KEGIATAN : PERENCANAAN RUMAH TINGGAL
PEKERJAAN : REHABILITASI RUMAH TINGGAL
LOKASI : CALUNG KARAWANG BARAT START DURASI END
TAHUN ANGGARAN : 2023 22-Mar 240 17-Nov
SUMBER DANA : -
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
A. PEKERJAAN KONSTRUKSI LANTAI 1
I. PEKERJAAN PERSIAPAN DAN PEMBERSIHAN = 22,664,370.01
Rp 2.87% 2.65% 1.99% 0.66% 0.66% L L L
II. PEKERJAAN TANAH & URUGAN = 3,248,390.63
Rp 0.41% 0.41% 0.14% 0.14% 0.14% I I I
III. PEKERJAAN STRUKTUR BETON BERTULANG LT.1 = 100,011,090.39
Rp 12.68% 12.14% 2.11% 2.11% 2.11% 1.06% B B B 2.11% 2.11% 1.06%
IV. PEKERJAAN FINISHING ARSITEKTUR LT.1 = 204,081,338.59
Rp 25.88% 0.00% U U U 4.31% 4.31% 4.31% 2.16% 2.16% 2.16% 2.16% 2.16% 2.16%
V. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.1 = 20,416,573.00
Rp 2.59% 0.97% 0.65% R R R 0.65% 0.65% 0.65%
B. PEKERJAAN KONSTRUKSI LANTAI 2
I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.2 = 88,352,656.53
Rp 11.20% 10.50% I I I 2.80% 2.80% 2.80% 2.80%
II. PEKERJAAN FINISHING ARSITEKTUR LT.2 = 196,995,972.38
Rp 26.98% 5.05% D D D 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45%
III. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.2 = 24,072,131.13
Rp 3.05% 0.91% U U U 0.76% 0.76% 0.76% 0.76%
C. PEKERJAAN KONSTRUKSI LANTAI 3 L L L
I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.3 = 8,986,933.40
Rp 1.14% 1.14% 0.23% 0.23% 0.23% 0.23% 0.23%
II. PEKERJAAN KONSTRUKSIPENUTUP ATAP = 25,367,565.85
Rp 2.22% 0.39% F F F 0.44% 0.44% 0.44% 0.44% 0.44%
III. PEKERJAAN FINISHING ARSITEKTUR LT.3 = 87,124,204.93
Rp 10.05% 0.24% I I I 2.51% 2.51% 2.51% 2.51%
IV. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.3 = 7,351,665.00
Rp 0.93% 0.39% T T T 0.47% 0.47%
100% 34.79% R R R
PROGRESS MINGGUAN 0% 4.24% 3.56% 2.91% 1.06% 0.00% 0.00% 0.00% 2.11% 4.91% 1.82% 2.80% 5.50% 5.86% 5.79% 4.54% 2.93% 2.93% 2.93% 3.14% 3.14% 3.14% 2.70% 2.70% 2.16% 2.80% 2.80% 3.25% 2.60% 3.37% 1.21% 1.21% 0.45% 2.96% 2.96% 2.51% 2.51% 0.47% 0.47%
KOMULATIF RENCANA PROGRESS MINGGUAN 0% 4.24% 7.80% 10.72% 11.77% 11.77% 11.77% 11.77% 13.89% 18.80% 20.62% 23.42% 28.92% 34.78% 40.57% 45.12% 48.04% 50.97% 53.89% 57.03% 60.17% 63.32% 66.01% 68.71% 70.87% 73.67% 76.47% 79.72% 82.32% 85.69% 86.90% 88.12% 88.57% 91.53% 94.49% 97.00% 99.51% 99.98% 100%
AKTUAL PROGRESS MINGGUAN 2.76% 2.76% 2.76% 2.93% 2.93% 2.93% 2.93% 3.96% 4.26% 5.02% 2.54% 3.55% 3.62%
KOMULATIF AKTUAL PROGRESS MINGGUAN 0% 4.52% 8.28% 13.78% 14.63% 14.63% 14.63% 14.63% 19.8% 21.29% 25.08% 27.62% 31.17% 34.79%
DEVIASI 0% 0.28% 0.47% 3.06% 2.86% 2.86% 2.86% 2.86% 5.90% 2.49% 4.46% 4.20% 2.25% 0.01%
Diajukan Oleh : Menyetujui
CV. Satria Bangkit Propertindo CUSTOMER
( Aji Darmawan ) ( Bp Andi)
Kontraktor Owner
SCHEDULE PEKERJAAN VS ACTUAL PROGRESS
DESEMBER
JUMLAH HARGA
APRIL MEI JUNI JULI AGUSTUS
BOBOT
PEKERJAAN
AKTUAL
PROGRESS
MARET
NO.
SEPTEMBER OKTOBER NOVEMBER
URAIAN KEGIATAN
0%
4.24%
7.80%
10.72% 11.77% 11.77% 11.77% 11.77%
13.89%
18.80% 20.62%
23.42%
28.92%
34.78%
40.57%
45.12%
48.04%
50.97%
53.89%
57.03%
60.17%
63.32%
66.01%
68.71%
70.87%
73.67%
76.47%
79.72%
82.32%
85.69% 86.90% 88.12% 88.57%
91.53%
94.49%
97.00%
99.51% 99.98% 100%
4.52%
8.28%
13.78% 14.63% 14.63% 14.63%
19.8% 21.29%
25.08%
31.17%
34.79%
KEGIATAN : PEMBANGUNAN RUMAH
PEKERJAAN : PEMBANGUNAN TEMPAT TINGGAL
LOKASI : KARAWANG TIMUR
PEMILIK : BP ANDI
BOBOT PERSENTASE ACT BOBOT
1 4 5
A. PEKERJAAN KONSTRUKSI LANTAI 1
I. PEKERJAAN PERSIAPAN DAN PEMBERSIHAN 2.87% 2.65%
1 Membersihkan Lapangan Awal Hingga Akhir 85.00 m² 0.26% 40.00% 0.10%
2 Pengukuran & Pasang Bouwplank Kayu Lokal 55.50 m' 0.36% 100.00% 0.36%
3 Pembongkaran 1 m3 dinding tembok bata 14.40 m³ 1.68% 100.00% 1.68%
4 Pembongkaran Kusen Jendela Existing 1.00 pkt 0.25% 100.00% 0.25%
5 Sewa Scafolding 1.00 pkt 0.32% 80.00% 0.25%
II. PEKERJAAN TANAH & URUGAN 0.41% 0.41%
1 Menggali Tanah Biasa Sedalam 1 m 25.88 m³ 0.33% 100.00% 0.33%
2 Urugan tanah kembali 8.63 m³ 0.08% 100.00% 0.08%
III. PEKERJAAN STRUKTUR BETON BERTULANG LT.1 12.68% 12.14%
1 Pekerjaan Pondasi Footplat K225
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.00 m³ 0.45% 100.00% 0.45%
b.) Pembesian dengan Besi Ulir 0.00 kg
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.00 m³ 0.49% 100.00% 0.49%
d.) Bekisting Kayu Tahun 6.08 m² 0.05% 100.00% 0.05%
2 Pekerjaan Beton Bertulang Sloof K225
a.) Pembesian dengan Besi Polos 385.03 kg 0.77% 100.00% 0.77%
b.) Pembesian dengan Besi Ulir 0.00 kg
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 2.08 m³ 0.34% 100.00% 0.34%
d.) Bekisting Kayu Tahun 16.18 m² 0.15% 100.00% 0.15%
3 Pekerjaan Beton Bertulang Kolom Struktur K225
a.) Pembesian dengan Besi Polos 454.98 kg 0.91% 100.00% 0.91%
b.) Pembesian dengan Besi Ulir 0.00 kg
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.24 m³ 0.53% 100.00% 0.53%
d.) Bekisting Kayu Tahun 47.11 m² 0.44% 100.00% 0.44%
4 Pekerjaan Beton Bertulang Struktur Balok Lt.2 K225
a.) Pembesian dengan Besi Polos 116.33 kg 0.23% 100.00% 0.23%
b.) Pembesian dengan Besi Ulir 362.70 kg 0.73% 100.00% 0.73%
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.54 m³ 0.58% 100.00% 0.58%
d.) Bekisting Kayu Tahun 43.73 m² 0.60% 100.00% 0.60%
5 Pekerjaan Beton Bertulang Struktur Plat Lt.2 K225
a.) Pembesian dg Wiremesh M8 873.84 kg 1.61% 100.00% 1.61%
b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 7.94 m³ 1.30% 100.00% 1.30%
c.) Plat Bondek t=0,75mm 66.20 m² 1.48% 100.00% 1.48%
6 Pekerjaan Beton Bertulang Kolom, Balok Praktis K175
a.) Pembesian dengan Besi Polos 135.17 kg 0.27% 100.00% 0.27%
b.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 0.81 m³ 0.13% 100.00% 0.13%
c.) Bekisting Kayu Tahun 11.33 m² 0.11% 100.00% 0.11%
7 Pekerjaan Beton Bertulang StrukturTangga Lt.1 ke Lt.2 K225
a.) Pembesian dengan Besi Polos 183.03 kg 0.37% 100.00% 0.37%
b.) Pembesian dengan Besi Ulir 14.85 kg 0.03% 100.00% 0.03%
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.23 m³ 0.20% 100.00% 0.20%
d.) Bekisting Kayu Tahun 12.01 m² 0.37% 100.00% 0.37%
8 Pas. Waterproofing Mortar 51.00 m² 0.54% 0.00% 0.0%
IV. PEKERJAAN FINISHING ARSITEKTUR LT.1 25.88% 0.00%
a. PEKERJAAN PASANGAN & PLESTERAN 9.86% 0.00%
1 Pemasang Batu Kosong/ Anstamping 5.55 m³ 0.52% 100.00% 0.52%
2 Pemasangan Pondasi Batu Belah 1SP : 6 PP 13.32 m³ 1.86% 100.00% 1.86%
3 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 194.25 m² 2.71% 100.00% 2.71%
4 Pemasangan Finishing Plesteran Conven 388.50 m² 3.20% 0.00% 0.00%
5 Pemasangan Finishing Acian Semen 388.50 m² 1.23% 0.00% 0.00%
6 Pas. List Profil Dinding 101.20 m' 0.33% 0.00% 0.00%
b. PEKERJAAN PENUTUP LANTAI DAN DINDING 3.62% 0.00%
1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Lt.1 46.00 m² 1.49% 0.00% 0.00%
2 Pas. Lantai Keramik Motif Batu 39.00 m² 1.36% 0.00% 0.00%
3 Pas. Lantai Toilet Homogenous Tile uk. 60 x 60cm Doff 2.40 m² 0.08% 0.00% 0.00%
4 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi 17.92 m² 0.68% 0.00% 0.00%
c. PEKERJAAN SANITAIR 0.16% 0.00%
1 Memasang Closet Jongkok 1.00 bh 0.10% 0.00% 0.00%
2
DETAIL ENGINEERING DESIGN
( DED )
NO VOL SAT
URAIAN PEKERJAAN
Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah
Telp. 082225314338
BOBOT PERSENTASE ACT BOBOT
1 4 5
2
NO VOL SAT
URAIAN PEKERJAAN
2 Pemasangan Floor Drain Stainless Steel 1.00 bh 0.03% 0.00% 0.00%
3 Pemasangan Jet Shower 1.00 bh 0.03% 0.00% 0.00%
4 Membuat Septiktank + Resapan 1.00 unit
d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 6.52% 0.00%
1 Pas. Pintu Type P1, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 3.00 unit 1.18% 0.00% 0.00%
2 Pas. Pintu Type P2, Panil pvc 2.00 unit 0.25% 0.00% 0.00%
2 Pas. Pintu Type P3, Pintu Panel Besi Toko 1.00 unit 1.95% 0.00% 0.00%
3 Pas. Pintu Type P3, Pintu Panel Besi Garasi 1.00 unit 2.04% 0.00% 0.00%
4 Pas. Jendela Type J1, Kaca Bening t=5mm 1.00 unit 0.49% 0.00% 0.00%
5 Pas. Railing Tangga 7.20 m' 0.59% 0.00% 0.00%
e. PEKERJAAN LANGIT - LANGIT 1.47% 0.00%
1 Memasang Rk. hollow Galvanis, modul 60 x 60 cm, plafon 72.00 m² 0.91% 0.00% 0.00%
2 Memasang Langit-langit Gypsum Board, Uk(120x240) tebal 9mm 72.00 m² 0.32% 0.00% 0.00%
3 List Langit-Langit Gypsum 77.20 m' 0.23% 0.00% 0.00%
f. PEKERJAAN PENGECATAN 4.26% 0.00%
1 Pengecatan Tembok Baru Sek. Vinillex Interior 388.50 m² 1.72% 0.00% 0.00%
2 Pengecatan Tembok Baru Sek. Vinillex Exterior 388.50 m² 2.22% 0.00% 0.00%
3 Pengecatan Plafond Sek. Vinillex Interior 72.00 m² 0.32% 0.00% 0.00%
g. PEKERJAAN FURNITURE
Exclude
V. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.1 2.59% 0.97%
1. PEKERJAAN PLUMBING 1.11% 0.97%
1 Pemasangan Pipa PVC tipe AW Ø ¾" 48.00 m' 0.19% 25.00% 0.05%
2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 24.00 m' 0.39% 100.00% 0.39%
3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 24.00 m' 0.53% 100.00% 0.53%
2. PEKERJAAN MEKANIKAL ELEKTRIKAL 1.33% 0.00%
1 PEKERJAAN INSTALASI LISTRIK
- Inst. Penerangan Lampu 11.00 Ttk 0.24% 0.00% 0.00%
- Inst. Stop Kontak 12.00 Ttk 0.27% 0.00% 0.00%
- Inst. AC 1.00 Ttk 0.13% 0.00% 0.00%
- Pekerjaan Sipil dan Bobokan Pipa Instalasi 23.00 Ttk 0.15% 0.00% 0.00%
- Material Konsumable Instalasi 1.00 pkt 0.25% 0.00% 0.00%
2 PEKERJAAN SUPPLY MATERIAL
- Stop Kontak Dinding Tunggal 8.00 Ttk 0.05% 0.00% 0.00%
- Stop Kontak Dinding Ganda 2.00 Ttk 0.01% 0.00% 0.00%
- Stop Kontak AC Dinding 200W 2.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Saklar Ganda 8.00 Ttk 0.05% 0.00% 0.00%
- Pemasangan Saklar Tunggal 2.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Downlight Slim Inbow LED 3W 3000K 2.00 Ttk 0.03% 0.00% 0.00%
- Pemasangan Downlight Slim Outbow LED 3W 3000K 10.00 Ttk 0.13% 0.00% 0.00%
3. PEKERJAAN INST. TATA UDARA 0.15% 0.00%
- Pipa PVC tipe AW Ø 3/4" (drainase AC) 10.00 m' 0.03% 0.00% 0.00%
- Pipa Refrigrant 3/8 : 5/8 10.00 m' 0.13% 0.00% 0.00%
Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah
Telp. 082225314338
KEGIATAN : PERENCANAAN RUMAH TINGGAL
PEKERJAAN : REHABILITASI RUMAH TINGGAL
LOKASI : CALUNG KARAWANG BARAT
TAHUN ANGGARAN : 2023
SUMBER DANA : -
BOBOT PERSENTASE ACT BOBOT
1 3 4 5
B. PEKERJAAN KONSTRUKSI LANTAI 2
I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.2 11.20% 10.50%
1 Pekerjaan Beton Bertulang Kolom Struktur K225
a.) Pembesian dengan Besi Polos 98.21 kg 0.20% 100% 0.20%
b.) Pembesian dengan Besi Ulir 202.63 kg 0.41% 100% 0.41%
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.89 m³ 0.31% 100% 0.31%
d.) Bekisting Kayu Tahun 13.26 m² 0.13% 100% 0.13%
2 Pekerjaan Beton Bertulang Struktur Balok Lt.3 K225
a.) Pembesian dengan Besi Polos 199.18 kg 0.40% 100% 0.40%
b.) Pembesian dengan Besi Ulir 362.70 kg 0.73% 100% 0.73%
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.39 m³ 0.55% 100% 0.55%
d.) Bekisting Kayu Tahun 82.39 m² 1.14% 100% 1.14%
b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 0.00 m²
1 Pekerjaan Beton Bertulang Struktur Plat Lt.3 K225 0.00% 100% 0.00%
a.) Pembesian dg Wiremesh M8 873.84 kg 1.61% 100% 1.61%
b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 7.94 m³ 1.30% 100% 1.30%
c.) Plat Bondek t=0,75mm 66.20 m² 1.48% 100% 1.48%
1 Pekerjaan Beton Bertulang Kolom, Balok Praktis K175 0.00% 100% 0.00%
a.) Pembesian dengan Besi Polos 195.30 kg 0.39% 100% 0.39%
b.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 1.26 m³ 0.20% 100% 0.20%
c.) Bekisting Kayu Tahun 41.19 m² 0.39% 100% 0.39%
2 Pekerjaan Beton Bertulang StrukturTangga Lt.2 ke Lt.3 K225 0.00% 100% 0.00%
a.) Pembesian dengan Besi Polos 244.04 kg 0.49% 100% 0.49%
b.) Pembesian dengan Besi Ulir 19.80 kg 0.04% 100% 0.04%
c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.64 m³ 0.27% 100% 0.27%
d.) Bekisting Kayu Tahun 16.02 m² 0.49% 100% 0.49%
3 Pas. Waterproofing Mortar 66.20 m² 0.71% 0% 0.00%
II. PEKERJAAN FINISHING ARSITEKTUR LT.2 26.98% 5.05%
a. PEKERJAAN PASANGAN & PLESTERAN 10.93% 5.05%
1 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 218.75 241.75 m² 5.05% 100% 5.05%
2 Pemasangan Finishing Plesteran Conven 437.50 507.58 m² 3.61% 0% 0.00%
3 Pekerjaan BackDrop TV Ruang Tengah Lantai 2 1.00 Unit 0.89% 0% 0.00%
4 Pemasangan Finishing Acian Semen 437.50 507.58 m² 1.39% 0% 0.00%
b. PEKERJAAN PENUTUP LANTAI DAN DINDING 5.15% 0.00%
1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Lt.2 58.50 m² 1.90% 0% 0.00%
2 Pas. Keramik Dinding uk. 30 x 60cm Façade Depan 9.00 m² 0.41% 0% 0.00%
3 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi 39.20 m² 1.49% 0% 0.00%
4 Pas. Lantai Toilet Homogenous Tile uk. 60 x 60cm Doff 5.25 m² 0.18% 0% 0.00%
5 Pemasangan Keramik Lantai tangga 24.00 m² 1.17% 0% 0.00%
c. PEKERJAAN SANITAIR 1.56% 0.00%
1 Memasang Closet Jongkok 1.00 bh 0.10% 0% 0.00%
1 Memasang Closet Duduk 1.00 bh 0.34% 0% 0.00%
2 Memasang Washtafle Gantung Lengkap (Sifon + Kran) Sericite 1.00 bh 0.29% 0% 0.00%
3 Pemasangan Floor Drain Stainless Steel 2.00 bh 0.06% 0% 0.00%
4 Pemasangan Jet Shower 2.00 bh 0.08% 0% 0.00%
5 Pemasangan Kran Doble Shower 2.00 bh 0.75% 0% 0.00%
1 Pemasangan Floor Drain Stainless Steel (Roofdrain) 1.00 bh 0.04% 0% 0.00%
d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 4.16% 0.00%
1 Pas. Pintu Type P1, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 4.00 unit 1.58% 0% 0.00%
2 Pas. Pintu Type P2, Panil pvc 3.00 unit 0.38% 0% 0.00%
3 Pintu Jendela Depan PJ2 ( include Sliding Door dan Aksesoris ) 1.00 unit 0.99% 0% 0.00%
4 Pas. Jendela Type J1, Kaca Bening t=5mm 1.00 unit 0.43% 0% 0.00%
5 Pas. Jendela Type J2, Kaca Bening t=5mm 3.00 unit 0.55% 0% 0.00%
6 Pas Rooster Tampak Depan 1.60 m2 0.12% 0% 0.00%
7 Pas. Boven Type BV 1.00 unit 0.11% 0% 0.00%
e. PEKERJAAN LANGIT - LANGIT 2.78% 0.00%
1 Memasang Rk. hollow Galvanis, modul 60 x 60 cm, plafon 63.00 m² 0.80% 0% 0.00%
2 Memasang Langit-langit Gypsum Board, Uk(120x240) tebal 9mm 63.00 m² 0.28% 0% 0.00%
3 List Langit-Langit Gypsum 82.80 m' 0.25% 0% 0.00%
4 Pas. Railing Tangga 7.20 m' 0.59% 0% 0.00%
5 Pas. Railing Balkon Type RL (Rk. Pipa Stainless + Kaca Temperd 10mm) 4.00 unit 0.86% 0% 0.00%
f. PEKERJAAN PENGECATAN 2.39% 0.00%
1 Pengecatan Tembok Baru Sek. Vinillex Interior 437.50 m² 1.94% 0% 0.00%
2 Pengecatan Tembok Baru Sek. Vinillex Exterior 30.00 m² 0.17% 0% 0.00%
3 Pengecatan Plafond Sek. Vinillex Interior 63.00 m² 0.28% 0% 0.00%
III. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.2 3.05% 0.91%
1. PEKERJAAN PLUMBING 0.99% 0.91%
1 Pemasangan Pipa PVC tipe AW Ø ¾" 25.00 m' 0.10% 25% 0.02%
2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 22.00 m' 0.36% 100% 0.36%
3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 24.00 m' 0.53% 100% 0.53%
2. PEKERJAAN MEKANIKAL ELEKTRIKAL 1.67% 0.00%
1 PEKERJAAN INSTALASI LISTRIK 0.00% 0% 0.00%
- Inst. Penerangan Lampu 15.00 Ttk 0.33% 0% 0.00%
- Inst. Stop Kontak 12.00 Ttk 0.27% 0% 0.00%
- Inst. Cooker Hood 1.00 Ttk 0.02% 0% 0.00%
2
DETAIL ENGINEERING DESIGN
( DED )
NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT
Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah
Telp. 082225314338
BOBOT PERSENTASE ACT BOBOT
1 3 4 5
2
NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT
- Inst. Water Heater 2.00 Ttk 0.13% 0% 0.00%
- Instalasi Exhausfan Ceiling 2.00 Ttk 0.10% 0% 0.00%
- Pekerjaan Sipil dan Bobokan Pipa Instalasi 30.00 Ttk 0.19% 0% 0.00%
- Material Konsumable Instalasi 1.00 pkt 0.26% 0% 0.00%
2 PEKERJAAN SUPPLY MATERIAL 0.00% 0% 0.00%
- Stop Kontak Dinding Tunggal 11.00 Ttk 0.06% 0% 0.00%
- Stop Kontak Dinding Ganda 2.00 Ttk 0.01% 0% 0.00%
- Stop Kontak AC Dinding 200W 3.00 Ttk 0.02% 0% 0.00%
- Pemasangan Saklar Ganda 11.00 Ttk 0.06% 0% 0.00%
- Pemasangan Saklar Tunggal 2.00 Ttk 0.01% 0% 0.00%
- Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0% 0.00%
- Pemasangan Downlight Slim Inbow LED 3W 3000K 2.00 Ttk 0.03% 0% 0.00%
- Pemasangan Downlight Slim Outbow LED 3W 3000K 13.00 Ttk 0.17% 0% 0.00%
3. PEKERJAAN INST. TATA UDARA 0.40% 0.00%
- Pipa PVC tipe AW Ø 3/4" (drainase AC) 20.00 m' 0.08% 0% 0.00%
- Pipa Refrigrant 3/8 : 5/8 25.00 m' 0.32% 0% 0.00%
Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah
Telp. 082225314338
KEGIATAN : PERENCANAAN RUMAH TINGGAL
PEKERJAAN : REHABILITASI RUMAH TINGGAL
LOKASI : CALUNG KARAWANG BARAT
TAHUN ANGGARAN : 2023
SUMBER DANA : -
BOBOT PERSENTASE ACT BOBOT
1 3 4 5
C. PEKERJAAN KONSTRUKSI LANTAI 3
I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.3 1.14% 1.14%
1 Pekerjaan Beton Bertulang Kolom, Balok & Plat Praktis K175
a.) Pembesian dengan Besi Polos 151.20 kg 0.30% 100% 0.30%
b.) Pembesian dg Wiremesh M8 151.20 kg 0.28% 100% 0.28%
c.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 0.54 m³ 0.08% 100% 0.08%
d.) Bekisting Kayu Tahun 34.50 m² 0.33% 100% 0.33%
e.) Plat Bondek t=0,75mm 4.50 m² 0.10% 100% 0.10%
2 Pas. Waterproofing Mortar 4.50 m² 0.05% 100% 0.05%
II. PEKERJAAN KONSTRUKSI PENUTUP ATAP 2.22% 0.39%
Pekerjaan Atap Utama
1 Pas. Rangka Atap Kaso dan Reng Baja Ringan 45.00 m² 0.77% 50.00% 0.39%
2 Pemasangan 1 m2 Alderon doubel Layer 10 mm 45.00 m² 0.19% 0.00% 0.00%
3 Pemasangan 1 m’ Ban Banan Finish Waterproofing 14.64 m² 0.06% 0.00% 0.00%
4 Pemasangan 1m' Listplank 3x30cm Kalsi plank 7.50 m' 0.03% 0.00% 0.00%
Pekerjaan Rooflight R. Jemur & R. Santai lt 2
5 Pas. Atap Kaca Solar Flat 3 mm 7.30 m² 0.60% 0.00% 0.00%
6 Pas. Rangka Atap Besi Hollow 40x60x1,2mm, Fin. Duco 7.30 m² 0.46% 0.00% 0.00%
7 Angkur Dynabolt M10 40.00 bh 0.10% 0.00% 0.00%
III. PEKERJAAN FINISHING ARSITEKTUR LT.3 10.05% 0.24%
a. PEKERJAAN PASANGAN & PLESTERAN 2.28% 0.24%
1 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 89.25 m² 0.24% 100% 0.24%
2 Pemasangan Finishing Plesteran Conven 178.50 m² 1.47% 0.00% 0.00%
3 Pemasangan Finishing Acian Semen 178.50 m² 0.57% 0.00% 0.00%
b. PEKERJAAN PENUTUP LANTAI DAN DINDING 4.10% 0.00%
1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Kamar 4.00 m² 0.13% 0.00% 0.00%
2 Pas. Lantai Homogenous Tile uk. 60 x 60cm Rooftop 41.00 m² 1.56% 0.00% 0.00%
3 Pas. Lantai Homogenous Tile uk. 60 x 60cm Doff Toilet dan Area Cuci 4.50 m² 0.15% 0.00% 0.00%
3 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi dan Area Cuci 18.00 m² 0.68% 0.00% 0.00%
4 Pas. Keramik Tangga 24.00 m² 1.17% 0.00% 0.00%
5 Pasang Ruster 20 x 20 x 10 cm 126.00 bh 0.40% 0.00% 0.00%
c. PEKERJAAN SANITAIR 0.45% 0.00%
1 Pemasangan Floor Drain Stainless Steel 2.00 bh 0.06% 0.00% 0.00%
2 Pemasangan Floor Drain Stainless Steel (Roofdrain) 5.00 bh 0.09% 0.00% 0.00%
3 Pemasangan 1 buah Kran Diameter ½” atau ¾ ” Onda 3.00 bh 0.07% 0.00% 0.00%
4 Tanki air 520 L 1.00 bh 0.24% 0.00% 0.00%
d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 1.37% 0.00%
1 Pas. Pintu Type PJ2, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 1.00 unit 1.00% 0.00% 0.00%
2 Pas. Pintu Type J3 Alluminium 3" Warna Hitam 1.00 unit 0.37% 0.00% 0.00%
e. PEKERJAAN LANGIT - LANGIT 0.55% 0.00%
1 Plafon 28.00 m² 0.55% 0.00% 0.00%
f. PEKERJAAN PENGECATAN 1.30% 0.00%
1 Pengecatan Tembok Baru Sek. Vinillex Interior 178.50 m² 0.79% 0.00% 0.00%
2 Pengecatan Tembok Baru Sek. Vinillex Exterior 66.50 m² 0.38% 0.00% 0.00%
3 Pengecatan Plafond Sek. Vinillex Interior 28.00 m² 0.12% 0.00% 0.00%
IV. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.3 0.93% 0.39%
1. PEKERJAAN PLUMBING 0.42% 0.39%
1 Pemasangan Pipa PVC tipe AW Ø ¾" 10.00 m' 0.04% 25.00% 0.01%
2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 10.00 m' 0.16% 100% 0.16%
3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 10.00 m' 0.22% 100% 0.22%
2. PEKERJAAN MEKANIKAL ELEKTRIKAL 0.51% 0.00%
1 PEKERJAAN INSTALASI LISTRIK 0.00% 0.00% 0.00%
- Inst. Penerangan Lampu 8.00 Ttk 0.18% 0.00% 0.00%
- Inst. Stop Kontak 6.00 Ttk 0.13% 0.00% 0.00%
- Inst. Pompa 1.00 Ttk 0.02% 0.00% 0.00%
- Pekerjaan Sipil dan Bobokan Pipa Instalasi 6.00 Ttk 0.04% 0.00% 0.00%
- Material Konsumable Instalasi 1.00 pkt 0.06% 0.00% 0.00%
2 PEKERJAAN SUPPLY MATERIAL 0.00% 0.00% 0.00%
- Stop Kontak Dinding Tunggal 2.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Saklar Ganda 2.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Saklar Tunggal 1.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0.00% 0.00%
- Pemasangan Lampu Downlight Outbow LED 5W 3000K 3.00 Ttk 0.04% 0.00% 0.00%
2
DETAIL ENGINEERING DESIGN
( DED )
NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT
Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah
Telp. 082225314338

Master Schedule vs Actual Progress Bp Andi Week 13.pdf

  • 1.
    KEGIATAN : PERENCANAANRUMAH TINGGAL PEKERJAAN : REHABILITASI RUMAH TINGGAL LOKASI : CALUNG KARAWANG BARAT START DURASI END TAHUN ANGGARAN : 2023 22-Mar 240 17-Nov SUMBER DANA : - W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 A. PEKERJAAN KONSTRUKSI LANTAI 1 I. PEKERJAAN PERSIAPAN DAN PEMBERSIHAN = 22,664,370.01 Rp 2.87% 2.65% 1.99% 0.66% 0.66% L L L II. PEKERJAAN TANAH & URUGAN = 3,248,390.63 Rp 0.41% 0.41% 0.14% 0.14% 0.14% I I I III. PEKERJAAN STRUKTUR BETON BERTULANG LT.1 = 100,011,090.39 Rp 12.68% 12.14% 2.11% 2.11% 2.11% 1.06% B B B 2.11% 2.11% 1.06% IV. PEKERJAAN FINISHING ARSITEKTUR LT.1 = 204,081,338.59 Rp 25.88% 0.00% U U U 4.31% 4.31% 4.31% 2.16% 2.16% 2.16% 2.16% 2.16% 2.16% V. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.1 = 20,416,573.00 Rp 2.59% 0.97% 0.65% R R R 0.65% 0.65% 0.65% B. PEKERJAAN KONSTRUKSI LANTAI 2 I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.2 = 88,352,656.53 Rp 11.20% 10.50% I I I 2.80% 2.80% 2.80% 2.80% II. PEKERJAAN FINISHING ARSITEKTUR LT.2 = 196,995,972.38 Rp 26.98% 5.05% D D D 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 2.70% 0.45% 0.45% 0.45% 0.45% 0.45% 0.45% III. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.2 = 24,072,131.13 Rp 3.05% 0.91% U U U 0.76% 0.76% 0.76% 0.76% C. PEKERJAAN KONSTRUKSI LANTAI 3 L L L I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.3 = 8,986,933.40 Rp 1.14% 1.14% 0.23% 0.23% 0.23% 0.23% 0.23% II. PEKERJAAN KONSTRUKSIPENUTUP ATAP = 25,367,565.85 Rp 2.22% 0.39% F F F 0.44% 0.44% 0.44% 0.44% 0.44% III. PEKERJAAN FINISHING ARSITEKTUR LT.3 = 87,124,204.93 Rp 10.05% 0.24% I I I 2.51% 2.51% 2.51% 2.51% IV. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.3 = 7,351,665.00 Rp 0.93% 0.39% T T T 0.47% 0.47% 100% 34.79% R R R PROGRESS MINGGUAN 0% 4.24% 3.56% 2.91% 1.06% 0.00% 0.00% 0.00% 2.11% 4.91% 1.82% 2.80% 5.50% 5.86% 5.79% 4.54% 2.93% 2.93% 2.93% 3.14% 3.14% 3.14% 2.70% 2.70% 2.16% 2.80% 2.80% 3.25% 2.60% 3.37% 1.21% 1.21% 0.45% 2.96% 2.96% 2.51% 2.51% 0.47% 0.47% KOMULATIF RENCANA PROGRESS MINGGUAN 0% 4.24% 7.80% 10.72% 11.77% 11.77% 11.77% 11.77% 13.89% 18.80% 20.62% 23.42% 28.92% 34.78% 40.57% 45.12% 48.04% 50.97% 53.89% 57.03% 60.17% 63.32% 66.01% 68.71% 70.87% 73.67% 76.47% 79.72% 82.32% 85.69% 86.90% 88.12% 88.57% 91.53% 94.49% 97.00% 99.51% 99.98% 100% AKTUAL PROGRESS MINGGUAN 2.76% 2.76% 2.76% 2.93% 2.93% 2.93% 2.93% 3.96% 4.26% 5.02% 2.54% 3.55% 3.62% KOMULATIF AKTUAL PROGRESS MINGGUAN 0% 4.52% 8.28% 13.78% 14.63% 14.63% 14.63% 14.63% 19.8% 21.29% 25.08% 27.62% 31.17% 34.79% DEVIASI 0% 0.28% 0.47% 3.06% 2.86% 2.86% 2.86% 2.86% 5.90% 2.49% 4.46% 4.20% 2.25% 0.01% Diajukan Oleh : Menyetujui CV. Satria Bangkit Propertindo CUSTOMER ( Aji Darmawan ) ( Bp Andi) Kontraktor Owner SCHEDULE PEKERJAAN VS ACTUAL PROGRESS DESEMBER JUMLAH HARGA APRIL MEI JUNI JULI AGUSTUS BOBOT PEKERJAAN AKTUAL PROGRESS MARET NO. SEPTEMBER OKTOBER NOVEMBER URAIAN KEGIATAN 0% 4.24% 7.80% 10.72% 11.77% 11.77% 11.77% 11.77% 13.89% 18.80% 20.62% 23.42% 28.92% 34.78% 40.57% 45.12% 48.04% 50.97% 53.89% 57.03% 60.17% 63.32% 66.01% 68.71% 70.87% 73.67% 76.47% 79.72% 82.32% 85.69% 86.90% 88.12% 88.57% 91.53% 94.49% 97.00% 99.51% 99.98% 100% 4.52% 8.28% 13.78% 14.63% 14.63% 14.63% 19.8% 21.29% 25.08% 31.17% 34.79%
  • 2.
    KEGIATAN : PEMBANGUNANRUMAH PEKERJAAN : PEMBANGUNAN TEMPAT TINGGAL LOKASI : KARAWANG TIMUR PEMILIK : BP ANDI BOBOT PERSENTASE ACT BOBOT 1 4 5 A. PEKERJAAN KONSTRUKSI LANTAI 1 I. PEKERJAAN PERSIAPAN DAN PEMBERSIHAN 2.87% 2.65% 1 Membersihkan Lapangan Awal Hingga Akhir 85.00 m² 0.26% 40.00% 0.10% 2 Pengukuran & Pasang Bouwplank Kayu Lokal 55.50 m' 0.36% 100.00% 0.36% 3 Pembongkaran 1 m3 dinding tembok bata 14.40 m³ 1.68% 100.00% 1.68% 4 Pembongkaran Kusen Jendela Existing 1.00 pkt 0.25% 100.00% 0.25% 5 Sewa Scafolding 1.00 pkt 0.32% 80.00% 0.25% II. PEKERJAAN TANAH & URUGAN 0.41% 0.41% 1 Menggali Tanah Biasa Sedalam 1 m 25.88 m³ 0.33% 100.00% 0.33% 2 Urugan tanah kembali 8.63 m³ 0.08% 100.00% 0.08% III. PEKERJAAN STRUKTUR BETON BERTULANG LT.1 12.68% 12.14% 1 Pekerjaan Pondasi Footplat K225 c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.00 m³ 0.45% 100.00% 0.45% b.) Pembesian dengan Besi Ulir 0.00 kg c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.00 m³ 0.49% 100.00% 0.49% d.) Bekisting Kayu Tahun 6.08 m² 0.05% 100.00% 0.05% 2 Pekerjaan Beton Bertulang Sloof K225 a.) Pembesian dengan Besi Polos 385.03 kg 0.77% 100.00% 0.77% b.) Pembesian dengan Besi Ulir 0.00 kg c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 2.08 m³ 0.34% 100.00% 0.34% d.) Bekisting Kayu Tahun 16.18 m² 0.15% 100.00% 0.15% 3 Pekerjaan Beton Bertulang Kolom Struktur K225 a.) Pembesian dengan Besi Polos 454.98 kg 0.91% 100.00% 0.91% b.) Pembesian dengan Besi Ulir 0.00 kg c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.24 m³ 0.53% 100.00% 0.53% d.) Bekisting Kayu Tahun 47.11 m² 0.44% 100.00% 0.44% 4 Pekerjaan Beton Bertulang Struktur Balok Lt.2 K225 a.) Pembesian dengan Besi Polos 116.33 kg 0.23% 100.00% 0.23% b.) Pembesian dengan Besi Ulir 362.70 kg 0.73% 100.00% 0.73% c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.54 m³ 0.58% 100.00% 0.58% d.) Bekisting Kayu Tahun 43.73 m² 0.60% 100.00% 0.60% 5 Pekerjaan Beton Bertulang Struktur Plat Lt.2 K225 a.) Pembesian dg Wiremesh M8 873.84 kg 1.61% 100.00% 1.61% b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 7.94 m³ 1.30% 100.00% 1.30% c.) Plat Bondek t=0,75mm 66.20 m² 1.48% 100.00% 1.48% 6 Pekerjaan Beton Bertulang Kolom, Balok Praktis K175 a.) Pembesian dengan Besi Polos 135.17 kg 0.27% 100.00% 0.27% b.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 0.81 m³ 0.13% 100.00% 0.13% c.) Bekisting Kayu Tahun 11.33 m² 0.11% 100.00% 0.11% 7 Pekerjaan Beton Bertulang StrukturTangga Lt.1 ke Lt.2 K225 a.) Pembesian dengan Besi Polos 183.03 kg 0.37% 100.00% 0.37% b.) Pembesian dengan Besi Ulir 14.85 kg 0.03% 100.00% 0.03% c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.23 m³ 0.20% 100.00% 0.20% d.) Bekisting Kayu Tahun 12.01 m² 0.37% 100.00% 0.37% 8 Pas. Waterproofing Mortar 51.00 m² 0.54% 0.00% 0.0% IV. PEKERJAAN FINISHING ARSITEKTUR LT.1 25.88% 0.00% a. PEKERJAAN PASANGAN & PLESTERAN 9.86% 0.00% 1 Pemasang Batu Kosong/ Anstamping 5.55 m³ 0.52% 100.00% 0.52% 2 Pemasangan Pondasi Batu Belah 1SP : 6 PP 13.32 m³ 1.86% 100.00% 1.86% 3 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 194.25 m² 2.71% 100.00% 2.71% 4 Pemasangan Finishing Plesteran Conven 388.50 m² 3.20% 0.00% 0.00% 5 Pemasangan Finishing Acian Semen 388.50 m² 1.23% 0.00% 0.00% 6 Pas. List Profil Dinding 101.20 m' 0.33% 0.00% 0.00% b. PEKERJAAN PENUTUP LANTAI DAN DINDING 3.62% 0.00% 1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Lt.1 46.00 m² 1.49% 0.00% 0.00% 2 Pas. Lantai Keramik Motif Batu 39.00 m² 1.36% 0.00% 0.00% 3 Pas. Lantai Toilet Homogenous Tile uk. 60 x 60cm Doff 2.40 m² 0.08% 0.00% 0.00% 4 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi 17.92 m² 0.68% 0.00% 0.00% c. PEKERJAAN SANITAIR 0.16% 0.00% 1 Memasang Closet Jongkok 1.00 bh 0.10% 0.00% 0.00% 2 DETAIL ENGINEERING DESIGN ( DED ) NO VOL SAT URAIAN PEKERJAAN Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah Telp. 082225314338
  • 3.
    BOBOT PERSENTASE ACTBOBOT 1 4 5 2 NO VOL SAT URAIAN PEKERJAAN 2 Pemasangan Floor Drain Stainless Steel 1.00 bh 0.03% 0.00% 0.00% 3 Pemasangan Jet Shower 1.00 bh 0.03% 0.00% 0.00% 4 Membuat Septiktank + Resapan 1.00 unit d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 6.52% 0.00% 1 Pas. Pintu Type P1, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 3.00 unit 1.18% 0.00% 0.00% 2 Pas. Pintu Type P2, Panil pvc 2.00 unit 0.25% 0.00% 0.00% 2 Pas. Pintu Type P3, Pintu Panel Besi Toko 1.00 unit 1.95% 0.00% 0.00% 3 Pas. Pintu Type P3, Pintu Panel Besi Garasi 1.00 unit 2.04% 0.00% 0.00% 4 Pas. Jendela Type J1, Kaca Bening t=5mm 1.00 unit 0.49% 0.00% 0.00% 5 Pas. Railing Tangga 7.20 m' 0.59% 0.00% 0.00% e. PEKERJAAN LANGIT - LANGIT 1.47% 0.00% 1 Memasang Rk. hollow Galvanis, modul 60 x 60 cm, plafon 72.00 m² 0.91% 0.00% 0.00% 2 Memasang Langit-langit Gypsum Board, Uk(120x240) tebal 9mm 72.00 m² 0.32% 0.00% 0.00% 3 List Langit-Langit Gypsum 77.20 m' 0.23% 0.00% 0.00% f. PEKERJAAN PENGECATAN 4.26% 0.00% 1 Pengecatan Tembok Baru Sek. Vinillex Interior 388.50 m² 1.72% 0.00% 0.00% 2 Pengecatan Tembok Baru Sek. Vinillex Exterior 388.50 m² 2.22% 0.00% 0.00% 3 Pengecatan Plafond Sek. Vinillex Interior 72.00 m² 0.32% 0.00% 0.00% g. PEKERJAAN FURNITURE Exclude V. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.1 2.59% 0.97% 1. PEKERJAAN PLUMBING 1.11% 0.97% 1 Pemasangan Pipa PVC tipe AW Ø ¾" 48.00 m' 0.19% 25.00% 0.05% 2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 24.00 m' 0.39% 100.00% 0.39% 3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 24.00 m' 0.53% 100.00% 0.53% 2. PEKERJAAN MEKANIKAL ELEKTRIKAL 1.33% 0.00% 1 PEKERJAAN INSTALASI LISTRIK - Inst. Penerangan Lampu 11.00 Ttk 0.24% 0.00% 0.00% - Inst. Stop Kontak 12.00 Ttk 0.27% 0.00% 0.00% - Inst. AC 1.00 Ttk 0.13% 0.00% 0.00% - Pekerjaan Sipil dan Bobokan Pipa Instalasi 23.00 Ttk 0.15% 0.00% 0.00% - Material Konsumable Instalasi 1.00 pkt 0.25% 0.00% 0.00% 2 PEKERJAAN SUPPLY MATERIAL - Stop Kontak Dinding Tunggal 8.00 Ttk 0.05% 0.00% 0.00% - Stop Kontak Dinding Ganda 2.00 Ttk 0.01% 0.00% 0.00% - Stop Kontak AC Dinding 200W 2.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Saklar Ganda 8.00 Ttk 0.05% 0.00% 0.00% - Pemasangan Saklar Tunggal 2.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Downlight Slim Inbow LED 3W 3000K 2.00 Ttk 0.03% 0.00% 0.00% - Pemasangan Downlight Slim Outbow LED 3W 3000K 10.00 Ttk 0.13% 0.00% 0.00% 3. PEKERJAAN INST. TATA UDARA 0.15% 0.00% - Pipa PVC tipe AW Ø 3/4" (drainase AC) 10.00 m' 0.03% 0.00% 0.00% - Pipa Refrigrant 3/8 : 5/8 10.00 m' 0.13% 0.00% 0.00% Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah Telp. 082225314338
  • 4.
    KEGIATAN : PERENCANAANRUMAH TINGGAL PEKERJAAN : REHABILITASI RUMAH TINGGAL LOKASI : CALUNG KARAWANG BARAT TAHUN ANGGARAN : 2023 SUMBER DANA : - BOBOT PERSENTASE ACT BOBOT 1 3 4 5 B. PEKERJAAN KONSTRUKSI LANTAI 2 I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.2 11.20% 10.50% 1 Pekerjaan Beton Bertulang Kolom Struktur K225 a.) Pembesian dengan Besi Polos 98.21 kg 0.20% 100% 0.20% b.) Pembesian dengan Besi Ulir 202.63 kg 0.41% 100% 0.41% c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.89 m³ 0.31% 100% 0.31% d.) Bekisting Kayu Tahun 13.26 m² 0.13% 100% 0.13% 2 Pekerjaan Beton Bertulang Struktur Balok Lt.3 K225 a.) Pembesian dengan Besi Polos 199.18 kg 0.40% 100% 0.40% b.) Pembesian dengan Besi Ulir 362.70 kg 0.73% 100% 0.73% c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 3.39 m³ 0.55% 100% 0.55% d.) Bekisting Kayu Tahun 82.39 m² 1.14% 100% 1.14% b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 0.00 m² 1 Pekerjaan Beton Bertulang Struktur Plat Lt.3 K225 0.00% 100% 0.00% a.) Pembesian dg Wiremesh M8 873.84 kg 1.61% 100% 1.61% b.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 7.94 m³ 1.30% 100% 1.30% c.) Plat Bondek t=0,75mm 66.20 m² 1.48% 100% 1.48% 1 Pekerjaan Beton Bertulang Kolom, Balok Praktis K175 0.00% 100% 0.00% a.) Pembesian dengan Besi Polos 195.30 kg 0.39% 100% 0.39% b.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 1.26 m³ 0.20% 100% 0.20% c.) Bekisting Kayu Tahun 41.19 m² 0.39% 100% 0.39% 2 Pekerjaan Beton Bertulang StrukturTangga Lt.2 ke Lt.3 K225 0.00% 100% 0.00% a.) Pembesian dengan Besi Polos 244.04 kg 0.49% 100% 0.49% b.) Pembesian dengan Besi Ulir 19.80 kg 0.04% 100% 0.04% c.) Membuat Beton Mutu f'c=19,3 MPa (K225), slump (120±20) mm 1.64 m³ 0.27% 100% 0.27% d.) Bekisting Kayu Tahun 16.02 m² 0.49% 100% 0.49% 3 Pas. Waterproofing Mortar 66.20 m² 0.71% 0% 0.00% II. PEKERJAAN FINISHING ARSITEKTUR LT.2 26.98% 5.05% a. PEKERJAAN PASANGAN & PLESTERAN 10.93% 5.05% 1 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 218.75 241.75 m² 5.05% 100% 5.05% 2 Pemasangan Finishing Plesteran Conven 437.50 507.58 m² 3.61% 0% 0.00% 3 Pekerjaan BackDrop TV Ruang Tengah Lantai 2 1.00 Unit 0.89% 0% 0.00% 4 Pemasangan Finishing Acian Semen 437.50 507.58 m² 1.39% 0% 0.00% b. PEKERJAAN PENUTUP LANTAI DAN DINDING 5.15% 0.00% 1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Lt.2 58.50 m² 1.90% 0% 0.00% 2 Pas. Keramik Dinding uk. 30 x 60cm Façade Depan 9.00 m² 0.41% 0% 0.00% 3 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi 39.20 m² 1.49% 0% 0.00% 4 Pas. Lantai Toilet Homogenous Tile uk. 60 x 60cm Doff 5.25 m² 0.18% 0% 0.00% 5 Pemasangan Keramik Lantai tangga 24.00 m² 1.17% 0% 0.00% c. PEKERJAAN SANITAIR 1.56% 0.00% 1 Memasang Closet Jongkok 1.00 bh 0.10% 0% 0.00% 1 Memasang Closet Duduk 1.00 bh 0.34% 0% 0.00% 2 Memasang Washtafle Gantung Lengkap (Sifon + Kran) Sericite 1.00 bh 0.29% 0% 0.00% 3 Pemasangan Floor Drain Stainless Steel 2.00 bh 0.06% 0% 0.00% 4 Pemasangan Jet Shower 2.00 bh 0.08% 0% 0.00% 5 Pemasangan Kran Doble Shower 2.00 bh 0.75% 0% 0.00% 1 Pemasangan Floor Drain Stainless Steel (Roofdrain) 1.00 bh 0.04% 0% 0.00% d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 4.16% 0.00% 1 Pas. Pintu Type P1, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 4.00 unit 1.58% 0% 0.00% 2 Pas. Pintu Type P2, Panil pvc 3.00 unit 0.38% 0% 0.00% 3 Pintu Jendela Depan PJ2 ( include Sliding Door dan Aksesoris ) 1.00 unit 0.99% 0% 0.00% 4 Pas. Jendela Type J1, Kaca Bening t=5mm 1.00 unit 0.43% 0% 0.00% 5 Pas. Jendela Type J2, Kaca Bening t=5mm 3.00 unit 0.55% 0% 0.00% 6 Pas Rooster Tampak Depan 1.60 m2 0.12% 0% 0.00% 7 Pas. Boven Type BV 1.00 unit 0.11% 0% 0.00% e. PEKERJAAN LANGIT - LANGIT 2.78% 0.00% 1 Memasang Rk. hollow Galvanis, modul 60 x 60 cm, plafon 63.00 m² 0.80% 0% 0.00% 2 Memasang Langit-langit Gypsum Board, Uk(120x240) tebal 9mm 63.00 m² 0.28% 0% 0.00% 3 List Langit-Langit Gypsum 82.80 m' 0.25% 0% 0.00% 4 Pas. Railing Tangga 7.20 m' 0.59% 0% 0.00% 5 Pas. Railing Balkon Type RL (Rk. Pipa Stainless + Kaca Temperd 10mm) 4.00 unit 0.86% 0% 0.00% f. PEKERJAAN PENGECATAN 2.39% 0.00% 1 Pengecatan Tembok Baru Sek. Vinillex Interior 437.50 m² 1.94% 0% 0.00% 2 Pengecatan Tembok Baru Sek. Vinillex Exterior 30.00 m² 0.17% 0% 0.00% 3 Pengecatan Plafond Sek. Vinillex Interior 63.00 m² 0.28% 0% 0.00% III. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.2 3.05% 0.91% 1. PEKERJAAN PLUMBING 0.99% 0.91% 1 Pemasangan Pipa PVC tipe AW Ø ¾" 25.00 m' 0.10% 25% 0.02% 2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 22.00 m' 0.36% 100% 0.36% 3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 24.00 m' 0.53% 100% 0.53% 2. PEKERJAAN MEKANIKAL ELEKTRIKAL 1.67% 0.00% 1 PEKERJAAN INSTALASI LISTRIK 0.00% 0% 0.00% - Inst. Penerangan Lampu 15.00 Ttk 0.33% 0% 0.00% - Inst. Stop Kontak 12.00 Ttk 0.27% 0% 0.00% - Inst. Cooker Hood 1.00 Ttk 0.02% 0% 0.00% 2 DETAIL ENGINEERING DESIGN ( DED ) NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah Telp. 082225314338
  • 5.
    BOBOT PERSENTASE ACTBOBOT 1 3 4 5 2 NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT - Inst. Water Heater 2.00 Ttk 0.13% 0% 0.00% - Instalasi Exhausfan Ceiling 2.00 Ttk 0.10% 0% 0.00% - Pekerjaan Sipil dan Bobokan Pipa Instalasi 30.00 Ttk 0.19% 0% 0.00% - Material Konsumable Instalasi 1.00 pkt 0.26% 0% 0.00% 2 PEKERJAAN SUPPLY MATERIAL 0.00% 0% 0.00% - Stop Kontak Dinding Tunggal 11.00 Ttk 0.06% 0% 0.00% - Stop Kontak Dinding Ganda 2.00 Ttk 0.01% 0% 0.00% - Stop Kontak AC Dinding 200W 3.00 Ttk 0.02% 0% 0.00% - Pemasangan Saklar Ganda 11.00 Ttk 0.06% 0% 0.00% - Pemasangan Saklar Tunggal 2.00 Ttk 0.01% 0% 0.00% - Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0% 0.00% - Pemasangan Downlight Slim Inbow LED 3W 3000K 2.00 Ttk 0.03% 0% 0.00% - Pemasangan Downlight Slim Outbow LED 3W 3000K 13.00 Ttk 0.17% 0% 0.00% 3. PEKERJAAN INST. TATA UDARA 0.40% 0.00% - Pipa PVC tipe AW Ø 3/4" (drainase AC) 20.00 m' 0.08% 0% 0.00% - Pipa Refrigrant 3/8 : 5/8 25.00 m' 0.32% 0% 0.00% Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah Telp. 082225314338
  • 6.
    KEGIATAN : PERENCANAANRUMAH TINGGAL PEKERJAAN : REHABILITASI RUMAH TINGGAL LOKASI : CALUNG KARAWANG BARAT TAHUN ANGGARAN : 2023 SUMBER DANA : - BOBOT PERSENTASE ACT BOBOT 1 3 4 5 C. PEKERJAAN KONSTRUKSI LANTAI 3 I. PEKERJAAN STRUKTUR BETON BERTULANG Lt.3 1.14% 1.14% 1 Pekerjaan Beton Bertulang Kolom, Balok & Plat Praktis K175 a.) Pembesian dengan Besi Polos 151.20 kg 0.30% 100% 0.30% b.) Pembesian dg Wiremesh M8 151.20 kg 0.28% 100% 0.28% c.) Membuat Beton Mutu f’c=14,5 Mpa (K175), slump 120 ± 20mm 0.54 m³ 0.08% 100% 0.08% d.) Bekisting Kayu Tahun 34.50 m² 0.33% 100% 0.33% e.) Plat Bondek t=0,75mm 4.50 m² 0.10% 100% 0.10% 2 Pas. Waterproofing Mortar 4.50 m² 0.05% 100% 0.05% II. PEKERJAAN KONSTRUKSI PENUTUP ATAP 2.22% 0.39% Pekerjaan Atap Utama 1 Pas. Rangka Atap Kaso dan Reng Baja Ringan 45.00 m² 0.77% 50.00% 0.39% 2 Pemasangan 1 m2 Alderon doubel Layer 10 mm 45.00 m² 0.19% 0.00% 0.00% 3 Pemasangan 1 m’ Ban Banan Finish Waterproofing 14.64 m² 0.06% 0.00% 0.00% 4 Pemasangan 1m' Listplank 3x30cm Kalsi plank 7.50 m' 0.03% 0.00% 0.00% Pekerjaan Rooflight R. Jemur & R. Santai lt 2 5 Pas. Atap Kaca Solar Flat 3 mm 7.30 m² 0.60% 0.00% 0.00% 6 Pas. Rangka Atap Besi Hollow 40x60x1,2mm, Fin. Duco 7.30 m² 0.46% 0.00% 0.00% 7 Angkur Dynabolt M10 40.00 bh 0.10% 0.00% 0.00% III. PEKERJAAN FINISHING ARSITEKTUR LT.3 10.05% 0.24% a. PEKERJAAN PASANGAN & PLESTERAN 2.28% 0.24% 1 Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Pakai 89.25 m² 0.24% 100% 0.24% 2 Pemasangan Finishing Plesteran Conven 178.50 m² 1.47% 0.00% 0.00% 3 Pemasangan Finishing Acian Semen 178.50 m² 0.57% 0.00% 0.00% b. PEKERJAAN PENUTUP LANTAI DAN DINDING 4.10% 0.00% 1 Pas. Lantai Homogenous Tile uk. 60 x 60cm Glossy Kamar 4.00 m² 0.13% 0.00% 0.00% 2 Pas. Lantai Homogenous Tile uk. 60 x 60cm Rooftop 41.00 m² 1.56% 0.00% 0.00% 3 Pas. Lantai Homogenous Tile uk. 60 x 60cm Doff Toilet dan Area Cuci 4.50 m² 0.15% 0.00% 0.00% 3 Pas. Keramik Dinding uk. 30 x 60cm Kamar Mandi dan Area Cuci 18.00 m² 0.68% 0.00% 0.00% 4 Pas. Keramik Tangga 24.00 m² 1.17% 0.00% 0.00% 5 Pasang Ruster 20 x 20 x 10 cm 126.00 bh 0.40% 0.00% 0.00% c. PEKERJAAN SANITAIR 0.45% 0.00% 1 Pemasangan Floor Drain Stainless Steel 2.00 bh 0.06% 0.00% 0.00% 2 Pemasangan Floor Drain Stainless Steel (Roofdrain) 5.00 bh 0.09% 0.00% 0.00% 3 Pemasangan 1 buah Kran Diameter ½” atau ¾ ” Onda 3.00 bh 0.07% 0.00% 0.00% 4 Tanki air 520 L 1.00 bh 0.24% 0.00% 0.00% d. PEKERJAAN PASANG KUSEN, PINTU DAN JENDELA 1.37% 0.00% 1 Pas. Pintu Type PJ2, Panil Engineering door, Rk. Alluminium 3" Warna Hitam 1.00 unit 1.00% 0.00% 0.00% 2 Pas. Pintu Type J3 Alluminium 3" Warna Hitam 1.00 unit 0.37% 0.00% 0.00% e. PEKERJAAN LANGIT - LANGIT 0.55% 0.00% 1 Plafon 28.00 m² 0.55% 0.00% 0.00% f. PEKERJAAN PENGECATAN 1.30% 0.00% 1 Pengecatan Tembok Baru Sek. Vinillex Interior 178.50 m² 0.79% 0.00% 0.00% 2 Pengecatan Tembok Baru Sek. Vinillex Exterior 66.50 m² 0.38% 0.00% 0.00% 3 Pengecatan Plafond Sek. Vinillex Interior 28.00 m² 0.12% 0.00% 0.00% IV. PEKERJAAN PLUMBING, MEKANIKAL ELEKTRIKAL LT.3 0.93% 0.39% 1. PEKERJAAN PLUMBING 0.42% 0.39% 1 Pemasangan Pipa PVC tipe AW Ø ¾" 10.00 m' 0.04% 25.00% 0.01% 2 Pemasangan Pipa PVC tipe AW Ø 3" Type D Merah 10.00 m' 0.16% 100% 0.16% 3 Pemasangan Pipa PVC tipe AW Ø 4" Type D Merah 10.00 m' 0.22% 100% 0.22% 2. PEKERJAAN MEKANIKAL ELEKTRIKAL 0.51% 0.00% 1 PEKERJAAN INSTALASI LISTRIK 0.00% 0.00% 0.00% - Inst. Penerangan Lampu 8.00 Ttk 0.18% 0.00% 0.00% - Inst. Stop Kontak 6.00 Ttk 0.13% 0.00% 0.00% - Inst. Pompa 1.00 Ttk 0.02% 0.00% 0.00% - Pekerjaan Sipil dan Bobokan Pipa Instalasi 6.00 Ttk 0.04% 0.00% 0.00% - Material Konsumable Instalasi 1.00 pkt 0.06% 0.00% 0.00% 2 PEKERJAAN SUPPLY MATERIAL 0.00% 0.00% 0.00% - Stop Kontak Dinding Tunggal 2.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Saklar Ganda 2.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Saklar Tunggal 1.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Saklar Hotel Tunggal 1.00 Ttk 0.01% 0.00% 0.00% - Pemasangan Lampu Downlight Outbow LED 5W 3000K 3.00 Ttk 0.04% 0.00% 0.00% 2 DETAIL ENGINEERING DESIGN ( DED ) NO URAIAN PEKERJAAN SPESIFIKASI VOL SAT Jl. Gerilya Gg. II No. 26, Tanjung, Purwokerto Selatan, Banyumas, Jawa Tengah Telp. 082225314338