Project Verification Form
Title of the Project General Management to Increase System Efficiency
Commencement Date 6th
May, 2016
Completion Date 5th
July, 2016
Project Supervisor Mr. Sudarshan Lodha
Organization/Institution where the
Project was accomplished
JM Industries
Project Description: The Project “General Management to Increase System Efficiency” was focused on
general management which included capacity planning, implementation of a new system to increase
production, improve quality, data collection formats which can be used in future, updating old data,
improving material handling methods, storage solutions. During the project duration, I also focused
my time to merge two different processing departments into one common fabrication department.
Merger also included common floor planning of both the departments.
As a management internee, I also worked on ERP implementation. This included requirement
determination, GAP assessment, ERP- customization and configuration, readiness review and
delivery.
Department wise project detailed are as follows:
1. Casting Department: JM Industries is committed to manufacturing of Aluminium Extruded
Sections. Aluminium Logs are used as raw material in extrusion process. So Log casting is one
of the main factors of the company processes. Changes in technology and current casting
systems were suggested to eliminate problems like diameter variation of logs, log bending,
surface roughness, shearing & overflow.
Some key factors are;
I. New casting technology like “AirSlip® Air Casting Technology” will eliminate the
problem of diameter variation, rough surface, shearing and overflow.
II. Changing the cast moulds on regular interval and proper maintenance can also reduce
the variation in log diameters.
III. Double rope type casting bed has minimized the log bending problem to the lowest.
Proper maintenance of water quenching system will further reduce the problem.
2. Production Department: The goal here was to increase recovery thus daily production.
I. Online material rejection is decreased by more than 15% by fixing the die assembly.
Wear out die rings were replaced by new one which resulted in much shorter butt
discard. This increased the annual production by 200 Ton.
II. Rejection of extruded section can further be reduced by changing Conveyor belts of
parking bed as old (burned) belts leads to scratches. This will again reduce the
rejection by 5%
III. A new method (Software- Algorithm) is designed for production planning eliminating
manual work thus possibility of human error and man power requirement. This digital
data stored can also be used for future references.
IV. Daily Production Report was extended to collect important data like rejection quantity
and reason.
3. Fabrication Department: Currently, two different departments exist for fabrication.
Fabrication dept. provides services like Straight cut, Taper cut, Drilling, Punching, Bending,
Embossing, Part assembly, Notching.
I. A new floor plan is designed to merge both the existing departments and increase
efficiency.
II. Material handling & storage solutions are implemented in terms of Plastic Crates,
Wheeled Shelves, Racks, Trolley and Fixed Almira.
III. Changes in machine operating cycle are made to reduce the cycle time by 5%
IV. A stopper is attached to the double head cutting machine to cut small lengths. This
reduced machine setting time by 50%
V. Manual mode is promoted for single cut, which allows single saw action thus reducing
power consumption by 40% and 2% less material wastage.
VI. System was implemented to keep daily track of raw material and finished good.
VII. Production planning method is changed to profile (in house die profile) wise planning
instead of party’s part number. This will fasten up the fabrication process.
By appending your signatures to this form you acknowledge and agree that:
• This form along with the certificate would serve as the official document between the project supervisor and
Students Placement Office, IIT Kanpur regarding verification of the student’s project work
• The student will provide additional information and documentation relevant to his/her project upon request by
the Students’ Placement Office
• The student has clearly defined his/her individual role in projects done in cooperation with other students,
faculty, groups or company personnel.
• Incorrectly over-stating the reach, impact and/or quantitative/qualitative results of a project is unethical.
• In case of violation of any of the above rules, Students’ Placement Office, IIT Kanpur reserves the right to take
necessary action including de-registering the student from the placement season and reporting the misconduct
to the Institute Authorities.
Submitted by:- Project Supervisor Details:-
Name: Ankit Bansal Name: Sudarshan Lodha
Roll No: 13115 Designation: Manager
Signature: Signature:

More Related Content

What's hot

IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET Journal
 
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysemDesign of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
Maheer Sohbat
 
PLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUTPLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUT
Endashaw Yohannes Hailu
 
Plant layout of industries
Plant layout of industriesPlant layout of industries
Plant layout of industries
MOCKYPATIL98
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.
ASHISH MENKUDALE
 
Design And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery PlantDesign And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery Plant
IRJET Journal
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET Journal
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET Journal
 
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESSA SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
Dr. V.R.Manoj
 
Cv waseem anwar
Cv waseem anwarCv waseem anwar
Cv waseem anwar
waseem anwar
 
FACILITY PLANNING
FACILITY PLANNINGFACILITY PLANNING
FACILITY PLANNING
Endashaw Yohannes Hailu
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
IRJET Journal
 
vijay resume final
vijay resume finalvijay resume final
vijay resume finalVijay thakur
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET Journal
 
CIRAS_improvements_lead_to_profits_plant_success
CIRAS_improvements_lead_to_profits_plant_successCIRAS_improvements_lead_to_profits_plant_success
CIRAS_improvements_lead_to_profits_plant_successMichael R. Willett
 

What's hot (15)

IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
Design of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysemDesign of facilty Layout of a LED bulb Production sysem
Design of facilty Layout of a LED bulb Production sysem
 
PLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUTPLANNING AND INSTALLATION OF LAYOUT
PLANNING AND INSTALLATION OF LAYOUT
 
Plant layout of industries
Plant layout of industriesPlant layout of industries
Plant layout of industries
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.
 
Design And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery PlantDesign And Manufacture Prototype of Jaggery Plant
Design And Manufacture Prototype of Jaggery Plant
 
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
IRJET- Study to Condense Expenditure through Engineering Management of Wood P...
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESSA SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
A SHORT REPORT OF SUSTAINABLE ENERGY ISSUES IN CNC AND MACHINING PROCESS
 
Cv waseem anwar
Cv waseem anwarCv waseem anwar
Cv waseem anwar
 
FACILITY PLANNING
FACILITY PLANNINGFACILITY PLANNING
FACILITY PLANNING
 
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing UnitImplementation of Single Minute Exchange of Die in Motor Manufacturing Unit
Implementation of Single Minute Exchange of Die in Motor Manufacturing Unit
 
vijay resume final
vijay resume finalvijay resume final
vijay resume final
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
CIRAS_improvements_lead_to_profits_plant_success
CIRAS_improvements_lead_to_profits_plant_successCIRAS_improvements_lead_to_profits_plant_success
CIRAS_improvements_lead_to_profits_plant_success
 

Similar to JM Industries PVF

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET Journal
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET Journal
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
IRJET Journal
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET Journal
 
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design SoftwareIRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET Journal
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET Journal
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET Journal
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET Journal
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
IRJET Journal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET Journal
 
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
IRJET Journal
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET Journal
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IRJET Journal
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
Amanuzzaman Aman
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET Journal
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET Journal
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
ijsrd.com
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET Journal
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
IRJET Journal
 
Joined document 24_5
Joined document 24_5Joined document 24_5
Joined document 24_5
JOSEPH FRANCIS
 

Similar to JM Industries PVF (20)

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
IRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites ProgressIRJET- Daily Updates on Construction Sites Progress
IRJET- Daily Updates on Construction Sites Progress
 
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
IRJET- Improving Quality and Productivity in Switchgear Tank Welding through ...
 
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design SoftwareIRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...IRJET- Multiple Project Execution System for a Construction Contracting Organ...
IRJET- Multiple Project Execution System for a Construction Contracting Organ...
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
IRJET- The Evaluation of Payback period for Formwork system
IRJET-  	  The Evaluation of Payback period for Formwork systemIRJET-  	  The Evaluation of Payback period for Formwork system
IRJET- The Evaluation of Payback period for Formwork system
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRYPRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
PRODUCTIVITY IMPROVEMENT USING LEAN TOOLS IN PUMP INDUSTRY
 
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...IRJET-  	  A Study of Implementing Lean & Fast Tracking in Construction Proje...
IRJET- A Study of Implementing Lean & Fast Tracking in Construction Proje...
 
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESSIMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
IMPLEMENTATION OF LEAN TECHNIQUES IN INDIAN SCEANIRO AND TESTING ITS FITNESS
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
 
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...IRJET- An Investigation of Maintenance Management of Construction Equipment f...
IRJET- An Investigation of Maintenance Management of Construction Equipment f...
 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
Joined document 24_5
Joined document 24_5Joined document 24_5
Joined document 24_5
 

JM Industries PVF

  • 1. Students’ Placement Office, IIT Kanpur Project Verification Form
  • 2. Title of the Project General Management to Increase System Efficiency Commencement Date 6th May, 2016 Completion Date 5th July, 2016 Project Supervisor Mr. Sudarshan Lodha Organization/Institution where the Project was accomplished JM Industries Project Description: The Project “General Management to Increase System Efficiency” was focused on general management which included capacity planning, implementation of a new system to increase production, improve quality, data collection formats which can be used in future, updating old data, improving material handling methods, storage solutions. During the project duration, I also focused my time to merge two different processing departments into one common fabrication department. Merger also included common floor planning of both the departments. As a management internee, I also worked on ERP implementation. This included requirement determination, GAP assessment, ERP- customization and configuration, readiness review and delivery. Department wise project detailed are as follows: 1. Casting Department: JM Industries is committed to manufacturing of Aluminium Extruded Sections. Aluminium Logs are used as raw material in extrusion process. So Log casting is one of the main factors of the company processes. Changes in technology and current casting systems were suggested to eliminate problems like diameter variation of logs, log bending, surface roughness, shearing & overflow. Some key factors are; I. New casting technology like “AirSlip® Air Casting Technology” will eliminate the problem of diameter variation, rough surface, shearing and overflow. II. Changing the cast moulds on regular interval and proper maintenance can also reduce the variation in log diameters. III. Double rope type casting bed has minimized the log bending problem to the lowest. Proper maintenance of water quenching system will further reduce the problem. 2. Production Department: The goal here was to increase recovery thus daily production. I. Online material rejection is decreased by more than 15% by fixing the die assembly. Wear out die rings were replaced by new one which resulted in much shorter butt discard. This increased the annual production by 200 Ton. II. Rejection of extruded section can further be reduced by changing Conveyor belts of parking bed as old (burned) belts leads to scratches. This will again reduce the rejection by 5% III. A new method (Software- Algorithm) is designed for production planning eliminating manual work thus possibility of human error and man power requirement. This digital data stored can also be used for future references. IV. Daily Production Report was extended to collect important data like rejection quantity and reason. 3. Fabrication Department: Currently, two different departments exist for fabrication. Fabrication dept. provides services like Straight cut, Taper cut, Drilling, Punching, Bending, Embossing, Part assembly, Notching. I. A new floor plan is designed to merge both the existing departments and increase efficiency. II. Material handling & storage solutions are implemented in terms of Plastic Crates, Wheeled Shelves, Racks, Trolley and Fixed Almira. III. Changes in machine operating cycle are made to reduce the cycle time by 5% IV. A stopper is attached to the double head cutting machine to cut small lengths. This reduced machine setting time by 50% V. Manual mode is promoted for single cut, which allows single saw action thus reducing power consumption by 40% and 2% less material wastage. VI. System was implemented to keep daily track of raw material and finished good. VII. Production planning method is changed to profile (in house die profile) wise planning instead of party’s part number. This will fasten up the fabrication process.
  • 3. By appending your signatures to this form you acknowledge and agree that: • This form along with the certificate would serve as the official document between the project supervisor and Students Placement Office, IIT Kanpur regarding verification of the student’s project work • The student will provide additional information and documentation relevant to his/her project upon request by the Students’ Placement Office • The student has clearly defined his/her individual role in projects done in cooperation with other students, faculty, groups or company personnel. • Incorrectly over-stating the reach, impact and/or quantitative/qualitative results of a project is unethical. • In case of violation of any of the above rules, Students’ Placement Office, IIT Kanpur reserves the right to take necessary action including de-registering the student from the placement season and reporting the misconduct to the Institute Authorities. Submitted by:- Project Supervisor Details:- Name: Ankit Bansal Name: Sudarshan Lodha Roll No: 13115 Designation: Manager Signature: Signature: