The Lean Startup
      Calvin Chin

     @calvinwuchin
     chen@qifang.cn
Intro
geek
             ABC
                 husband


                      father


social entrepreneur
Qifang
Qifang is a web service for students and schools to
find funding and recipients for loans and
scholarships, manage relationships and data, and
                                                      Students
share in a community of borrowers, lenders and
donors.




                                         qifang.cn



  Schools
                                                      Funding
Social
                         Ventures
  non-
profits   social change              profitability   corporations
    &
NGOs
technology




                  Social
                Innovation
social change                profitability
Agenda


• the bad news
• the good news
the bad news
startups fail
Probability of Success
                       Individual Event                               Probability
Company has sufficient capital                                               80%
Management is capable and focused                                          80%
Product development goes as planned                                        80%
Production and component sourcing goes as planned                          80%
Competitors behave as expected                                             80%
Customers want product                                                     80%
Pricing is forecast correctly                                              80%
Patents are issued and are enforceable                                     80%
Combined Probability of Success                                            17%

 If just one of the variables falls to 50%, the overall probability
                           goes to 10%.
                                               Source: Source: Zider, B., Harvard Business Review
common mistakes
1. team
team
•   only one founder

      •    vote of no confidence

      •    thought partnership

      •    moral support

•   fights between founders

      •    usually due to people not situation

      •    face conflicts and misgivings early

      •    lack of documentation

•   bad engineers

      •    business people have difficulty judging who is a good product developer


                                                                          Source: Paul Graham
2. location
location


•   startup hubs

     •   experts

     •   resources: supporting industries

     •   sympathy

     •   serendipity




                                            Source: Paul Graham
3. flawed concept
flawed concept

•   Marginal niche

     •   avoid competitors, end up avoiding customers

     •   intimidated by big ideas

•   Derivative

     •   limited by who you are derivative of

     •   feature not a product not a company

     •   solve a problem no one is solving



                                                        Source: Paul Graham
3. timing
timing




                  Error                                            Result
     revenue grow faster than employees          inadequate customer service


    revenues grow slower than employees          burn rate too high, run out of cash

                                                 bad early customer experience, first
PR grows faster than quality of code (product)
                                                 impressions

                                                 too many cooks; culture of slowness and low
 employees grow faster than code (product)
                                                 effort
                                                                                  Source: Joel Spolsky
4. funding
funding
•   Expensive

      •    time consuming to raise

      •    time consuming after, investor management

•   Raising too little

      •    distractions: keeping day jobs

      •    lack of effort

•   Raising too much/spending too much

      •    hiring too many people

      •    corrupts company culture

      •    harder to change direction


                                                       Source: Paul Graham
5. launch
launch

•   launch too late

      •   perfect is the enemy of the good

      •   afraid of customer rejection

      •   chase customers with customization and features

•   launching without customer understanding

      •   not getting hands dirty

•   sacrificing customers for profit maximization


                                                      Source: Paul Graham
How do you lower
   your risks?
the good news
new models
new funding models
new funding models
                                    Accelerating   Model defined
            FCS                      Adoption       and proven
                                                                       Valuation
                                                                    (Adoption Curve)


                  Low-burn
                  experimentation
                  phase




                   <?>
                   Time                                                       Risk (ß)

  Seed                                                                      Capital
(angels?)                            Series A            Expansion
                                                   (or founder liquidity)




                                                                                 Source: Benchmark Capital
accelerators



•   Incubator 2.0

•   Funding+ model

•   Mentorship

•   Network
                         Source: ReadWriteWeb
social venture capital
Angel Investors              social venture capital                                  Philanthropy
Venture Capital
Bank Financing
                                patient capital                                      Foundations
                                                                               Government Grants



Financial                                                                            Social &
Returns                                                                        Environmental
                                                                                     Returns
 •   Multiple Priorities
        •   Single bottom line:    economic returns


        •   Double-bottom line:    economic returns   +   social returns


        •   Triple-bottom line:    economic returns   +   social returns   +    ecological returns
new operating model
The Lean Startup
many think startups are just
  small large companies

          large
        company    = ⨏(             large company
                                                     )

 “if you want your company to be big, act like it is big...”
large companies...
                  have culture
               have customers
             have departments
                have meetings
                   have money
                     have time
Large Company
product development model
            Product     Alpha/Beta
Concept   Development
                                     Launch
                           Test




                                     Source: Steve Blank
product development model
                 Product                Alpha/Beta
Concept        Development
                                                                    Launch
                                           Test


             - create marketing/
                                                            - create demand
             comunications          - hire PR agency
 Marketing   materials              - generate early buzz
                                                            - launch event
                                                            - branding
             - create positioning




                                                                     Source: Steve Blank
product development model
                 Product                 Alpha/Beta
Concept        Development
                                                                        Launch
                                            Test

             - create marketing/
                                                              - create demand
             comunications          - hire PR agency
 Marketing   materials              - generate early buzz
                                                              - launch event
                                                              - branding
             - create positioning


                                    - hire sales VP           - build sales
   Sales                            - hire first sales staff   organization




                                                                         Source: Steve Blank
product development model
                   Product                 Alpha/Beta
Concept          Development
                                                                          Launch
                                              Test

               - create marketing/
                                                                - create demand
               comunications          - hire PR agency
  Marketing    materials              - generate early buzz
                                                                - launch event
                                                                - branding
               - create positioning


                                      - hire sales VP           - build sales
    Sales                             - hire first sales staff   organization



   Business                           - hire first biz dev       - do deals for FCS
 Development


                                                                           Source: Steve Blank
startups are not small big
        companies

startup
          ≠     large
              company   ≠ ⨏(   large company
                                               )
product/market fit

         product
                   ?   startup

market             ∉


                                 Source: Marc Andreesen
product/market fit
                      product
                                                                   Depends on your model
                                                                          - market traction
                                              - 40% of customers “must have” your product
                                         - means being in a good market with a product that
      market                                                         can satisfy that market

         before product/market fit                                    after product/market fit
                                                            The customers are buying the product just as fast
                                                          as you can make it -- or usage is growing just as fast
   You can always feel when product/market fit isn't                 as you can add more servers. Money from
happening. The customers aren't quite getting value           customers is piling up in your company checking
  out of the product, word of mouth isn't spreading,        account.You're hiring sales and customer support
 usage isn't growing that fast, press reviews are kind            staff as fast as you can. Reporters are calling
 of "blah", the sales cycle takes too long, and lots of       because they've heard about your hot new thing
                                    deals never close.         and they want to talk to you about it.You start
                                                                 getting entrepreneur of the year awards from
                                                             Harvard Business School. Investment bankers are
                                                                                        staking out your house...

                                                                                 Source: Marc Andreesen, Sean Ellis
problems/worries
search for a                                                       execution of a
business model                                                    business model

   scalable startup                   transition                large company



                                                                    Scaling problems
Startup problems
                                                  - how do we make enough product?
- will people buy?                product

                                                         - how do we keep inventory?
- how do we market?          market
                                                        - how do we maintain quality?
- how do we pay our bills?
                                               - how do we find enough good people?
                                                                              - etc...?
operations/metrics
search for a                                               execution of a
business model                                            business model

    scalable startup                 transition         large company



Startup Accounting                                      Traditional Accounting
- customer acquisition cost                 product              - balance sheet
- viral coefficient                                       - cash flow statement
                                       market
- customer lifetime value                                   - income statement
- average selling price/order size                    - predictable forecasting
- monthly burn rate
- etc...
                                                                Source: Steve Blank
customer development model

 Customer    Customer     Customer   Company
 Discovery   Validation   Creation    Building




                                     Source: Steve Blank
Customer Development: Key Concepts

•   Parallel/integrated process to Product
    Development
•   Measurable Checkpoints
•   Customer milestones, not product milestones
•   Pragmatic view on market types
•   Emphasis on learning and discovery (before
    execution)

                                             Source: Steve Blank
Customer Development: Heuristics

• Inside your building, opinions; outside of the
  building, facts
• Develop for the Few, not the Many
• ‘Earlyvangelists’ make your company and
  know more than you
• Focus Groups are for big companies
• Minimum viable product
                                           Source: Steve Blank
Hierarchy of Earlyvangelists

            has or can acquire
                 budget
         put together a makeshift
                 solution

      actively looking for solution

      is aware of having a problem

             has a problem



                                      Source: Steve Blank
customer development model

 Customer            Customer            Customer            Company
 Discovery           Validation          Creation             Building




- Stop selling, start listening
- Test your assumptions, hypotheses
    - Customer Problem, Customer Solution (your product concept)


                                                             Source: Steve Blank
Customer Discovery: Exit Criteria
•   What are your customers top problems?

    •   How much will they pay to solve them

•   Does your product concept solve them?      Chinese Social Startups Specifics:


    •   Do customers agree?
                                               •   What is the government view
                                                   on your project/issue?

    •   How much will they pay?                •   What structure/registration
                                                   should your project take?
•   Draw a day-in-the-life of a customer       •   Are you in the right location?

    •   before and after your product

•   Draw the org chart of users and buyers




                                                                 Source: Steve Blank
customer development model

  Customer            Customer             Customer   Company
  Discovery           Validation           Creation    Building




- Develop a repeatable sales process
- Only earlyvangelists are crazy enough to buy

                                                      Source: Steve Blank
Customer Validation: Exit Criteria

•   Do you have a proven sales roadmap

    •   Org chart? Influence map?

•   Do you understand the sales cycle?

    •   ASP, ROI, etc...

•   Do you have a set of orders validating the roadmap

    •   List price

•   Does the financial model make sense?



                                                         Source: Steve Blank
customer development model

  Customer            Customer          Customer   Company
  Discovery           Validation        Creation    Building




- Creation comes after proof of sales
- ‘Cross the chasm’
- Strategy not a tactic

                                                   Source: Steve Blank
Customer Creation: Key Concepts

•   Grow customers from few to many

•   Four customer creation activities

      •   Year One objectives

      •   Positioning

      •   Launch

      •   Demand creation

•   Creation is different for different market types



                                                       Source: Steve Blank
customer development model

 Customer            Customer            Customer        Company
 Discovery           Validation          Creation         Building




- (re)build your company’s organization and management
- review your mission


                                                         Source: Steve Blank
Company Building: Key Concepts

•   Management needs to change as the company grows

      •    Founders are casualties


      Development-orientation
                                        Process-orientation
          Mission-orientation



•   Sales Growth to match market type



                                                              Source: Steve Blank
Company Building: Exit Criteria


•   Does sales growth plan match market type?

•   Does spending plan match market type?

•   Does the Board agree?

•   Is your team right for the stage of the company?

•   Have you built a mission-oriented culture?




                                                       Source: Steve Blank
Customer                Product
              ||
Development        Development




                            Source: Steve Blank
product development
the fundamental startup loop

                        !"#$%&


       ,#$-.&                              *+!,"&




                "$)$&              '("#&




                        /#$%+-#&




                                                    Source: Eric Ries
Continuous Deployment
                                             !"#$%&


 -$'*.%&'()$*%                                                           !"#$%&'()$*%
 ><?5&@A84&-00:&
                   ,#$-.&                                       *+!,"&    '01213034&
 ';345&$1;784<4&                                                         "56708951:&




                             "$)$&                      '("#&




                        +$'(,*$%&'()$*%
                                             /#$%+-#&
                        -;6<=&%67<:&)54:4&




                                                                                        Source: Eric Ries
Continuous Deployment


•   Deploy new software quickly

•   Tell a good change from a bad change quickly

•   Revert a bad change quickly

•   Work in small batches

•   Break large projects down into small batches




                                                   Source: Eric Ries
Rapid Split Tests
                                            !"#$%&


-$'*.%&'()$*%                                                           !"#$%&'()$*%
><?5&@A84&-00:&
                  ,#$-.&                                       *+!,"&    '01213034&
';345&$1;784<4&                                                         "56708951:&




                            "$)$&                      '("#&




                       +$'(,*$%&'()$*%
                                            /#$%+-#&
                       -;6<=&%67<:&)54:4&




                                                                                       Source: Eric Ries
Split-testing all the time


•   A/B testing is key to validating your hypothesis

•   Has to be simple enough for everyone to use and understand

•   Make creating a split-test no more than one line of code

•   AAA: actionable, accessible, auditable

•   Measure the macro: split-test the small, measure the large




                                                                 Source: Eric Ries
Five Whys
                                            !"#$%&


-$'*.%&'()$*%                                                           !"#$%&'()$*%
><?5&@A84&-00:&
                  ,#$-.&                                       *+!,"&    '01213034&
';345&$1;784<4&                                                         "56708951:&




                            "$)$&                      '("#&




                       +$'(,*$%&'()$*%
                                            /#$%+-#&
                       -;6<=&%67<:&)54:4&




                                                                                       Source: Eric Ries
Five Whys Root Cause Analysis


•   Technique for continuous improvement of company process

•   Ask “why” five times when something unexpected happens

•   Make proportional investments in prevention at all five levels of
    the hierarchy

•   Behind every supposed technical problem is usually a human
    problem. Fix the cause, not just the symptom.




                                                                Source: Eric Ries
Other strategies
                                                     !"#$%&


-$'*.%&'()$*%                                                                                    !"#$%&'()$*%
%@712&)3424&
                      ,#$-.&                                                   *+!,"&              +012&)3424&
';429?3=&!023=G13J4&                                                                           +45617128&)3424&
';429?3=&"3G379@?302&                                                                '90:0;9;4&!023<=5:90&
A1G3&KL84&-992&'5;43&$0578414&                                                     !0>=3?30257&"3@798?302&
';429?3=&$DG149=8&*95=D&                                                   A=33&B&(@30C%9;=>3&'9?@903024&
A5741M5673&N8@92L3434&                                                                      '79;D&'9?@;:0<&
I=9D;>2&(J03=&$>>9;025617128&                                                       '7;423=&!??;03&%8423?&
';429?3=&$=>L328@34&                 "$)$&                            '("#&           E;42C10C:?3&%>575617128&
'=944CF;0>:9057&)35?4&                                                                           -3F5>29=10<&
%3?1C5;2909?9;4&)35?4&                                                                   "3G379@3=&%50D69H&
%?9O3&)3424&



                                 +$'(,*$%&'()$*%
                                                    /#$%+-#&
                                 %@712&)3424&                      A;0037&$0578414&
                                 '735=&I=9D;>2&(J03=&              '9L9=2&$0578414&
                                 '90:0;9;4&"3@798?302&         .32&I=9?923=&%>9=3&
                                 +45617128&)3424&         %35=>L&#0<103&/5=O3:0<&
                                 -357C:?3&/90129=10<&           -357C)1?3&$73=:0<&
                                 ';429?3=&,151490&           I=3D1>:G3&/90129=10<&




                                                                                                                  Source: Eric Ries
questions
appendix
Source: Steve Blank
Traditional Product Development
       Unit of progress: Advance to next stage

                                  Waterfall

             !"#$%&"'"()*+

                        ,"*%-(+
 Problem: known                                        Solution: known
                             .'/0"'"()123(+


                                       4"&%56123(+

                                              71%()"(1(6"+




                                                                         Source: Eric Ries
Agile
    Unit of progress: a line of working code


“Product Owner” or
in-house customer




    Problem: Known          Solution: Unknown




                                                Source: Eric Ries
Lean Product Development
Unit of progress: validated learning about customers ($$$)




           Problem: Unknown      Solution: Unknown


                                                     Source: Eric Ries
More on Earlyvangelists
1 Value your key differentiators – Your product will have benefits that only it can deliver along with benefits
  that customers can get elsewhere.  For example you are offering a product where the key benefits are related to
  simplicity, scale and cost reduction.Your customer research has validated that all three of these are important to
  customers in the space.   You think you beat the other products in your market when it comes to simplicity and
  cost reduction but nobody else offers scale.  The easiest segment you could go after is one where scale really
  matters because even though you think you might be better at simple, the difference between you and the
  alternatives might not be meaningful for customers.
2 Don’t care much about the stuff you aren’t good at – In the early stages there will be gaping holes in
  your product and other things that your product just doesn’t do all that well.  Your best segment doesn’t care too
  much that those things (at least not at the beginning).
3 Risks of adopting your product are lower for them – There will be reasons why customers will not adopt
  your product related to the risk in doing so.  For example some segments will have to migrate off of another
  product in order to adopt yours or customers will have to trust that you can do what you say you can do.  It’s
  often a useful exercise to document all of the reasons people won’t adopt your product and then map that our
  against your potential customer segments. Choose a segment that has the least barriers to adopting your product.

4 Segment is big enough or is a gateway to a big enough segment – Make sure that the segment you end
  up with is big enough to get your business to where it needs to go.  If it isn’t quite big enough then it should at
  least be a good, clear pathway to a bigger segment.  For example, having a beachhead of customers in mid-sized
  services businesses might be enough to help you get into the market for independent consultants (where having
  that base would address some of their concerns).




                                                                                                      Source: April Dunford
•   Customer Discovery – Achieve Problem/Solution Fit

•   Customer Validation – Achieve Product/Market Fit

•   Customer Creation – Drive Demand

•   Company Building – Scale the Company




                                                        Source: Ash Maurya
Test the Riskiest Thing First

          Depending on your business:


          Minimum Viable Product
          	

   Distribution, Revenue, Business model
          Minimum Feasible Product
          	

   Transistors/inch, Power usage, Cures cancer
          Minimum Desirable Product
          	

   Engagement, Sustainable growth, Love <3




                                          Source: IDEO, Andrew Chen

Lean Startup

  • 1.
    The Lean Startup Calvin Chin @calvinwuchin chen@qifang.cn
  • 2.
  • 3.
    geek ABC husband father social entrepreneur
  • 5.
    Qifang Qifang is aweb service for students and schools to find funding and recipients for loans and scholarships, manage relationships and data, and Students share in a community of borrowers, lenders and donors. qifang.cn Schools Funding
  • 6.
    Social Ventures non- profits social change profitability corporations & NGOs
  • 7.
    technology Social Innovation social change profitability
  • 8.
    Agenda • the badnews • the good news
  • 9.
  • 10.
  • 11.
    Probability of Success Individual Event Probability Company has sufficient capital 80% Management is capable and focused 80% Product development goes as planned 80% Production and component sourcing goes as planned 80% Competitors behave as expected 80% Customers want product 80% Pricing is forecast correctly 80% Patents are issued and are enforceable 80% Combined Probability of Success 17% If just one of the variables falls to 50%, the overall probability goes to 10%. Source: Source: Zider, B., Harvard Business Review
  • 12.
  • 13.
  • 14.
    team • only one founder • vote of no confidence • thought partnership • moral support • fights between founders • usually due to people not situation • face conflicts and misgivings early • lack of documentation • bad engineers • business people have difficulty judging who is a good product developer Source: Paul Graham
  • 15.
  • 16.
    location • startup hubs • experts • resources: supporting industries • sympathy • serendipity Source: Paul Graham
  • 17.
  • 18.
    flawed concept • Marginal niche • avoid competitors, end up avoiding customers • intimidated by big ideas • Derivative • limited by who you are derivative of • feature not a product not a company • solve a problem no one is solving Source: Paul Graham
  • 19.
  • 20.
    timing Error Result revenue grow faster than employees inadequate customer service revenues grow slower than employees burn rate too high, run out of cash bad early customer experience, first PR grows faster than quality of code (product) impressions too many cooks; culture of slowness and low employees grow faster than code (product) effort Source: Joel Spolsky
  • 21.
  • 22.
    funding • Expensive • time consuming to raise • time consuming after, investor management • Raising too little • distractions: keeping day jobs • lack of effort • Raising too much/spending too much • hiring too many people • corrupts company culture • harder to change direction Source: Paul Graham
  • 23.
  • 24.
    launch • launch too late • perfect is the enemy of the good • afraid of customer rejection • chase customers with customization and features • launching without customer understanding • not getting hands dirty • sacrificing customers for profit maximization Source: Paul Graham
  • 25.
    How do youlower your risks?
  • 26.
  • 27.
  • 28.
  • 29.
    new funding models Accelerating Model defined FCS Adoption and proven Valuation (Adoption Curve) Low-burn experimentation phase <?> Time Risk (ß) Seed Capital (angels?) Series A Expansion (or founder liquidity) Source: Benchmark Capital
  • 30.
    accelerators • Incubator 2.0 • Funding+ model • Mentorship • Network Source: ReadWriteWeb
  • 31.
    social venture capital AngelInvestors social venture capital Philanthropy Venture Capital Bank Financing patient capital Foundations Government Grants Financial Social & Returns Environmental Returns • Multiple Priorities • Single bottom line: economic returns • Double-bottom line: economic returns + social returns • Triple-bottom line: economic returns + social returns + ecological returns
  • 32.
  • 33.
  • 35.
    many think startupsare just small large companies large company = ⨏( large company ) “if you want your company to be big, act like it is big...”
  • 36.
    large companies... have culture have customers have departments have meetings have money have time
  • 37.
    Large Company product developmentmodel Product Alpha/Beta Concept Development Launch Test Source: Steve Blank
  • 38.
    product development model Product Alpha/Beta Concept Development Launch Test - create marketing/ - create demand comunications - hire PR agency Marketing materials - generate early buzz - launch event - branding - create positioning Source: Steve Blank
  • 39.
    product development model Product Alpha/Beta Concept Development Launch Test - create marketing/ - create demand comunications - hire PR agency Marketing materials - generate early buzz - launch event - branding - create positioning - hire sales VP - build sales Sales - hire first sales staff organization Source: Steve Blank
  • 40.
    product development model Product Alpha/Beta Concept Development Launch Test - create marketing/ - create demand comunications - hire PR agency Marketing materials - generate early buzz - launch event - branding - create positioning - hire sales VP - build sales Sales - hire first sales staff organization Business - hire first biz dev - do deals for FCS Development Source: Steve Blank
  • 41.
    startups are notsmall big companies startup ≠ large company ≠ ⨏( large company )
  • 42.
    product/market fit product ? startup market ∉ Source: Marc Andreesen
  • 43.
    product/market fit product Depends on your model - market traction - 40% of customers “must have” your product - means being in a good market with a product that market can satisfy that market before product/market fit after product/market fit The customers are buying the product just as fast as you can make it -- or usage is growing just as fast You can always feel when product/market fit isn't as you can add more servers. Money from happening. The customers aren't quite getting value customers is piling up in your company checking out of the product, word of mouth isn't spreading, account.You're hiring sales and customer support usage isn't growing that fast, press reviews are kind staff as fast as you can. Reporters are calling of "blah", the sales cycle takes too long, and lots of because they've heard about your hot new thing deals never close. and they want to talk to you about it.You start getting entrepreneur of the year awards from Harvard Business School. Investment bankers are staking out your house... Source: Marc Andreesen, Sean Ellis
  • 44.
    problems/worries search for a execution of a business model business model scalable startup transition large company Scaling problems Startup problems - how do we make enough product? - will people buy? product - how do we keep inventory? - how do we market? market - how do we maintain quality? - how do we pay our bills? - how do we find enough good people? - etc...?
  • 45.
    operations/metrics search for a execution of a business model business model scalable startup transition large company Startup Accounting Traditional Accounting - customer acquisition cost product - balance sheet - viral coefficient - cash flow statement market - customer lifetime value - income statement - average selling price/order size - predictable forecasting - monthly burn rate - etc... Source: Steve Blank
  • 46.
    customer development model Customer Customer Customer Company Discovery Validation Creation Building Source: Steve Blank
  • 47.
    Customer Development: KeyConcepts • Parallel/integrated process to Product Development • Measurable Checkpoints • Customer milestones, not product milestones • Pragmatic view on market types • Emphasis on learning and discovery (before execution) Source: Steve Blank
  • 48.
    Customer Development: Heuristics •Inside your building, opinions; outside of the building, facts • Develop for the Few, not the Many • ‘Earlyvangelists’ make your company and know more than you • Focus Groups are for big companies • Minimum viable product Source: Steve Blank
  • 49.
    Hierarchy of Earlyvangelists has or can acquire budget put together a makeshift solution actively looking for solution is aware of having a problem has a problem Source: Steve Blank
  • 50.
    customer development model Customer Customer Customer Company Discovery Validation Creation Building - Stop selling, start listening - Test your assumptions, hypotheses - Customer Problem, Customer Solution (your product concept) Source: Steve Blank
  • 51.
    Customer Discovery: ExitCriteria • What are your customers top problems? • How much will they pay to solve them • Does your product concept solve them? Chinese Social Startups Specifics: • Do customers agree? • What is the government view on your project/issue? • How much will they pay? • What structure/registration should your project take? • Draw a day-in-the-life of a customer • Are you in the right location? • before and after your product • Draw the org chart of users and buyers Source: Steve Blank
  • 52.
    customer development model Customer Customer Customer Company Discovery Validation Creation Building - Develop a repeatable sales process - Only earlyvangelists are crazy enough to buy Source: Steve Blank
  • 53.
    Customer Validation: ExitCriteria • Do you have a proven sales roadmap • Org chart? Influence map? • Do you understand the sales cycle? • ASP, ROI, etc... • Do you have a set of orders validating the roadmap • List price • Does the financial model make sense? Source: Steve Blank
  • 54.
    customer development model Customer Customer Customer Company Discovery Validation Creation Building - Creation comes after proof of sales - ‘Cross the chasm’ - Strategy not a tactic Source: Steve Blank
  • 55.
    Customer Creation: KeyConcepts • Grow customers from few to many • Four customer creation activities • Year One objectives • Positioning • Launch • Demand creation • Creation is different for different market types Source: Steve Blank
  • 56.
    customer development model Customer Customer Customer Company Discovery Validation Creation Building - (re)build your company’s organization and management - review your mission Source: Steve Blank
  • 57.
    Company Building: KeyConcepts • Management needs to change as the company grows • Founders are casualties Development-orientation Process-orientation Mission-orientation • Sales Growth to match market type Source: Steve Blank
  • 58.
    Company Building: ExitCriteria • Does sales growth plan match market type? • Does spending plan match market type? • Does the Board agree? • Is your team right for the stage of the company? • Have you built a mission-oriented culture? Source: Steve Blank
  • 59.
    Customer Product || Development Development Source: Steve Blank
  • 60.
  • 61.
    the fundamental startuploop !"#$%& ,#$-.& *+!,"& "$)$& '("#& /#$%+-#& Source: Eric Ries
  • 62.
    Continuous Deployment !"#$%& -$'*.%&'()$*% !"#$%&'()$*% ><?5&@A84&-00:& ,#$-.& *+!,"& '01213034& ';345&$1;784<4& "56708951:& "$)$& '("#& +$'(,*$%&'()$*% /#$%+-#& -;6<=&%67<:&)54:4& Source: Eric Ries
  • 63.
    Continuous Deployment • Deploy new software quickly • Tell a good change from a bad change quickly • Revert a bad change quickly • Work in small batches • Break large projects down into small batches Source: Eric Ries
  • 64.
    Rapid Split Tests !"#$%& -$'*.%&'()$*% !"#$%&'()$*% ><?5&@A84&-00:& ,#$-.& *+!,"& '01213034& ';345&$1;784<4& "56708951:& "$)$& '("#& +$'(,*$%&'()$*% /#$%+-#& -;6<=&%67<:&)54:4& Source: Eric Ries
  • 65.
    Split-testing all thetime • A/B testing is key to validating your hypothesis • Has to be simple enough for everyone to use and understand • Make creating a split-test no more than one line of code • AAA: actionable, accessible, auditable • Measure the macro: split-test the small, measure the large Source: Eric Ries
  • 66.
    Five Whys !"#$%& -$'*.%&'()$*% !"#$%&'()$*% ><?5&@A84&-00:& ,#$-.& *+!,"& '01213034& ';345&$1;784<4& "56708951:& "$)$& '("#& +$'(,*$%&'()$*% /#$%+-#& -;6<=&%67<:&)54:4& Source: Eric Ries
  • 67.
    Five Whys RootCause Analysis • Technique for continuous improvement of company process • Ask “why” five times when something unexpected happens • Make proportional investments in prevention at all five levels of the hierarchy • Behind every supposed technical problem is usually a human problem. Fix the cause, not just the symptom. Source: Eric Ries
  • 68.
    Other strategies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ource: Eric Ries
  • 69.
  • 70.
  • 71.
  • 72.
    Traditional Product Development Unit of progress: Advance to next stage Waterfall !"#$%&"'"()*+ ,"*%-(+ Problem: known Solution: known .'/0"'"()123(+ 4"&%56123(+ 71%()"(1(6"+ Source: Eric Ries
  • 73.
    Agile Unit of progress: a line of working code “Product Owner” or in-house customer Problem: Known Solution: Unknown Source: Eric Ries
  • 74.
    Lean Product Development Unitof progress: validated learning about customers ($$$) Problem: Unknown Solution: Unknown Source: Eric Ries
  • 76.
    More on Earlyvangelists 1Value your key differentiators – Your product will have benefits that only it can deliver along with benefits that customers can get elsewhere.  For example you are offering a product where the key benefits are related to simplicity, scale and cost reduction.Your customer research has validated that all three of these are important to customers in the space.   You think you beat the other products in your market when it comes to simplicity and cost reduction but nobody else offers scale.  The easiest segment you could go after is one where scale really matters because even though you think you might be better at simple, the difference between you and the alternatives might not be meaningful for customers. 2 Don’t care much about the stuff you aren’t good at – In the early stages there will be gaping holes in your product and other things that your product just doesn’t do all that well.  Your best segment doesn’t care too much that those things (at least not at the beginning). 3 Risks of adopting your product are lower for them – There will be reasons why customers will not adopt your product related to the risk in doing so.  For example some segments will have to migrate off of another product in order to adopt yours or customers will have to trust that you can do what you say you can do.  It’s often a useful exercise to document all of the reasons people won’t adopt your product and then map that our against your potential customer segments. Choose a segment that has the least barriers to adopting your product. 4 Segment is big enough or is a gateway to a big enough segment – Make sure that the segment you end up with is big enough to get your business to where it needs to go.  If it isn’t quite big enough then it should at least be a good, clear pathway to a bigger segment.  For example, having a beachhead of customers in mid-sized services businesses might be enough to help you get into the market for independent consultants (where having that base would address some of their concerns). Source: April Dunford
  • 77.
    Customer Discovery – Achieve Problem/Solution Fit • Customer Validation – Achieve Product/Market Fit • Customer Creation – Drive Demand • Company Building – Scale the Company Source: Ash Maurya
  • 78.
    Test the RiskiestThing First Depending on your business: Minimum Viable Product Distribution, Revenue, Business model Minimum Feasible Product Transistors/inch, Power usage, Cures cancer Minimum Desirable Product Engagement, Sustainable growth, Love <3 Source: IDEO, Andrew Chen