The Future of Learning (Yours) Eric Grant, LDT 05 Futurist, Edupreneur email:  [email_address] twitter: senatorgrant
Overview Lecture: A Bit of Context for Today
Discussion: Education in the Flat World
Lecture: Tools Used by the Pros
Activity: Scenario Development
Lecture: Products of the Pros
Discussion: What's Next?
Suggested Reading The World is Flat  by Thomas Friedman Optional:  Education in the Flat World Shift Happens 2.0
Here Comes Everybody  by Clay Shirky
Wikinomics  by Dan Tapscott
Disrupting Class  by Clayton Christensen
A Whole New Mind  by Daniel Pink
Generations  by Strauss and Howe
Context for Today or: Explicit Learning Goals Most likely, the Future is not that different from now Demographics change, capacities increase, but humans still learn, work, play, love, and die The Future is impossible to  predict , and if you try, you will be wrong, and probably be ridiculed But the future can be  forecasted  through a variety of fuzzy arts and rigorous methods An unchanged Future is boring and useless But talking about the extreme possibilities is much more interesting and generates better strategies
Futurists, aka Futurismologists Futures Studies, Foresight, or Futurology is the science, art and practice of postulating possible, probable, and preferable futures and the worldviews and myths that underlie them.
Futures Studies seeks to understand what is likely to continue, what is likely to change, and what is novel.
The discipline thus seeks a systematic and pattern-based understanding of past and present, and to determine the likelihood of future events and trends.
Some Fun Foresight Shapes The future can often be depicted in terms of pendulum shifts The future sometimes looks like a long tail Source: Longtail.com Source: Wikipedia
Some Fun Foresight Shapes The S-Curve is popular for forecasting adoption of new technologies and products But the Hype Cycle is usually more accurate Source: Gartner via Wikipedia Source: Wikipedia
Some Fun Foresight Shapes The future can be depicted as a “cone of uncertainty” It becomes more uncertain the further out you try to look Trends that seem obvious now become wilder and more unpredictable
Tools of the Pros: Trend Analysis collecting information and attempting to spot a pattern, or trend, in the information

LDT Future of Learning 2010

  • 1.
    The Future ofLearning (Yours) Eric Grant, LDT 05 Futurist, Edupreneur email: [email_address] twitter: senatorgrant
  • 2.
    Overview Lecture: ABit of Context for Today
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
    Suggested Reading TheWorld is Flat by Thomas Friedman Optional: Education in the Flat World Shift Happens 2.0
  • 9.
    Here Comes Everybody by Clay Shirky
  • 10.
    Wikinomics byDan Tapscott
  • 11.
    Disrupting Class by Clayton Christensen
  • 12.
    A Whole NewMind by Daniel Pink
  • 13.
    Generations byStrauss and Howe
  • 14.
    Context for Todayor: Explicit Learning Goals Most likely, the Future is not that different from now Demographics change, capacities increase, but humans still learn, work, play, love, and die The Future is impossible to predict , and if you try, you will be wrong, and probably be ridiculed But the future can be forecasted through a variety of fuzzy arts and rigorous methods An unchanged Future is boring and useless But talking about the extreme possibilities is much more interesting and generates better strategies
  • 15.
    Futurists, aka FuturismologistsFutures Studies, Foresight, or Futurology is the science, art and practice of postulating possible, probable, and preferable futures and the worldviews and myths that underlie them.
  • 16.
    Futures Studies seeksto understand what is likely to continue, what is likely to change, and what is novel.
  • 17.
    The discipline thusseeks a systematic and pattern-based understanding of past and present, and to determine the likelihood of future events and trends.
  • 18.
    Some Fun ForesightShapes The future can often be depicted in terms of pendulum shifts The future sometimes looks like a long tail Source: Longtail.com Source: Wikipedia
  • 19.
    Some Fun ForesightShapes The S-Curve is popular for forecasting adoption of new technologies and products But the Hype Cycle is usually more accurate Source: Gartner via Wikipedia Source: Wikipedia
  • 20.
    Some Fun ForesightShapes The future can be depicted as a “cone of uncertainty” It becomes more uncertain the further out you try to look Trends that seem obvious now become wilder and more unpredictable
  • 21.
    Tools of thePros: Trend Analysis collecting information and attempting to spot a pattern, or trend, in the information