Lean Project Management • Know the cost (Time, Goals, Recources) - Flexible Targets • Manage for flow and speed – fast is better than slow • NO Waste • Agile Risk Management • Collaboration • Manage Knowledge - PMO • Visual Management • Late start • Concurrent work • Standards • Resource utilization 4/17/2021 21 ©norbert majerus consulting llc 2021
  • 22. norbert majerus consulting llc Principles of Lean Project Management • Know the cost of time, goals, recources - Flexible Targets • Manage for flow and speed – fast is better than slow • NO Waste • Agile Risk Management • Collaboration • Manage Knowledge - PMO • Visual Management • Late start • Concurrent work • Standards • Resource utilization 4/17/2021 22 ©norbert majerus consulting llc 2021
  • 23. norbert majerus consulting llc This Photo by Unknown Author is licensed under CC BY- SA This Photo by Unknown Author is licensed under CC BY- GOALS TIME BUDGET This Photo by Unknown Author is licensed under CC BY-SA This Photo by Unknown Author is licensed under CC BY- SA GOALS TIME BUDGET Flexible Management 4/17/2021 23 ©norbert majerus consulting llc 2021
  • 24. norbert majerus consulting llc Agile CREATION PRINCIPLES You know nothing about the product until you start developing it And it will change every day
  • 25. norbert majerus consulting llc Experiment in small steps Allocate money in agile manner © Copyright - norbert majerus consulting llc 2021
  • 26. norbert majerus consulting llc 4/17/2021 26 ©norbert majerus consulting llc 2021
  • 27. norbert majerus consulting llc Name function or work to do TO DO IN PROGRESS DONE Time Period Goal, deliverable …. Quick Learning Cycles – SCRUM, sprints, agile … • Work in very small steps, FAST – often time limited steps • Cross functionally from the beginning • Retain flexibility through the process – launch or pivot at any time 4/17/2021 27 ©norbert majerus consulting llc 2021 Agile, scrum, scaled agile, sprints …
  • 28. norbert majerus consulting llc Agile - but not like this © Copyright - norbert majerus consulting llc 2021 This Photo by Unknown Author is licensed under CC BY-SA-NC
  • 29. norbert majerus consulting llc Agile - but not like this © Copyright - norbert majerus consulting llc 2021 This Photo by Unknown Author is licensed under CC BY-SA-NC This Photo by Unknown Author is licensed under CC BY-NC-ND
  • 30. norbert majerus consulting llc Follow the Risk Scale With Critical Questions This Photo by Unknown Author is licensed under CC BY-SA © Copyright - norbert majerus consulting llc 2021 Time Risk
  • 31. norbert majerus consulting llc This Photo by Unknown Author is licensed under CC BY-SA Pivot Stay the course Freeze © Copyright - norbert majerus consulting llc 2021
  • 32. norbert majerus consulting llc Time Risk START Launch © Copyright - norbert majerus consulting llc 2020 Project Risk Assessment INVEST Success assured
  • 33. norbert majerus consulting llc Goodyear Iterations
  • 34. norbert majerus consulting llc 4/17/2021 34 10 Second Rule 10 sec rule - Notice fast - Address immediately - Crossfunctional - Problem solve if needed ©norbert majerus consulting llc 2021
  • 35. norbert majerus consulting llc Knowledge Management 4/17/2021 35 ©norbert majerus consulting llc 2021
  • 36. norbert majerus consulting llc Matrix 4/17/2021 36 ©norbert majerus consulting llc 2021
  • 37. norbert majerus consulting llc PMO Function •Purpose of function • Support Projects • Develop/ Manage Knowledge • Share/educate/coach •PM’s dual report to technical directors and PM office 4/17/2021 37 ©norbert majerus consulting llc 2021
  • 38. norbert majerus consulting llc Managing People in a Lean Manner 4/17/2021 38 ©norbert majerus consulting llc 2021
  • 39. norbert majerus consulting llc Billy Taylor, Director NAT Manufacturing Ellis Jones, Plant Manager Akron Upside Down Leadership 4/17/2021 39 ©norbert majerus consulting llc 2021
  • 40. norbert majerus consulting llc Leadership *Inspired by unattributed graph 4/17/2021 40 ©norbert majerus consulting llc 2021
  • 41. norbert majerus consulting llc Lean Leadership 4/17/2021 41 ©norbert majerus consulting llc 2021
  • 42. norbert majerus consulting llc MY Story About Corporate Humility Paul Akers – 2sec Lean 4/17/2021 42 ©norbert majerus consulting llc 2021
  • 43. norbert majerus consulting llc Evolution of a Servant Leader We pay you to solve your problems Here is the solution – go do it I ask you questions and coach you towards MY solution >> A3 cookie trail Responsible? 4/17/2021 43 This Photo by Unknown Author is licensed under CC BY-SA-NC ©norbert majerus consulting llc 2021
  • 44. norbert majerus consulting llc Evolution of a Servant Leader I coach you towards finding your own solution Let’s figure this out together I agree with your suggestion. You are responsible - keep me informed and I will support you 4/17/2021 44 ©norbert majerus consulting llc 2021
  • 45. norbert majerus consulting llc A Good Lean Project Manager •Leads with respect and humility •Aligns the team behind the correct goals •Removes roadblocks and helps team members be successful •Develops team members 4/17/2021 45 ©norbert majerus consulting llc 2021
  • 46. norbert majerus consulting llc If your project goes well, you are not going fast enough 4/17/2021 46 ©norbert majerus consulting llc 2021