SlideShare a Scribd company logo
HOW MUCH TIME DOES
YOUR CRANE HAVE LEFT?
.
CRANES AND THEIR
COMPONENTS ARE
NOT DESIGNED TO
LAST FOREVER
Welded structures and machinery components
experience fatigue and wear-and-tear whenever
a crane is working.
These components have a finite service life –
which is correlated to usage, not calendar time.
Structures consume their design life in work
cycles, while machineries consume their design
life in running hours.
Both structures and machineries take the
load into account – half the rated load
consumes design life by a factor of 0.125.
WORK CYCLES
RUNNING HOURS
ACTUAL/DESIGN LOAD
EXHAUSTED
DESIGN LIFE
DESIGN CLASS
DETERMINES
USABLE DESIGN LIFE
Design class indicates how many times a
load can be lifted, and how many operational
hours the machinery is rated to endure.
Lifting the same load repeatedly, a lower
class of crane will not last as long as a
higher class of crane.
VS.
*According to ISO, FEM and BS with full nominal load
A8/M8*
STRUCTURE = 1,000,000 LIFTS
MACHINERY = 12,500 HOURS
C8/M8**
STRUCTURE = 1,000,000 LIFTS
MACHINERY = 12,500 HOURS
F/ISO-M8†
STRUCTURE = 2,000,000 LIFTS
MACHINERY = 12,500 HOURS
A4/M4*
STRUCTURE = 64,000 LIFTS
MACHINERY = 800 HOURS
C4/M4**
STRUCTURE = 64,000 LIFTS
MACHINERY = 800 HOURS
C/ISO-M4†
STRUCTURE = 20,000 LIFTS
MACHINERY = 800 HOURS
** AS 1418.1 † CMAA #70
10t
UNDERSTANDING THE DESIGN LIFE
OF YOUR CRANE IS CRITICAL
Knowing the remaining design life of your crane
and its components gives you an estimate of
the limit for safe operational life, based on
actual usage.
Regular inspections help identify risks and support
compliance, but their frequency and scope are
not enough to catch failures caused by fast crack
propagation in machineries. The likelihood of such
failure increases closer to the end of design life.
CRITICAL CRACK SIZE
DETECTABLE CRACK SIZE
NUMBER OF STRESS CYCLES
SIZEOFCRACK
Structures Machineries
safe time period between inspections
DETERMINING DESIGN LIFE IS ESPECIALLY
IMPORTANT FOR OLDER CRANES
component replacements. All of these reduce
operational costs and safely extend the useful
life of the crane.
Operation costs increase over time as the crane
needs more frequent maintenance and spare parts.
Knowing the design life of your crane allows you to
plan timely modernizations, general overhauls and
ECONOMICAL OPERATING COST OF YOUR CRANE
MODERNIZATION
LIFETIME
CRANECOSTS
DESIGN LIFE
ANALYSIS IS NOT
JUST A MATTER
OF ECONOMICS.
IT’S INDUSTRY
STANDARD.
Determining the current status of remaining
design life is now a yearly requirement for
crane owners, according to ISO 12482-2014
and AS 2550.1:2011.
This regulation calls for the design working
period (DWP) calculation for both the structures
and machineries of a crane, in conjunction with
periodic inspections at 12-month intervals.
When the design life of the crane or any
of its components will end before the
next scheduled inspection, an engineering
assessment such as a Crane Reliability Survey
(CRS) is recommended to provide a detailed
plan for the future of the crane.
WHERE TO FIND
EXPERT ANALYSIS
OF THE REMAINING
DESIGN LIFE OF
YOUR CRANE
Our approach to crane maintenance is called
Lifecycle Care – a comprehensive and systematic
approach, supported by world-class tools
and processes.
Konecranes crane experts apply a systematic Risk
and Recommendation Method and a consultative,
planning and review process to drive continuous
improvement in safety and productivity.
We have specially trained professionals who
translate past crane usage into an analyzable
format, then use state-of-the-art software to
calculate the remaining design life.
Konecranes can provide this analysis for all makes
and models of cranes and their components.
LEARN ABOUT
KONECRANES DESIGN
LIFE ANALYSIS
Konecranes is a world-leading group of Lifting Businesses™
offering lifting
equipment and services that improve productivity in a wide variety of industries.
The company is listed on NASDAQ OMX Helsinki Ltd (symbol: KCR1V). With almost
12,000 employees at 600 locations in nearly 50 countries we have the resources,
technology and determination to deliver on the promise of Lifting Businesses™
.
© 2015 Konecranes Plc. All rights reserved. ‘Konecranes’, ‘Lifting Businesses’
and are either registered trademarks or trademarks of Konecranes Plc.

More Related Content

What's hot

Konecranes Customer Portal
Konecranes Customer PortalKonecranes Customer Portal
Konecranes Customer Portal
Konecranes
 
Hoist brochure singlepages_040912
Hoist brochure singlepages_040912Hoist brochure singlepages_040912
Hoist brochure singlepages_040912Simba Zhao
 
Reva Products - Cranes | Hoists | Helical Reduction Gear Boxes
Reva Products - Cranes | Hoists | Helical Reduction Gear BoxesReva Products - Cranes | Hoists | Helical Reduction Gear Boxes
Reva Products - Cranes | Hoists | Helical Reduction Gear Boxes
Reva Industries Ltd.
 
Coates Hire - Engineering and Product Solutions
Coates Hire - Engineering and Product SolutionsCoates Hire - Engineering and Product Solutions
Coates Hire - Engineering and Product Solutions
Rafi Tchopourian
 
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
IRJET Journal
 
The Complete Pumps Solution from ERIKS
The Complete Pumps Solution from ERIKSThe Complete Pumps Solution from ERIKS
The Complete Pumps Solution from ERIKS
ERIKS UK
 
Safe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed AssadSafe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed Assad
arab.eng
 
Vechile Tire issues and problem
Vechile Tire issues and problemVechile Tire issues and problem
Vechile Tire issues and problem
Aravind Ganesh
 
QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15Hennie Oelofse
 
Marine Deck Cranes
Marine Deck CranesMarine Deck Cranes
Marine Deck Cranes
ewebplace.com
 
OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADC
Muanisa Waras
 
Coates Engineering Solutions
Coates Engineering Solutions Coates Engineering Solutions
Coates Engineering Solutions
Rafi Tchopourian
 
Wilmer Filion CV 2016 e
Wilmer Filion CV 2016 eWilmer Filion CV 2016 e
Wilmer Filion CV 2016 ewilmer filion
 

What's hot (20)

Konecranes Customer Portal
Konecranes Customer PortalKonecranes Customer Portal
Konecranes Customer Portal
 
Cmaa 70
Cmaa 70Cmaa 70
Cmaa 70
 
Norma cmaa 70
Norma cmaa 70Norma cmaa 70
Norma cmaa 70
 
Hoist brochure singlepages_040912
Hoist brochure singlepages_040912Hoist brochure singlepages_040912
Hoist brochure singlepages_040912
 
May 2015 CV
May 2015 CVMay 2015 CV
May 2015 CV
 
Reva Products - Cranes | Hoists | Helical Reduction Gear Boxes
Reva Products - Cranes | Hoists | Helical Reduction Gear BoxesReva Products - Cranes | Hoists | Helical Reduction Gear Boxes
Reva Products - Cranes | Hoists | Helical Reduction Gear Boxes
 
Coates Hire - Engineering and Product Solutions
Coates Hire - Engineering and Product SolutionsCoates Hire - Engineering and Product Solutions
Coates Hire - Engineering and Product Solutions
 
FAHAD CV 2016
FAHAD CV 2016FAHAD CV 2016
FAHAD CV 2016
 
Ramesh up dated CV
Ramesh up dated CVRamesh up dated CV
Ramesh up dated CV
 
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
Study on Hard Shifting of Gears in Transmission Box Assembly and Analysis of ...
 
CSAR Brochure
CSAR BrochureCSAR Brochure
CSAR Brochure
 
The Complete Pumps Solution from ERIKS
The Complete Pumps Solution from ERIKSThe Complete Pumps Solution from ERIKS
The Complete Pumps Solution from ERIKS
 
Safe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed AssadSafe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed Assad
 
Vechile Tire issues and problem
Vechile Tire issues and problemVechile Tire issues and problem
Vechile Tire issues and problem
 
QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15
 
Siemens certificates
Siemens certificatesSiemens certificates
Siemens certificates
 
Marine Deck Cranes
Marine Deck CranesMarine Deck Cranes
Marine Deck Cranes
 
OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADC
 
Coates Engineering Solutions
Coates Engineering Solutions Coates Engineering Solutions
Coates Engineering Solutions
 
Wilmer Filion CV 2016 e
Wilmer Filion CV 2016 eWilmer Filion CV 2016 e
Wilmer Filion CV 2016 e
 

Viewers also liked

Crane Reliability Study - SlideShare
Crane Reliability Study - SlideShareCrane Reliability Study - SlideShare
Crane Reliability Study - SlideShare
Konecranes
 
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
Konecranes
 
Konecranes CXT Wire Rope Hoist Cranes
Konecranes CXT Wire Rope Hoist CranesKonecranes CXT Wire Rope Hoist Cranes
Konecranes CXT Wire Rope Hoist Cranes
Konecranes
 
Workstation Lifting Systems product range
Workstation Lifting Systems product rangeWorkstation Lifting Systems product range
Workstation Lifting Systems product range
Konecranes
 
Konecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive MaintenanceKonecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive Maintenance
Konecranes
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes
 
Tema2 esfuerzos
Tema2 esfuerzosTema2 esfuerzos
Tema2 esfuerzosannaly
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structures
Timóteo Rocha
 
Wind Load of Wind Turbine Tower
Wind Load of Wind Turbine TowerWind Load of Wind Turbine Tower
Wind Load of Wind Turbine Tower
Henry Kurniadi
 
Lifecycle Care in Real Time
Lifecycle Care in Real TimeLifecycle Care in Real Time
Lifecycle Care in Real Time
Konecranes
 
Design and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generationDesign and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generation
Aakash Bagchi
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizations
Konecranes
 
Wind loads calculation
Wind loads calculationWind loads calculation
Wind loads calculationHenry Kurniadi
 
Wind load calculation
Wind load calculationWind load calculation
Wind load calculation
Godfrey James
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONS
jagrutib22
 

Viewers also liked (16)

Crane Reliability Study - SlideShare
Crane Reliability Study - SlideShareCrane Reliability Study - SlideShare
Crane Reliability Study - SlideShare
 
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
TRUCONNECT® and yourKONECRANES.com work together to enable Lifecycle Care in ...
 
Konecranes CXT Wire Rope Hoist Cranes
Konecranes CXT Wire Rope Hoist CranesKonecranes CXT Wire Rope Hoist Cranes
Konecranes CXT Wire Rope Hoist Cranes
 
Workstation Lifting Systems product range
Workstation Lifting Systems product rangeWorkstation Lifting Systems product range
Workstation Lifting Systems product range
 
Konecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive MaintenanceKonecranes Inspections and Preventive Maintenance
Konecranes Inspections and Preventive Maintenance
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
 
Tema2 esfuerzos
Tema2 esfuerzosTema2 esfuerzos
Tema2 esfuerzos
 
Guide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structuresGuide for the design of crane supporting steel structures
Guide for the design of crane supporting steel structures
 
Wind Load of Wind Turbine Tower
Wind Load of Wind Turbine TowerWind Load of Wind Turbine Tower
Wind Load of Wind Turbine Tower
 
Lifecycle Care in Real Time
Lifecycle Care in Real TimeLifecycle Care in Real Time
Lifecycle Care in Real Time
 
Design and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generationDesign and construction of wind turbine towers for maximum power generation
Design and construction of wind turbine towers for maximum power generation
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizations
 
Wind_Load
Wind_LoadWind_Load
Wind_Load
 
Wind loads calculation
Wind loads calculationWind loads calculation
Wind loads calculation
 
Wind load calculation
Wind load calculationWind load calculation
Wind load calculation
 
ALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONSALL ABOUT DEEP FOUNDATIONS
ALL ABOUT DEEP FOUNDATIONS
 

Similar to Konecranes Overhead Crane Design Life White Paper

brochure_leo_hull_2d_3d_EN
brochure_leo_hull_2d_3d_ENbrochure_leo_hull_2d_3d_EN
brochure_leo_hull_2d_3d_ENJulien HYVERT
 
landing-gear-design-and-development
landing-gear-design-and-developmentlanding-gear-design-and-development
landing-gear-design-and-developmentdurga kumari
 
LCAS Presentation
LCAS PresentationLCAS Presentation
LCAS Presentation
Sruli Weinreb
 
MPV Update – Issue 2016
MPV Update – Issue 2016MPV Update – Issue 2016
MPV Update – Issue 2016Jost Bergmann
 
Cm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalogCm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalog
Roberto Ortega
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
ABHINAV KUMAR
 
DLW training report
DLW  training reportDLW  training report
DLW training report
Ishant Gautam.
 
Anish report
Anish reportAnish report
Anish report
rboy001
 
Nirmal kumar updated resume
Nirmal kumar updated resumeNirmal kumar updated resume
Nirmal kumar updated resumeNirmal Parikh
 
Design and Development of Pneumatic Scissor Lift
Design and Development of Pneumatic Scissor LiftDesign and Development of Pneumatic Scissor Lift
Design and Development of Pneumatic Scissor Lift
IRJET Journal
 
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDFHEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
Vegar Haraldsen
 
Session 5 design of rcc structural elements PROF YADUNANDAN
Session 5 design of rcc structural elements  PROF YADUNANDANSession 5 design of rcc structural elements  PROF YADUNANDAN
Session 5 design of rcc structural elements PROF YADUNANDAN
Ajit Sabnis
 
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDANDESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
Ajit Sabnis
 
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERYDESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
IRJET Journal
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
SHAILESH SHUKLA
 
Fps report landing gear
Fps report landing gearFps report landing gear
Fps report landing gear
Harsh Yadav
 
CFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft bodyCFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft body
IRJET Journal
 
IRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft bodyIRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft body
IRJET Journal
 

Similar to Konecranes Overhead Crane Design Life White Paper (20)

CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
brochure_leo_hull_2d_3d_EN
brochure_leo_hull_2d_3d_ENbrochure_leo_hull_2d_3d_EN
brochure_leo_hull_2d_3d_EN
 
landing-gear-design-and-development
landing-gear-design-and-developmentlanding-gear-design-and-development
landing-gear-design-and-development
 
LCAS Presentation
LCAS PresentationLCAS Presentation
LCAS Presentation
 
IJSRDV3I80015
IJSRDV3I80015IJSRDV3I80015
IJSRDV3I80015
 
MPV Update – Issue 2016
MPV Update – Issue 2016MPV Update – Issue 2016
MPV Update – Issue 2016
 
Cm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalogCm p1-11643-en-skf-microlog-accessories-catalog
Cm p1-11643-en-skf-microlog-accessories-catalog
 
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo...
 
DLW training report
DLW  training reportDLW  training report
DLW training report
 
Anish report
Anish reportAnish report
Anish report
 
Nirmal kumar updated resume
Nirmal kumar updated resumeNirmal kumar updated resume
Nirmal kumar updated resume
 
Design and Development of Pneumatic Scissor Lift
Design and Development of Pneumatic Scissor LiftDesign and Development of Pneumatic Scissor Lift
Design and Development of Pneumatic Scissor Lift
 
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDFHEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
HEXAGON_MI_CaseStudy_Bias_Turk_A4_EN_Web (2).PDF
 
Session 5 design of rcc structural elements PROF YADUNANDAN
Session 5 design of rcc structural elements  PROF YADUNANDANSession 5 design of rcc structural elements  PROF YADUNANDAN
Session 5 design of rcc structural elements PROF YADUNANDAN
 
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDANDESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
DESIGN OF RCC ELEMENTS SESSION 5 PROF. YADUNANDAN
 
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERYDESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
DESIGN AND DEVELOPMENT OF A CHASSIS FRAME FOR MINI- HARVESTING MACHINERY
 
Summer Training Report, DLW Varanasi
Summer Training Report, DLW VaranasiSummer Training Report, DLW Varanasi
Summer Training Report, DLW Varanasi
 
Fps report landing gear
Fps report landing gearFps report landing gear
Fps report landing gear
 
CFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft bodyCFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft body
 
IRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft bodyIRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft body
 

More from Konecranes

Konecranes Industrial Cranes
Konecranes Industrial Cranes Konecranes Industrial Cranes
Konecranes Industrial Cranes
Konecranes
 
Konecranes SMARTON and UNITON Open Winch Cranes
Konecranes SMARTON and UNITON Open Winch CranesKonecranes SMARTON and UNITON Open Winch Cranes
Konecranes SMARTON and UNITON Open Winch Cranes
Konecranes
 
Konecranes Smart Features
Konecranes Smart FeaturesKonecranes Smart Features
Konecranes Smart Features
Konecranes
 
Konecranes RENTALL
Konecranes RENTALLKonecranes RENTALL
Konecranes RENTALL
Konecranes
 
Konecranes CLX Chain Hoist Crane
Konecranes CLX Chain Hoist CraneKonecranes CLX Chain Hoist Crane
Konecranes CLX Chain Hoist Crane
Konecranes
 
Konecranes Electric Chain Hoists
Konecranes Electric Chain HoistsKonecranes Electric Chain Hoists
Konecranes Electric Chain Hoists
Konecranes
 
Konecranes Automotive industry
Konecranes Automotive industryKonecranes Automotive industry
Konecranes Automotive industry
Konecranes
 
Konecranes Waste to Energy and Biomass industry
Konecranes Waste to Energy and Biomass industryKonecranes Waste to Energy and Biomass industry
Konecranes Waste to Energy and Biomass industry
Konecranes
 

More from Konecranes (8)

Konecranes Industrial Cranes
Konecranes Industrial Cranes Konecranes Industrial Cranes
Konecranes Industrial Cranes
 
Konecranes SMARTON and UNITON Open Winch Cranes
Konecranes SMARTON and UNITON Open Winch CranesKonecranes SMARTON and UNITON Open Winch Cranes
Konecranes SMARTON and UNITON Open Winch Cranes
 
Konecranes Smart Features
Konecranes Smart FeaturesKonecranes Smart Features
Konecranes Smart Features
 
Konecranes RENTALL
Konecranes RENTALLKonecranes RENTALL
Konecranes RENTALL
 
Konecranes CLX Chain Hoist Crane
Konecranes CLX Chain Hoist CraneKonecranes CLX Chain Hoist Crane
Konecranes CLX Chain Hoist Crane
 
Konecranes Electric Chain Hoists
Konecranes Electric Chain HoistsKonecranes Electric Chain Hoists
Konecranes Electric Chain Hoists
 
Konecranes Automotive industry
Konecranes Automotive industryKonecranes Automotive industry
Konecranes Automotive industry
 
Konecranes Waste to Energy and Biomass industry
Konecranes Waste to Energy and Biomass industryKonecranes Waste to Energy and Biomass industry
Konecranes Waste to Energy and Biomass industry
 

Recently uploaded

Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
Lviv Startup Club
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 

Recently uploaded (20)

Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...Kseniya Leshchenko: Shared development support service model as the way to ma...
Kseniya Leshchenko: Shared development support service model as the way to ma...
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 

Konecranes Overhead Crane Design Life White Paper

  • 1. HOW MUCH TIME DOES YOUR CRANE HAVE LEFT?
  • 2. . CRANES AND THEIR COMPONENTS ARE NOT DESIGNED TO LAST FOREVER Welded structures and machinery components experience fatigue and wear-and-tear whenever a crane is working. These components have a finite service life – which is correlated to usage, not calendar time. Structures consume their design life in work cycles, while machineries consume their design life in running hours. Both structures and machineries take the load into account – half the rated load consumes design life by a factor of 0.125. WORK CYCLES RUNNING HOURS ACTUAL/DESIGN LOAD EXHAUSTED DESIGN LIFE
  • 3. DESIGN CLASS DETERMINES USABLE DESIGN LIFE Design class indicates how many times a load can be lifted, and how many operational hours the machinery is rated to endure. Lifting the same load repeatedly, a lower class of crane will not last as long as a higher class of crane. VS. *According to ISO, FEM and BS with full nominal load A8/M8* STRUCTURE = 1,000,000 LIFTS MACHINERY = 12,500 HOURS C8/M8** STRUCTURE = 1,000,000 LIFTS MACHINERY = 12,500 HOURS F/ISO-M8† STRUCTURE = 2,000,000 LIFTS MACHINERY = 12,500 HOURS A4/M4* STRUCTURE = 64,000 LIFTS MACHINERY = 800 HOURS C4/M4** STRUCTURE = 64,000 LIFTS MACHINERY = 800 HOURS C/ISO-M4† STRUCTURE = 20,000 LIFTS MACHINERY = 800 HOURS ** AS 1418.1 † CMAA #70 10t
  • 4. UNDERSTANDING THE DESIGN LIFE OF YOUR CRANE IS CRITICAL Knowing the remaining design life of your crane and its components gives you an estimate of the limit for safe operational life, based on actual usage. Regular inspections help identify risks and support compliance, but their frequency and scope are not enough to catch failures caused by fast crack propagation in machineries. The likelihood of such failure increases closer to the end of design life. CRITICAL CRACK SIZE DETECTABLE CRACK SIZE NUMBER OF STRESS CYCLES SIZEOFCRACK Structures Machineries safe time period between inspections
  • 5. DETERMINING DESIGN LIFE IS ESPECIALLY IMPORTANT FOR OLDER CRANES component replacements. All of these reduce operational costs and safely extend the useful life of the crane. Operation costs increase over time as the crane needs more frequent maintenance and spare parts. Knowing the design life of your crane allows you to plan timely modernizations, general overhauls and ECONOMICAL OPERATING COST OF YOUR CRANE MODERNIZATION LIFETIME CRANECOSTS
  • 6. DESIGN LIFE ANALYSIS IS NOT JUST A MATTER OF ECONOMICS. IT’S INDUSTRY STANDARD. Determining the current status of remaining design life is now a yearly requirement for crane owners, according to ISO 12482-2014 and AS 2550.1:2011. This regulation calls for the design working period (DWP) calculation for both the structures and machineries of a crane, in conjunction with periodic inspections at 12-month intervals. When the design life of the crane or any of its components will end before the next scheduled inspection, an engineering assessment such as a Crane Reliability Survey (CRS) is recommended to provide a detailed plan for the future of the crane.
  • 7. WHERE TO FIND EXPERT ANALYSIS OF THE REMAINING DESIGN LIFE OF YOUR CRANE Our approach to crane maintenance is called Lifecycle Care – a comprehensive and systematic approach, supported by world-class tools and processes. Konecranes crane experts apply a systematic Risk and Recommendation Method and a consultative, planning and review process to drive continuous improvement in safety and productivity. We have specially trained professionals who translate past crane usage into an analyzable format, then use state-of-the-art software to calculate the remaining design life. Konecranes can provide this analysis for all makes and models of cranes and their components.
  • 8. LEARN ABOUT KONECRANES DESIGN LIFE ANALYSIS Konecranes is a world-leading group of Lifting Businesses™ offering lifting equipment and services that improve productivity in a wide variety of industries. The company is listed on NASDAQ OMX Helsinki Ltd (symbol: KCR1V). With almost 12,000 employees at 600 locations in nearly 50 countries we have the resources, technology and determination to deliver on the promise of Lifting Businesses™ . © 2015 Konecranes Plc. All rights reserved. ‘Konecranes’, ‘Lifting Businesses’ and are either registered trademarks or trademarks of Konecranes Plc.