This document provides details of work items, quantities, units, weights, progress percentages, and cost for various stages of a construction project, including:
1. Preparatory work like mobilization, site supervision, safety equipment.
2. Pile foundation work including jackpile installation, testing.
3. Excavation and filling for pile caps and footings of various sizes.
4. Formwork for pile caps, footings, and slabs.
The document lists line items with descriptions, quantities, units, cost weights, and progress percentages to track budget and progress across different stages of the project.
1. MINGGU KE : 32 (TIGA PULUH DUA)
PERSIAPAN
1 Trial Mix 1.00 ls 0.027 100.00% 0.00% 100.00% 0.027
2 Design,Shop Drawing & As Built Drawing 1.00 LS 0.305 54.00% 10.00% 64.00% 0.195
3 Direksi Keet , Kantor Lapangan, Barak Kerja dan Gudang + Toilet 169.40 M2 0.569 100.00% 0.00% 100.00% 0.569
4 Shelter Sementara Keluarga Pasien RST M2 0.000 0.00% 0.000
5 Listrik Kerja 14.00 bln 0.256 54.00% 5.00% 59.00% 0.151
6 Penyediaan air kerja 14.00 Bln 0.085 54.00% 5.00% 59.00% 0.050
7 Laporan & Photo Proyek 1.00 LS 0.028 54.00% 5.00% 59.00% 0.016
8 Pagar Sementara Proyek 318.00 M1 0.320 100.00% 0.00% 100.00% 0.320
9 Papan Nama Proyek 1.00 Unit 0.003 100.00% 0.00% 100.00% 0.003
10 Perlengkapan Safety ( K3 ) 1.00 LS 0.244 85.00% 9.00% 94.00% 0.230
11 Mobilisasi - Demobilisasi material, tenaga kerja dan alat bantu. 1.00 LS 0.275 62.00% 10.00% 72.00% 0.198
12 Biaya keamanan dan kebersihan proyek 14.00 Bln 1.333 54.00% 5.00% 59.00% 0.787
13 Site Supervision 14.00 LS 0.983 50.00% 10.00% 60.00% 0.590
14 Sewa Crane LS 0.000 0.00% 0.000
15 CAR 1.00 LS 0.073 0.00% 50.00% 50.00% 0.037
16 BPJS 1.00 LS 0.153 100.00% 0.00% 100.00% 0.153
Sub Total : 3.325
I PEKERJAAN PONDASI TIANG PANCANG - JACKING PILE
A Pekerjaan Persiapan
1 Pekerjaan mobilisasi dan demobilisasi alat jacking pile 1.00 Ls 0.336 100.00% 0.00% 100.00% 0.336
B Pekerjaan Pemancangan Tiang
1 Pengadaan tiang pile - uk □ 25 x 25 cm (6 + 3) m 2727.00 M' 3.800 100.00% 0.00% 100.00% 3.800
2 Plat sambungan dan jasa pengelasan 606.00 set 0.305 100.00% 0.00% 100.00% 0.305
3 Jasa pemancangan - rata - rata 9 m / s.d tanah keras 2727.00 M' 1.149 100.00% 0.00% 100.00% 1.149
4 Bobokan tiang pancang 303.00 ttk 0.509 100.00% 0.00% 100.00% 0.509
5 PDA Test 3.00 ttk 0.121 100.00% 0.00% 100.00% 0.121
Sub Total : 6.220
II PEKERJAAN GALIAN TANAH DAN URUGAN PASIR BAWAH PONDASI
A Pekerjaan Galian Tanah
- Galian Pile Cap
a Galian Pondasi type - 60 x 60 cm 34.02 M3 0.023 100.00% 0.00% 100.00% 0.023
b Galian Pondasi type - 135 x 70 cm 15.59 M3 0.010 100.00% 0.00% 100.00% 0.010
c Galian Pondasi type - 135 x 125 cm 11.47 M3 0.008 100.00% 0.00% 100.00% 0.008
d Galian Pondasi type - 135 x 135 cm 106.45 M3 0.071 100.00% 0.00% 100.00% 0.071
e Galian Pondasi type - 210 x 135 cm 48.30 M3 0.032 100.00% 0.00% 100.00% 0.032
- Galian Sloof
a Galian Pondasi type TB1 - uk 30 x 70 cm 24.48 M3 0.016 100.00% 0.00% 100.00% 0.016
b Galian Pondasi type TB1A - uk 30 x 70 cm 29.83 M3 0.020 100.00% 0.00% 100.00% 0.020
c Galian Pondasi type TB2 - uk 30 x 60 cm 108.00 M3 0.073 100.00% 0.00% 100.00% 0.073
d Galian Pondasi type TB3 - uk 25 x 50 cm 24.57 M3 0.017 100.00% 0.00% 100.00% 0.017
e Galian Pondasi type TB4 - uk 30 x 60 cm 38.47 M3 0.026 100.00% 0.00% 100.00% 0.026
f Galian Pondasi type TB5 - uk 20 x 50 cm 39.88 M3 0.027 100.00% 0.00% 100.00% 0.027
g Galian Pondasi type TB6 - uk 20 x 50 cm 28.80 M3 0.019 100.00% 0.00% 100.00% 0.019
h Galian Pondasi type TB7 - uk 20 x 40 cm 12.70 M3 0.009 100.00% 0.00% 100.00% 0.009
B Pekerjaan Urugan Pasir
- Urugan pasir bawah pile cap
a Urugan Pasir Pondasi type - 60 x 60 cm 3.26 M3 0.006 100.00% 0.00% 100.00% 0.006
b Urugan Pasir Pondasi type - 135 x 70 cm 1.26 M3 0.002 100.00% 0.00% 100.00% 0.002
c Urugan Pasir Pondasi type - 135 x 125 cm 0.75 M3 0.001 100.00% 0.00% 100.00% 0.001
d Urugan Pasir Pondasi type - 135 x 135 cm 6.93 M3 0.013 100.00% 0.00% 100.00% 0.013
e Urugan Pasir Pondasi type - 210 x 135 cm 32.60 M3 0.063 100.00% 0.00% 100.00% 0.063
- Urugan pasir bawah sloof
a Urugan pasir type TB1 - uk 30 x 70 cm 2.40 M3 0.005 100.00% 0.00% 100.00% 0.005
b Urugan pasir type TB1A - uk 30 x 70 cm 2.48 M3 0.005 100.00% 0.00% 100.00% 0.005
c Urugan pasir type TB2 - uk 30 x 60 cm 9.89 M3 0.019 100.00% 0.00% 100.00% 0.019
d Urugan pasir type TB3 - uk 25 x 50 cm 3.78 M3 0.007 100.00% 0.00% 100.00% 0.007
e Urugan pasir type TB4 - uk 30 x 60 cm 3.83 M3 0.007 100.00% 0.00% 100.00% 0.007
f Urugan pasir type TB5 - uk 20 x 50 cm 6.26 M3 0.012 100.00% 0.00% 100.00% 0.012
g Urugan pasir type TB6 - uk 20 x 50 cm 6.05 M3 0.012 100.00% 0.00% 100.00% 0.012
h Urugan pasir type TB7 - uk 20 x 40 cm 2.84 M3 0.006 100.00% 0.00% 100.00% 0.006
- Urugan tanah peninggian elevasi
a Urugan tanah + campur puing, peninggian elevasi lantai 1482.54 m3 1.277 100.00% 0.00% 100.00% 1.277
b Pemadatan tanah ex Urugan 1040.90 m3 0.218 100.00% 0.00% 100.00% 0.218
Urugan tanah tangga utama 284.20 m3 0.245 0.00% 100.00% 100.00% 0.245
- Lantai Kerja Bawah Pondasi Pile Cap
a Lantai Kerja Pondasi type - 60 x 60 cm 1.64 M3 0.008 100.00% 0.00% 100.00% 0.008
b Lantai Kerja Pondasi type - 135 x 70 cm 0.63 M3 0.003 100.00% 0.00% 100.00% 0.003
c Lantai Kerja Pondasi type - 135 x 125 cm 0.39 M3 0.002 100.00% 0.00% 100.00% 0.002
d Lantai Kerja Pondasi type - 135 x 135 cm 3.46 M3 0.018 100.00% 0.00% 100.00% 0.018
e Lantai Kerja Pondasi type - 210 x 135 cm 1.42 M3 0.007 100.00% 0.00% 100.00% 0.007
- Lantai Kerja Bawah Sloof
a Lantai Kerjatype TB1 - uk 30 x 70 cm 1.20 M3 0.006 100.00% 0.00% 100.00% 0.006
b Lantai Kerjatype TB1A - uk 30 x 70 cm 1.24 M3 0.006 100.00% 0.00% 100.00% 0.006
c Lantai Kerjatype TB2 - uk 30 x 60 cm 4.95 M3 0.025 100.00% 0.00% 100.00% 0.025
d Lantai Kerjatype TB3 - uk 25 x 50 cm 1.89 M3 0.010 100.00% 0.00% 100.00% 0.010
e Lantai Kerjatype TB4 - uk 30 x 60 cm 1.91 M3 0.010 100.00% 0.00% 100.00% 0.010
f Lantai Kerjatype TB5 - uk 20 x 50 cm 3.13 M3 0.016 100.00% 0.00% 100.00% 0.016
g Lantai Kerjatype TB6 - uk 20 x 50 cm 3.02 M3 0.015 100.00% 0.00% 100.00% 0.015
h Lantai Kerjatype TB7 - uk 20 x 40 cm 1.42 M3 0.007 100.00% 0.00% 100.00% 0.007
Lantai Kerja Bawah Plat Lantai
a Lantai Kerja tebal 5 cm 71.40 M3 0.365 100.00% 0.00% 100.00% 0.365
Sub Total : 2.751
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
Page 1
2. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
IV PEKERJAAN STRUKTUR BETON
A PEKERJAAN BEKISTING STRUKTUR BETON
Bekisting Pile Cap
1 Bekisting Pondasi type - 60 x 60 cm 122.72 M2 0.072 100.00% 0.00% 100.00% 0.072
2 Bekisting Pondasi type - 135 x 70 cm 47.70 M2 0.028 100.00% 0.00% 100.00% 0.028
3 Bekisting Pondasi type - 135 x 125 cm 56.07 M2 0.033 100.00% 0.00% 100.00% 0.033
4 Bekisting Pondasi type - 135 x 135 cm 237.80 M2 0.140 100.00% 0.00% 100.00% 0.140
5 Bekisting Pondasi type - 210 x 135 cm 82.19 M2 0.048 100.00% 0.00% 100.00% 0.048
6 Bekisting Pondasi Menara - 170 x 170 cm 10.71 M2 0.006 100.00% 0.00% 100.00% 0.006
Bekisting Sloof
1 Bekisting batako type TB1 - uk 30 x 70 cm 81.60 M2 0.051 100.00% 0.00% 100.00% 0.051
2 Bekisting batako type TB1A - uk 30 x 70 cm 84.15 M2 0.053 100.00% 0.00% 100.00% 0.053
3 Bekisting batako type TB2 - uk 30 x 60 cm 296.70 M2 0.187 100.00% 0.00% 100.00% 0.187
4 Bekisting batako type TB3 - uk 25 x 50 cm 105.00 M2 0.066 100.00% 0.00% 100.00% 0.066
5 Bekisting batako type TB4 - uk 30 x 60 cm 114.83 M2 0.072 100.00% 0.00% 100.00% 0.072
6 Bekisting batako type TB5 - uk 20 x 50 cm 187.92 M2 0.118 100.00% 0.00% 100.00% 0.118
7 Bekisting batako type TB6 - uk 20 x 50 cm 181.39 M2 0.114 100.00% 0.00% 100.00% 0.114
8 Bekisting batako type TB7 - uk 20 x 40 cm 71.06 M2 0.045 100.00% 0.00% 100.00% 0.045
Bekisting DPT - Tangga
1 Bekisting Batako DPT tangga 80.55 M2 0.051 0.00% 0.00% 0.00% 0.051
2 Bekisting Batako DPT Peninggian Lantai 138.40 M2 0.087 100.00% 0.00% 100.00% 0.087
Bekisting Lantai Dasar
Bekisting DPT / Retaining Wall
1 Bekisting Kayu DPT tangga Luar as 14-15/C-H 80.55 M2 0.083 100.00% 0.00% 100.00% 0.083
2 Bekisting Kayu DPT Peninggian Lantai - 80 cm 138.40 M2 0.143 100.00% 0.00% 100.00% 0.143
Bekisting Kolom
1 Bekisting Kayu Kolom Type K1 - uk 60 x 60 cm 126.00 M2 0.159 100.00% 0.00% 100.00% 0.159
2 Bekisting Kayu Kolom Type K1A - uk 60 x 60 cm 50.40 M2 0.063 100.00% 0.00% 100.00% 0.063
3 Bekisting Kayu Kolom Type K2 - uk 30 x 30 cm 207.90 M2 0.214 100.00% 0.00% 100.00% 0.214
4 Bekisting Kayu Kolom Type K2A - uk 40 x 40 cm 134.40 M2 0.139 100.00% 0.00% 100.00% 0.139
5 Bekisting Kayu Kolom Type K3 - uk 20 x 20 cm 8.40 M2 0.009 100.00% 0.00% 100.00% 0.009
6 Bekisting Kayu Kolom Type K4 - uk 17 x 20 cm 31.08 M2 0.032 100.00% 0.00% 100.00% 0.032
7 Bekisting Kayu Kolom Type K5 - uk 15 x 47,5 cm 13.12 M2 0.014 100.00% 0.00% 100.00% 0.014
Bekisting Tangga
1 Bekisting Tangga Utama As C/9 27.25 M2 0.028 100.00% 0.00% 100.00% 0.028
2 Bekisting Tangga Utama As F/9 27.25 M2 0.028 100.00% 0.00% 100.00% 0.028
3 Bekisting Kayu Tangga Entrance Outdoor 288.48 M2 0.298 100.00% 0.00% 100.00% 0.298
4 Bekisting Balok Tangga - Type B4 - 20 x 50 cm 54.00 M2 0.056 100.00% 0.00% 100.00% 0.056
Bekisting Lantai Atas
Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding
Bekisting Balok Lantai Atas
1 Bekisting Balok Type B1 - 45 x 90 cm 162.00 M2 0.167 100.00% 0.00% 100.00% 0.167
2 Bekisting Balok Type B2 - 40 x 80 cm 120.00 M2 0.124 100.00% 0.00% 100.00% 0.124
3 Bekisting Balok Type B3 - 40 x 90 cm 70.40 M2 0.073 100.00% 0.00% 100.00% 0.073
4 Bekisting Balok Type B4 - 20 x 50 cm 396.98 M2 0.409 100.00% 0.00% 100.00% 0.409
5 Bekisting Balok Type B5 - 25 x 50 cm 95.06 M2 0.098 100.00% 0.00% 100.00% 0.098
6 Bekisting Balok Type B5A - 25 x 50 cm 25.00 M2 0.026 100.00% 0.00% 100.00% 0.026
7 Bekisting Balok Type B6 - 30 x 70 cm 55.48 M2 0.057 100.00% 0.00% 100.00% 0.057
8 Bekisting Balok Type B7 - 30 x 60 cm 126.00 M2 0.130 100.00% 0.00% 100.00% 0.130
9 Bekisting Balok Type B8 - 30 x 60 cm 48.00 M2 0.050 100.00% 0.00% 100.00% 0.050
10 Bekisting Balok Type B9 - 30 x 70 cm 20.40 M2 0.021 100.00% 0.00% 100.00% 0.021
11 Bekisting Balok Type B10 - 20 x 40 cm 55.00 M2 0.057 100.00% 0.00% 100.00% 0.057
12 Bekisting Balok Type B16 - 20 x 40 cm - Incld Balok Ramp 17.18 M2 0.018 100.00% 0.00% 100.00% 0.018
13 Bekisting Balok Type B18 - 30 x 60 cm 13.50 M2 0.014 100.00% 0.00% 100.00% 0.014
14 Bekisting Balok Type CB3 - 25 x 50 cm 7.50 M2 0.008 100.00% 0.00% 100.00% 0.008
15 Bekisting Balok Type CB5 - 20 x 40 cm 6.00 M2 0.006 100.00% 0.00% 100.00% 0.006
Bekisting PLat Lantai Atas
1 Bekisting Plat Lantai Type S1 - Tebal 120 mm 746.94 M2 0.770 100.00% 0.00% 100.00% 0.770
2 Bekisting Plat Lantai Type S2 - Tebal 130 mm 153.70 M2 0.159 100.00% 0.00% 100.00% 0.159
3 Bekisting Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.14181.54 M2 0.187 100.00% 0.00% 100.00% 0.187
4 Bekisting Plat Lantai Ramp type S1 54.11 M2 0.056 100.00% 0.00% 100.00% 0.056
Bekisting Kolom
1 Bekisting Kayu Kolom Type K1 - uk 60 x 60 cm 96.00 M2 0.121 100.00% 0.00% 100.00% 0.121
2 Bekisting Kayu Kolom Type KA1 - uk 30 x 30 cm 114.00 M2 0.118 100.00% 0.00% 100.00% 0.118
3 Bekisting Kayu Kolom Type KA2 - uk 14 x 40 cm 139.86 M2 0.144 100.00% 0.00% 100.00% 0.144
4 Bekisting Kayu Kolom Type KA3 - uk 13 x 30 cm 7.65 M2 0.008 100.00% 0.00% 100.00% 0.008
5 Bekisting Kayu Kolom Type KT1 - uk 13 x 40 cm 16.96 M2 0.017 100.00% 0.00% 100.00% 0.017
Bekisting Tangga
1 Bekisting Tangga Utama As C/8 26.28 M2 0.027 100.00% 0.00% 100.00% 0.027
2 Bekisting Tangga Utama As F/8 26.28 M2 0.027 100.00% 0.00% 100.00% 0.027
Bekisting Lantai Mezzanine
Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding
Bekisting Balok Lantai Mezanine
1 Bekisting Balok Type B1 - 45 x 90 cm 108.00 M2 0.111 100.00% 0.00% 100.00% 0.111
2 Bekisting Balok Type B2 - 40 x 80 cm 24.00 M2 0.025 100.00% 0.00% 100.00% 0.025
3 Bekisting Balok Type B4 - 20 x 50 cm 15.78 M2 0.016 100.00% 0.00% 100.00% 0.016
4 Bekisting Balok Type B5 - 25 x 50 cm 55.31 M2 0.057 100.00% 0.00% 100.00% 0.057
5 Bekisting Balok Type B8 - 30 x 60 cm 15.75 M2 0.016 100.00% 0.00% 100.00% 0.016
6 Bekisting Balok Type B10 - 20 x 40 cm 10.50 M2 0.011 100.00% 0.00% 100.00% 0.011
7 Bekisting Balok Type B11 - 25 x 50 cm 3.75 M2 0.004 100.00% 0.00% 100.00% 0.004
8 Bekisting Balok Type B13 - 20 x 40 cm 47.00 M2 0.048 100.00% 0.00% 100.00% 0.048
9 Bekisting Balok Type B14 - 20 x 40 cm 176.90 M2 0.182 100.00% 0.00% 100.00% 0.182
10 Bekisting Balok Type B19 - 15 x 30 cm 12.23 M2 0.013 100.00% 0.00% 100.00% 0.013
11 Bekisting Balok Type CB1 - 20 x 50 cm 9.36 M2 0.010 100.00% 0.00% 100.00% 0.010
Page 2
3. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
12 Bekisting Balok Type CB2 - 20 x 50 cm 8.32 M2 0.009 100.00% 0.00% 100.00% 0.009
13 Bekisting Balok Type CB5 - 20 x 50 cm 5.78 M2 0.006 100.00% 0.00% 100.00% 0.006
14 Bekisting Balok Type L1 - 15 x 60 cm 20.25 M2 0.021 100.00% 0.00% 100.00% 0.021
Bekisting PLat Lantai Mazaninne
1 Bekisting Plat Lantai Type S1 - Tebal 120 mm 354.00 M2 0.365 100.00% 0.00% 100.00% 0.365
2 Bekisting Plat Lantai Type S3 - Tebal 100 mm 188.00 M2 0.194 100.00% 0.00% 100.00% 0.194
Bekisting Kolom
1 Bekisting Kayu Kolom Type K1 - uk 40 x 40 cm 60.00 M2 0.062 100.00% 0.00% 100.00% 0.062
Bekisting Lantai Atap
Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding
Bekisting Balok Lantai Atap
1 Bekisting Balok Type B2 - 40 x 80 cm 24.00 M2 0.026 100.00% 0.00% 100.00% 0.026
2 Bekisting Balok Type B1A - 30 x 70 cm 25.50 M2 0.027 100.00% 0.00% 100.00% 0.027
3 Bekisting Balok Type B4 - 20 x 50 cm 46.60 M2 0.050 100.00% 0.00% 100.00% 0.050
4 Bekisting Balok Type B13 - 20 x 40 cm 39.00 M2 0.042 100.00% 0.00% 100.00% 0.042
5 Bekisting Balok Type B15 - 30 x 70 cm 134.73 M2 0.143 100.00% 0.00% 100.00% 0.143
6 Bekisting Balok Type B17 - 40 x 30 cm 15.00 M2 0.016 100.00% 0.00% 100.00% 0.016
7 Bekisting Balok Type B19 - 15 x 30 cm 6.11 M2 0.007 100.00% 0.00% 100.00% 0.007
8 Bekisting Balok Type CB3 - 25 x 50 cm 52.50 M2 0.056 100.00% 0.00% 100.00% 0.056
9 Bekisting Balok Type CB6 - 30 x 70 cm 18.62 M2 0.020 100.00% 0.00% 100.00% 0.020
10 Bekisting Balok Daguan/Dudukan Kuda - kuda baja 9.60 M2 0.010 100.00% 0.00% 100.00% 0.010
Bekisting PLat Lantai Atas
1 Bekisting Plat Lantai Type S2 - Tebal 100 mm 185.76 M2 0.198 100.00% 0.00% 100.00% 0.198
2 Bekisting Plat Lantai Type S3 - Tebal 150 mm 48.51 M2 0.052 100.00% 0.00% 100.00% 0.052
Bekisting Kolom
1 Bekisting Kayu Kolom Type KA4 - uk 20 x 20 cm 21.76 M2 0.023 100.00% 0.00% 100.00% 0.023
Bekisting Lantai Kubah
Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding
Bekisting Balok Lantai Atap
1 Bekisting Balok Type B16 - 20 x 40 cm 27.60 M2 0.029 0.00% 100.00% 100.00% 0.029
2 Bekisting Balok Type B10 - 20 x 40 cm 32.90 M2 0.035 0.00% 100.00% 100.00% 0.035
3 Bekisting Balok Type B19 - 15 x 30 cm 33.56 M2 0.036 0.00% 100.00% 100.00% 0.036
4 Bekisting Balok Type CB5 - 20 x 40 cm 9.48 M2 0.010 0.00% 100.00% 100.00% 0.010
Bekisting PLat Lantai Atas
1 Bekisting Plat Lantai Type S2 - Tebal 100 mm 15.80 M2 0.017 0.00% 100.00% 100.00% 0.017
Bekisting Ramp
1 Kolom type KR 15 x 40 cm 60.72 M2 0.065 100.00% 0.00% 100.00% 0.065
2 Kolom type KR1 15 x 40 cm 85.10 M2 0.091 100.00% 0.00% 100.00% 0.091
3 Balok type B16 20 x 40 cm 93.22 M2 0.099 100.00% 0.00% 100.00% 0.099
4 CB 240 2.40 M2 0.003 100.00% 0.00% 100.00% 0.003
5 Plat tebal 12 cm 116.79 M2 0.124 100.00% 0.00% 100.00% 0.124
B PEKERJAAN TULANGAN PEMBESIAN
Pembesian Pile Cap
1 Pembesian Pondasi type - 60 x 60 cm 1469.66 Kg 0.109 71.26% 0.00% 71.26% 0.109
2 Pembesian Pondasi type - 135 x 70 cm 875.5 Kg 0.065 100.00% 0.00% 100.00% 0.065
3 Pembesian Pondasi type - 135 x 125 cm 837.39 Kg 0.062 100.00% 0.00% 100.00% 0.062
4 Pembesian Pondasi type - 135 x 135 cm 7212.69 Kg 0.535 100.00% 0.00% 100.00% 0.535
5 Pembesian Pondasi type - 210 x 135 cm 3515.4 Kg 0.261 100.00% 0.00% 100.00% 0.261
6 Pembesian Pondasi Menara - 170 x 170 cm 263.837761 Kg 0.020 0.00% 0.00% 0.00% 0.020
Pembesian Sloof
1 Pembesian Tulangan type TB1 - uk 30 x 70 cm 2036.32 Kg 0.151 100.00% 0.00% 100.00% 0.151
2 Pembesian Tulangan type TB1A - uk 30 x 70 cm 1670.76 Kg 0.124 100.00% 0.00% 100.00% 0.124
3 Pembesian Tulangan type TB2 - uk 30 x 60 cm 7041.6 Kg 0.523 100.00% 0.00% 100.00% 0.523
4 Pembesian Tulangan type TB3 - uk 25 x 50 cm 1911 Kg 0.142 100.00% 0.00% 100.00% 0.142
5 Pembesian Tulangan type TB4 - uk 30 x 60 cm 1739.07 Kg 0.129 100.00% 0.00% 100.00% 0.129
6 Pembesian Tulangan type TB5 - uk 20 x 50 cm 2791.88 Kg 0.207 100.00% 0.00% 100.00% 0.207
7 Pembesian Tulangan type TB6 - uk 20 x 50 cm 1251.92 Kg 0.093 100.00% 0.00% 100.00% 0.093
8 Pembesian Tulangan type TB7 - uk 20 x 40 cm 830.88 Kg 0.062 100.00% 0.00% 100.00% 0.062
Pembesian DPT Tangga
1 Pembesian Tulangan DPT tangga 1703.56 Kg 0.126 100.00% 0.00% 100.00% 0.126
2 Pembesian DPT Peninggian Lantai 2315.42 Kg 0.172 100.00% 0.00% 100.00% 0.172
Pembesian Kolom
1 Pembesian Tulangan Kolom Type K1 - uk 60 x 60 cm 4290.3 Kg 0.318 100.00% 0.00% 100.00% 0.318
2 Pembesian Tulangan Kolom Type K1A - uk 60 x 60 cm 1716.12 Kg 0.127 100.00% 0.00% 100.00% 0.127
3 Pembesian Tulangan Kolom Type K2 - uk 30 x 30 cm 4163.19 Kg 0.309 100.00% 0.00% 100.00% 0.309
4 Pembesian Tulangan Kolom Type K2A - uk 40 x 40 cm 2956.8 Kg 0.219 100.00% 0.00% 100.00% 0.219
5 Pembesian Tulangan Kolom Type K3 - uk 20 x 20 105.26 Kg 0.008 100.00% 0.00% 100.00% 0.008
6 Pembesian Tulangan Kolom Type K4 - uk 17 x 20 401.26 Kg 0.030 100.00% 0.00% 100.00% 0.030
7 Pembesian Tulangan Kolom Type K5 - uk 15 x 48 175.85 Kg 0.013 100.00% 0.00% 100.00% 0.013
Pembesian Tangga
Pembesian Tangga Utama As C/9 548.64 Kg 0.041 0.00% 100.00% 100.00% 0.041
Pembesian Tangga Utama As F/9 548.64 Kg 0.041 0.00% 100.00% 100.00% 0.041
Pembesian Tangga Entrance Outdoor 7786.13 Kg 0.578 0.00% 100.00% 100.00% 0.578
Pembesian Balok Tangga - Type B4 - 20 x 50 cm 717.96 Kg 0.053 0.00% 100.00% 100.00% 0.053
Pembesian Plat Lantai Dasar
Pembesian Plat Lantai Dasar - tebal 12 cm 21,117.8 Kg 1.567 100.00% 0.00% 100.00% 1.567
Pembesian Balok Lantai Atas
1 Pembesian Type B1 - 45 x 90 cm 6735.96 Kg 0.500 100.00% 0.00% 100.00% 0.500
2 Pembesian Type B2 - 40 x 80 cm 4704 Kg 0.349 100.00% 0.00% 100.00% 0.349
3 Pembesian Type B3 - 40 x 90 cm 2960.64 Kg 0.220 100.00% 0.00% 100.00% 0.220
4 Pembesian Balok Type B4 - 20 x 50 cm 5096.2 Kg 0.378 100.00% 0.00% 100.00% 0.378
5 Pembesian Balok Type B5 - 25 x 50 cm 1472.5 Kg 0.109 100.00% 0.00% 100.00% 0.109
6 Pembesian Tulangan Balok Type B5A - 25 x 50 cm 458.64 Kg 0.025 100.00% 0.00% 100.00% 0.025
Page 3
4. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
7 Pembesian Tulangan Balok Type B6 - 30 x 70 cm 153.72 Kg 0.123 100.00% 0.00% 100.00% 0.123
8 Pembesian Tulangan Balok Type B7 - 30 x 60 cm 38.12 Kg 0.172 100.00% 0.00% 100.00% 0.172
9 Pembesian Tulangan Balok Type B8 - 30 x 60 cm 688 Kg 0.000 100.00% 0.00% 100.00% -
10 Pembesian Tulangan Balok Type B9 - 30 x 70 cm 2640.24 Kg 0.021 100.00% 0.00% 100.00% 0.021
11 Pembesian Tulangan Balok Type B10 - 20 x 40 cm 167.67 Kg 0.048 100.00% 0.00% 100.00% 0.048
12 Pembesian Tulangan Balok Type B16 - 20 x 40 cm - Incld Balok Ramp 207.47 Kg 0.009 100.00% 0.00% 100.00% 0.009
13 Pembesian Tulangan Balok Type B18 - 30 x 60 cm 322.1 Kg 0.020 100.00% 0.00% 100.00% 0.020
14 Pembesian Tulangan Balok Type CB3 - 25 x 50 cm 107.52 Kg 0.010 100.00% 0.00% 100.00% 0.010
15 Pembesian Tulangan Balok Type CB5 - 20 x 40 cm 265.35 Kg 0.012 100.00% 0.00% 100.00% 0.012
Pembesian Tulangan PLat Lantai Atas
1 Pembesian Tulangan Plat Lantai Type S1 - Tebal 120 mm 11046.79 Kg 0.820 100.00% 0.00% 100.00% 0.820
2 Pembesian Tulangan Plat Lantai Type S2 - Tebal 130 mm 2273.13 Kg 0.169 100.00% 0.00% 100.00% 0.169
3 Pembesian Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.142684.87 Kg 0.199 100.00% 0.00% 100.00% 0.199
4 Pembesian Plat Lantai Ramp type S1 800.25 Kg 0.059 100.00% 0.00% 100.00% 0.059
Pembesian Tulangan Kolom
1 Pembesian Tulangan Kolom Type K1 - uk 60 x 60 cm 2260.61 Kg 0.168 100.00% 0.00% 100.00% 0.168
2 Pembesian Tulangan Kolom Type KA1 - uk 30 x 30 cm 1733.19 Kg 0.129 100.00% 0.00% 100.00% 0.129
3 Pembesian Tulangan Kolom Type KA2 - uk 14 x 40 cm 1895.43 Kg 0.141 100.00% 0.00% 100.00% 0.141
4 Pembesian Tulangan Kolom Type KA3 - uk 13 x 30 cm 60.39 Kg 0.004 100.00% 0.00% 100.00% 0.004
5 Pembesian Tulangan Kolom Type KT1 - uk 13 x 40 cm 99.98 Kg 0.007 100.00% 0.00% 100.00% 0.007
Pembesian Tulangan Tangga
1 Pembesian Tulangan Tangga Utama As C/8 621.35 Kg 0.046 100.00% 0.00% 100.00% 0.046
2 Pembesian Tulangan Tangga Utama As F/8 621.35 Kg 0.046 100.00% 0.00% 100.00% 0.046
Pembesian Lantai Mezzanine
Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir)
Pembesian Balok Lantai Mezanine
1 Pembesian Balok Type B1 - 45 x 90 cm 4490.64 Kg 0.333 100.00% 0.00% 100.00% 0.333
2 Pembesian Balok Type B2 - 40 x 80 cm 940.8 Kg 0.070 100.00% 0.00% 100.00% 0.070
3 Pembesian Balok Type B4 - 20 x 50 cm 365.2 Kg 0.027 100.00% 0.00% 100.00% 0.027
4 Pembesian Balok Type B5 - 25 x 50 cm 896.1 Kg 0.066 100.00% 0.00% 100.00% 0.066
5 Pembesian Balok Type B8 - 30 x 60 cm 458.64 Kg 0.034 100.00% 0.00% 100.00% 0.034
6 Pembesian Balok Type B10 - 20 x 40 cm 153.72 Kg 0.011 100.00% 0.00% 100.00% 0.011
7 Pembesian Balok Type B11 - 25 x 50 cm 38.12 Kg 0.003 100.00% 0.00% 100.00% 0.003
8 Pembesian Balok Type B13 - 20 x 40 cm 688 Kg 0.051 100.00% 0.00% 100.00% 0.051
9 Pembesian Balok Type B14 - 20 x 40 cm 2640.24 Kg 0.196 100.00% 0.00% 100.00% 0.196
10 Pembesian Balok Type B19 - 15 x 30 cm 167.67 Kg 0.012 100.00% 0.00% 100.00% 0.012
11 Pembesian Balok Type CB1 - 20 x 50 cm 207.47 Kg 0.015 100.00% 0.00% 100.00% 0.015
12 Pembesian Balok Type CB2 - 20 x 50 cm 322.1 Kg 0.024 100.00% 0.00% 100.00% 0.024
13 Pembesian Balok Type CB5 - 20 x 50 cm 107.52 Kg 0.008 100.00% 0.00% 100.00% 0.008
14 Pembesian Balok Type L1 - 15 x 60 cm 265.35 Kg 0.020 100.00% 0.00% 100.00% 0.020
Pembesian PLat Lantai Mezzanine
1 Pembesian Plat Lantai Type S1 - Tebal 120 mm 3623.84668 Kg 0.269 100.00% 0.00% 100.00% 0.269
2 Pembesian Plat Lantai Type S3 - Tebal 100 mm 2780.4072 Kg 0.206 100.00% 0.00% 100.00% 0.206
Pembesian Kolom
1 Pembesian Kolom Type K1 - uk 40 x 40 cm 1816.05944 Kg 0.135 100.00% 0.00% 100.00% 0.135
Pembesian Lantai Atap
Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir)
Pembesian Balok Lantai Atap
1 Pembesian Balok Type B2 - 40 x 80 cm 1003.46079 Kg 0.074 100.00% 0.00% 100.00% 0.074
2 Pembesian Balok Type B1A - 30 x 70 cm 631.322513 Kg 0.047 100.00% 0.00% 100.00% 0.047
3 Pembesian Balok Type B4 - 20 x 50 cm 619.641228 Kg 0.046 100.00% 0.00% 100.00% 0.046
4 Pembesian Balok Type B13 - 20 x 40 cm 524.653965 Kg 0.039 100.00% 0.00% 100.00% 0.039
5 Pembesian Balok Type B15 - 30 x 70 cm 3503.86613 Kg 0.260 100.00% 0.00% 100.00% 0.260
6 Pembesian Balok Type B17 - 40 x 30 cm 225.351018 Kg 0.017 100.00% 0.00% 100.00% 0.017
7 Pembesian Balok Type B19 - 15 x 30 cm 73.478669 Kg 0.005 100.00% 0.00% 100.00% 0.005
8 Pembesian Balok Type CB3 - 25 x 50 cm 786.68516 Kg 0.058 100.00% 0.00% 100.00% 0.058
9 Pembesian Balok Type CB6 - 30 x 70 cm 308.925917 Kg 0.023 100.00% 0.00% 100.00% 0.023
10 Pembesian Balok Daguan/Dudukan Kuda - kuda baja 105.300528 Kg 0.008 100.00% 0.00% 100.00% 0.008
Pembesian PLat Lantai Atap
1 Pembesian Plat Lantai Type S2 - Tebal 100 mm 2747.27894 Kg 0.204 0.00% 100.00% 100.00% 0.204
2 Pembesian Plat Lantai Type S3 - Tebal 150 mm 717.433794 Kg 0.053 0.00% 100.00% 100.00% 0.053
Pembesian Kolom
1 Pembesian Kayu Kolom Type KA4 - uk 20 x 20 cm 241.047501 Kg 0.018 0.00% 100.00% 100.00% 0.018
Pembesian Lantai Kubah
Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir)
Pembesian Balok Lantai Atap
1 Pembesian Balok Type B16 - 20 x 40 cm 413.008784 Kg 0.031 0.00% 100.00% 100.00% 0.031
2 Pembesian Balok Type B10 - 20 x 40 cm 442.708365 Kg 0.033 0.00% 100.00% 100.00% 0.033
3 Pembesian Balok Type B19 - 15 x 30 cm 189.059013 Kg 0.014 0.00% 100.00% 100.00% 0.014
4 Pembesian Balok Type CB5 - 20 x 40 cm 145.616432 Kg 0.011 0.00% 100.00% 100.00% 0.011
Pembesian PLat Lantai Atas
1 Pembesian Plat Lantai Type S2 - Tebal 100 mm 407.15 Kg 0.030 0.00% 100.00% 100.00% 0.030
Pembesian Ramp
1 Kolom type KR 15 x 40 cm 639.95 Kg 0.047 100.00% 0.00% 100.00% 0.047
2 Kolom type KR1 15 x 40 cm 92.25 Kg 0.007 100.00% 0.00% 100.00% 0.007
3 Balok type B16 20 x 40 cm 1614.25 Kg 0.120 100.00% 0.00% 100.00% 0.120
4 CB 240 92.16 Kg 0.007 100.00% 0.00% 100.00% 0.007
5 Plat tebal 12 cm 1620.61 Kg 0.120 100.00% 0.00% 100.00% 0.120
PEKERJAAN BETON
Beton Pile Cap
1 Beton Pondasi type - 60 x 60 cm 11.018 M3 0.087 50.00% 50.00% 100.00% 0.087
2 Beton Pondasi type - 135 x 70 cm 7.6545 M3 0.061 100.00% 0.00% 100.00% 0.061
3 Beton Pondasi type - 135 x 125 cm 6.75 M3 0.053 100.00% 0.00% 100.00% 0.053
4 Beton Pondasi type - 135 x 135 cm 69.255 M3 0.549 100.00% 0.00% 100.00% 0.549
Page 4
5. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
5 Beton Pondasi type - 210 x 135 cm 28.35 M3 0.225 100.00% 0.00% 100.00% 0.225
6 Beton Pondasi Menara - 170 x 170 cm 2.89 M3 0.023 0.00% 100.00% 100.00% 0.023
Beton Sloof
1 Beton type TB1 - uk 30 x 70 cm 10.08 M3 0.080 100.00% 0.00% 100.00% 0.080
2 Beton type TB1A - uk 30 x 70 cm 12.285 M3 0.097 100.00% 0.00% 100.00% 0.097
3 Beton type TB2 - uk 30 x 60 cm 43.20 M3 0.342 100.00% 0.00% 100.00% 0.342
4 Beton type TB3 - uk 25 x 50 cm 10.20 M3 0.081 100.00% 0.00% 100.00% 0.081
5 Beton type TB4 - uk 30 x 60 cm 15.39 M3 0.122 100.00% 0.00% 100.00% 0.122
6 Beton type TB5 - uk 20 x 50 cm 15.34 M3 0.122 100.00% 0.00% 100.00% 0.122
7 Beton type TB6 - uk 20 x 50 cm 11.08 M3 0.088 100.00% 0.00% 100.00% 0.088
8 Beton type TB7 - uk 20 x 40 cm 4.60 M3 0.036 100.00% 0.00% 100.00% 0.036
Beton DPT - Tangga
1 Beton DPT tangga 19.56 M3 0.155 100.00% 0.00% 100.00% 0.155
2 Beton DPT Peninggian Lantai 26.02 M3 0.206 100.00% 0.00% 100.00% 0.206
Beton Lantai Dasar
Mutu beton Ready Mix K 300 - tanpa fly ash
Beton Kolom
1 Beton Kolom Type K1 - uk 60 x 60 cm 17.82 M3 0.141 100.00% 0.00% 100.00% 0.141
2 Beton Kolom Type K1A - uk 60 x 60 cm 7.128 M3 0.056 100.00% 0.00% 100.00% 0.056
3 Beton Kolom Type K2 - uk 30 x 30 cm 15.2685 M3 0.121 100.00% 0.00% 100.00% 0.121
4 Beton Kolom Type K2A - uk 40 x 40 cm 7.12 M3 0.056 100.00% 0.00% 100.00% 0.056
5 Beton Kolom Type K3 - uk 20 x 20 0.348 M3 0.003 100.00% 0.00% 100.00% 0.003
6 Beton Kolom Type K4 - uk 17 x 20 1.479 M3 0.012 100.00% 0.00% 100.00% 0.012
7 Beton Kolom Type K5 - uk 15 x 48 0.619875 M3 0.005 100.00% 0.00% 100.00% 0.005
Beton Tangga
1 Beton Tangga Utama As C/9 2.41254 M3 0.019 100.00% 0.00% 100.00% 0.019
2 Beton Tangga Utama As F/9 2.41254 M3 0.019 100.00% 0.00% 100.00% 0.019
3 Beton Tangga Entrance Outdoor 86.5425 M3 0.685 100.00% 0.00% 100.00% 0.685
4 Beton Balok Tangga - Type B4 - 20 x 50 cm 4.5 M3 0.036 100.00% 0.00% 100.00% 0.036
Beton Plat Lantai Dasar
1 Beton Plat Lantai Dasar - tebal 12 cm 171.35 M3 1.357 100.00% 0.00% 100.00% 1.357
Beton Balok Lantai Atas
1 Beton Balok Type B1 - 45 x 90 cm 29.16 M3 0.231 100.00% 0.00% 100.00% 0.231
2 Beton Balok Type B2 - 40 x 80 cm 19.2 M3 0.152 100.00% 0.00% 100.00% 0.152
3 Beton Balok Type B3 - 40 x 90 cm 11.52 M3 0.091 100.00% 0.00% 100.00% 0.091
4 Beton Balok Type B4 - 20 x 50 cm 33.082 M3 0.262 100.00% 0.00% 100.00% 0.262
5 Beton Balok Type B5 - 25 x 50 cm 9.50625 M3 0.075 100.00% 0.00% 100.00% 0.075
6 Beton Balok Type B5A - 25 x 50 cm 2.5 M3 0.020 100.00% 0.00% 100.00% 0.020
7 Beton Balok Type B6 - 30 x 70 cm 5.355 M3 0.042 100.00% 0.00% 100.00% 0.042
8 Beton Balok Type B7 - 30 x 60 cm 15.12 M3 0.120 100.00% 0.00% 100.00% 0.120
9 Beton Balok Type B8 - 30 x 60 cm 5.76 M3 0.046 100.00% 0.00% 100.00% 0.046
10 Beton Balok Type B9 - 30 x 70 cm 2.52 M3 0.020 100.00% 0.00% 100.00% 0.020
11 Beton Balok Type B10 - 20 x 40 cm 4.4 M3 0.035 100.00% 0.00% 100.00% 0.035
12 Beton Balok Type B16 - 20 x 40 cm 1.374 M3 0.011 100.00% 0.00% 100.00% 0.011
13 Beton Balok Type B18 - 30 x 60 cm 1.62 M3 0.013 100.00% 0.00% 100.00% 0.013
14 Beton Balok Type CB3 - 25 x 50 cm 0.75 M3 0.006 100.00% 0.00% 100.00% 0.006
15 Beton Balok Type CB5 - 20 x 40 cm 0.48 M3 0.004 100.00% 0.00% 100.00% 0.004
Beton PLat Lantai Atas
1 Beton Plat Lantai Type S1 - Tebal 120 mm 89.6328 M3 0.710 100.00% 0.00% 100.00% 0.710
2 Beton Plat Lantai Type S2 - Tebal 130 mm 19.981 M3 0.158 100.00% 0.00% 100.00% 0.158
3 Pembesian Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.1423.6002 M3 0.187 100.00% 0.00% 100.00% 0.187
Beton Kolom
1 Beton Kolom Type K1 - uk 60 x 60 cm 11.52 M3 0.091 100.00% 0.00% 100.00% 0.091
2 Beton Kolom Type KA1 - uk 30 x 30 cm 8.55 M3 0.068 100.00% 0.00% 100.00% 0.068
3 Beton Kolom Type KA2 - uk 14 x 40 cm 7.252 M3 0.057 100.00% 0.00% 100.00% 0.057
4 Beton Kolom Type KA3 - uk 13 x 30 cm 0.3471 M3 0.003 100.00% 0.00% 100.00% 0.003
5 Beton Kolom Type KT1 - uk 13 x 40 cm 0.832 M3 0.007 100.00% 0.00% 100.00% 0.007
Beton Tangga
1 Beton Tangga Utama As C/8 2.58075 M3 0.020 100.00% 0.00% 100.00% 0.020
2 Beton Tangga Utama As F/8 2.58075 M3 0.020 100.00% 0.00% 100.00% 0.020
Beton Balok Lantai Mezanine
1 Beton Balok Type B1 - 45 x 90 cm 19.44 M3 0.154 100.00% 0.00% 100.00% 0.154
2 Beton Balok Type B2 - 40 x 80 cm 3.84 M3 0.030 100.00% 0.00% 100.00% 0.030
3 Beton Balok Type B4 - 20 x 50 cm 2.2 M3 0.017 100.00% 0.00% 100.00% 0.017
4 Beton Balok Type B5 - 25 x 50 cm 5.78 M3 0.046 100.00% 0.00% 100.00% 0.046
5 Beton Balok Type B8 - 30 x 60 cm 2.2 M3 0.017 100.00% 0.00% 100.00% 0.017
6 Beton Balok Type B10 - 20 x 40 cm 0.84 M3 0.007 100.00% 0.00% 100.00% 0.007
7 Beton Balok Type B11 - 25 x 50 cm 0.375 M3 0.003 100.00% 0.00% 100.00% 0.003
8 Beton Balok Type B13 - 20 x 40 cm 4 M3 0.032 100.00% 0.00% 100.00% 0.032
9 Beton Balok Type B14 - 20 x 40 cm 13.68 M3 0.108 100.00% 0.00% 100.00% 0.108
10 Beton Balok Type B19 - 15 x 30 cm 0.81 M3 0.006 100.00% 0.00% 100.00% 0.006
11 Beton Balok Type CB1 - 20 x 50 cm 1.44 M3 0.011 100.00% 0.00% 100.00% 0.011
12 Beton Balok Type CB2 - 20 x 50 cm 2.36 M3 0.019 100.00% 0.00% 100.00% 0.019
13 Beton Balok Type CB5 - 20 x 50 cm 0.56 M3 0.004 100.00% 0.00% 100.00% 0.004
14 Beton Balok Type L1 - 15 x 60 cm 1.8 M3 0.014 100.00% 0.00% 100.00% 0.014
Beton PLat Lantai Mezzanine
1 Beton Plat Lantai Type S1 - Tebal 120 mm 38.88 M3 0.308 100.00% 0.00% 100.00% 0.308
2 Beton Plat Lantai Type S3 - Tebal 100 mm 17.85 M3 0.141 100.00% 0.00% 100.00% 0.141
Beton Kolom
1 Beton Kolom Type K1 - uk 40 x 40 cm 5.85 M3 0.046 100.00% 0.00% 100.00% 0.046
Page 5
6. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
Beton Lantai Atap
Mutu beton Ready Mix K 300 - tanpa fly ash
1 Beton Balok Lantai Atap
2 Beton Balok Type B2 - 40 x 80 cm 3.84 M3 0.030 100.00% 0.00% 100.00% 0.030
3 Beton Balok Type B1A - 30 x 70 cm 3.15 M3 0.025 100.00% 0.00% 100.00% 0.025
4 Beton Balok Type B4 - 20 x 50 cm 3.88 M3 0.031 100.00% 0.00% 100.00% 0.031
5 Beton Balok Type B13 - 20 x 40 cm 3.12 M3 0.025 100.00% 0.00% 100.00% 0.025
6 Beton Balok Type B15 - 30 x 70 cm 16.64 M3 0.132 100.00% 0.00% 100.00% 0.132
7 Beton Balok Type B17 - 40 x 30 cm 1.80 M3 0.014 100.00% 0.00% 100.00% 0.014
8 Beton Balok Type B19 - 15 x 30 cm 0.37 M3 0.003 100.00% 0.00% 100.00% 0.003
9 Beton Balok Type CB3 - 25 x 50 cm 5.25 M3 0.042 100.00% 0.00% 100.00% 0.042
10 Beton Balok Type CB6 - 30 x 70 cm 2.30 M3 0.018 100.00% 0.00% 100.00% 0.018
11 Beton Balok Daguan/Dudukan Kuda - kuda baja 0.38 M3 0.003 100.00% 0.00% 100.00% 0.003
Beton PLat Lantai Atap
1 Beton Plat Lantai Type S2 - Tebal 100 mm 18.58 M3 0.147 100.00% 0.00% 100.00% 0.147
2 Beton Plat Lantai Type S3 - Tebal 150 mm 7.28 M3 0.058 100.00% 0.00% 100.00% 0.058
Beton Kolom
1 Beton Kayu Kolom Type KA4 - uk 20 x 20 cm 1.09 M3 0.009 100.00% 0.00% 100.00% 0.009
Beton Lantai Kubah
Mutu beton Ready Mix K 300 - tanpa fly ash
Beton Balok Lantai Atap
1 Beton Balok Type B16 - 20 x 40 cm M3 0.017 0.00% 100.00% 100.00% 0.017
2 Beton Balok Type B10 - 20 x 40 cm M3 0.021 0.00% 100.00% 100.00% 0.021
3 Beton Balok Type B19 - 15 x 30 cm M3 0.007 0.00% 100.00% 100.00% 0.007
4 Beton Balok Type CB5 - 20 x 40 cm M3 0.006 0.00% 100.00% 100.00% 0.006
Beton PLat Lantai Atas
1 Beton Plat Lantai Type S2 - Tebal 100 mm M3 0.011 0.00% 100.00% 100.00% 0.011
Betn Ramp
1 Kolom type KR 15 x 40 cm M3 0.026 0.00% 100.00% 100.00% 0.026
2 Kolom type KR1 15 x 40 cm M3 0.004 0.00% 100.00% 100.00% 0.004
3 Balok type B16 20 x 40 cm M3 0.077 0.00% 100.00% 100.00% 0.077
4 CB 240 M3 0.004 0.00% 100.00% 100.00% 0.004
5 Plat tebal 12 cm M3 0.109 0.00% 100.00% 100.00% 0.109
Sub Total : 29.348
V PEKERJAAN STRUKTUR BAJA
A Struktur Baja Pintu Utama
Pekerjaan Kolom Baja
a Kolom IWF 400.200.8.13 - type KB1 1986.336 Kg 0.242 100.00% 0.00% 100.00% 0.242
b Kolom IWF 300.150.6,5.9 - type KB2 456.181 Kg 0.056 100.00% 0.00% 100.00% 0.056
c Stifner plat dan base plate 244.2517 Kg 0.030 100.00% 0.00% 100.00% 0.030
Pekerjaan Balok Baja
a Kolom IWF 300.150.6,5.9 - type BB1 678.216 Kg 0.083 100.00% 0.00% 100.00% 0.083
b Kolom IWF 250.125.5,5.8 - type BB1 273.504 Kg 0.033 100.00% 0.00% 100.00% 0.033
c Stifner plat dan base plate 95.172 Kg 0.012 100.00% 0.00% 100.00% 0.012
d Cat Zinkromat 3733.6607 Kg 0.030 100.00% 0.00% 100.00% 0.030
Struktur Baja Atap
Pekerjaan Kuda - Kuda Baja
1 Kolom IWF 200.100.5,5.8 - type R1 895 Kg 0.109 100.00% 0.00% 100.00% 0.109
2 Gording C 150.50.20.2,3 1,342 Kg 0.163 100.00% 0.00% 100.00% 0.163
3 Bracing RB D 16 403 Kg 0.049 100.00% 0.00% 100.00% 0.049
4 Reng Baja Ringan 271 M2 0.136 100.00% 0.00% 100.00% 0.136
5 Pek penutup atap spandek 271 M2 0.216 100.00% 0.00% 100.00% 0.216
Sub Total : 1.158
PEKERJAAN ARSITEKTUR
A Pekerjaan Plafond
A.1 Plafond Lantai Dasar
a Plafond Flat Lantai Dasar
Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow
galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Serba Guna 575.33 M2 0.555 30.00% 50.00% 80.00% 0.444
2 Ruang Preparation 28.53 M2 0.028 30.00% 0.00% 30.00% 0.008
3 Ruang Gudang 18.32 M2 0.018 30.00% 0.00% 30.00% 0.005
4 Ruang Meeting Dan Ruang Kerja 34.31 M2 0.033 30.00% 0.00% 30.00% 0.010
5 Ruang Klinik 17.31 M2 0.017 30.00% 0.00% 30.00% 0.005
6 Ruang Marbot 17.31 M2 0.017 30.00% 0.00% 30.00% 0.005
7 Ruang Penitipan Sepatu Dan Selasar samping 107.54 M2 0.104 30.00% 0.00% 30.00% 0.031
8 Ruang Rias 1 dan 2 35.72 M2 0.034 30.00% 0.00% 30.00% 0.010
b Plafond Flat Lantai Dasar
Plafond GRC Board tebal = 3 mm + rangka hollow
galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Teras samping kanan 30.09 M2 0.028 0.00% 0.00% 0.00% 0.000
2 Teras samping Kiri 30.09 M2 0.028 0.00% 0.00% 0.00% 0.000
3 Toilet Pria dan wanita 64.29 M2 0.059 0.00% 0.00% 0.00% 0.000
4 Toilet Disabilitas/Khusus Orang Cacat 3.96 M2 0.004 0.00% 0.00% 0.00% 0.000
5 Tempat Wudhu Pria dan Wanita 78.10 M2 0.072 0.00% 0.00% 0.00% 0.000
6 Selasar Samping 14.60 M2 0.013 0.00% 0.00% 0.00% 0.000
c Plafond Exposed Beton
Plafond exposed beton - acian
1 Teras luar 58.29 M2 0.037 0.00% 0.00% 0.00% 0.000
d Plafond Up Ceiling
Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow
Galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Seba Guna 163.10 M2 0.164 0.00% 0.00% 0.00% 0.000
Page 6
7. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
e List Plafond
List plafond shadowline - aluminium
1 Ruang Seba Guna 291.17 M2 0.110 0.00% 0.00% 0.00% 0.000
2 Ruang Preparation 21.55 M2 0.008 0.00% 0.00% 0.00% 0.000
3 Ruang Gudang 17.55 M2 0.007 0.00% 0.00% 0.00% 0.000
4 Ruang Meeting Dan Ruang Kerja 33.85 M2 0.013 0.00% 0.00% 0.00% 0.000
5 Ruang Klinik 16.70 M2 0.006 0.00% 0.00% 0.00% 0.000
6 Ruang Marbot 16.70 M2 0.006 0.00% 0.00% 0.00% 0.000
7 Ruang Penitipan Sepatu Dan Selasar samping 92.33 M2 0.035 0.00% 0.00% 0.00% 0.000
8 Ruang Rias 1 dan 2 37.00 M2 0.014 0.00% 0.00% 0.00% 0.000
9 Teras samping kanan 26.00 M2 0.010 0.00% 0.00% 0.00% 0.000
10 Teras samping Kiri 26.00 M2 0.010 0.00% 0.00% 0.00% 0.000
11 Toilet Pria dan wanita 46.00 M2 0.017 0.00% 0.00% 0.00% 0.000
12 Tempat Wudhu Pria dan Wanita 55.04 M2 0.021 0.00% 0.00% 0.00% 0.000
13 Tempat wudhu luar 14.35 M2 0.005 0.00% 0.00% 0.00% 0.000
14 Selasar Samping 27.10 M2 0.010 0.00% 0.00% 0.00% 0.000
4 Toilet Disabilitas/Khusus Orang Cacat 7.40 M2 0.003 0.00% 0.00% 0.00% 0.000
f Pekerjaan Pengecatan Plafond
1 Cat plafond ex Vinilex/Setara 1,113.79 M2 0.168 0.00% 0.00% 0.00% 0.000
A.2 Plafond Lantai Atas
a Plafond Flat Lantai Atas
Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow
Galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Shalat 250.90 M2 0.253 0.00% 0.00% 0.00% 0.000
2 Ruang Mihrab + Ruang Imam / Utility 16.04 M2 0.015 0.00% 0.00% 0.00% 0.000
a Plafond Flat Peforated Lantai Atas
Plafond gypsum peforated + rangka hollow
galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Shalat 86.20 M2 0.109 0.00% 0.00% 0.00% 0.000
c Plafond Exposed Beton
Plafond exposed beton - acian
1 Teras luar 156.48 M2 0.099 0.00% 0.00% 0.00% 0.000
d Plafond GRC
1 Plafond Teras Entrace - Plafond GRC 5 mm 35.71 M2 0.033 0.00% 0.00% 0.00% 0.000
e List Plafond
List plafond shadowline - aluminium
1 Ruang Shalat 85.08 M2 0.032 0.00% 0.00% 0.00% 0.000
2 Ruang Shalat area pforated gypsum 258.90 M2 0.098 0.00% 0.00% 0.00% 0.000
f List Plafond
List plafond gypsum uk 5 x 5 cm
1 Ruang Mihrab + Ruang Imam / Utility 27.30 M2 0.003 0.00% 0.00% 0.00% 0.000
g Pekerjaan Pengecatan Plafond
1 Cat plafond 545.33 M2 0.082 0.00% 0.00% 0.00% 0.000
A.3 Plafond Lantai Mezanine
a Plafond Flat Lantai Atas
Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow
galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Shalat 244.11 M2 0.236 0.00% 0.00% 0.00% 0.000
b List Plafond
List plafond shadowline - aluminium
1 Ruang Shalat 81.94 M2 0.031 0.00% 0.00% 0.00% 0.000
c List Plafond
List plafond gypsum uk 5 x 5 cm
1 Ruang Shalat area pforated gypsum 259.6 M2 0.033 0.00% 0.00% 0.00% 0.000
d Pekerjaan Pengecatan Plafond
Cat plafond ex Vinilex/Setara
1 Cat plafond ex Vinilex/Setara 244.11 M2 0.037 0.00% 0.00% 0.00% 0.000
A.4 Plafond Lantai Kubah
a Plafond Flat Lantai Atas
Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow
galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm
1 Ruang Shalat 240.43 M2 0.303 0.00% 0.00% 0.00% 0.000
b List Plafond
List plafond shadowline - aluminium
1 Ruang Shalat 61.90 M2 0.023 0.00% 0.00% 0.00% 0.000
c List Plafond
List plafond gypsum uk 5 x 5 cm
1 Ruang Shalat area pforated gypsum 72.24 M2 0.009 0.00% 0.00% 0.00% 0.000
d Plafond Ornamen Kubah
1 Plafond ornamen kubah - uk 9,7 x 9,7 m2 1.00 M2 0.197 0.00% 0.00% 0.00% 0.000
e Pekerjaan Pengecatan Plafond
1 Cat plafond ex Vinilex/Setara 240.43 M2 0.036 0.00% 0.00% 0.00% 0.000
B Pekerjaan Penutup Lantai Dan Dinding
B.1 Lantai Dasar
a Penutup Lantai Homogenous Tile (1)
Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Marmaro Bianco Travertino/Setara
1 Ruang Seba Guna 578.89 M2 1.853 0.00% 0.00% 0.00% 0.000
2 Ruang Preparation 26.17 M2 0.084 0.00% 0.00% 0.00% 0.000
3 Ruang Gudang 17.55 M2 0.056 0.00% 0.00% 0.00% 0.000
4 Ruang Meeting Dan Ruang Kerja 34.31 M2 0.110 0.00% 0.00% 0.00% 0.000
5 Ruang Rias 1 dan 2 35.72 M2 0.114 0.00% 0.00% 0.00% 0.000
Page 7
8. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
b Penutup Lantai Homogenous Tile (3)
Pek penutup lantai homogenous tile uk 40 x 40 cm - Polish/Gloss - ex Indogress Uni Color
1 Ruang Klinik 17.31 M2 0.044 0.00% 0.00% 0.00% 0.000
2 Ruang Marbot 17.31 M2 0.044 0.00% 0.00% 0.00% 0.000
c Penutup Lantai Homogenous Tile (4)
Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt - Indogress Mytica/ Setara
1 Ruang Penitipan Sepatu Dan Selasar samping 125.82 M2 0.360 0.00% 0.00% 0.00% 0.000
2 Bawah tangga selesar 21.64 M2 0.062 0.00% 0.00% 0.00% 0.000
3 Teras samping kanan 28.55 M2 0.082 0.00% 0.00% 0.00% 0.000
4 Teras samping Kiri 28.55 M2 0.082 0.00% 0.00% 0.00% 0.000
5 Toilet Pria dan wanita 27.60 M2 0.079 0.00% 0.00% 0.00% 0.000
6 Selasar Samping 14.60 M2 0.042 0.00% 0.00% 0.00% 0.000
7 Tangga samping 48.78 M2 0.140 0.00% 0.00% 0.00% 0.000
c Penutup Lantai Keramik (5)
Pek penutup lantai keramik 30 x 30 cm - unPolish/matt - ex Roman type 63306042 / Setara
1 Tempat Wudhu Pria dan Wanita 77.80 M2 0.094 0.00% 0.00% 0.00% 0.000
2 Toilet Pria dan wanita 41.36 M2 0.050 0.00% 0.00% 0.00% 0.000
3 Toilet Disabilitas 3.30 M2 0.004 0.00% 0.00% 0.00% 0.000
d Penutup Lantai Batu Alam (6)
Pek penutup lantai Batu Alam Andesite Bakar rata mesin - uk 30 x 30
1 Teras luar 254.98 M2 0.375 0.00% 0.00% 0.00% 0.000
2 Teras Belakang (Dekat jendela) 3.20 M2 0.005 0.00% 0.00% 0.00% 0.000
e Penutup Lantai Batu Alam (7)
Pek penutup lantai Batu Alam Templek
1 Tempat wudhu luar 39.27 M2 0.049 0.00% 0.00% 0.00% 0.000
2 Teras Belakang (Dekat jendela) 7.20 M2 0.009 0.00% 0.00% 0.00% 0.000
f Penutup Dinding
Pek penutup dinding keramik 30 x 60 cm - unPolish/matt - ex Roman W63535 Coloseum Beige/Setara
1 T. Wudhu Luar 26.14 M2 0.035 0.00% 0.00% 0.00% 0.000
2 Tempat Wudhu Pria dan Wanita 81.00 M2 0.109 0.00% 0.00% 0.00% 0.000
g Pek penutup dinding keramik 30 x 30 cm - unPolish/matt - ex Roman W63535 Coloseum Beige/Setara
1 Toilet pria dan wanita 49.17 M2 0.064 0.00% 0.00% 0.00% 0.000
h Penutup Lantai Grass Block (9)
Pek penutup lantai Grass Block
1 Area taman dekat menara 6.29 M2 0.009 0.00% 0.00% 0.00% 0.000
B.2 Lantai Atas
a Penutup Lantai Homogenous Tile (1)
Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Marmaro Bianco Travertino/Setara
1 Ruang Shalat 489.60 M2 1.401 0.00% 0.00% 0.00% 0.000
2 Ruang Mihrab + Ruang Imam / Utility 16.04 M2 0.046 0.00% 0.00% 0.00% 0.000
b Penutup Lantai Homogenous Tile (1)
Pek penutup lantai border homogenous tile uk 60 x 10 cm - ex Indogrees Uni Color / Setara
1 Ruang Shalat 360.00 M2 0.453 0.00% 0.00% 0.00% 0.000
c Penutup Lantai Homogenous Tile (4)
Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt - Indogress Mytica/Setara
1 Teras 69.30 M2 0.198 0.00% 0.00% 0.00% 0.000
2 Selasar Luar / Bawah Canopy 158.11 M2 0.453 0.00% 0.00% 0.00% 0.000
3 Pasang drop keramik untuk gutter - teras samping 49.00 M2 0.140 0.00% 0.00% 0.00% 0.000
d Penutup Lantai Batu Alam (6)
Pek penutup lantai Batu Alam Andesite Bakar rata mesin - uk 30 x 30
1 Teras luar dan Ramp 79.71 M2 0.120 0.00% 0.00% 0.00% 0.000
2 Tangga entrance 155.36 M2 0.235 0.00% 0.00% 0.00% 0.000
e Penutup Lantai Batu Alam (7)
Pek penutup lantai Batu Alam Templek
1 Wudhu luar ruang imam 7.15 M2 0.009 0.00% 0.00% 0.00% 0.000
g Penutup Lantai rumput sintetis (13)
Pek penutup lantai rumput sintetis
1 Pelataran 154.65 M2 0.357 0.00% 0.00% 0.00% 0.000
h Penutup Waterproofing + Screed
Pek Waterproofing coating Sika + penutup screed
1 Dak Atas (termasuk dak ruang mihrab dan utility) 81.63 M2 0.116 0.00% 0.00% 0.00% 0.000
2 Pelataran 314.09 M2 0.448 0.00% 0.00% 0.00% 0.000
B.3 Lantai Mezzanine
a Penutup Lantai Homogenous Tile (1)
Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Natura / Setara
1 Ruang Shalat 241.08 M2 0.690 0.00% 0.00% 0.00% 0.000
b Penutup Lantai Homogenous Tile (1)
Pek penutup lantai border homogenous tile uk 60 x 10 cm - ex Indogrees Uni Color / Setara
1 Ruang Shalat 186.00 M2 0.234 0.00% 0.00% 0.00% 0.000
c Penutup Lantai Homogenous Tile (4)
Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt ex Indogrees Uni Color / Setara
1 Tangga Utama 49.98 M2 0.126 0.00% 0.00% 0.00% 0.000
d Pek Waterproofing coating Sika + penutup screed
Pek Waterproofing membrane sheet 3 mm + penutup screed
1 Dak Atas Canopy Selasar 144.70 M2 0.207 0.00% 0.00% 0.00% 0.000
B.4 Lantai Atap
a Penutup Waterproofing + Screed
Pek Waterproofing membrane sheet 3 mm + penutup screed
1 Dak Atas Atap 170.99 M2 0.244 0.00% 0.00% 0.00% 0.000
C.1 Lantai Dasar
a Pekerjaan Pasang Dinding
1 Pek Dinding bata merah + campuran semen dan pasir - Trasraam 381.00 M2 0.422 0.00% 50.00% 50.00% 0.211
2 Pek Dinding bata merah + campuran semen dan pasir 1,408.78 M2 1.474 100.00% 0.00% 100.00% 1.474
3 Pek plesteran dinding - campuran semen dan pasir 2,817.56 M2 0.866 100.00% 0.00% 100.00% 0.866
Page 8
9. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
4 Pek acian dinding - semen abu 2,817.56 M2 0.194 100.00% 0.00% 100.00% 0.194
5 Pek cat dinding ex Vinilex 2,817.56 M2 0.426 0.00% 0.00% 0.00% 0.000
6 Pek pasangan rollag teras samping 20.48 M2 0.151 0.00% 0.00% 0.00% 0.000
7 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 228.00 M3 0.139 100.00% 0.00% 100.00% 0.139
C.2 Lantai Atas
a Pekerjaan Pasang Dinding
1 Pek Dinding bata merah + campuran semen dan pasir 381.00 M2 0.536 25.00% 0.00% 25.00% 0.134
2 Pek plesteran dinding - campuran semen dan pasir 1,408.78 M2 0.315 0.00% 0.00% 0.00% 0.000
3 Pek acian dinding - semen abu 2,817.56 M2 0.071 0.00% 0.00% 0.00% 0.000
4 Pek cat dinding ex Vinilex 2,817.56 M2 0.155 0.00% 0.00% 0.00% 0.000
5 Pek pasangan rollag teras samping 2,817.56 M2 0.132 0.00% 0.00% 0.00% 0.000
6 Pek pasangan rollag Trap teras entrance 20.48 M2 0.050 0.00% 0.00% 0.00% 0.000
7 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 228.00 M2 0.056 0.00% 0.00% 0.00% 0.000
C.3 Lantai Mezannine
a Pekerjaan Pasang Dinding
1 Pek Dinding bata merah + campuran semen dan pasir 589.20 M2 0.616 0.00% 0.00% 0.00% 0.000
2 Pek plesteran dinding - campuran semen dan pasir 1,185.49 M2 0.364 0.00% 0.00% 0.00% 0.000
3 Pek acian dinding - semen abu 1,185.49 M2 0.082 0.00% 0.00% 0.00% 0.000
4 Pek cat dinding ex Vinilex 1,185.49 M2 0.179 0.00% 0.00% 0.00% 0.000
5 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 127.60 M2 0.078 0.00% 0.00% 0.00% 0.000
C.4 Pek Pasangan Lainnya
1 Pek Ring Balok praktis 14 x 14 cm besi 4Ø8 + Ø8-200 200.65 M2 0.122 0.00% 0.00% 0.00% 0.000
2 Pek Tanggulan Lantai - pasangan bata tinggi 90 cm 180.59 M2 0.189 0.00% 0.00% 0.00% 0.000
3 Pek Ban - Banan diatas dak canopy selasar Lt. Atas 191.30 M2 0.040 0.00% 0.00% 0.00% 0.000
4 pekerjaan kolom praktis tanggulan 296.40 M2 0.180 0.00% 0.00% 0.00% 0.000
c.5 Pekerjaan Pasangan Shaft
1 Pasangan bata 294.48 M2 0.308 0.00% 40.00% 40.00% 0.123
2 Shaft plesteran 294.48 M2 0.111 0.00% 40.00% 40.00% 0.044
3 bekisting kolom praktis 83.71 M2 0.084 0.00% 40.00% 40.00% 0.034
4 beton kolom praktis 5.02 M2 0.147 0.00% 40.00% 40.00% 0.059
Parapet
1 Pasangan Bata 232.56 M2 0.243 100.00% 0.00% 100.00% 0.243
2 Plesteran 465.12 M2 0.207 90.00% 0.00% 90.00% 0.186
3 bekisting kolom praktis 19.21 M2 0.019 90.00% 0.00% 90.00% 0.017
4 beton kolom praktis 1.13 M3 0.033 70.00% 30.00% 100.00% 0.033
D Pekerjaan Kusen, Pintu Dan Jendela
1 Pintu Type P1 - uk 180 x 350 cm 8.00 Unit 0.418 0.00% 0.00% 0.00% 0.000
Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara
Daun pintu frame alumunium + kaca 5 mm
Engsel dan kunci standard/ex Deksson/Setara
2 Pintu Type P2 - uk 90 x 240 cm 11.00 Unit 0.442 0.00% 0.00% 0.00% 0.000
Kusen kayu enggeneering door
Daun pintu engeneering door
Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB
Lever Handle LHTR DKS 040 sss
Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN
3 Pintu Type P3 - uk 160 x 240 cm 1.00 Unit 0.035 0.00% 0.00% 0.00% 0.000
Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara
Daun pintu frame alumunium + kaca 5 mm
Engsel dan kunci standard/ex Deksson/Setara
4 Pintu Type P11 - uk 80 x 240 cm 2.00 Unit 0.080 0.00% 0.00% 0.00% 0.000
Kusen kayu enggeneering door
Daun pintu engeneering door
Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB
Lever Handle LHTR DKS 040 sss
Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN
5 Pintu Type P5 - uk 70 x 210 cm 10.00 Unit 0.401 0.00% 0.00% 0.00% 0.000
Kusen kayu enggeneering door
Daun pintu engeneering door
Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB
Lever Handle LHTR DKS 040 sss
Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN
6 Pintu Type P6 - uk 100 x 240 cm 1.00 Unit 0.036 0.00% 0.00% 0.00% 0.000
Kusen besi hollow 40 x 60 finish cat
Daun pintu besi siku 40 x 40 mm jarak 4 cm - finish cat
7 Pintu Type P7 - uk 72 x 385 cm 24.00 Unit 0.723 0.00% 0.00% 0.00% 0.000
Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara
Daun pintu frame alumunium + kaca 5 mm
Engsel dan kunci standard/ex Deksson/Setara
8 Pintu Type J6 - uk 72 x 395 cm 24.00 Unit 0.613 0.00% 0.00% 0.00% 0.000
Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca nako
9 Pintu Utama Type P8 - uk 240 x 300 cm 1.00 Unit 0.236 0.00% 0.00% 0.00% 0.000
Kusen kayu solid Jati - finish melamik
Daun pintu kayu solid motif - jati - finish melamik
Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB
Pull Handle DKS 802 32 x 457 x 300 SSS
Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN
10 Pintu type P9 - uk 100 x 300 cm 2.00 Unit 0.054 0.00% 0.00% 0.00% 0.000
Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara
Daun pintu frame alumunium + kaca 5 mm
Engsel dan kunci standard/ex Deksson/Setara
Page 9
10. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
11 Pintu Type P10 - uk 110 x 240 cm 1.00 Unit 0.135 0.00% 0.00% 0.00% 0.000
Kusen kayu solid Jati - finish melamik
Daun pintu kayu solid motif - jati - finish melamik
Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB
Pull Handle DKS 802 32 x 457 x 300 SSS
Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN
12 Pintu Type P4 - uk 80 x 240 cm 4.00 Unit 0.107 0.00% 0.00% 0.00% 0.000
Kusen besi hollow 40 x 60 finish cat
Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat
13 Pintu Type P4a - uk 80 x 180 cm - ruang pompa 1.00 Unit 0.028 0.00% 0.00% 0.00% 0.000
Kusen besi hollow 40 x 60 finish cat
Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat
13 Jendela type J1 - uk 100 x 360 cm 10.00 Unit 0.225 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca nako
14 Jendela type J1A - uk 100 x 360 cm 4.00 Unit 0.121 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela frame alumunium + kaca 5 mm
15 Jendela type J2 - uk 160 x 350 cm 2.00 Unit 0.064 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela frame alumunium + kaca 5 mm
16 Jendela type J3 - uk 80 x 220 cm 4.00 Unit 0.107 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela frame alumunium + kaca 5 mm
17 Jendela type J3A - uk 160 x 220 cm 2.00 Unit 0.055 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela frame alumunium + kaca 5 mm
18 Jendela type J4 - uk 100 x 99 cm 2.00 Unit 0.027 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca nako
19 Jendela type J5 - uk 50 x 330 cm 16.00 Unit 0.332 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca 5 mm - Jendela fixed
20 Jendela type J5A - uk 50 x 540 cm 16.00 Unit 0.427 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca nako
21 Jendela Type J6 - uk 80 x 180 cm - ruang pompa 1.00 Unit 0.028 0.00% 0.00% 0.00% 0.000
Kusen besi hollow 40 x 60 finish cat
Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat
22 Jendela Maintenance Kubah - uk 75 x 60 cm 16.00 Unit 0.232 0.00% 0.00% 0.00% 0.000
Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara
Daun jendela kaca
E Pekerjaan Sanitary
E.1 Sanitary Toilet Pria + T. Wudhu - Lantai Dasar
1 Lavatory ex TOTO type LW521V1A 3.00 Unit 0.017 0.00% 0.00% 0.00% 0.000
2 Lavatory Faucet ex TOTO type TX 111LRYR 3.00 Unit 0.003 0.00% 0.00% 0.00% 0.000
3 Paper Holder ex TOTO type AW360I 3.00 Unit 0.011 0.00% 0.00% 0.00% 0.000
4 Closet ex TOTO CW421J 3.00 Unit 0.040 0.00% 0.00% 0.00% 0.000
5 Jet Washer ex TOTO TX4035 V1 3.00 Unit 0.006 0.00% 0.00% 0.00% 0.000
6 Floor Drain ex TOTO Type TX1 BN 5.00 Unit 0.006 0.00% 0.00% 0.00% 0.000
7 Closet Jongkok ex TOTO type CE7 2.00 Unit 0.007 0.00% 0.00% 0.00% 0.000
8 Kran Dinding ex TOTO Type T23BQ13N 36.00 Unit 0.048 0.00% 0.00% 0.00% 0.000
9 Urinoir ex TOTO Type Khusus Muslim 3.00 Unit 0.057 0.00% 0.00% 0.00% 0.000
10 Cermin wastafel 3.00 Unit 0.034 0.00% 0.00% 0.00% 0.000
11 Cubicle toilet 5.00 Pintu 0.134 0.00% 0.00% 0.00% 0.000
12 Grill tempat wudhu - Siku baja + Plat strip 32.35 M' 0.136 0.00% 0.00% 0.00% 0.000
E.2 Sanitary Toilet Wanita + T. Wudhu - Lantai Dasar
1 Lavatory ex TOTO type LW521V1A 3.00 Unit 0.017 0.00% 0.00% 0.00% 0.000
2 Lavatory Faucet ex TOTO type TX 111LRYR 3.00 Unit 0.003 0.00% 0.00% 0.00% 0.000
3 Paper Holder ex TOTO type AW360I 3.00 Unit 0.011 0.00% 0.00% 0.00% 0.000
4 Closet ex TOTO CW421J 3.00 Unit 0.040 0.00% 0.00% 0.00% 0.000
5 Jet Washer ex TOTO TX4035 V1 3.00 Unit 0.006 0.00% 0.00% 0.00% 0.000
6 Floor Drain ex TOTO Type TX1 BN 5.00 Unit 0.006 0.00% 0.00% 0.00% 0.000
7 Closet Jongkok ex TOTO type CE7 2.00 Unit 0.007 0.00% 0.00% 0.00% 0.000
8 Kran Dinding ex TOTO Type T23BQ13N 24.00 Unit 0.032 0.00% 0.00% 0.00% 0.000
9 Cermin wastafel 3.00 Unit 0.034 0.00% 0.00% 0.00% 0.000
10 Cubicle toilet 5.00 Pintu 0.134 0.00% 0.00% 0.00% 0.000
11 Grill tempat wudhu - Siku baja + Plat strip 32.35 M' 0.136 0.00% 0.00% 0.00% 0.000
E.3 Toilet Disabilitas Lt. Dasar
1 Lavatory ex TOTO type LW521V1A 1.00 Unit 0.006 0.00% 0.00% 0.00% 0.000
2 Lavatory Faucet ex TOTO type TX 111LRYR 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
3 Paper Holder ex TOTO type AW360I 1.00 Unit 0.004 0.00% 0.00% 0.00% 0.000
4 Closet ex TOTO CW421J 1.00 Unit 0.013 0.00% 0.00% 0.00% 0.000
5 Jet Washer ex TOTO TX4035 V1 1.00 Unit 0.002 0.00% 0.00% 0.00% 0.000
6 Floor Drain ex TOTO Type TX1 BN 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
7 Kran Dinding ex TOTO Type T23BQ13N 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
8 Cermin wastafel 1.00 Unit 0.011 0.00% 0.00% 0.00% 0.000
9 Pek railing pegangan 1.00 Unit 0.030 0.00% 0.00% 0.00% 0.000
E.4 Toilet Imam - Lantai Atas
1 Kran Dinding ex TOTO Type T23BQ13N 3.00 Unit 0.004 0.00% 0.00% 0.00% 0.000
2 Grill tempat wudhu - Siku baja + Plat strip 3.58 M' 0.015 0.00% 0.00% 0.00% 0.000
3 Grill tempat Pelataran - Siku baja + Plat strip 44.25 M' 0.186 0.00% 0.00% 0.00% 0.000
Page 10
11. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
F Pekerjaan Railing Tangga Dan Void
F.1 Pekerjaan Railing Tangga
Railing besi hollow 20 x 40 mm finish cat + Handrailing kayu solid 50 x 80 finish melamik
1 Tangga Lt. Dasar 50.84 M' 0.175 0.00% 0.00% 0.00% 0.000
2 Tangga Lt. Atas 59.80 M' 0.205 0.00% 0.00% 0.00% 0.000
3 Railing void mezanine 15.10 M' 0.052 0.00% 0.00% 0.00% 0.000
4 Handrailing - pipa stainless 2" untuk pegangan disable di ramp 59.95 M' 0.206 0.00% 0.00% 0.00% 0.000
5 Pasang railing teras samping 49.00 M' 0.168 0.00% 0.00% 0.00% 0.000
F.2 Pekerjaan Tangga Maintenance
1 Tangga maintenance - besi pipa diameter 1,5" dan 1" finish cat - area dak ruang mihrab3.00 Unit 0.031 0.00% 0.00% 0.00% 0.000
G Pekerjaan Ornamen Fasad
1 Pekerjaan ornamen fasad - tampak 1 - sisi luar
a Kerawangan KR 1 - GRC + Rangka finish Cat sisi luar - dengan backing rangka hollow finish cat + covering wiremesh + panel GRC finish cat sisi dalam1.00 PS 0.386 0.00% 0.00% 0.00% 0.000
b Architrave gawangan plester + aci finish cat - lebar profil 5 cm 32.30 PS 0.016 0.00% 0.00% 0.00% 0.000
c Architrave gawangan keramik - lebar architrave 30 cm 32.30 PS 0.096 0.00% 0.00% 0.00% 0.000
d Kerawangan KR 2 - Kerawangan GRC finish cat 1.00 PS 0.059 0.00% 0.00% 0.00% 0.000
e Architrave gawangan GRC finish cat - lebar architrave 350 mm 21.30 PS 0.033 0.00% 0.00% 0.00% 0.000
f Kerawangan KR 3 - Kerawangan GRC finish cat 1.00 PS 0.074 0.00% 0.00% 0.00% 0.000
g Architrave gawangan GRC finish cat - lebar architrave 350 mm - lengkung kubah luar 1.00 PS 0.030 0.00% 0.00% 0.00% 0.000
h Kerawangan KR 4 - Kerawangan GRC finish cat 1.00 PS 0.095 0.00% 0.00% 0.00% 0.000
i Architrave gawangan GRC finish cat - lebar architrave - lengkung kubah dalam 1.00 PS 0.068 0.00% 0.00% 0.00% 0.000
2 Pekerjaan ornamen fasad - tampak 1 - sisi dalam
a Architrave gawangan GRC finish cat - lebar architrave 800 mm 1.00 Unit 0.075 0.00% 0.00% 0.00% 0.000
3 Pekerjaan ornamen fasad - tampak samping
a Kerwangan GRC (depan jendela samping ) finish cat - uk 100 x 385 - termasuk frame ban - banan keliling12.00 Unit 0.579 0.00% 0.00% 0.00% 0.000
4 Pekerjaan ornamen fasad - tampak samping
a Kerawangan roster - area selasar tempat wudhu 125.80 M2 0.432 0.00% 0.00% 0.00% 0.000
5 Pekerjaan ornamen tampak belakang - tampak 3 - sisi luar
a Kerawangan KR 1 - Besi plat peforated finish cat - uk Cek Gambar 1.00 PS 0.735 0.00% 0.00% 0.00% 0.000
b Architrave gawangan plester + aci finish cat - lebar profil 5 cm 34.60 PS 0.017 0.00% 0.00% 0.00% 0.000
c Architrave gawangan keramik - lebar architrave 30 cm 34.60 PS 0.103 0.00% 0.00% 0.00% 0.000
H Pekerjaan Minaret
1 Pekerjaan Minaret Masjid - H 24 1.00 PS 2.351 0.00% 0.00% 0.00% 0.000
Panel GRC teba 2 cm - Segmented 12 setiap 20 cm finish cat
Struktur minaret besi pipa baja 18" + rangka CNP 150.65.20.2,3
Ornamen bulan sabit - plat stainless steel
Tangga maintenance
I Pekerjaan Kubah Masjid
1 Pekerjaan Kubah Masjid Radius 4750 mm 1.00 PS 0.619 0.00% 60.00% 60.00% 0.371
Tebal GRC Atap - 10 mm
Tebal GRC Ceililng - 8 mm
List Bawah Kubah
Frame pipa 4" dan 3" cat zincromat
2 Finishing atap kubah finish cat 1.00 PS 0.104 0.00% 0.00% 0.00% 0.000
3 pekerjaan tangga service 11.00 m 0.034 0.00% 0.00% 0.00% 0.000
Sub Total : 4.648
A PEKERJAAN GROUND WATERTANK
1 Pekerjaan Galian Tanah 108.1344 M3 0.073 100.00% 0.00% 100.00% 0.073
2 Pekerjaan galian tanah - galian manual 108.1344 M3 0.054 100.00% 0.00% 100.00% 0.054
3 Pekerjaan buang atau lansir tanah 37.27 M3 0.013 0.00% 100.00% 100.00% 0.013
Pekerjaan urugan GWT
Pekerjaan Struktur GWT
1 Pekerjaan urugan pasir bawah GWT 3.84 M3 0.007 100.00% 0.00% 100.00% 0.007
2 Pekerjaan lantai kerja bawah GWT 38.4 M3 0.196 100.00% 0.00% 100.00% 0.196
3 Pekerjaan bekisting GWT 123.67 M3 0.133 100.00% 0.00% 100.00% 0.133
4 Pekerjaan cor beton readymix K300 + termasuk tutup GWT 26.8224 M3 0.588 100.00% 0.00% 100.00% 0.588
5 Pekerjaan waterproofing coating ex Sika 99.82 M2 0.130 0.000 0.00% 0.00% 0.00%
C Pekerjaan Finishing GWT
1 Pekerjaan pasang keramik dinding 30 x 30 ex Asia Tile Putih 123.67 M2 0.156 0.00% 0.00% 0.00% 0.000
2 tutup manhole 100x100 2.00 pcs 0.010 0.00% 0.00% 0.00% 0.000
II PEKERJAAN RUMAH POMPA
A Pekerjaan Rumah Pompa
1 Pekerjaan kolom beton 15 x 20 cm 0.48 M3 0.014 0.00% 35.00% 35.00% 0.005
2 Pekerjaan cor dak atap ruang pompa tebal 12 cm 23.80 M3 0.457 0.00% 30.00% 30.00% 0.137
3 Pekerjaan pasangan dinding 17.50 M2 0.019 0.00% 35.00% 35.00% 0.007
4 Pekerjaan plesteran dinding 35.00 M2 0.009 0.00% 0.00% 0.00% 0.000
5 Pekerjaan acian dinding 35.00 M2 0.003 0.00% 0.00% 0.00% 0.000
6 Pekerjaan pengecatan 50.80 M2 0.007 0.00% 0.00% 0.00% 0.000
7 Pekerjaan waterproofing coating ex Sika 10.96 M2 0.014 0.00% 0.00% 0.00% 0.000
8 Pekerjaan lantai keramik 12.03 M2 0.015 0.00% 0.00% 0.00% 0.000
9 pintu besi 2.00 pcs 0.069 0.00% 0.00% 0.00% 0.000
10 talang air d3" 2.00 pcs 0.018 0.00% 0.00% 0.00% 0.000
11 batu alam 12.10 m2 0.014 0.00% 0.00% 0.00% 0.000
12 bekisting kolom 6.40 m2 0.005 0.00% 100.00% 100.00% 0.005
Sub Total : 1.218
A PEKERJAAN ELEKTRIKAL
I. PANEL
1 PANEL MDP 1.00 Unit 0.737 0.00% 0.00% 0.00% 0.000
2 LP-DASAR 1.00 Unit 0.098 0.00% 0.00% 0.00% 0.000
3 PP-AC DASAR 1.00 Unit 0.132 0.00% 0.00% 0.00% 0.000
4 LP-ATAS 1.00 Unit 0.092 0.00% 0.00% 0.00% 0.000
5 PP-AC ATAS 1.00 Unit 0.098 0.00% 0.00% 0.00% 0.000
6 PP-TRANSFER PUMP 1.00 Unit 0.090 0.00% 0.00% 0.00% 0.000
7 Grounding System 1.00 Ls 0.137 0.00% 50.00% 50.00% 0.069
Page 11
12. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
8 Material Bantu 1.00 Ls 0.039 0.00% 0.00% 0.00% 0.000
9 Testing & Commissioning 1.00 Ls 0.015 0.00% 0.00% 0.00% 0.000
II. KABEL FEEDER - ex Supreme/Setara
1 Dari Genset Existing ke MDP 80.00 m 0.396 0.00% 0.00% 0.00% 0.000
NYFGBY 4x95mm2 + 50 mm2
2 Dari PLN Existing ke MDP
NYFGBY 4x185mm2 + 70 mm2) 80.00 m 0.782 0.00% 0.00% 0.00% 0.000
Dari MDP ke :
3 LP-DASAR, NYY 4 x 10 mm2+NYA 10 mm2 5.00 m 0.003 100.00% 0.00% 100.00% 0.003
4 PP-AC DASAR, NYY 4 x 70 mm2+NYA 35 mm2 5.00 m 0.019 90.00% 0.00% 90.00% 0.019
5 LP-ATAS, NYY 4 x 10 mm2+NYA 10 mm2 35.00 m 0.024 90.00% 0.00% 90.00% 0.024
6 PP-AC ATAS, NYY 4 x 25 mm2+NYA 25 mm2 35.00 m 0.060 90.00% 0.00% 90.00% 0.060
7 PP-TRANSFER PUMP, NYFGBY 4 x 6 mm2+NYA 6mm2 52.00 m 0.038 90.00% 0.00% 90.00% 0.038
III RAK KABEL
III.1. Lantai Dasar
a Instalasi Rak Kabel termasuk Penggantung dan accessories
Straight 185.00 m 0.428 0.00% 0.00% 0.00% 0.000
W = 450 x 100 mm
Elbow
450 x 100 mm 1.00 bh 0.001 0.00% 0.00% 0.00% 0.000
Tee
450 x 450 x 450 mm 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000
b Material Bantu 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000
IV. LAMPU PENERANGAN, INSTALASI PENERANGAN DAN
STOP KONTAK
IV.1 Lantai Dasar - ex Panasonic Standard
1 Lampu Sorot Pohon 50 W 28.00 bh 0.176 0.00% 0.00% 0.00% 0.000
2 Lampu Up Light 80 W 2.00 bh 0.007 0.00% 0.00% 0.00% 0.000
3 Lampu Down light PLC 26 W 82.00 bh 0.125 0.00% 0.00% 0.00% 0.000
4 Lampu Step Light 18 W 22.00 bh 0.067 0.00% 0.00% 0.00% 0.000
5 Lampu TL Blak 1x36 W 97.00 bh 0.177 0.00% 0.00% 0.00% 0.000
6 Lampu Baret TLE 18 W 6.00 bh 0.024 0.00% 0.00% 0.00% 0.000
7 Lampu Spot Light 250 W 4.00 bh 0.031 0.00% 0.00% 0.00% 0.000
8 Stop Kontak 1 phase 10 A, 200 VA 46.00 bh 0.016 0.00% 0.00% 0.00% 0.000
9 Saklar tunggal 8.00 bh 0.002 0.00% 0.00% 0.00% 0.000
10 Saklar ganda 8.00 bh 0.003 0.00% 0.00% 0.00% 0.000
11 Instalasi Penerangan, NYM 3x2,5 mm2 in conduit PVC dia.20 241.00 ttk 0.413 0.00% 80.00% 80.00% 0.331
12 Instalasi Stop Kontak, NYM 3x2,5 mm2 in conduit PVC dia 20 46.00 ttk 0.097 0.00% 50.00% 50.00% 0.049
13 Instalasi Exhaust Fan, NYM 3x2,5 mm2 in conduit PVC dia.20 8.00 ttk 0.014 0.00% 50.00% 50.00% 0.007
IV.1 Lantai Atas, Mezzanine - ex Panasonic Standard
1 Wall lamp 50 W 22.00 bh 0.074 0.00% 0.00% 0.00% 0.000
2 Lampu Up Light 80 W 18.00 bh 0.082 0.00% 0.00% 0.00% 0.000
3 Lampu Down light PLC 26 W 76.00 bh 0.116 0.00% 0.00% 0.00% 0.000
4 Lampu Step Light 18 W 55.00 bh 0.167 0.00% 0.00% 0.00% 0.000
5 Lampu TL Blak 1x36 W 16.00 bh 0.029 0.00% 0.00% 0.00% 0.000
6 Lampu Spot Light 250 W 4.00 bh 0.031 0.00% 0.00% 0.00% 0.000
7 Stop Kontak 1 phase 10 A, 200 VA 17.00 bh 0.006 0.00% 0.00% 0.00% 0.000
8 Saklar tunggal 4.00 bh 0.001 0.00% 0.00% 0.00% 0.000
9 Saklar ganda 7.00 bh 0.003 0.00% 0.00% 0.00% 0.000
10 Instalasi Penerangan, NYM 3x2,5 mm2 in conduit PVC dia.20 191.00 ttk 0.328 0.00% 80.00% 80.00% 0.262
11 Instalasi Stop Kontak, NYM 3x2,5 mm2 in conduit PVC dia 20 17.00 ttk 0.036 0.00% 50.00% 50.00% 0.018
12 Material Bantu 1.00 lot 0.050 0.00% 0.00% 0.00% 0.000
13 Testing & Commissioning 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000
V. PENANGKAL PETIR
1 Air Terminal, type Spit sentz 24.00 Unit 0.057 0.00% 0.00% 0.00% 0.000
2 Conductor BC 50 mm 2
180.00 m 0.067 0.00% 0.00% 0.00% 0.000
3 Cable Clamp+Support 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000
4 Grounding 12 M BC 50 mm 3.00 lot 0.017 0.00% 0.00% 0.00% 0.000
5 Bak Kontrol 400 x 400 3.00 bh 0.00% 0.00% 0.00% 0.000
6 Ijin Depnaker 1.00 lot 0.067 0.00% 0.00% 0.00% 0.000
V. GENSET DAN PENYAMBUNGAN PLN
Sambungan PLN 1.00 lot 1.347 0.00% 0.00% 0.00% 0.000
Genset 150 kva 1.00 unit 2.018 0.00% 0.00% 0.00% 0.000
Sub Total : 0.879
PEKERJAAN ELEKTRONIK
INSTALASI FIRE ALARM
Peralatan Utama
MCFA type Conventional 5 zone lengkap dengan : 1.00 Set 0.137 0.00% 0.00% 0.00% 0.000
* Rectifier
* Battery nicad kapasitas bertahanan min. 4 jam
* Control Relay modul for Lift, Fire pump
* Power supply
* Stabilizer
* Active announciator
* Sirene 60 - 70 dB
* Power surge Arrester
*Material bantu
Announciator 1.00 Unit 0.060 0.00% 0.00% 0.00% 0.000
MDF Fire Alarm 1.00 Unit 0.044 0.00% 0.00% 0.00% 0.000
Grounding system 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000
Kabel Utama
Kabel dari MCFA ke :
- JB-FA.Dasar, NYA 2x1,5mm2 4.00 m' 0.007 0.00% 0.00% 0.00% 0.004
(Dalam PVC H Conduit ∅ 20 mm) 0.000
- JB-FA.Atas, NYA 2x1,5mm2 36.00 m' 0.065 0.00% 0.00% 0.00% 0.032
Page 12
13. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
(Dalam PVC H Conduit ∅ 20 mm)
Testing & Commisioning 1.00 Lot 0.027 0.00% 0.00% 0.00% 0.000
Lantai Dasar
Terminal box Fire Alarm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000
Photo Electric Smoke Detector 11.00 bh 0.042 0.00% 0.00% 0.00% 0.000
Rate Of Rise Heat Detector 8.00 bh 0.012 0.00% 0.00% 0.00% 0.000
Manual push button 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000
Alarm Bell 1.00 bh 0.003 0.00% 0.00% 0.00% 0.000
Indicator lamp 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000
Instalasi Detektor, NYA 2 x 1,5 mm² 19.00 ttk 0.040 0.00% 0.00% 0.00% 0.032
Instalasi Alarm Bell & Indicator Lamp, NYA 2 x 1,5 mm² 1.00 ttk 0.003 0.00% 0.00% 0.00% 0.002
Material bantu 1.00 Lot 0.021 0.00% 0.00% 0.00% 0.016
Testing & Commissioning 1.00 Lot 0.027 0.00% 0.00% 0.00% 0.000
Lantai Atas
Terminal box Fire Alarm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000
Photo Electric Smoke Detector 5.00 bh 0.019 0.00% 0.00% 0.00% 0.000
Rate Of Rise Heat Detector 6.00 bh 0.009 0.00% 0.00% 0.00% 0.000
Manual push button 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000
Alarm Bell 1.00 bh 0.003 0.00% 0.00% 0.00% 0.000
Indicator lamp 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000
Instalasi Detektor, NYA 2 x 1,5 mm² 11.00 ttk 0.023 0.00% 0.00% 0.00% 0.000
Instalasi Alarm Bell & Indicator Lamp, NYA 2 x 1,5 mm² 1.00 ttk 0.003 0.00% 0.00% 0.00% 0.001
Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.011
Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000
INSTALASI TATA SUARA
Peralatan Utama Tata Suara
- Radio Tuner AM/FM + Antenna 1.00 Set 0.029 0.00% 0.00% 0.00% 0.000
- DVD Player 1.00 unit 0.021 0.00% 0.00% 0.00% 0.000
- Mixer Frame w/Moudules + Speaker selector 1.00 unit 0.090 0.00% 0.00% 0.00% 0.000
- Power Amplifier 240 Watt 3.00 unit 0.067 0.00% 0.00% 0.00% 0.000
- Paging Microphone 1.00 unit 0.013 0.00% 0.00% 0.00% 0.000
- Cabinet Rack 1.00 unit 0.058 0.00% 0.00% 0.00% 0.000
- MDF 1.00 unit 0.009 0.00% 0.00% 0.00% 0.000
Peralatan Utama Tata Suara Car Call
- Mixer Frame w/Moudules 1.00 unit 0.082 0.00% 0.00% 0.00% 0.000
- Power Amplifier 120 Watt 1.00 unit 0.047 0.00% 0.00% 0.00% 0.000
- Paging Microphone 1.00 unit 0.010 0.00% 0.00% 0.00% 0.000
-Horn speaker 15 W 4.00 bh 0.011 0.00% 0.00% 0.00% 0.000
-Instalasi Speaker, NYMHY 2 x 1.5 mm² 4.00 ttk 0.007 0.00% 0.00% 0.00% 0.004
Kabel Utama
Kabel dari speaker selector ke :
- MDF-SS.1 NYM 2 x 2,5 mm² + PVC Conduit dia 20 mm 3.00 m' 0.010 0.00% 0.00% 0.00% 0.005
Kabel dari MDF-SS.1 ke :
- JBTS-DASAR NYMHY 2 x 1,5 mm² + PVC Conduit dia 20 mm 4.00 m' 0.007 0.00% 0.00% 0.00% 0.004
- JBTS-ATAS NYMHY 2 x 1,5 mm² + PVC Conduit dia 20 mm 36.00 m' 0.063 0.00% 0.00% 0.00% 0.032
Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000
SUB TOTAL. B1
Lantai Dasar
Junction Box 1.00 bh 0.008 0.00% 0.00% 0.00% 0.000
Coloumb speaker 20 w 8.00 bh 0.039 0.00% 0.00% 0.00% 0.000
Ceiling Speaker 3 W 14.00 bh 0.013 0.00% 0.00% 0.00% 0.000
Instalasi Speaker, NYMHY 2 x 1.5 mm² 22.00 ttk 0.039 0.00% 0.00% 0.00% 0.019
Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.011
Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000
SUB TOTAL. B2
Lantai Atas, Mezzanine
Junction Box 1.00 bh 0.008 0.00% 0.00% 0.00% 0.000
Coloumb speaker 20 w 12.00 bh 0.058 0.00% 0.00% 0.00% 0.000
Ceiling Speaker 3 W 40.00 bh 0.038 0.00% 0.00% 0.00% 0.000
Horn Speaker menara 15 W 2.00 bh 0.007 0.00% 0.00% 0.00% 0.000
Instalasi Speaker, NYMHY 2 x 1.5 mm² 54.00 ttk 0.095 0.00% 0.00% 0.00% 0.000
Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.000
Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000
Sub Total : 0.174
C. PEKERJAAN PEMADAM KEBAKARAN
I PEKERJAAN PEMIPAAN
1 Site Plan& lantai dasar
a. Pengadaan dan Pemasangan Pipa BS sch 40
dia. 100 mm 255 mtr 69.27% 0.00% 0.00% 0.00% 0.000
dia. 65 mm 20 mtr 3.06% 0.00% 0.00% 0.00% 0.000
b. Valve - Valve
Gate Valve
dia. 100 mm 5 bh 17.33% 0.00% 0.00% 0.00% 0.000
dia. 65 mm 1 bh 1.63% 0.00% 0.00% 0.00% 0.000
c. Out Door Hydrant Box 5 bh 13.30% 0.00% 0.00% 0.00% 0.000
Hydrant pilar 5 bh 14.78% 0.00% 0.00% 0.00% 0.000
Indoor Hydrant Box 1 bh 3.35% 0.00% 0.00% 0.00% 0.000
lengkap dengan nozle,hose rackkatup vander hydent
d. Air Release Valve (dia. 50) 1 bh 7.53% 0.00% 0.00% 0.00% 0.000
e. Fire Extinguisher Class ABC 3 Kg 3 bh 2.06% 0.00% 0.00% 0.00% 0.000
f. Fitting 1 lot 1.91% 0.00% 0.00% 0.00% 0.000
g. Material Bantu 1 lot 0.88% 0.00% 0.00% 0.00% 0.000
Page 13
14. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
h. Pengetesan 1 lot 2.68% 0.00% 0.00% 0.00% 0.000
I. Conecting Hidrant
Pipa 6”x50 m+Gate Valve 6" 2 bh + 50 m 23.27% 0.00% 0.00% 0.00% 0.000
Bongkar Pasang trotoar, jalan, ondasi batu kali
Sub Total : 0.000
D. PEKERJAAN PLUMBING
I. PERALATAN UTAMA PLUMBING
1 Shalow Well (Lokasi Site) 3.00 Unit 0.258 0.00% 0.00% 0.00% 0.000
Kapasitas : 45 l/m
Head : 30 meter
Speed : 1450 rpm
Daya : 0.5Kw/ 3Ø/ 220 V/50 hz/1 ph
2 Transfer Pump (Lokasi Ruang Pompa) 2.00 Unit 0.275 0.00% 0.00% 0.00% 0.000
Kapasitas : 125 l/m
Head : 25 meter
Speed : 1450 rpm
Daya : 3 Kw/380 V/50 Hz/3 ph
Type : End Suction
Spesifikasi Pompa :
Alternate with WLC 1 Operasi, 1 Stand By
3 Tanki Air Bawah (Ground Water Tank) , Lokasi Site 1.00 set 0.00% 0.00% 0.00% 0.000
Kapasitas : 30 m3
Bahan : Beton Bertulang
Lengkap dengan dudukan pondasi, dan pipa over flow, dan
sistim drain. Termasuk tangga pengontrol
4 Tanki Air Atas (Roof tank) , Lokasi Atap 3.00 unit 0.299 0.00% 0.00% 0.00% 0.000
Kapasitas : 3300 liter
Bahan : Fiber
Lengkap dengan dudukan pondasi, dan pipa over flow, dan
sistem drain.
5 Pengolahan Limbah Septic tank Biotec 1.00 set 0.810 0.00% 0.00% 0.00% 0.000
Kapasitas : 15 m3
Bahan : FRP
6 Resapan 1.00 bh 0.00% 0.00% 0.00% 0.000
Kapasitas : 3 m3
Bahan : Pasangan Bata
Lengkap dengan tutup
7 Material Bantu 1.00 lot 0.022 0.00% 0.00% 0.00% 0.000
8 Testing & Commissioning 1.00 lot 0.024 0.00% 0.00% 0.00% 0.000
Sub. Total-I (PERALATAN UTAMA)
II. PEKERJAAN AIR HUJAN
Pipa PVC AW Class 10 K - ex Wavin
1 Site Plan
dia. 100 mm 72.00 m 0.075 0.00% 0.00% 0.00% 0.000
2 Lt. -dasar
dia. 100 mm (Pipa Tegak) 65.00 m 0.068 0.00% 0.00% 0.00% 0.000
3 Lt. atas
dia. 100 mm (Pipa Tegak) 52.00 m 0.054 0.00% 0.00% 0.00% 0.000
4 Lt. Atap
dia. 100 mm (Pipa Tegak) 78.00 m 0.081 0.00% 0.00% 0.00% 0.000
Roof Drain
dia. 100 mm 13.00 bh 0.034 0.00% 0.00% 0.00% 0.000
bak kontrol 400X400 13.00 bh
5 Fitting 1.00 lot 0.026 0.00% 0.00% 0.00% 0.000
6 Material Bantu 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000
7 Pengetesan 1.00 lot 0.013 0.00% 0.00% 0.00% 0.000
Sub. Total-II (PEKERJAAN AIR HUJAN)
III. PEKERJAAN AIR BERSIH
III.1. Site Plan
1 Penyambungan PDAM dia. 25 mm 1.00 lot 0.00% 0.00% 0.00% 0.000
Perizinan Penyambungan PDAM 1.00 lot 0.00% 0.00% 0.00% 0.000
Instalasi Ruang Pompa
2 Gate Valve
dia. 65 mm 4.00 bh 0.058 0.00% 0.00% 0.00% 0.000
dia. 50 mm 3.00 bh
3 Check Valve
dia. 50 mm 3.00 bh 0.020 0.00% 0.00% 0.00% 0.000
4 Strainer
dia. 65 mm 3.00 bh 0.00% 0.00% 0.00% 0.000
5 Flexible Joint
dia. 50 mm 3.00 bh 0.018 0.00% 0.00% 0.00% 0.000
dia. 65 mm 3.00 bh 0.022 0.00% 0.00% 0.00% 0.000
6 Floater Valve
dia. 50 mm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000
7 Header
dia. 80 mm 1.00 set 0.016 0.00% 0.00% 0.00% 0.000
8 Instalasi Air Bersih menggunakan pipa GIP Medium Class
dia. 65 mm 6.00 m' 0.008 0.00% 0.00% 0.00% 0.000
dia. 50 mm 6.00 m' 0.007 0.00% 0.00% 0.00% 0.000
9 Fitting 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000
10 Material Bantu 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000
11 Pengetesan 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000
Site Plan
Page 14
15. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
13 (Pipa Galvanized Iron Medium Class)
dia. 65 mm (Dari SHALOOW WELL) 1.00 lot 0.034 0.00% 0.00% 0.00% 0.000
dia. 50 mm (Dari PDAM) 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000
dia. 50 mm 40.00 M 0.056 0.00% 0.00% 0.00% 0.000
14 Water Meter dia. 25 mm 1.00 bh 0.004 0.00% 0.00% 0.00% 0.000
15 Fitting 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000
16 Material Bantu 1.00 lot 0.006 0.00% 0.00% 0.00% 0.000
17 Pengetesan 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000
III.2. Lantai dasar
Instalasi Air Bersih menggunakan pipa PPR PN 10 - ex Wavin Tigris
1 dia. 65 mm (Pipa Tegak Distribusi) 15.00 m 0.015 0.00% 0.00% 0.00% 0.000
dia. 50 mm pipa transfer 15.00 m 0.011 0.00% 0.00% 0.00% 0.000
dia. 65 mm 24.00 m 0.025 0.00% 0.00% 0.00% 0.000
dia. 50 mm 18.00 m 0.013 0.00% 0.00% 0.00% 0.000
dia. 40 mm 10.00 m 0.005 0.00% 0.00% 0.00% 0.000
dia. 32 mm 32.00 m 0.012 0.00% 0.00% 0.00% 0.000
dia. 25 mm 68.00 m 0.018 0.00% 0.00% 0.00% 0.000
dia. 20 mm 46.00 m 0.010 0.00% 0.00% 0.00% 0.000
dia. 15 mm 268.00 m 0.030 0.00% 0.00% 0.00% 0.000
2 Gate Valve
dia. 40 mm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000
dia. 32 mm 8.00 bh 0.030 0.00% 0.00% 0.00% 0.000
dia. 25mm 2.00 bh 0.005 0.00% 0.00% 0.00% 0.000
3 Fitting 1.00 lot 0.022 0.00% 0.00% 0.00% 0.000
4 Material Bantu 1.00 lot 0.006 0.00% 0.00% 0.00% 0.000
5 Pengetesan 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000
III.3. Lt. -ATAP
1 (Pipa Galvanized Iron Medium Class)
HEADER dia. 80 mm 1.00 lot 0.012 0.00% 0.00% 0.00% 0.000
dia. 65 mm 26.00 m 0.036 0.00% 0.00% 0.00% 0.000
dia. 50 mm 16.00 m 0.019 0.00% 0.00% 0.00% 0.000
dia. 40 mm 36.00 m 0.019 0.00% 0.00% 0.00% 0.000
2 Gate Valve
dia. 40 mm 9.00 bh 0.042 0.00% 0.00% 0.00% 0.000
dia. 65 mm 1.00 bh 0.014 0.00% 0.00% 0.00% 0.000
Floating Valve
dia. 40 mm 3.00 bh 0.018 0.00% 0.00% 0.00% 0.000
3 Fitting 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000
4 Material Bantu 1.00 lot 0.015 0.00% 0.00% 0.00% 0.000
5 Pengetesan 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000
PEKERJAAN AIR KOTOR, BEKAS DAN VENTING
Lt. Dasar
(Pipa PVC Class AW, Class 10 K) Air Kotor & air bekas - ex Wavin
1 dia. 150 mm 22.00 M2 0.046 100.00% 0.00% 100.00% 0.046
2 dia. 100 mm 152.00 M2 0.159 80.00% 0.00% 80.00% 0.127
3 dia. 80 mm 24.00 M2 0.016 100.00% 0.00% 100.00% 0.016
4 dia. 65 mm 54.00 M2 0.019 100.00% 0.00% 100.00% 0.019
5 dia. 50 mm 12.00 M2 0.003 100.00% 0.00% 100.00% 0.003
(Pipa Vent PVC Class D, Class 5 K) Venting
1 dia. 65 mm (Pipa Tegak) 6.00 M2 0.002 100.00% 0.00% 100.00% 0.002
2 dia. 65 mm 18.00 M2 0.005 100.00% 0.00% 100.00% 0.005
3 dia. 50 mm 34.00 M2 0.008 100.00% 0.00% 100.00% 0.008
4 dia. 40 mm 8.00 M2 0.002 100.00% 0.00% 100.00% 0.002
5 dia. 32 mm 24.00 M2 0.004 100.00% 0.00% 100.00% 0.004
Floor Drain (FD)
1 dia. 65 mm 11.00 bh 0.039 0.00% 0.00% 0.00% 0.000
2 Clean Out (CO)
3 dia. 80 mm 2.00 m 0.003 0.00% 0.00% 0.00% 0.000
4 dia. 65 mm 5.00 m 0.008 0.00% 0.00% 0.00% 0.000
5 Fitting 1.00 lot 0.015 0.00% 0.00% 0.00% 0.000
6 Material Bantu 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000
7 Pengetesan 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000
Sub Total : 0.230
PEKERJAAN TATA UDARA (VAC)
PERALATAN UTAMA
Lantai dasar
Indoor Unit AC 8.00 Unit 0.025 0.00% 0.00% 0.00% 0.000
Indoor Unit AC 3.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
Indoor Unit AC 3.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
PI
Pemasangan 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000
Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Lantai Atas
Indoor Unit AC 4.00 Unit 0.013 0.00% 0.00% 0.00% 0.000
Lantai Mezzanine
Indoor Unit AC 6.00 Unit 0.002 0.00% 0.00% 0.00% 0.000
Pemasangan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Page 15
16. MINGGU KE : 32 (TIGA PULUH DUA)
s/d
Minggu
Ini (%)
PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015
NO URAIAN VOLUME UNIT
BOBOT
(%)
Progres thd Jenis Pekerjaan
Prestasi
thd Bobot
Kerja (%)
Minggu
Lalu (%)
Minggu
Ini (%)
PEKERJAAN PEMIPAAN
Lantai dasar
Pipa Referigerant & Pipa Drain
Pipa Referigerant AC 9.000 btu/h (1/4" dan 1/2") 42.00 m 0.000 0.00% 0.00% 0.00% 0.004
Pipa Drain (1/2") 30.00 m 0.000 0.00% 0.00% 0.00% 0.000
Pipa Referigerant & Pipa Drain
Pipa Referigerant AC 12.000 btu/h (1/4" dan 1/2") 42.00 m 0.000 0.00% 0.00% 0.00% 0.004
Pipa Drain (1/2") 30.00 m 0.000 0.00% 0.00% 0.00% 0.000
Pipa Referigerant & Pipa Drain
Pipa Referigerant AC 75.000 btu/h (1/2" dan 1") 8.00 m 0.000 0.00% 0.00% 0.00% 0.001
Pipa Drain (3/4") 48.00 m 0.000 0.00% 0.00% 0.00% 0.000
Lantai Atas
Pipa Referigerant & Pipa Drain
Pipa Referigerant AC 75.000 btu/h (1/2" dan 1") 56.00 m 0.001 0.00% 0.00% 0.00% 0.000
Pipa Drain (3/4") 45.00 m 0.000 0.00% 0.00% 0.00% 0.000
Lantai Mezzanaine
Pipa Referigerant & Pipa Drain
Pipa Referigerant AC 24.000 btu/h (3/8" dan5/82") 84.00 m 0.001 0.00% 0.00% 0.00% 0.000
Pipa Drain (1/2") 90.00 m 0.000 0.00% 0.00% 0.00% 0.000
PEKERJAAN FAN
Lantai dasar
EXHAUST FAN ex KDK/Setara 10.00 Unit 0.001 0.00% 0.00% 0.00% 0.000
Pemasangan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
PEKERJAAN PEMIPAAN EXHAUST FAN
Instalasi Pipa PVC Exhaust
Lantai Dasar
PVC dia. 100 mm 20.00 m 0.000 0.00% 0.00% 0.00% 0.000
PVC dia. 80 mm 14.00 m 0.000 0.00% 0.00% 0.00% 0.000
Fitting 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
PEKERJAAN GRILLE & LOUVRE
Lantai Dasar
Louvre
150x150 2.00 bh 0.000 0.00% 0.00% 0.00% 0.000
Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000
Sub Total : 0.009
TOTAL……….. 49.963