SlideShare a Scribd company logo
Just-in-Time SystemsJust-in-Time Systems
Reducing Waste and Lead Time in the Supply ChainReducing Waste and Lead Time in the Supply Chain
BYBY
SUDHIR REDDY S.V.RSUDHIR REDDY S.V.R
Topics to be CoveredTopics to be Covered
 Review of JIT & WasteReview of JIT & Waste
 JIT PrinciplesJIT Principles
 BENEFITS OF JITBENEFITS OF JIT
 JIT RELATION TO F.M.SJIT RELATION TO F.M.S
WasteWaste is ‘anything other thanis ‘anything other than
thethe minimumminimum amount ofamount of
equipment, materials, parts,equipment, materials, parts,
space, and worker’s time,space, and worker’s time,
which are absolutelywhich are absolutely
essential toessential to add valueadd value to theto the
product.’product.’
—— Shoichiro ToyodaShoichiro Toyoda
President, ToyotaPresident, Toyota © 1995 Corel Corp.
Introductory QuotationIntroductory Quotation
What is JIT?What is JIT?
 A corporate system designed to produceA corporate system designed to produce
output within the minimum lead time and atoutput within the minimum lead time and at
the lowest total cost by continuouslythe lowest total cost by continuously
identifying and eliminating all forms ofidentifying and eliminating all forms of
corporate waste.corporate waste.
 It is used to describe stockless productionIt is used to describe stockless production
manufacturing approach, where only rightmanufacturing approach, where only right
parts are completed at right time.parts are completed at right time.
 Focus of JIT:Focus of JIT:
•• Stockless production.Stockless production.
Seven Basic Types of WasteSeven Basic Types of Waste
 Transportation wasteTransportation waste
 Process WasteProcess Waste
 Inventory WasteInventory Waste
 Waste of motionWaste of motion
 Waste from product defectsWaste from product defects
 Waiting timeWaiting time
 OverproductionOverproduction
Push versus PullPush versus Pull
 PushPush system: material issystem: material is pushedpushed intointo
downstream workstations regardless ofdownstream workstations regardless of
whether resources are availablewhether resources are available
 PullPull system: material issystem: material is pulledpulled to ato a
workstation just as it is neededworkstation just as it is needed
JIT is a pull system.JIT is a pull system.
Pull System
 Material is pulled through the system whenMaterial is pulled through the system when
neededneeded
 Reversal of traditional push system whereReversal of traditional push system where
material is pushed according to a schedulematerial is pushed according to a schedule
 Forces cooperationForces cooperation
 Prevent over and underproductionPrevent over and underproduction
 While push systems rely on a predetermined
schedule, pull systems rely on customer
requests.
 Part is produced on the authorization referred to
as a KANBAN is issued from the next
workstation
What is kanban?What is kanban?
 Developed at Toyota 1950s to manage lineDeveloped at Toyota 1950s to manage line
material flows.material flows.
 Kanban ( Kan=card, Ban= signal )Kanban ( Kan=card, Ban= signal )
 simple movement systemsimple movement system
 Boxes/containers to take “lots” of parts from one workBoxes/containers to take “lots” of parts from one work
station to another (client-server).station to another (client-server).
 ““Cards” to signal & communicate reorder informationCards” to signal & communicate reorder information
What is kanban?What is kanban?
 Server only delivers components to client work station asServer only delivers components to client work station as
& when needed (called/pulled).& when needed (called/pulled).
 Minimise storage in the production area.Minimise storage in the production area.
 Workstations only produce/deliver components whenWorkstations only produce/deliver components when
called (they receive card + empty container).called (they receive card + empty container).
 The work-station produces enough to fill the containerThe work-station produces enough to fill the container
 Kanban = an authorization to produce more inventoryKanban = an authorization to produce more inventory
 We thus limit the amount of inventory in process.We thus limit the amount of inventory in process.
BENEFITS OF JITBENEFITS OF JIT
 Reduced inventoryReduced inventory
 Reduced working progressReduced working progress
 Improved qualityImproved quality
 Reduced direct laborReduced direct labor
 Reduced floor spaceReduced floor space
 Minimum tool repair costMinimum tool repair cost
 Reduced material handling and increaseReduced material handling and increase
in overall through put.in overall through put.
JIT RELATION TO FMSJIT RELATION TO FMS
 JIT can be either a cause or an effect ofJIT can be either a cause or an effect of
F.M.SF.M.S
 Achievement of true results of F.M.SAchievement of true results of F.M.S
without implementing JIT is difficult.without implementing JIT is difficult.
 Results due to incorporation of JIT inResults due to incorporation of JIT in
F.M.S are decreased lead times, less workF.M.S are decreased lead times, less work
in process on shop floor, smaller finishedin process on shop floor, smaller finished
part inventory and increased customerpart inventory and increased customer
satisfaction.satisfaction.
THANQTHANQ

More Related Content

What's hot

Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
Alan Wei Teck
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222harkesh singh
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancingSonali Guha
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover TimeDamian Denis
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
Rohit Goutam
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
OH!Manufacturing
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
Ishan Parekh
 

What's hot (9)

Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancing
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)Group Layout (Manufacturing Management)
Group Layout (Manufacturing Management)
 

Viewers also liked

Laser_ arc hybrid welding
Laser_ arc hybrid weldingLaser_ arc hybrid welding
Seminor on air motors
Seminor on air motorsSeminor on air motors
Seminor on air motorsSudhir Reddy
 
Introduction to microprocessor
Introduction to microprocessorIntroduction to microprocessor
Introduction to microprocessorSudhir Reddy
 
Welding symbol
Welding symbolWelding symbol
Welding symbol
Tori Tom
 
Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbolsSudhir Reddy
 
04 wis5 symbol
04 wis5 symbol04 wis5 symbol
04 wis5 symbolTori Tom
 
0 twi introduction
0  twi introduction0  twi introduction
0 twi introduction
Ilgar Nahmatov
 

Viewers also liked (7)

Laser_ arc hybrid welding
Laser_ arc hybrid weldingLaser_ arc hybrid welding
Laser_ arc hybrid welding
 
Seminor on air motors
Seminor on air motorsSeminor on air motors
Seminor on air motors
 
Introduction to microprocessor
Introduction to microprocessorIntroduction to microprocessor
Introduction to microprocessor
 
Welding symbol
Welding symbolWelding symbol
Welding symbol
 
Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbols
 
04 wis5 symbol
04 wis5 symbol04 wis5 symbol
04 wis5 symbol
 
0 twi introduction
0  twi introduction0  twi introduction
0 twi introduction
 

Similar to Just in-time systems

Ppt jit
Ppt jitPpt jit
Ppt jit
Vibha Nayak
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
rushin202003
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
Raj Shravanthi
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
Prasanna3804
 
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
IndiaMART InterMESH Limited
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
Thanushreepandikumari
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
Ashima Kandari
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
Ayman Aljahdali
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemDeepak25
 
Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.ppt
venkatmie
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
jasonhian
 
JIT.ppt
JIT.pptJIT.ppt
JIT.ppt
ssuser81322e
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
iWriteEssays
 

Similar to Just in-time systems (20)

Ppt jit
Ppt jitPpt jit
Ppt jit
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
jit
jitjit
jit
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
Emergency Light And AC Adaptor By ILJIN ELECTRONICS (I) PVT. LTD., Greater No...
 
Basic Elements of Lean
Basic Elements of LeanBasic Elements of Lean
Basic Elements of Lean
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Jit systems
Jit systemsJit systems
Jit systems
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Basics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.pptBasics of Pull_Manufacturing - A presentation.ppt
Basics of Pull_Manufacturing - A presentation.ppt
 
Just in Time
Just in TimeJust in Time
Just in Time
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
JIT.ppt
JIT.pptJIT.ppt
JIT.ppt
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 

More from Sudhir Reddy

Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systemsSudhir Reddy
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)Sudhir Reddy
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematicsSudhir Reddy
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systemsSudhir Reddy
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fmsSudhir Reddy
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balanceSudhir Reddy
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’sSudhir Reddy
 

More from Sudhir Reddy (12)

Pumps & pumping systems
Pumps & pumping systemsPumps & pumping systems
Pumps & pumping systems
 
Programming logic controllers (plc)
Programming  logic controllers (plc)Programming  logic controllers (plc)
Programming logic controllers (plc)
 
Manipulator kinematics
Manipulator kinematicsManipulator kinematics
Manipulator kinematics
 
L20
L20L20
L20
 
Gear pump
Gear pumpGear pump
Gear pump
 
Flexible manufacturing systems
Flexible manufacturing systemsFlexible manufacturing systems
Flexible manufacturing systems
 
Cadcam considerations about fms
Cadcam considerations about fmsCadcam considerations about fms
Cadcam considerations about fms
 
Assembly systems & line balance
Assembly systems & line balanceAssembly systems & line balance
Assembly systems & line balance
 
Application of robot’s
Application of robot’sApplication of robot’s
Application of robot’s
 
Accumulators
AccumulatorsAccumulators
Accumulators
 
10 mech seminars
10 mech seminars10 mech seminars
10 mech seminars
 
Nc programming
Nc programmingNc programming
Nc programming
 

Recently uploaded

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
goswamiyash170123
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
ShivajiThube2
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 

Recently uploaded (20)

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 

Just in-time systems

  • 1. Just-in-Time SystemsJust-in-Time Systems Reducing Waste and Lead Time in the Supply ChainReducing Waste and Lead Time in the Supply Chain BYBY SUDHIR REDDY S.V.RSUDHIR REDDY S.V.R
  • 2. Topics to be CoveredTopics to be Covered  Review of JIT & WasteReview of JIT & Waste  JIT PrinciplesJIT Principles  BENEFITS OF JITBENEFITS OF JIT  JIT RELATION TO F.M.SJIT RELATION TO F.M.S
  • 3. WasteWaste is ‘anything other thanis ‘anything other than thethe minimumminimum amount ofamount of equipment, materials, parts,equipment, materials, parts, space, and worker’s time,space, and worker’s time, which are absolutelywhich are absolutely essential toessential to add valueadd value to theto the product.’product.’ —— Shoichiro ToyodaShoichiro Toyoda President, ToyotaPresident, Toyota © 1995 Corel Corp. Introductory QuotationIntroductory Quotation
  • 4. What is JIT?What is JIT?  A corporate system designed to produceA corporate system designed to produce output within the minimum lead time and atoutput within the minimum lead time and at the lowest total cost by continuouslythe lowest total cost by continuously identifying and eliminating all forms ofidentifying and eliminating all forms of corporate waste.corporate waste.  It is used to describe stockless productionIt is used to describe stockless production manufacturing approach, where only rightmanufacturing approach, where only right parts are completed at right time.parts are completed at right time.  Focus of JIT:Focus of JIT: •• Stockless production.Stockless production.
  • 5. Seven Basic Types of WasteSeven Basic Types of Waste  Transportation wasteTransportation waste  Process WasteProcess Waste  Inventory WasteInventory Waste  Waste of motionWaste of motion  Waste from product defectsWaste from product defects  Waiting timeWaiting time  OverproductionOverproduction
  • 6. Push versus PullPush versus Pull  PushPush system: material issystem: material is pushedpushed intointo downstream workstations regardless ofdownstream workstations regardless of whether resources are availablewhether resources are available  PullPull system: material issystem: material is pulledpulled to ato a workstation just as it is neededworkstation just as it is needed JIT is a pull system.JIT is a pull system.
  • 7. Pull System  Material is pulled through the system whenMaterial is pulled through the system when neededneeded  Reversal of traditional push system whereReversal of traditional push system where material is pushed according to a schedulematerial is pushed according to a schedule  Forces cooperationForces cooperation  Prevent over and underproductionPrevent over and underproduction  While push systems rely on a predetermined schedule, pull systems rely on customer requests.  Part is produced on the authorization referred to as a KANBAN is issued from the next workstation
  • 8. What is kanban?What is kanban?  Developed at Toyota 1950s to manage lineDeveloped at Toyota 1950s to manage line material flows.material flows.  Kanban ( Kan=card, Ban= signal )Kanban ( Kan=card, Ban= signal )  simple movement systemsimple movement system  Boxes/containers to take “lots” of parts from one workBoxes/containers to take “lots” of parts from one work station to another (client-server).station to another (client-server).  ““Cards” to signal & communicate reorder informationCards” to signal & communicate reorder information
  • 9. What is kanban?What is kanban?  Server only delivers components to client work station asServer only delivers components to client work station as & when needed (called/pulled).& when needed (called/pulled).  Minimise storage in the production area.Minimise storage in the production area.  Workstations only produce/deliver components whenWorkstations only produce/deliver components when called (they receive card + empty container).called (they receive card + empty container).  The work-station produces enough to fill the containerThe work-station produces enough to fill the container  Kanban = an authorization to produce more inventoryKanban = an authorization to produce more inventory  We thus limit the amount of inventory in process.We thus limit the amount of inventory in process.
  • 10. BENEFITS OF JITBENEFITS OF JIT  Reduced inventoryReduced inventory  Reduced working progressReduced working progress  Improved qualityImproved quality  Reduced direct laborReduced direct labor  Reduced floor spaceReduced floor space  Minimum tool repair costMinimum tool repair cost  Reduced material handling and increaseReduced material handling and increase in overall through put.in overall through put.
  • 11. JIT RELATION TO FMSJIT RELATION TO FMS  JIT can be either a cause or an effect ofJIT can be either a cause or an effect of F.M.SF.M.S  Achievement of true results of F.M.SAchievement of true results of F.M.S without implementing JIT is difficult.without implementing JIT is difficult.  Results due to incorporation of JIT inResults due to incorporation of JIT in F.M.S are decreased lead times, less workF.M.S are decreased lead times, less work in process on shop floor, smaller finishedin process on shop floor, smaller finished part inventory and increased customerpart inventory and increased customer satisfaction.satisfaction.