Kashish Madaan  : +91-9920664754
Civil Engineer, Male Skype : kashishskype92
DOB: September 12, 1992  : kashishnmm@gmail.com
Passport No.: H5459052
Address: Madaan Cottage, Kapoor Estate, Nr. Hotel Himani, Solan (HP) - 173212
PROFILE SNAPSHOT
A versatile, high-energy professional with 2 years of experience in:
- Project Planning - Project Coordination
 Hands on experience on Microsoft Project for Tracking and updating baselines for projects.
 International English Language Testing System (IELTS) Score- 7.5 band.
 Have good exposure with ERP- In4 Suite (In4 Velocity) and SAP (PS Module)
 Proficient in AutoCAD and Microsoft Office
 Have international work exposure in Real Estate and Infrastructure Projects.
WORK EXPERIENCE (24 Months)
JP Infra Mumbai Pvt. Ltd. Dec’15 to Aug’16
EXECUTIVE- PLANNING & COORDINATION
Roles & Responsibilities:
1. Preparation, monitoring and tracking the Project schedule of High rise residential towers.
2. Setting out construction targets on weekly, monthly and quarterly basis
3. Analyze gaps between the planned and actual progress and highlight the areas of concern which require
action of the associate task member.
4. Coordinate with the Architectural Department for the release of GFCs at the site for execution.
5. Prepare Cash flow (S-Curve) quarterly for different projects.
6. MIS reporting of different residential projects in terms of WPR and MPR.
7. Coordinate with different departments like Estimation, Contracts, Billing, Sales, Consultants, Procurement,
and Design Department etc. and inform the Immediate Reporting Person about the criticalities to achieve
scheduled timeline.
8. Conducting weekly monitoring meeting with site in charges & updating the schedule accordingly.
PROJECTS:
1. JP Decks (Goregaon, Mumbai): 6.8lac sq.ft.
 Tower comprising of 38+ storeys and awarded with Best Sustainable designs of the year.
2. JP North (Mira Road, Mumbai): 11.7lac sq.ft.
 Residential Township consisting of 24 towers.
3. Altus (Lower Parel, Mumbai): 2.72lac sq.ft.
 43-storied residential tower with world class amenities.
4. Unity Towers (Lower Parel, Mumbai): 2.8lac sq.ft.
 2 towers comprising 22 floors each.
Overseas Infrastructure Alliance Pvt. Ltd. Aug’14 to Nov’2015
EXECUTIVE- COST ENGINEERING AND PLANNING
Roles and Responsibilities:
1. Responsible Project Planning, Technical Coordination with tracking and scheduling the progress of work at
site.
2. Effective checking of RCC, Architectural and services drawings with all aspects and timely releasing GFC’s on
site for execution.
3. Material planning as per the site requirement and creating purchase requisition in SAP for the same.
4. Assisting in Budget Preparation and Cost Analysis by preparing Cost Curve showing variations in planned v/s
actual cost for the project.
5. Coordination with the various departments like Projects, Execution, Procurement, Billing, Estimation & Site-
office to set targets for project milestones to ensure timely progress.
6. Responsible for tender stage planning and scheduling for new project tenders.
Projects:
1. Construction of 485 Housing Units on Design Build Basis, Republic of Maldives.
Client: Ministry of Housing & Infrastructure, Republic of Maldives.
Project Value: 39 Million USD.
2. Rural Electrification for Délégation Générale des Grands Travaux (DGGT), Republic of Congo
Client: The General Delegation of Major Works (DGGT)
Project Value: 79 Million USD.
CERTIFICATIONS & TRAININGS
 ERP- In4 Suite (In4 Velocity) Training on Budget Creation and Projects related BOQ creation and WO linking with
BOQ - by JP Infra Mumbai Pvt. Ltd.
 SAP Controls- PS Module and MM Module (Beginner) by OIA Pvt. Ltd.
 MS Project – Creating WBS, Scheduling, allotting resources and Project Tracking by OIA Pvt. Ltd.
 Diploma in Network Security – Bharati Vidyapeeth Deemed University, Pune (July’ 2010 to July’ 2014).
INTERNSHIPS
S.J.V.N. (Satluj Jal Vidyut Nigam Ltd.) R.H.E.P. (Rampur Hydro Electric Project) 6 Weeks (June’ 2013 to Aug’ 2013)
1. Project Details:
 The Rampur Hydro Electric Project (R.H.E.P.) with a generation potential of 412 MW is located on River Satluj, a
major tributary of Indus basin, in Shimla and Kullu district of Himachal Pradesh in North India. The project is
designed as a cascade run-of-the-river plant to the 1500 MW Nathpa-Jhakri hydroelectric power plant.
ORGANISATIONAL SKILLS
 Excellent problem solving abilities, highly result orientated with a strong drive to deliver practical solutions.
 Strong presentation skills / excellent reporting and writing skills.
 Good interpersonal skills, ability to communicate effectively to all levels both internally and with external clients.
 Interest to acquire more knowledge and willingness to learn new assignments.
SCHOLASTIC RECORD
2014
B.tech in Civil
Engineering
Bharati Vidyapeeth Deemed University,
Pune
65.60
First Class with
Distinction
2010 XII
B.L. Central Public School, Solan(HP)
CBSE
75.60 Pass
2008 X
St. Luke’s Sec. Sen. School, Solan(HP)
CBSE
84.60 Pass
ACHIEVEMENTS
Academic & Co-curricular
 Cleared GATE-2014 with GATE score of 418 and All India Rank 7818.
 Core Member of Marketing (Civil Engineering Student Association) at College Level.
 Marketing Head of CESA (Civil Engineering Student’s Association) for the year 2012-13.
 Organiser at Fireball 2011, 2012 held at Deccan gymkhana, Pune and Fireball 2013 held at Bharati Vidyapeeth
Deemed University, Pune.
 Media Coordinator of Leo Club of Pune (Prime) Bharti Vidyapeeth Dist:323 D2 for the session 2010-11.
 Marketing Head of Leo Club of Pune (Prime) Bharti Vidyapeeth Dist:323 D2 for the session 2012-13 (A child body
of Lion’s club of Pune Prime).
Extra-curricular
 Won first prize in Extreme Sports- Cricket (Team)-2014 at Bharatiyam (Bharti Vidyapeeth College of Engineering’s
cultural fest).
 Participated in Techno Quiz and Techno Freak at Bharatiyam.
 Actively participated in various sports activities such as Badminton, football etc. both at interschool level and
district qualifiers.
 Nominated to attend SSB training.
 Secured 6th
position in the Pre-Senior category of the 26th
All-India UNESCO Information Test conducted by the
United Schools International (USI) conducted all over India on 30th
September, 2004.
X

KashishMadaanCV

  • 1.
    Kashish Madaan : +91-9920664754 Civil Engineer, Male Skype : kashishskype92 DOB: September 12, 1992  : kashishnmm@gmail.com Passport No.: H5459052 Address: Madaan Cottage, Kapoor Estate, Nr. Hotel Himani, Solan (HP) - 173212 PROFILE SNAPSHOT A versatile, high-energy professional with 2 years of experience in: - Project Planning - Project Coordination  Hands on experience on Microsoft Project for Tracking and updating baselines for projects.  International English Language Testing System (IELTS) Score- 7.5 band.  Have good exposure with ERP- In4 Suite (In4 Velocity) and SAP (PS Module)  Proficient in AutoCAD and Microsoft Office  Have international work exposure in Real Estate and Infrastructure Projects. WORK EXPERIENCE (24 Months) JP Infra Mumbai Pvt. Ltd. Dec’15 to Aug’16 EXECUTIVE- PLANNING & COORDINATION Roles & Responsibilities: 1. Preparation, monitoring and tracking the Project schedule of High rise residential towers. 2. Setting out construction targets on weekly, monthly and quarterly basis 3. Analyze gaps between the planned and actual progress and highlight the areas of concern which require action of the associate task member. 4. Coordinate with the Architectural Department for the release of GFCs at the site for execution. 5. Prepare Cash flow (S-Curve) quarterly for different projects. 6. MIS reporting of different residential projects in terms of WPR and MPR. 7. Coordinate with different departments like Estimation, Contracts, Billing, Sales, Consultants, Procurement, and Design Department etc. and inform the Immediate Reporting Person about the criticalities to achieve scheduled timeline. 8. Conducting weekly monitoring meeting with site in charges & updating the schedule accordingly. PROJECTS: 1. JP Decks (Goregaon, Mumbai): 6.8lac sq.ft.  Tower comprising of 38+ storeys and awarded with Best Sustainable designs of the year. 2. JP North (Mira Road, Mumbai): 11.7lac sq.ft.  Residential Township consisting of 24 towers. 3. Altus (Lower Parel, Mumbai): 2.72lac sq.ft.  43-storied residential tower with world class amenities. 4. Unity Towers (Lower Parel, Mumbai): 2.8lac sq.ft.  2 towers comprising 22 floors each. Overseas Infrastructure Alliance Pvt. Ltd. Aug’14 to Nov’2015 EXECUTIVE- COST ENGINEERING AND PLANNING Roles and Responsibilities: 1. Responsible Project Planning, Technical Coordination with tracking and scheduling the progress of work at site. 2. Effective checking of RCC, Architectural and services drawings with all aspects and timely releasing GFC’s on site for execution. 3. Material planning as per the site requirement and creating purchase requisition in SAP for the same. 4. Assisting in Budget Preparation and Cost Analysis by preparing Cost Curve showing variations in planned v/s actual cost for the project. 5. Coordination with the various departments like Projects, Execution, Procurement, Billing, Estimation & Site- office to set targets for project milestones to ensure timely progress. 6. Responsible for tender stage planning and scheduling for new project tenders. Projects: 1. Construction of 485 Housing Units on Design Build Basis, Republic of Maldives. Client: Ministry of Housing & Infrastructure, Republic of Maldives. Project Value: 39 Million USD. 2. Rural Electrification for Délégation Générale des Grands Travaux (DGGT), Republic of Congo Client: The General Delegation of Major Works (DGGT) Project Value: 79 Million USD.
  • 2.
    CERTIFICATIONS & TRAININGS ERP- In4 Suite (In4 Velocity) Training on Budget Creation and Projects related BOQ creation and WO linking with BOQ - by JP Infra Mumbai Pvt. Ltd.  SAP Controls- PS Module and MM Module (Beginner) by OIA Pvt. Ltd.  MS Project – Creating WBS, Scheduling, allotting resources and Project Tracking by OIA Pvt. Ltd.  Diploma in Network Security – Bharati Vidyapeeth Deemed University, Pune (July’ 2010 to July’ 2014). INTERNSHIPS S.J.V.N. (Satluj Jal Vidyut Nigam Ltd.) R.H.E.P. (Rampur Hydro Electric Project) 6 Weeks (June’ 2013 to Aug’ 2013) 1. Project Details:  The Rampur Hydro Electric Project (R.H.E.P.) with a generation potential of 412 MW is located on River Satluj, a major tributary of Indus basin, in Shimla and Kullu district of Himachal Pradesh in North India. The project is designed as a cascade run-of-the-river plant to the 1500 MW Nathpa-Jhakri hydroelectric power plant. ORGANISATIONAL SKILLS  Excellent problem solving abilities, highly result orientated with a strong drive to deliver practical solutions.  Strong presentation skills / excellent reporting and writing skills.  Good interpersonal skills, ability to communicate effectively to all levels both internally and with external clients.  Interest to acquire more knowledge and willingness to learn new assignments. SCHOLASTIC RECORD 2014 B.tech in Civil Engineering Bharati Vidyapeeth Deemed University, Pune 65.60 First Class with Distinction 2010 XII B.L. Central Public School, Solan(HP) CBSE 75.60 Pass 2008 X St. Luke’s Sec. Sen. School, Solan(HP) CBSE 84.60 Pass ACHIEVEMENTS Academic & Co-curricular  Cleared GATE-2014 with GATE score of 418 and All India Rank 7818.  Core Member of Marketing (Civil Engineering Student Association) at College Level.  Marketing Head of CESA (Civil Engineering Student’s Association) for the year 2012-13.  Organiser at Fireball 2011, 2012 held at Deccan gymkhana, Pune and Fireball 2013 held at Bharati Vidyapeeth Deemed University, Pune.  Media Coordinator of Leo Club of Pune (Prime) Bharti Vidyapeeth Dist:323 D2 for the session 2010-11.  Marketing Head of Leo Club of Pune (Prime) Bharti Vidyapeeth Dist:323 D2 for the session 2012-13 (A child body of Lion’s club of Pune Prime). Extra-curricular  Won first prize in Extreme Sports- Cricket (Team)-2014 at Bharatiyam (Bharti Vidyapeeth College of Engineering’s cultural fest).  Participated in Techno Quiz and Techno Freak at Bharatiyam.  Actively participated in various sports activities such as Badminton, football etc. both at interschool level and district qualifiers.  Nominated to attend SSB training.  Secured 6th position in the Pre-Senior category of the 26th All-India UNESCO Information Test conducted by the United Schools International (USI) conducted all over India on 30th September, 2004. X