SlideShare a Scribd company logo
CURRICULAMVITAE
Kundan Kumar Singh
08871886584, 08936062466, Kundan.singh481@gmail.com,kundan.singh48125@gmail.com
OBJECTIVE
Lookingforan excellentopportunitytoworkasa Civil Engineerwhere mytalent andknowledge
can be bestutilizedforthe developmentof the organisation.
PROFESSIONALSUMMARY
 Having4 yearof competitiveexperience inconstructionField &Goodknowledgeof Quality
and Safety &Execution.
 Good workethicswithexcellent communication,interpersonal skill andHandlingthe
departmental activities.
 ExcellentMotivational,Leadershipskill inafast –pacedEnvironment.
 Capable toLearn and understand new leadingTechnologies.
 Abilitytoworkwell inbothateam Environmentand individual Environment.
 Experience inProjectExecution,ProjectPlanning&Monitoring,Resource Allocation&
Management,ProcessAdherence,Manpower Supervision,ProjectCoordinationand
ProcessImprovement
TECHNICAL SKILL
 Knowledge of Quantity Survey,Estimation, Bar Bend Schedule (BBS) & Quality
Control/ QualityAssurance of Water Project & Building Project.
 Good Approach about IS-Codes & SP CODES.
 Good Approachof Understanding, Readingof Structural, ArchDrawing,AutoCad.
 Laying, Jointing, and Testing of DI, HDPE, MS & UPVCPIPES.
 Knowledgeof Hydraulicdesignandprocedure of intakewell&Tube Well.
TOTALEXPERIENCE (4years)
Company: JINDALSAWLimited(DEC215-CurrentlyWorking)
Role:QualityControl Engineer.
Consultant:Tata ConsultingEngineers(TCE)
PREVIOUS COMPANY:EDMAC ENGINEERING CONSULTANT INDIAPVT.LTD
(OCT 2014-DEC2015)
Client:BiharMedical Services Infrastructure CorporationLimited(BMSICL)
Contractor- L&TConstruction Limited(GovtMedical College &Hospital Madhepura)
Role:ProjectManagement Consultant(QA/QC).
Project Cost- 800 cr.( Bihar’sLargest& First Green BuildingProject IncludingWTP&STP )
PREVIOUS COMPANY: NCC Limited (JUNE 2012-SEP 2014).
Role: SITEENGINEER.
JOB RESPONSIBLITIES
Project Management & Planning Responsibility
1. Preparationof ContractorBill & Planningof ContractorWork.
2. ReviewProjectPlan(RollingProgramme) andupdate ona regularly.
3. Co-ordinate Review of Contractor Submittals, job procedure, drawings and materials.
4. Considerationthe Gridof DrawingfromAUTO CAD.
5. Co-ordinationwithLocal bodiesand subcontractors.
6. Able tohandle anytype of Project,Dominative Nature,self confident,hardworkingand
flexible forwork.
Quality Responsibility
1. Preparation, Development and Review of Project Quality Plan.
2. Ensure compliance with Client Quality Objective.
3. Responsible for all engineering functions of work. &Effect close liaison with client reps.
4. Conduct all Lab tests and prepare all Reports.
5. Co-ordination with Govt body /Agencies /NIT/IIT for quality Lab Respective.
Lab TestesResponsibility
1. Compressive StrengthTest. 2) ConsistencyTest.3) DLBD Test.
4) Initial &Final SettingTime Test forCement. 5) Sieve AnalysisforAggregate.
6) Bulking& SiltContentTestforSand.
7) Flakiness&ElongationIndex TestForCoarse Aggregate.
8) Impact Value TestforCoarse Aggregate.
9) Soil CompactionTest(Core CutterMethod)
10) Pile LoadTestfor Pile Foundation.
11) Plate LoadTest forSoil BearingCapacity(SBC)
12) SlumpTestforWorkability of Concrete.
13) Aggregate SpecificGravity&ApparentSpecificGravityTest.
14) WaterAbsorptiontestforAggregate.
15) Finesse modulusTest.
16) HydraulicTestingof DIPipeline.
Execution Responsibility
1. Preparation& Cross Check of Bar Bend Schedule (of pile foundation, footing, Slab, Beam,
Column, intake Well, Over Head Tank & WTP).
2. Responsible for site Execution & supervision & other Structural work.
3. Excellent approach of Layoutaccordingto drawingand designof BuildingWork
4. Measurementof Quantity&Estimate forConcrete & steel.
5. ManagementwithClient&Contractor.
6. Pouring, shuttering and formwork, production of concrete, Masonry construction and
finishes.
7. Monitor safety and quality of contractor’s efforts
QUALIFICATION
 Bachelorof EngineeringfromRITRaipurCivil Engineeringwith68.40 %.
 10+2 fromMMM InterCollege, Varanasi with 69%.
 10th fromMMB HS KumnaSaran with70%.
INTERNSHIP
 6 Month internshipin Maneesh pipespvtltd (8th
semester&ProjectCost-250 cror.).
 1 Month Major Trainingfrompublicworksdept.
 1 Month minorTrainingfrom jamui jail construction Bihar.
HOBBIES
 ReadingNewspaperandBooks,playingvolleyball andcricket, watchingmovies.
 Listeningmusic.
ACHIEVEMENT&STRENGTH
 Able tocooperate with Consultants,client &contractor.
 I am alsoa Sportsman,Runner(Caption)inintercollege volleyball championship(organised
by CSVTU)
LANGUAGE: English,Hindi,Bhojpuri
PERSONALDETAILS
Date of Birth:16/10/1990.
Vill+Po. –Sawari,Ps.-jalalpur Distt.- Saran(Bihar)
Date: 08/07/2016 KUNDAN KUMAR SINGH
Kundan kumar singh

More Related Content

What's hot

The New Frontier of Oil and Gas Production
The New Frontier of Oil and Gas ProductionThe New Frontier of Oil and Gas Production
The New Frontier of Oil and Gas Production
EWI
 
Nitin sardana Resume
Nitin sardana ResumeNitin sardana Resume
Nitin sardana Resumenitincrsce
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
Anwardeen Jawaharlal
 
Company profile of Sgm Lab Solutions
Company profile of Sgm Lab SolutionsCompany profile of Sgm Lab Solutions
Company profile of Sgm Lab Solutions
abhishekabhi123
 
Caleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb Bentsen
 
Novatech india
Novatech indiaNovatech india
Novatech india
Novatech India
 
Reliant Testing Engineers, Inc. SOQ
Reliant Testing Engineers, Inc. SOQReliant Testing Engineers, Inc. SOQ
Reliant Testing Engineers, Inc. SOQ
Reliant Testing Engineers, Inc.
 
Keith hayes 2015 resume
Keith hayes 2015 resumeKeith hayes 2015 resume
Keith hayes 2015 resume
keith hayes
 

What's hot (20)

KL updated resume
KL updated resumeKL updated resume
KL updated resume
 
CV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdfCV_RKSEN_01.11.2016.pdf
CV_RKSEN_01.11.2016.pdf
 
The New Frontier of Oil and Gas Production
The New Frontier of Oil and Gas ProductionThe New Frontier of Oil and Gas Production
The New Frontier of Oil and Gas Production
 
Nitin sardana Resume
Nitin sardana ResumeNitin sardana Resume
Nitin sardana Resume
 
Scott Bullock CV 25112016
Scott Bullock CV 25112016Scott Bullock CV 25112016
Scott Bullock CV 25112016
 
Precast Concrete QA/QC CV
Precast Concrete QA/QC CVPrecast Concrete QA/QC CV
Precast Concrete QA/QC CV
 
Company profile of Sgm Lab Solutions
Company profile of Sgm Lab SolutionsCompany profile of Sgm Lab Solutions
Company profile of Sgm Lab Solutions
 
Certifikat FSM
Certifikat FSMCertifikat FSM
Certifikat FSM
 
CV
CVCV
CV
 
MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1
 
Caleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb T Bentsen Resume
Caleb T Bentsen Resume
 
Novatech india
Novatech indiaNovatech india
Novatech india
 
Reliant Testing Engineers, Inc. SOQ
Reliant Testing Engineers, Inc. SOQReliant Testing Engineers, Inc. SOQ
Reliant Testing Engineers, Inc. SOQ
 
CV Vijayraj_Latest
CV Vijayraj_LatestCV Vijayraj_Latest
CV Vijayraj_Latest
 
QASIM CV
QASIM CVQASIM CV
QASIM CV
 
resume nov 14
resume nov 14resume nov 14
resume nov 14
 
Resume (sudha)
Resume (sudha)Resume (sudha)
Resume (sudha)
 
SHANNA LANDRY
SHANNA LANDRYSHANNA LANDRY
SHANNA LANDRY
 
Keith hayes 2015 resume
Keith hayes 2015 resumeKeith hayes 2015 resume
Keith hayes 2015 resume
 
Wtp melbourne office plasma
Wtp melbourne office plasmaWtp melbourne office plasma
Wtp melbourne office plasma
 

Viewers also liked

Evaluation Question 4
Evaluation Question 4Evaluation Question 4
Evaluation Question 4
MariannaK24
 
Tarek_Adel_Thabet 14
Tarek_Adel_Thabet 14Tarek_Adel_Thabet 14
Tarek_Adel_Thabet 14Tarek Thabet
 
Kundan kumar singh - building
Kundan kumar singh - buildingKundan kumar singh - building
Kundan kumar singh - buildingKundan Singh
 
Alumni slide share linkedin
Alumni slide share linkedinAlumni slide share linkedin
Alumni slide share linkedin
Andrew White
 
Stp fiama di wills
Stp fiama di willsStp fiama di wills
Stp fiama di wills
Aatish Raj
 
College essay w footer
College essay w footerCollege essay w footer
College essay w footersprabhu1
 
How do you Cool Your Brew? Cool Brewing Fermentation Cooler
How do you Cool Your Brew? Cool Brewing Fermentation CoolerHow do you Cool Your Brew? Cool Brewing Fermentation Cooler
How do you Cool Your Brew? Cool Brewing Fermentation CoolerCool-brewing
 
Ppt profile
Ppt profilePpt profile
Ppt profile
Nandan Lorekar
 
Getting started with one drive
Getting started with one driveGetting started with one drive
Getting started with one drivesprabhu1
 
Smart Briefcase
Smart BriefcaseSmart Briefcase
Smart Briefcase
Aatish Raj
 
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSF
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSFExpanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSF
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSFMartin Lieberman, DDS
 

Viewers also liked (20)

Evaluation Question 4
Evaluation Question 4Evaluation Question 4
Evaluation Question 4
 
jagadeesh updated
jagadeesh updatedjagadeesh updated
jagadeesh updated
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Tarek_Adel_Thabet 14
Tarek_Adel_Thabet 14Tarek_Adel_Thabet 14
Tarek_Adel_Thabet 14
 
Jabu cv
Jabu cv Jabu cv
Jabu cv
 
Kundan kumar singh - building
Kundan kumar singh - buildingKundan kumar singh - building
Kundan kumar singh - building
 
o
oo
o
 
CV Tobias, Alberts
CV Tobias, AlbertsCV Tobias, Alberts
CV Tobias, Alberts
 
Alumni slide share linkedin
Alumni slide share linkedinAlumni slide share linkedin
Alumni slide share linkedin
 
Stp fiama di wills
Stp fiama di willsStp fiama di wills
Stp fiama di wills
 
pretty
prettypretty
pretty
 
College essay w footer
College essay w footerCollege essay w footer
College essay w footer
 
How do you Cool Your Brew? Cool Brewing Fermentation Cooler
How do you Cool Your Brew? Cool Brewing Fermentation CoolerHow do you Cool Your Brew? Cool Brewing Fermentation Cooler
How do you Cool Your Brew? Cool Brewing Fermentation Cooler
 
Choosing a Major
Choosing a MajorChoosing a Major
Choosing a Major
 
Ppt profile
Ppt profilePpt profile
Ppt profile
 
Getting started with one drive
Getting started with one driveGetting started with one drive
Getting started with one drive
 
Smart Briefcase
Smart BriefcaseSmart Briefcase
Smart Briefcase
 
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSF
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSFExpanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSF
Expanding-Access-with-NFP-Dental-Practices-July-2015-Lieberman-Scott-WDSF
 
Pvsp final
Pvsp finalPvsp final
Pvsp final
 

Similar to Kundan kumar singh

Resume qaqc
Resume qaqcResume qaqc
Resume qaqc
sakthi vel
 
Ghulam mujtaba updated cv
Ghulam mujtaba updated cvGhulam mujtaba updated cv
Ghulam mujtaba updated cv
ghulam mujtaba
 
Fasil ck resume
Fasil ck resumeFasil ck resume
Fasil ck resume
Fasil CK
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
kashaf Sheikh
 
Dubai Resume_Subin.T.M
Dubai Resume_Subin.T.MDubai Resume_Subin.T.M
Dubai Resume_Subin.T.MSUBIN T M
 
Suchindra CV
Suchindra CVSuchindra CV
Suchindra CV
suchindra samavedam
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...
IRJET Journal
 

Similar to Kundan kumar singh (20)

CONSTRUCTION ENGINEER
CONSTRUCTION ENGINEERCONSTRUCTION ENGINEER
CONSTRUCTION ENGINEER
 
Danish Khan CV
Danish Khan CVDanish Khan CV
Danish Khan CV
 
Resume qaqc
Resume qaqcResume qaqc
Resume qaqc
 
Ghulam mujtaba updated cv
Ghulam mujtaba updated cvGhulam mujtaba updated cv
Ghulam mujtaba updated cv
 
Neel CV_Updated
Neel CV_UpdatedNeel CV_Updated
Neel CV_Updated
 
20161206CJRogers
20161206CJRogers20161206CJRogers
20161206CJRogers
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
Fasil ck resume
Fasil ck resumeFasil ck resume
Fasil ck resume
 
OBENDRA_NEW__1_
OBENDRA_NEW__1_OBENDRA_NEW__1_
OBENDRA_NEW__1_
 
PRANOY CV
PRANOY CVPRANOY CV
PRANOY CV
 
CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
updated CV
updated CVupdated CV
updated CV
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
Dubai Resume_Subin.T.M
Dubai Resume_Subin.T.MDubai Resume_Subin.T.M
Dubai Resume_Subin.T.M
 
Suchindra CV
Suchindra CVSuchindra CV
Suchindra CV
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
QAQC Engineer
QAQC EngineerQAQC Engineer
QAQC Engineer
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...
 

Kundan kumar singh

  • 1. CURRICULAMVITAE Kundan Kumar Singh 08871886584, 08936062466, Kundan.singh481@gmail.com,kundan.singh48125@gmail.com OBJECTIVE Lookingforan excellentopportunitytoworkasa Civil Engineerwhere mytalent andknowledge can be bestutilizedforthe developmentof the organisation. PROFESSIONALSUMMARY  Having4 yearof competitiveexperience inconstructionField &Goodknowledgeof Quality and Safety &Execution.  Good workethicswithexcellent communication,interpersonal skill andHandlingthe departmental activities.  ExcellentMotivational,Leadershipskill inafast –pacedEnvironment.  Capable toLearn and understand new leadingTechnologies.  Abilitytoworkwell inbothateam Environmentand individual Environment.  Experience inProjectExecution,ProjectPlanning&Monitoring,Resource Allocation& Management,ProcessAdherence,Manpower Supervision,ProjectCoordinationand ProcessImprovement TECHNICAL SKILL  Knowledge of Quantity Survey,Estimation, Bar Bend Schedule (BBS) & Quality Control/ QualityAssurance of Water Project & Building Project.  Good Approach about IS-Codes & SP CODES.  Good Approachof Understanding, Readingof Structural, ArchDrawing,AutoCad.  Laying, Jointing, and Testing of DI, HDPE, MS & UPVCPIPES.  Knowledgeof Hydraulicdesignandprocedure of intakewell&Tube Well. TOTALEXPERIENCE (4years) Company: JINDALSAWLimited(DEC215-CurrentlyWorking) Role:QualityControl Engineer. Consultant:Tata ConsultingEngineers(TCE) PREVIOUS COMPANY:EDMAC ENGINEERING CONSULTANT INDIAPVT.LTD (OCT 2014-DEC2015) Client:BiharMedical Services Infrastructure CorporationLimited(BMSICL) Contractor- L&TConstruction Limited(GovtMedical College &Hospital Madhepura) Role:ProjectManagement Consultant(QA/QC).
  • 2. Project Cost- 800 cr.( Bihar’sLargest& First Green BuildingProject IncludingWTP&STP ) PREVIOUS COMPANY: NCC Limited (JUNE 2012-SEP 2014). Role: SITEENGINEER. JOB RESPONSIBLITIES Project Management & Planning Responsibility 1. Preparationof ContractorBill & Planningof ContractorWork. 2. ReviewProjectPlan(RollingProgramme) andupdate ona regularly. 3. Co-ordinate Review of Contractor Submittals, job procedure, drawings and materials. 4. Considerationthe Gridof DrawingfromAUTO CAD. 5. Co-ordinationwithLocal bodiesand subcontractors. 6. Able tohandle anytype of Project,Dominative Nature,self confident,hardworkingand flexible forwork. Quality Responsibility 1. Preparation, Development and Review of Project Quality Plan. 2. Ensure compliance with Client Quality Objective. 3. Responsible for all engineering functions of work. &Effect close liaison with client reps. 4. Conduct all Lab tests and prepare all Reports. 5. Co-ordination with Govt body /Agencies /NIT/IIT for quality Lab Respective. Lab TestesResponsibility 1. Compressive StrengthTest. 2) ConsistencyTest.3) DLBD Test. 4) Initial &Final SettingTime Test forCement. 5) Sieve AnalysisforAggregate. 6) Bulking& SiltContentTestforSand. 7) Flakiness&ElongationIndex TestForCoarse Aggregate. 8) Impact Value TestforCoarse Aggregate. 9) Soil CompactionTest(Core CutterMethod) 10) Pile LoadTestfor Pile Foundation. 11) Plate LoadTest forSoil BearingCapacity(SBC) 12) SlumpTestforWorkability of Concrete. 13) Aggregate SpecificGravity&ApparentSpecificGravityTest. 14) WaterAbsorptiontestforAggregate. 15) Finesse modulusTest. 16) HydraulicTestingof DIPipeline.
  • 3. Execution Responsibility 1. Preparation& Cross Check of Bar Bend Schedule (of pile foundation, footing, Slab, Beam, Column, intake Well, Over Head Tank & WTP). 2. Responsible for site Execution & supervision & other Structural work. 3. Excellent approach of Layoutaccordingto drawingand designof BuildingWork 4. Measurementof Quantity&Estimate forConcrete & steel. 5. ManagementwithClient&Contractor. 6. Pouring, shuttering and formwork, production of concrete, Masonry construction and finishes. 7. Monitor safety and quality of contractor’s efforts QUALIFICATION  Bachelorof EngineeringfromRITRaipurCivil Engineeringwith68.40 %.  10+2 fromMMM InterCollege, Varanasi with 69%.  10th fromMMB HS KumnaSaran with70%. INTERNSHIP  6 Month internshipin Maneesh pipespvtltd (8th semester&ProjectCost-250 cror.).  1 Month Major Trainingfrompublicworksdept.  1 Month minorTrainingfrom jamui jail construction Bihar. HOBBIES  ReadingNewspaperandBooks,playingvolleyball andcricket, watchingmovies.  Listeningmusic. ACHIEVEMENT&STRENGTH  Able tocooperate with Consultants,client &contractor.  I am alsoa Sportsman,Runner(Caption)inintercollege volleyball championship(organised by CSVTU) LANGUAGE: English,Hindi,Bhojpuri PERSONALDETAILS Date of Birth:16/10/1990. Vill+Po. –Sawari,Ps.-jalalpur Distt.- Saran(Bihar) Date: 08/07/2016 KUNDAN KUMAR SINGH