Lag, etik och informationssystem Mathias Klang [email_address]
Vem är ni? Vana användare Blivande systemutvecklare  Blivande systemanvändare Digitala medborgare (sorry) Studenter…
Trying to legislate to control technological development or the ways people use technology is not perhaps ordering the tide to not come in, but it is certainly like trying to empty a bathtub with a teaspoon.
Teknologisk determinism “ the notion is that a kind of invisible hand guides technology ever onward and upward, using individuals and organizations as vessels for its purposes but guided by a sort of divine plan for bringing the greatest good to the greatest number.” Purcell, C. (1994)  White Heat . London: BBC, s. 38 Purcell syftar till en mystisk, “semi-religious faith in the inevitability of progress”
Teknologisk determinism “ the medium... shapes and controls the scale and form of human association and action” McLuhan, M. (1962)  The Gutenberg Galaxy: The Making of Typographic Man .
Allmänna Styrfaktorer Vänder IS på pyramiden? Lag Kontextuella &  programerade sociala  regler Arkitektur
Johnson & Post “ Cyberspace radically undermines the relationship between legally significant (online) phenomena and physical location. The rise of the global computer network is destroying the link between geographical location Law And Borders--The Rise of Law in Cyberspace, 1996
Arkitektur & grundlag “ In real space we recognize how laws regulate – through constitutions, statutes, and other legal codes.  In cyberspace, we must understand how code regulates – how the software and hardware that make cyberspace what it is regulate cyberspace as it is.” Lessig Code p. 6
Varför bry sig?
In the beginning there was technology…
Life is organised around technology (and it always has been??)
 
 
Varför bry sig?
 
Varför bry sig?
Disruptive Technology
The disruption occurs when the technology, which is introduced effects the social arrangements around which we build our lives
 
Impulse: control
 
Reglering LAG ARKITEKTUR NORMER MARKNAD
Reglera Rökning Lag  Får inte köpa om du är under X år. Får inte röka på förbjudna platser. Sociala normer Man röker inte hemma hos någon utan att fråga värden. Marknad Prisen på cigaretter (beskattning) påverkar konsumption. Arkitektur Skyltar, rökdetektorer & askkoppar.
Etik
Ethics: a very very  short  version ethnocentrism Cultural relativism Culture Human Nature Good Evil Choice? Nurture Nature absolutism Ethical relativism Social construct Social Contract Rousseau Hobbes Utilitarianism Bentham - Happiness Teleological ethics Mill - Good Rule ethics Kant Duties – not impulses Categorical imperative Rawls Rule creation Veil of ignorance Habermas Discourse ethics
Företagsansvar  "there is one and only one social responsibility of business–to use it resources and engage in activities designed to increase its profits so long as it stays within the rules of the game, which is to say, engages in open and free competition without deception or fraud." Milton Friedman “The Social Responsibility of Business is to Increase its Profits”  The New York Times Magazine, September 13, 1970
Företagets Ansvar Källa: Carroll (1991) Filantropiska  skyldigheter Vara en god (juridisk) person: bidra resurser till samhället, öka livskvalité. Etiska  skyldigheter: Skyldighet att agera på rätt sätt, rättvist och undvika skada Juridiska skyldigheter: Följa lagen: Lag är samhällets kodifikation av rätt & fel. Att följa spelets regler . Ekonomiska skyldigheter:  Vara lönsam
Att Skriva Mathias Klang [email_address]
Tidsplanering När ska du vara klar? Hur många sidor? ” Enkel” matematik Dra av för Vissa helger Tristess Det du aldrig trodde…
Att skriva Börja inte på sida 1 Låna meningar för inspiration (men skriv om) Skriv ner idéer så fort ni får dom – annars försvinner dom!
Tekniska & Sociala Problem Uppgraderingar Virusar Spel Socialt tryck
Att komma igång Bilder Brainstorming Mindmap Anteckingsblock Läs annat i samma genre Vänta inte med att anteckna ideer
Fokus Tappa inte tråden Vad är din idé? Är varje stycke ett led i din argumentation? Övergång mellan Meningar Stycken Avsnitt Tankar
Titel, abstrakt, slutsats, referenser Fånga  Beskriva Ödmjukhet Undvik interna skämt, ironi Överdriv inte!
Vad är en uppsats? Övning i tydlig överföring av logiska argument Argument = to offer a set of reasons, or evidence in support of a conclusion (Weston, 1992)
Varför uppsats? CSN Avsluta utbildning Titel Bevisa  Kurskrav Kommunikation Strukturerad argument Viktig ide Vill höras Övning i tanke
Läsaren Fånga läsaren Vem är läsaren Varför läsare jag detta? Varför skriver du detta?
Varför läser ngn din uppsats? Tvång Släktband Betyg Opponent Intresse Gemensam forskning Handledare One of the primary hurdles in getting people to read your paper   is  getting them to read the content of the paper. If the title is misleading,  and if the abstract and   introduction do not manage to establish the  setting in an interesting way, chances are that the reader will   not go  any further, unless they are very devoted to the topic, appointed  reviewers (in which case you are in   trouble anyway), or a close friend. (S ørensen)
Kunskapssökning Artiklar Böcker Internet mm Empiri CS varning Bibliotek Människor Inavel Var kritisk till källor! Varför ska dom användas – varför inte?
Struktur Fråga  Teori Metod Resultat Diskussion/analys Slutsats Problem domän Problem Forskningsansats Andras arbete Resultat
Titelsida (ofta samma som försättsblad) Rubrik, författare, kurs, (moment), datum, nyckelord Fakultetstillhörighet  Sammanfattning (abstrakt) Kan finnas på titelsidan (kan uteslutas i många uppsatser) Kort uppsummering av de viktigaste idéerna i rapporten
Innehållsförteckning (Bör göras automatisk) Själva rapportinnehållet Referenser (Skall finnas för allt material av olika slag som använts)  -Använd vedertagna riktlinjer för referenser Bilagor Tilläggsmaterial
TACK!

Lag Etik & Informationssystem091020

  • 1.
    Lag, etik ochinformationssystem Mathias Klang [email_address]
  • 2.
    Vem är ni?Vana användare Blivande systemutvecklare Blivande systemanvändare Digitala medborgare (sorry) Studenter…
  • 3.
    Trying to legislateto control technological development or the ways people use technology is not perhaps ordering the tide to not come in, but it is certainly like trying to empty a bathtub with a teaspoon.
  • 4.
    Teknologisk determinism “the notion is that a kind of invisible hand guides technology ever onward and upward, using individuals and organizations as vessels for its purposes but guided by a sort of divine plan for bringing the greatest good to the greatest number.” Purcell, C. (1994) White Heat . London: BBC, s. 38 Purcell syftar till en mystisk, “semi-religious faith in the inevitability of progress”
  • 5.
    Teknologisk determinism “the medium... shapes and controls the scale and form of human association and action” McLuhan, M. (1962) The Gutenberg Galaxy: The Making of Typographic Man .
  • 6.
    Allmänna Styrfaktorer VänderIS på pyramiden? Lag Kontextuella & programerade sociala regler Arkitektur
  • 7.
    Johnson & Post“ Cyberspace radically undermines the relationship between legally significant (online) phenomena and physical location. The rise of the global computer network is destroying the link between geographical location Law And Borders--The Rise of Law in Cyberspace, 1996
  • 8.
    Arkitektur & grundlag“ In real space we recognize how laws regulate – through constitutions, statutes, and other legal codes. In cyberspace, we must understand how code regulates – how the software and hardware that make cyberspace what it is regulate cyberspace as it is.” Lessig Code p. 6
  • 9.
  • 10.
    In the beginningthere was technology…
  • 11.
    Life is organisedaround technology (and it always has been??)
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
    The disruption occurswhen the technology, which is introduced effects the social arrangements around which we build our lives
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
    Reglera Rökning Lag Får inte köpa om du är under X år. Får inte röka på förbjudna platser. Sociala normer Man röker inte hemma hos någon utan att fråga värden. Marknad Prisen på cigaretter (beskattning) påverkar konsumption. Arkitektur Skyltar, rökdetektorer & askkoppar.
  • 24.
  • 25.
    Ethics: a veryvery short version ethnocentrism Cultural relativism Culture Human Nature Good Evil Choice? Nurture Nature absolutism Ethical relativism Social construct Social Contract Rousseau Hobbes Utilitarianism Bentham - Happiness Teleological ethics Mill - Good Rule ethics Kant Duties – not impulses Categorical imperative Rawls Rule creation Veil of ignorance Habermas Discourse ethics
  • 26.
    Företagsansvar "thereis one and only one social responsibility of business–to use it resources and engage in activities designed to increase its profits so long as it stays within the rules of the game, which is to say, engages in open and free competition without deception or fraud." Milton Friedman “The Social Responsibility of Business is to Increase its Profits” The New York Times Magazine, September 13, 1970
  • 27.
    Företagets Ansvar Källa:Carroll (1991) Filantropiska skyldigheter Vara en god (juridisk) person: bidra resurser till samhället, öka livskvalité. Etiska skyldigheter: Skyldighet att agera på rätt sätt, rättvist och undvika skada Juridiska skyldigheter: Följa lagen: Lag är samhällets kodifikation av rätt & fel. Att följa spelets regler . Ekonomiska skyldigheter: Vara lönsam
  • 28.
    Att Skriva MathiasKlang [email_address]
  • 29.
    Tidsplanering När skadu vara klar? Hur många sidor? ” Enkel” matematik Dra av för Vissa helger Tristess Det du aldrig trodde…
  • 30.
    Att skriva Börjainte på sida 1 Låna meningar för inspiration (men skriv om) Skriv ner idéer så fort ni får dom – annars försvinner dom!
  • 31.
    Tekniska & SocialaProblem Uppgraderingar Virusar Spel Socialt tryck
  • 32.
    Att komma igångBilder Brainstorming Mindmap Anteckingsblock Läs annat i samma genre Vänta inte med att anteckna ideer
  • 33.
    Fokus Tappa intetråden Vad är din idé? Är varje stycke ett led i din argumentation? Övergång mellan Meningar Stycken Avsnitt Tankar
  • 34.
    Titel, abstrakt, slutsats,referenser Fånga Beskriva Ödmjukhet Undvik interna skämt, ironi Överdriv inte!
  • 35.
    Vad är enuppsats? Övning i tydlig överföring av logiska argument Argument = to offer a set of reasons, or evidence in support of a conclusion (Weston, 1992)
  • 36.
    Varför uppsats? CSNAvsluta utbildning Titel Bevisa Kurskrav Kommunikation Strukturerad argument Viktig ide Vill höras Övning i tanke
  • 37.
    Läsaren Fånga läsarenVem är läsaren Varför läsare jag detta? Varför skriver du detta?
  • 38.
    Varför läser ngndin uppsats? Tvång Släktband Betyg Opponent Intresse Gemensam forskning Handledare One of the primary hurdles in getting people to read your paper is getting them to read the content of the paper. If the title is misleading, and if the abstract and introduction do not manage to establish the setting in an interesting way, chances are that the reader will not go any further, unless they are very devoted to the topic, appointed reviewers (in which case you are in trouble anyway), or a close friend. (S ørensen)
  • 39.
    Kunskapssökning Artiklar BöckerInternet mm Empiri CS varning Bibliotek Människor Inavel Var kritisk till källor! Varför ska dom användas – varför inte?
  • 40.
    Struktur Fråga Teori Metod Resultat Diskussion/analys Slutsats Problem domän Problem Forskningsansats Andras arbete Resultat
  • 41.
    Titelsida (ofta sammasom försättsblad) Rubrik, författare, kurs, (moment), datum, nyckelord Fakultetstillhörighet Sammanfattning (abstrakt) Kan finnas på titelsidan (kan uteslutas i många uppsatser) Kort uppsummering av de viktigaste idéerna i rapporten
  • 42.
    Innehållsförteckning (Bör görasautomatisk) Själva rapportinnehållet Referenser (Skall finnas för allt material av olika slag som använts) -Använd vedertagna riktlinjer för referenser Bilagor Tilläggsmaterial
  • 43.