When Jack-Up Barge, a leading supplier of self-
elevating platforms, was contracted for a major North
Sea project, it was apparent that the project deadline
would be challenging to meet. Jack-Up Barge had to
meet its customer’s scheduling demands in just a few
short weeks. The company needed to find a reliable
partner with the resources to work quickly, safely and
efficiently—and ultimately deliver all the essentials
needed to live and work productively offshore.
Deploying Offshore
Essentials Fast
PROJECT
Solution Selling for Jack-Up Barge
INDUSTRY
Wind Energy
CHALLENGE
Upon gathering information from the customer, Jack-Up Barge
discovered that in order to make the vessel livable for a large
crew –– custom-made, temporary, living accommodation and
facilities would be required. To make deadlines even more
pressing, Jack-Up Barge would be hit with costly performance
penalties for every single day deployment was delayed.
SOLUTION
HB Rentals was tasked with providing its versatile well service
modules. Thanks to its global network of comprehensive
resources, offshore accommodation experience and successful
industry track record, HB Rentals had the project management
expertise and end-to-end custom solutions capabilities required
to complete the project.
As soon as the contract was signed, HB Rentals got to work
ordering materials, engineering custom items and ensuring safe
installation under the critical timeline. To meet the demands of
the order, HB Rentals leveraged its global operations to bring
in dependable equipment like sewage systems from the United
States, HB accommodation modules from the Middle East and
pipe for water and sewage lines from London to provide the
complete solution for the build.
SEE THE RESULTS >
RESULTS
With no room for error, HB Rentals was able to meet the
aggressive schedule through diligent project management. From
engineering design to installation and commissioning, HB Rentals
successfully delivered on the client’s custom specifications. HB
Rentals made it possible by quickly identifying the challenges
involved in the project, such as the limited vessel footprint for the
accommodation complex, and solving problems as they occurred.
A customer focused approach ensured an all round seamless
project execution.
Despite the extreme time constraints, HB Rentals was able to
streamline operations while at the same time physically checking
every shipment. Quality assurance was completed at the end of
each day, and safety was at the forefront of the entire installation.
Additionally, HB Rentals employees maintained excellent contact
with sub-contractors and were able to efficiently manage the
project from beginning to end.
Upon project completion, HB Rentals sent its own technicians
to sail with the barge free of charge for two weeks to guarantee
everything was running properly, ensuring quality of both
equipment and installation. In the end, HB Rentals became a
trusted partner and secured a subsequent contract for Jack-Up
Barge who knew the company would reliably deliver equipment,
crews and processes needed on the new job.
Because HB Rentals was able to supply a comprehensive solution
under an aggressive schedule, Jack-Up Barge was able to meet
its obligations without incurring any financial penalties. With HB
Rentals’ accommodation on deck, Jack-Up Barge was able to set
sail on time.
World Headquarters
HB Rentals
5813 Hwy. 90 East
Broussard, Louisiana 70518 USA
+1.337.839.1641
Western Hemisphere HQ
HB Rentals
Corporate Sales Office
11000 Equity Drive, Suite 150
Houston, Texas 77041 USA
+1.281.999.0047
Eastern Hemisphere HQ
HB Rentals Limited
Kirkwood Business Park
Sauchen Inverurie, Aberdeenshire
Scotland, UK AB51 7LE
+44.1224.7723 04
HB RENTALS BUILT A CUSTOM SOLUTION FOR
JACK-UP BARGE WITH ACCOMMODATION MODULES,
AUXILIARY FACILITIES AND OPERATING ESSENTIALS
INCLUDING:
	•	Twenty 32ft. 4/8 sleepers
	•	Seven 32ft. open plan “welfare rooms”
	•	One conference room
	•	Two offices
	•	One food server/non-smoking lounge
	•	Two locker/changing rooms
	•	One laundry linen room
	•	One 20ft. smoking lounge
	•	One 20ft. coffee room
	•	One 20ft. dry goods container (baggage store room)
	•	Two sewage treatment plants and barrel pumps
	•	Access stairs
	•	Porches
	•	All hookup cables
	•	All pipework
RESULTS HB RENTALS ACCOMPLISHED:
	•	Zero safety incidents
	•	No major issues in installation
	•	No delays in production or sail date
	•	Quick issue resolution
	•	Enhanced productivity of workers in
	 a remote location
	•	Created an easier environment for
	 workforce management
www.hbrental.com Eastern Hemisphere
Dubai, UAE
The Oasis Centre
Level 3 Office 70, 85, 86
Al Quoz Ind. 1,
Sheikh Zayed Road,
Dubai, UAE
+971.4339.7017
Western Hemisphere
Claxton Bay, Trinidad and Tobago
237 Cedar Hill Road
Claxton Bay
Trinidad and Tobago
+1 868.659.3262

More Related Content

Viewers also liked

New Library Ship Energy Systems
New Library Ship Energy SystemsNew Library Ship Energy Systems
New Library Ship Energy SystemsSimulationX
 
Mobile offshore
Mobile offshoreMobile offshore
Mobile offshore
Sylas_carvalho
 
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Benji George
 
The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )
Kamel Elsayed
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
NUR FARHIYAH BASIR
 
Mat j ack up rig paper 2007
Mat j ack up rig paper 2007Mat j ack up rig paper 2007
Mat j ack up rig paper 2007Alsierra99
 
CLASSIFICATION OF SHIP
CLASSIFICATION OF SHIPCLASSIFICATION OF SHIP
CLASSIFICATION OF SHIP
NUR FARHIYAH BASIR
 
Rig types.
Rig types.Rig types.
Rig types.
Kamal Abdurahman
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
University of Azad Jammu & Kashmir
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 

Viewers also liked (12)

New Library Ship Energy Systems
New Library Ship Energy SystemsNew Library Ship Energy Systems
New Library Ship Energy Systems
 
Mobile offshore
Mobile offshoreMobile offshore
Mobile offshore
 
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
Innovative, faster and safer access solutions for jack-up-rig leg works - OJ...
 
The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
Mat j ack up rig paper 2007
Mat j ack up rig paper 2007Mat j ack up rig paper 2007
Mat j ack up rig paper 2007
 
CLASSIFICATION OF SHIP
CLASSIFICATION OF SHIPCLASSIFICATION OF SHIP
CLASSIFICATION OF SHIP
 
Final project
Final projectFinal project
Final project
 
Rig types.
Rig types.Rig types.
Rig types.
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Offshore Platforms
Offshore Platforms Offshore Platforms
Offshore Platforms
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 

Similar to Jack-Up Barge Case Study

James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James Lee
 
T.Y. Lin International Lines of Business Brochures
T.Y. Lin International Lines of Business BrochuresT.Y. Lin International Lines of Business Brochures
T.Y. Lin International Lines of Business Brochures
Maribel Castillo
 
Airservices
Airservices Airservices
Airservices
Od Solutions
 
Multi Utility Brochure
Multi Utility BrochureMulti Utility Brochure
Multi Utility Brochureamandabrown106
 
GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company ProfileMartin Tobin
 
InterContinental Double Bay
InterContinental Double Bay InterContinental Double Bay
InterContinental Double Bay
Od Solutions
 
Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Nicholas Grear
 
C-Net Electrical Pictorial Profile-2015
C-Net Electrical Pictorial Profile-2015C-Net Electrical Pictorial Profile-2015
C-Net Electrical Pictorial Profile-2015Errol C Bailey
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
weydon23
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4Keith Callanan
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
LOU NICKSIC - Industrial - Oil and Gas Resume  041116LOU NICKSIC - Industrial - Oil and Gas Resume  041116
LOU NICKSIC - Industrial - Oil and Gas Resume 041116Lou Nicksic
 
Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP
Robert Tyson
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose
 
Benjamin Miner_ENGL210_Assignment1
Benjamin Miner_ENGL210_Assignment1Benjamin Miner_ENGL210_Assignment1
Benjamin Miner_ENGL210_Assignment1Benjamin Miner
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPaul Newby
 
Hoar Construction's 2014 Year In Review
Hoar Construction's 2014 Year In ReviewHoar Construction's 2014 Year In Review
Hoar Construction's 2014 Year In Review
Hoar Construction
 
Dowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show viewDowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show view
mlandry77
 

Similar to Jack-Up Barge Case Study (20)

James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
 
T.Y. Lin International Lines of Business Brochures
T.Y. Lin International Lines of Business BrochuresT.Y. Lin International Lines of Business Brochures
T.Y. Lin International Lines of Business Brochures
 
Airservices
Airservices Airservices
Airservices
 
Multi Utility Brochure
Multi Utility BrochureMulti Utility Brochure
Multi Utility Brochure
 
GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company Profile
 
JVC Profile Jan 2016
JVC Profile Jan 2016JVC Profile Jan 2016
JVC Profile Jan 2016
 
InterContinental Double Bay
InterContinental Double Bay InterContinental Double Bay
InterContinental Double Bay
 
Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016
 
C-Net Electrical Pictorial Profile-2015
C-Net Electrical Pictorial Profile-2015C-Net Electrical Pictorial Profile-2015
C-Net Electrical Pictorial Profile-2015
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
zk resume
zk resumezk resume
zk resume
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
LOU NICKSIC - Industrial - Oil and Gas Resume  041116LOU NICKSIC - Industrial - Oil and Gas Resume  041116
LOU NICKSIC - Industrial - Oil and Gas Resume 041116
 
Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP Syscon Grade A Level 1 ASP
Syscon Grade A Level 1 ASP
 
Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016Jon Rose Design company profile Dec 2016
Jon Rose Design company profile Dec 2016
 
Benjamin Miner_ENGL210_Assignment1
Benjamin Miner_ENGL210_Assignment1Benjamin Miner_ENGL210_Assignment1
Benjamin Miner_ENGL210_Assignment1
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
Hoar Construction's 2014 Year In Review
Hoar Construction's 2014 Year In ReviewHoar Construction's 2014 Year In Review
Hoar Construction's 2014 Year In Review
 
Dowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show viewDowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show view
 

More from Peter Armstrong

ADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReadyADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReadyPeter Armstrong
 
ADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorezADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorezPeter Armstrong
 
HBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client NeedsHBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client NeedsPeter Armstrong
 
Mexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 AdMexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 AdPeter Armstrong
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementPeter Armstrong
 
Feb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon ProcessingFeb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon ProcessingPeter Armstrong
 
HydrocarbonProcessingFHS
HydrocarbonProcessingFHSHydrocarbonProcessingFHS
HydrocarbonProcessingFHSPeter Armstrong
 

More from Peter Armstrong (20)

ADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReadyADIPEC Ad Full Size-PrintReady
ADIPEC Ad Full Size-PrintReady
 
ADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorezADIPEC_Panels_new size_lorez
ADIPEC_Panels_new size_lorez
 
HBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client NeedsHBR - WP01 - Understanding Client Needs
HBR - WP01 - Understanding Client Needs
 
PES Article
PES ArticlePES Article
PES Article
 
Mexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 AdMexico Oil and Gas Review 2016 Ad
Mexico Oil and Gas Review 2016 Ad
 
Mexico Oil Gas Review
Mexico Oil Gas ReviewMexico Oil Gas Review
Mexico Oil Gas Review
 
MEE Reaching The Peak
MEE Reaching The PeakMEE Reaching The Peak
MEE Reaching The Peak
 
GulfConst-Performance
GulfConst-PerformanceGulfConst-Performance
GulfConst-Performance
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency Management
 
Sunday
SundaySunday
Sunday
 
Saturday
SaturdaySaturday
Saturday
 
Thursday
ThursdayThursday
Thursday
 
Friday
FridayFriday
Friday
 
Wednesday
WednesdayWednesday
Wednesday
 
Is Your Profit Leaking
Is Your Profit LeakingIs Your Profit Leaking
Is Your Profit Leaking
 
E&C Profilep123
E&C Profilep123E&C Profilep123
E&C Profilep123
 
Feb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon ProcessingFeb 2010 Hydrocarbon Processing
Feb 2010 Hydrocarbon Processing
 
HP FHS Spring 2011
HP FHS Spring 2011HP FHS Spring 2011
HP FHS Spring 2011
 
HydrocarbonProcessingFHS
HydrocarbonProcessingFHSHydrocarbonProcessingFHS
HydrocarbonProcessingFHS
 
Refomer Ad 2010
Refomer Ad 2010Refomer Ad 2010
Refomer Ad 2010
 

Jack-Up Barge Case Study

  • 1. Global Solutions for Onsite Housing and Operating Essentials Call us today at +44.1224.772304, or visit us at www.hbrental.com When Jack-Up Barge, a leading supplier of self- elevating platforms, was contracted for a major North Sea project, it was apparent that the project deadline would be challenging to meet. Jack-Up Barge had to meet its customer’s scheduling demands in just a few short weeks. The company needed to find a reliable partner with the resources to work quickly, safely and efficiently—and ultimately deliver all the essentials needed to live and work productively offshore. Deploying Offshore Essentials Fast PROJECT Solution Selling for Jack-Up Barge INDUSTRY Wind Energy CHALLENGE Upon gathering information from the customer, Jack-Up Barge discovered that in order to make the vessel livable for a large crew –– custom-made, temporary, living accommodation and facilities would be required. To make deadlines even more pressing, Jack-Up Barge would be hit with costly performance penalties for every single day deployment was delayed. SOLUTION HB Rentals was tasked with providing its versatile well service modules. Thanks to its global network of comprehensive resources, offshore accommodation experience and successful industry track record, HB Rentals had the project management expertise and end-to-end custom solutions capabilities required to complete the project. As soon as the contract was signed, HB Rentals got to work ordering materials, engineering custom items and ensuring safe installation under the critical timeline. To meet the demands of the order, HB Rentals leveraged its global operations to bring in dependable equipment like sewage systems from the United States, HB accommodation modules from the Middle East and pipe for water and sewage lines from London to provide the complete solution for the build. SEE THE RESULTS >
  • 2. RESULTS With no room for error, HB Rentals was able to meet the aggressive schedule through diligent project management. From engineering design to installation and commissioning, HB Rentals successfully delivered on the client’s custom specifications. HB Rentals made it possible by quickly identifying the challenges involved in the project, such as the limited vessel footprint for the accommodation complex, and solving problems as they occurred. A customer focused approach ensured an all round seamless project execution. Despite the extreme time constraints, HB Rentals was able to streamline operations while at the same time physically checking every shipment. Quality assurance was completed at the end of each day, and safety was at the forefront of the entire installation. Additionally, HB Rentals employees maintained excellent contact with sub-contractors and were able to efficiently manage the project from beginning to end. Upon project completion, HB Rentals sent its own technicians to sail with the barge free of charge for two weeks to guarantee everything was running properly, ensuring quality of both equipment and installation. In the end, HB Rentals became a trusted partner and secured a subsequent contract for Jack-Up Barge who knew the company would reliably deliver equipment, crews and processes needed on the new job. Because HB Rentals was able to supply a comprehensive solution under an aggressive schedule, Jack-Up Barge was able to meet its obligations without incurring any financial penalties. With HB Rentals’ accommodation on deck, Jack-Up Barge was able to set sail on time. World Headquarters HB Rentals 5813 Hwy. 90 East Broussard, Louisiana 70518 USA +1.337.839.1641 Western Hemisphere HQ HB Rentals Corporate Sales Office 11000 Equity Drive, Suite 150 Houston, Texas 77041 USA +1.281.999.0047 Eastern Hemisphere HQ HB Rentals Limited Kirkwood Business Park Sauchen Inverurie, Aberdeenshire Scotland, UK AB51 7LE +44.1224.7723 04 HB RENTALS BUILT A CUSTOM SOLUTION FOR JACK-UP BARGE WITH ACCOMMODATION MODULES, AUXILIARY FACILITIES AND OPERATING ESSENTIALS INCLUDING: • Twenty 32ft. 4/8 sleepers • Seven 32ft. open plan “welfare rooms” • One conference room • Two offices • One food server/non-smoking lounge • Two locker/changing rooms • One laundry linen room • One 20ft. smoking lounge • One 20ft. coffee room • One 20ft. dry goods container (baggage store room) • Two sewage treatment plants and barrel pumps • Access stairs • Porches • All hookup cables • All pipework RESULTS HB RENTALS ACCOMPLISHED: • Zero safety incidents • No major issues in installation • No delays in production or sail date • Quick issue resolution • Enhanced productivity of workers in a remote location • Created an easier environment for workforce management www.hbrental.com Eastern Hemisphere Dubai, UAE The Oasis Centre Level 3 Office 70, 85, 86 Al Quoz Ind. 1, Sheikh Zayed Road, Dubai, UAE +971.4339.7017 Western Hemisphere Claxton Bay, Trinidad and Tobago 237 Cedar Hill Road Claxton Bay Trinidad and Tobago +1 868.659.3262