KHULNA WATER SUPPLY PROJECT
Why This Project?
Khulna, the third-largest city in Bangladesh, is located on the
banks of the Bhairab and Rupsha rivers in the southwest of the
country. The present water supply to Khulna is mainly from
groundwater sources drawn from both deep and shallow tube
wells. In the long term as demand increases, conjunctive use of
groundwater and surface water will be required, even though
surface water may suffer from salinity intrusion in dry season. To
cope with current insufficient supply and increasing demand
Khulna WASA started Khulna Water Supply Improvement Project
to fulfill the demand of A million people of this City.
Goal of This Project
 Salinity Control
 Maximum use of Surface Water
 To purify & supply 110 Million
liters of water everyday
 To reserve 777 Million liters of
water at the reservoirs
Project At a Glance
Project Name: Khulna Water Supply Project
Project Number: 42171-013
Project Status: Active
Project Cost: 25.5 Billion Taka (Approx.)
Executing Agency: Khulna Water Supply and
Sewerage Authority
Project Location Map
Construction Overview’s
 1 Water Intake
 1 Impounding Reservoir
 1 Surface Water Treatment Plant (SWTP)
 5 Reservoirs
 11 Overhead Tanks
 Installation of 758 km water transmission pipe
line
(33km raw water, 25 km clear water & 700km
distribution pipe line.)
Water Intake, Impounding Reservoir
& SWTP
Distribution Reservoir &
Over Head Tank
Clear Water Transmission Line
Presentation Overview’s
 Construction Equipment
 Health and Safety Program
 Emergency Response Plan
Construction Equipments
✓ Construction
equipment refers
to heavy-duty
vehicles, specially
designed for
executing constru-
ction tasks, most
frequently ones
involving
earthwork
operations.
Advantages of Using Construction
Equipments
• Increase the rate of output through process
with best effective and efficient method.
• Reduce the overall construction cost.
• Carryout the activities which cannot be done
manually.
• Eliminates the construction hazarders provide
better health safety.
• Maintenances of standard is easy.
Construction Equipment's
in Our Project
Earthmoving
Equipments:
• Excavator
• Backhoe
loaders
• Loaders
• Trencher
• Crawler
mountain drill
Construction
Vehicles:
• Dump truck
• Tipper truck
Matrrial
handling
equipment’s:
• Crane
• Forklift
Construction
equipment’s:
• Portable
concrete
mixer
• Concrete
mixing
transport
trucks
• Road
roller
Earthmoving Equipments
• Earth movers are heavy machineries used
for shift large amount of earth, digging
foundation, pile hole etc.
• In our project required earthmoving
equipment’s are excavator, loaders,
backhoe, trencher, crawler mountain drill.
Excavators
Are used to
• Digging of trenches, holes,
foundations.
• Material handling.
• Brush cutting with
hydraulic attachments.
• Construction.
• General
grading/landscaping.
• Mining, especially, but not
only open-pit mining.
Backhoe Loaders
• Backhoe loaders are
very similar to tractors
with a slight difference:
they contain an
adjustable, shovel in
front of the equipment,
and a small bucket in
the back of the loader
used for digging
Loaders
• A loader is a heavy
equipment machine
used in construction to
move aside or load
materials such
as asphalt, demolition
debris, dirt, snow, feed,
gravel, logs,
raw minerals, recycled
material, rock, sand, wo
odchips,
Trencher
• A trencher is a piece
of construction
equipment used to
dig trenches,
especially for
laying pipes or cables,
for installing drainage,
or in preparation
for trench warfare
• In our project
trencher is used for
making trench for
water transmission
pipe installation
Crawler Mountain Drill
• A Crawler Mountain
Drill is used at large
limestone mines and the
like, and drills larger
holes for setting
explosives.
• In our project it is used
for digging pile hole.
Construction Vehicles
• It refers to heavy-duty vehicles, specially
designed for executing construction tasks,
most frequently ones involving earthwork
operations
• They usually comprise five equipment
systems: implement, traction,
structure, power train, control and
information.
• In our project Dumpers , Tipper truck are used
Dumpers
• A dump truck is
a truck used for
transporting loose
material (such
as sand, gravel, or
demolition waste)
for construction.
• With hydraulic
pistons it is able to
lift material at the
site of delivery
Tipper Truck
• The function of tipper
truck is similar to dump
truck but tipper is not
as heavy as dump
truck.it used for the
light weight
transportation
Material Handling Equipments
• Material handling equipment is
mechanical equipment used for the
movement, storage, control and protection of
materials, goods and products throughout the
process of manufacturing, distribution,
consumption and disposal.
• In our project crane & Forklifts are used.
Crane
• A crane is a type
of machine,
generally equipped
with a hoist
rope, wire
ropes or chains,
and sheaves, that
can be used both to
lift and lower
materials and to
move them
horizontally
Forklifts
• Forklifts are powerful,
heavy-duty electric lift
trucks that are used for
materials handling such
as crates, containers,
and other equipment
• Forklifts are also called
upon to carry the
troughs of mortar,
concrete blocks,
precast concrete
sections etc.
Construction Equipments
Portable concrete mixer
• A concrete mixer is a
device that
homogeneously
combines cement, aggre
gate such as sand or
gravel, and water to
form concrete
• It is used for smaller jobs,
such as residential
repairs, renovations, or
hobbyist-scale projects,
Concrete Mixer Transport Trucks
• Special concrete
transport trucks are
used to transport and
mix concrete up to the
construction site.
• The concrete mixing
transport truck
maintains the material's
liquid state through
agitation, or turning of
the drum, until delivery
Road Roller
• A road roller is a
compactor type
engineering
vehicle used to
compact soil,
gravel, concrete,
or asphalt in the
construction
of roads and
foundations.
Construction Safety
According to project
Definitions
Safety is free from risk and danger.
Accidents is defined as an unexpected and sudden
event resulting in damage or harm.
Hazards is an unsafe condition or activity, that if left
uncontrolled can contribute to an accident.
Risk is the assessment of ’probability of loss’ and
’potential amount of loss’.
Construction Safety & It’s
Meaning
Construction safety aims to ensure that a
construction site or the industry as a whole is
not the cause of immediate danger to the
public around a construction site, or the
workers at a construction site, as well as
making sure that the finished product of
construction meets required safety
standards.
Purpose of Construction Safety
• To understand the different types of existing
hazards on site
• Comprehend the diferent types of accident
measurement approach
• Appreciate the importance for improving health
& safety in construction
• Undertake the techniques of improving health &
safety in construction
• Understand the existing legislative framework
• Understand an accident analysis if required.
Common Causes of Fatalities
Leackage, flood
1%
Landslide, fall,breaking
of material
14%
Fire explosion
2%
Other injuries
2%
Body injury due to
physical lifting
17%
Body injury not due to
physical lifting
5%
Fall of person not from
height
11%
Fall from height
11%
Other form of loss of
control
1%
Loss control of material
handling
10%
Loss control of tools
15%
Lost control of vehicle
6%
Lost control of machine
5%
Personal Protective Equipment(PPE)
• PPE is equipment that will protect the user
against health or safety risks at work. It
can include items such as safety helmets,
gloves, eye protection, high-visibility
clothing, safety footwear and safety
harnesses.
Why PPE is important?
To protect the user against health or safety risks
such as:
• The lungs, e.g. from breathing in
contaminated air.
• The head and feet, e.g. from falling materials.
• The eyes, e.g. from flying particles or
splashes of corrosive liquids.
• The skin, e.g. from contact with corrosive
materials.
• The body, e.g. from extremes of heat or cold.
Three Basic Questions for safety
• Who is exposed and to what?
• How long are they exposed for?
• How much are they exposed to?
Types of personal protective
equipments in our Project
• Eyes & face protection
• Head and Neck protection
• Ears protection
• Hands and arms protection
• Legs and Feet's protection
• Lungs protection
Eyes & Face Protection
Eyes & face protection are needed to protect
hazards like:
• Chemical or metal splash
• Dust
• Projectiles
• Gas
• Vapour
Head and Neck Protection
• Impact from falling or
flying objects
• Risk of head bumping
• Hair getting tangled in
machinery
• Climate or temperature
etc.
Ears Protection
• People should wear a hearing
protector if the noise or sound
level at the workplace exceeds
85 decibels.
• Hearing protectors(Ear Plug)
reduce the noise exposure
level and the risk of hearing
loss.
Hands and Arms Protection
Hands and arms protection are needed to protect
hazards like:
• Abrasion
• Temperature extremes
• Cuts and punctures
• Impact
• Electric shock
• Vibration
• Prolonged immersion in water etc.
Gloves
Gloves are used for-
• Biohazard Protection.
• Abrasion Protection.
• Friction protection.
• Protection from extremes
of heat.
Feet and Legs Protection
Feet and Legs Protection gives protection from
following conditions:
• Wet
• Hot and cold conditions
• Electrostatic build-up
• Slipping
• Cuts and punctures
• Heavy loads
• Metal
Feet and Legs Protection
Safety boots and shoes
with protective toecaps and
penetration-resistant
Mid-sole wellington boots and
specific footwear, eg. foundry
boots and chainsaw boots
Respiratory protective equipment
(RPE)
• Used for lungs protection.
• Lungs inflammation may be
occurred due to exposed in
a long time in a dusty area.
• RPE may be the solution of
this problem.
Whole body protection
This equipment is
used when to
expose to high
temperature, or
where welding
work done.
Fall Protection
Others protection and support system
• Fire protection:
Drill & Emergency Rehearsal
Emergency Response Plan
Emergency Address
Emergency Contract Number
of Hospitals
Emergency contract no:
Khulna BNSB Eye Hospital
+880 1913-701887
Khulna Medical College
+880 41-761535
Sheikh Abu Naser Specialised
Hospital
+880 41-760390
Akij Medical College Hospital
+880 1713-488421
Report
Medical Hospital
Non-Fatal: First Aid Fatal
Report to
Admin
Results from a work
accident or
exposure
Does not result from a
work accident
A death
An Injury/Illness:▪ Any fracture
▪ Any amputation
▪ Dislocation of shoulder, hip
▪ Loss of sight
▪ Any injury resulting from electricity
Case must be recorded on Log
Medical Report
Civic Authorities
Insurance Company
Law Enforcement
Team Allocation Based on incident
Health
and
Safety
Investigati
on team
Misbehaviour
Investigation
team
Crime
Investigation
team
Security
Investigation
team
Investigation
Process and
collection of facts
and findings
Pattern Analysis
Risk Mitigation
Strategies
Accident Incident reporting system
Construction safety practices
in KWASA projects
Exterior people were
allowed during excavation
operation
Construction Safety Practices
Uses of helmet is
a good practice
Uses of
covering is also
a good
practice.
Construction Safety Practices
Using of eye
protection,
gloves are
neglected
Khulna watersupply project ppt

More Related Content

Similar to Khulna watersupply project ppt

Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.ppt
VinayakNaik80
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892
Sumit Modi
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
Nabeel Joomun
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
PinakRay1
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
Sagar Radadiya
 
Introduction to Advanced Construction Equipments
Introduction to Advanced Construction EquipmentsIntroduction to Advanced Construction Equipments
Introduction to Advanced Construction Equipments
ATUL DONGRE
 
Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptx
KartikSodha
 
Construction equipments By T.Ravi Prakash
Construction equipments By T.Ravi PrakashConstruction equipments By T.Ravi Prakash
Construction equipments By T.Ravi Prakash
ravicivil
 
Module 1 21civ14civil introduction
Module 1 21civ14civil introduction Module 1 21civ14civil introduction
Module 1 21civ14civil introduction
Ajith B T
 
Pm & construction equipment
Pm & construction equipmentPm & construction equipment
Pm & construction equipment
PrabhanjanThorat
 
Safety in various construction operations –
Safety in various construction operations –Safety in various construction operations –
Safety in various construction operations –
Nayana 54321
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised construction
MANUJ sinh
 
Demolition of building and blasting equipment
Demolition of building and blasting equipmentDemolition of building and blasting equipment
Demolition of building and blasting equipment
Chetan Karwa
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
Mijanur Rahman
 
drilling services in Tanzania .
drilling services in Tanzania           .drilling services in Tanzania           .
drilling services in Tanzania .
yeswitha3zen
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
JiaYu36
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
Kiran Goswami
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
Crosstown TO
 

Similar to Khulna watersupply project ppt (20)

Construction Equipments.ppt
Construction Equipments.pptConstruction Equipments.ppt
Construction Equipments.ppt
 
Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892Report 150720083151-lva1-app6892
Report 150720083151-lva1-app6892
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
Introduction to Advanced Construction Equipments
Introduction to Advanced Construction EquipmentsIntroduction to Advanced Construction Equipments
Introduction to Advanced Construction Equipments
 
Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
Construction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptxConstruction Equipment And Automation ppt.pptx
Construction Equipment And Automation ppt.pptx
 
Construction equipments By T.Ravi Prakash
Construction equipments By T.Ravi PrakashConstruction equipments By T.Ravi Prakash
Construction equipments By T.Ravi Prakash
 
Module 1 21civ14civil introduction
Module 1 21civ14civil introduction Module 1 21civ14civil introduction
Module 1 21civ14civil introduction
 
Pm & construction equipment
Pm & construction equipmentPm & construction equipment
Pm & construction equipment
 
Safety in various construction operations –
Safety in various construction operations –Safety in various construction operations –
Safety in various construction operations –
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised construction
 
OP YADAV PROJECT
OP YADAV PROJECTOP YADAV PROJECT
OP YADAV PROJECT
 
Demolition of building and blasting equipment
Demolition of building and blasting equipmentDemolition of building and blasting equipment
Demolition of building and blasting equipment
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
drilling services in Tanzania .
drilling services in Tanzania           .drilling services in Tanzania           .
drilling services in Tanzania .
 
Construction Technology I Presentation Slides
Construction Technology I Presentation SlidesConstruction Technology I Presentation Slides
Construction Technology I Presentation Slides
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 

Recently uploaded

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
manasideore6
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 

Recently uploaded (20)

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Fundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptxFundamentals of Induction Motor Drives.pptx
Fundamentals of Induction Motor Drives.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 

Khulna watersupply project ppt

  • 1. Construction Equipment , Health & Safety Plan KHULNA WATER SUPPLY PROJECT
  • 2. Why This Project? Khulna, the third-largest city in Bangladesh, is located on the banks of the Bhairab and Rupsha rivers in the southwest of the country. The present water supply to Khulna is mainly from groundwater sources drawn from both deep and shallow tube wells. In the long term as demand increases, conjunctive use of groundwater and surface water will be required, even though surface water may suffer from salinity intrusion in dry season. To cope with current insufficient supply and increasing demand Khulna WASA started Khulna Water Supply Improvement Project to fulfill the demand of A million people of this City.
  • 3. Goal of This Project  Salinity Control  Maximum use of Surface Water  To purify & supply 110 Million liters of water everyday  To reserve 777 Million liters of water at the reservoirs
  • 4. Project At a Glance Project Name: Khulna Water Supply Project Project Number: 42171-013 Project Status: Active Project Cost: 25.5 Billion Taka (Approx.) Executing Agency: Khulna Water Supply and Sewerage Authority
  • 6. Construction Overview’s  1 Water Intake  1 Impounding Reservoir  1 Surface Water Treatment Plant (SWTP)  5 Reservoirs  11 Overhead Tanks  Installation of 758 km water transmission pipe line (33km raw water, 25 km clear water & 700km distribution pipe line.)
  • 7. Water Intake, Impounding Reservoir & SWTP
  • 10. Presentation Overview’s  Construction Equipment  Health and Safety Program  Emergency Response Plan
  • 11. Construction Equipments ✓ Construction equipment refers to heavy-duty vehicles, specially designed for executing constru- ction tasks, most frequently ones involving earthwork operations.
  • 12. Advantages of Using Construction Equipments • Increase the rate of output through process with best effective and efficient method. • Reduce the overall construction cost. • Carryout the activities which cannot be done manually. • Eliminates the construction hazarders provide better health safety. • Maintenances of standard is easy.
  • 13. Construction Equipment's in Our Project Earthmoving Equipments: • Excavator • Backhoe loaders • Loaders • Trencher • Crawler mountain drill Construction Vehicles: • Dump truck • Tipper truck Matrrial handling equipment’s: • Crane • Forklift Construction equipment’s: • Portable concrete mixer • Concrete mixing transport trucks • Road roller
  • 14. Earthmoving Equipments • Earth movers are heavy machineries used for shift large amount of earth, digging foundation, pile hole etc. • In our project required earthmoving equipment’s are excavator, loaders, backhoe, trencher, crawler mountain drill.
  • 15. Excavators Are used to • Digging of trenches, holes, foundations. • Material handling. • Brush cutting with hydraulic attachments. • Construction. • General grading/landscaping. • Mining, especially, but not only open-pit mining.
  • 16. Backhoe Loaders • Backhoe loaders are very similar to tractors with a slight difference: they contain an adjustable, shovel in front of the equipment, and a small bucket in the back of the loader used for digging
  • 17. Loaders • A loader is a heavy equipment machine used in construction to move aside or load materials such as asphalt, demolition debris, dirt, snow, feed, gravel, logs, raw minerals, recycled material, rock, sand, wo odchips,
  • 18. Trencher • A trencher is a piece of construction equipment used to dig trenches, especially for laying pipes or cables, for installing drainage, or in preparation for trench warfare • In our project trencher is used for making trench for water transmission pipe installation
  • 19. Crawler Mountain Drill • A Crawler Mountain Drill is used at large limestone mines and the like, and drills larger holes for setting explosives. • In our project it is used for digging pile hole.
  • 20. Construction Vehicles • It refers to heavy-duty vehicles, specially designed for executing construction tasks, most frequently ones involving earthwork operations • They usually comprise five equipment systems: implement, traction, structure, power train, control and information. • In our project Dumpers , Tipper truck are used
  • 21. Dumpers • A dump truck is a truck used for transporting loose material (such as sand, gravel, or demolition waste) for construction. • With hydraulic pistons it is able to lift material at the site of delivery
  • 22. Tipper Truck • The function of tipper truck is similar to dump truck but tipper is not as heavy as dump truck.it used for the light weight transportation
  • 23. Material Handling Equipments • Material handling equipment is mechanical equipment used for the movement, storage, control and protection of materials, goods and products throughout the process of manufacturing, distribution, consumption and disposal. • In our project crane & Forklifts are used.
  • 24. Crane • A crane is a type of machine, generally equipped with a hoist rope, wire ropes or chains, and sheaves, that can be used both to lift and lower materials and to move them horizontally
  • 25. Forklifts • Forklifts are powerful, heavy-duty electric lift trucks that are used for materials handling such as crates, containers, and other equipment • Forklifts are also called upon to carry the troughs of mortar, concrete blocks, precast concrete sections etc.
  • 26. Construction Equipments Portable concrete mixer • A concrete mixer is a device that homogeneously combines cement, aggre gate such as sand or gravel, and water to form concrete • It is used for smaller jobs, such as residential repairs, renovations, or hobbyist-scale projects,
  • 27. Concrete Mixer Transport Trucks • Special concrete transport trucks are used to transport and mix concrete up to the construction site. • The concrete mixing transport truck maintains the material's liquid state through agitation, or turning of the drum, until delivery
  • 28. Road Roller • A road roller is a compactor type engineering vehicle used to compact soil, gravel, concrete, or asphalt in the construction of roads and foundations.
  • 30. Definitions Safety is free from risk and danger. Accidents is defined as an unexpected and sudden event resulting in damage or harm. Hazards is an unsafe condition or activity, that if left uncontrolled can contribute to an accident. Risk is the assessment of ’probability of loss’ and ’potential amount of loss’.
  • 31. Construction Safety & It’s Meaning
  • 32. Construction safety aims to ensure that a construction site or the industry as a whole is not the cause of immediate danger to the public around a construction site, or the workers at a construction site, as well as making sure that the finished product of construction meets required safety standards.
  • 33. Purpose of Construction Safety • To understand the different types of existing hazards on site • Comprehend the diferent types of accident measurement approach • Appreciate the importance for improving health & safety in construction • Undertake the techniques of improving health & safety in construction • Understand the existing legislative framework • Understand an accident analysis if required.
  • 34. Common Causes of Fatalities Leackage, flood 1% Landslide, fall,breaking of material 14% Fire explosion 2% Other injuries 2% Body injury due to physical lifting 17% Body injury not due to physical lifting 5% Fall of person not from height 11% Fall from height 11% Other form of loss of control 1% Loss control of material handling 10% Loss control of tools 15% Lost control of vehicle 6% Lost control of machine 5%
  • 35. Personal Protective Equipment(PPE) • PPE is equipment that will protect the user against health or safety risks at work. It can include items such as safety helmets, gloves, eye protection, high-visibility clothing, safety footwear and safety harnesses.
  • 36. Why PPE is important? To protect the user against health or safety risks such as: • The lungs, e.g. from breathing in contaminated air. • The head and feet, e.g. from falling materials. • The eyes, e.g. from flying particles or splashes of corrosive liquids. • The skin, e.g. from contact with corrosive materials. • The body, e.g. from extremes of heat or cold.
  • 37. Three Basic Questions for safety • Who is exposed and to what? • How long are they exposed for? • How much are they exposed to?
  • 38. Types of personal protective equipments in our Project • Eyes & face protection • Head and Neck protection • Ears protection • Hands and arms protection • Legs and Feet's protection • Lungs protection
  • 39. Eyes & Face Protection Eyes & face protection are needed to protect hazards like: • Chemical or metal splash • Dust • Projectiles • Gas • Vapour
  • 40. Head and Neck Protection • Impact from falling or flying objects • Risk of head bumping • Hair getting tangled in machinery • Climate or temperature etc.
  • 41. Ears Protection • People should wear a hearing protector if the noise or sound level at the workplace exceeds 85 decibels. • Hearing protectors(Ear Plug) reduce the noise exposure level and the risk of hearing loss.
  • 42. Hands and Arms Protection Hands and arms protection are needed to protect hazards like: • Abrasion • Temperature extremes • Cuts and punctures • Impact • Electric shock • Vibration • Prolonged immersion in water etc.
  • 43. Gloves Gloves are used for- • Biohazard Protection. • Abrasion Protection. • Friction protection. • Protection from extremes of heat.
  • 44. Feet and Legs Protection Feet and Legs Protection gives protection from following conditions: • Wet • Hot and cold conditions • Electrostatic build-up • Slipping • Cuts and punctures • Heavy loads • Metal
  • 45. Feet and Legs Protection Safety boots and shoes with protective toecaps and penetration-resistant Mid-sole wellington boots and specific footwear, eg. foundry boots and chainsaw boots
  • 46. Respiratory protective equipment (RPE) • Used for lungs protection. • Lungs inflammation may be occurred due to exposed in a long time in a dusty area. • RPE may be the solution of this problem.
  • 47. Whole body protection This equipment is used when to expose to high temperature, or where welding work done.
  • 49. Others protection and support system • Fire protection:
  • 50. Drill & Emergency Rehearsal
  • 53. Emergency Contract Number of Hospitals Emergency contract no: Khulna BNSB Eye Hospital +880 1913-701887 Khulna Medical College +880 41-761535 Sheikh Abu Naser Specialised Hospital +880 41-760390 Akij Medical College Hospital +880 1713-488421
  • 54. Report Medical Hospital Non-Fatal: First Aid Fatal Report to Admin Results from a work accident or exposure Does not result from a work accident A death An Injury/Illness:▪ Any fracture ▪ Any amputation ▪ Dislocation of shoulder, hip ▪ Loss of sight ▪ Any injury resulting from electricity Case must be recorded on Log Medical Report Civic Authorities Insurance Company Law Enforcement Team Allocation Based on incident Health and Safety Investigati on team Misbehaviour Investigation team Crime Investigation team Security Investigation team Investigation Process and collection of facts and findings Pattern Analysis Risk Mitigation Strategies Accident Incident reporting system
  • 55. Construction safety practices in KWASA projects Exterior people were allowed during excavation operation
  • 56. Construction Safety Practices Uses of helmet is a good practice Uses of covering is also a good practice.
  • 57. Construction Safety Practices Using of eye protection, gloves are neglected