SlideShare a Scribd company logo
QBCC LICENCE 1304470
Capability Statement
“We combine flexibility, people, creativity and
professionalism to achieve outstanding results.”
“Our vision was to create a company where clients could
depend on uncompromised high quality product.”
about us our history
We are a private company with
two shareholders actively involved
in the day to day corporate, project
and administrative management of
the business.
From humble beginnings in 2014, we
have grown to become a company
operating on independent sites
across regional and remote
Australia.
During this time, we have evolved
into a company that has excelled
in residential, commercial and civil
construction delivering industry best
practice solutions.
Our specific areas of specialty
include:
• Civil infrastructure
• Residential
• Commercial works
We have an excellent track record
across a full range of disciplines
including direct management,
construction management,
project management, and site
management.
Most importantly we work closely
with our clients at all times never
wavering from our commitment to
deliver projects on time and within
budget. We work side by side with
our clients to ensure they receive
maximum benefit from our
involvement. It is this partnership
approach with our clients and
stakeholders that has contributed to
the company’s growth and success.
Allconstruct was established
in 2014 in Brisbane, built around
integrity and quality.
The initial scope of work was
based on providing general civil
construction projects in regional and
remote areas of Queensland.
Relatively quickly the company also
began to specialise on residential
renovations and commercial fit-out
work.
From the start the company
established two major commitments:
to not compromise on providing
a quality product, and prioritising
good communications and relations.
www.allconstruct.com.au www.allconstruct.com.au
“Our staff is led by example from the Managing Director
to the Leading Hands.”
“Safety, Quality and the Environment is our Core Focus
when delivering your project.”
our people our management systems
Flexibility creativity and
innovation are derived from talented
people working well together in a
productive environment. We work
across a multitude of disciplines from
our highly skilled project managers,
cutting edge systems engineers,
specialist project teams through to
our creative and productive support
staff.
Our range of disciplines requires a
team- based approach with a flat
management structure. This flat
structure offers immense benefits. It
promotes effective communication
between our team and our clients
and maximises the quality and
efficiency of our projects. Teamwork,
accountability and respect are the
hallmarks of our company culture,
both in our internal and external
dealings.
This approach provides our clients
with a level of assurance that we will
continually meet and exceed their
expectations.
We provide our team members with
formal and on-the-job training. A
system of continuous monitoring
and performance appraisal ensures
ongoing professional development.
The team culture developed
throughout the company is most
important, and great care is taken in
the recruitment of aspiring members.
In addition to the investment we
make in our people we ensure they
have access to the latest equipment
and technology. With these core
elements we are driven to deliver
successful outcomes for our clients
and stakeholders.
We are committed to partnering
with our clients, local communities,
subcontractors and all other
relevant stakeholders to ensure
appropriate consideration is given to
all safety, quality and environmental
factors relating to our projects. We
offer our clients a comprehensive
Third Party Certified Safety, Quality
and Environmental Management
System.
We have a highly skilled
management team that is
dedicated to facilitating this system
and developing comprehensive
project specific management plans.
This allows Allconstruct to literally hit
the ground running upon the award
of a project.
When awarded a project, our team
of professionals ensure the ongoing
monitoring and review of each
project to ensure all expectations
are met to the best of our ability and
to facilitate continual improvement
throughout our business. Allconstruct
in-depth understanding of the
management systems review
process that sets us apart from our
competitors and has contributed to
the company’s growth and success.
www.allconstruct.com.au www.allconstruct.com.au
“Safety, Quality and the Environment
is our Core Focus when delivering your project.”
Design & Build Project Design & Build Project
our projects our projects
Description
This project was located at Highgate
Hill, Brisbane. The site consisted of an
old run down dwelling, which we had
to demolish and take off site before
the site earthworks could start. Then
we commenced the earthworks and
construction of the new dwelling.
Works
The work undertaken included:
•	 Design and Planning Approval
Application
•	 Demolishing of the existing house.
•	 Earthworks and drainage works.
•	 Concrete slab reinforcement and
pour
•	 Timber frame fabrication and
erection of the dwelling
•	 Electrical, plumbing and AC fitting
•	 1st and 2nd fix carpentry
•	 Kitchen and wardrobe fit-outs
•	 Painting and decorating
•	 Interior design work
Challenges
•	 Pedestrian management for
construction in an urban area
•	 Underground services
management with a frequent
presence of telecommunication
conduits, Electrical cables, water
mains and sewer pipes
•	 Inclement weather conditions
Our Management
Allconstruct were the principal
contractor of this project and in
charge of the project management,
subcontractor management and
engagement. Allconstruct built a
great relationship with the client and
were able to complete the project
ahead of time and on budget. There
were highly qualified and specialised
staff managing the project, who
ensured that the project was
completed to the highest standard.
Value Add
The Project reached practical
completion early May, which was
well ahead of contractual practical
completion date. The project team
took on a vigorous approach to
tackle issues to go the extra mile
to cater for our client’s special
requirements.
Description
This project was located at Redhill,
Brisbane. The site consisted of an old
run down dwelling, which we had
to demolish and take off site before
the site earthworks could start. Then
we commenced the earthworks and
construction of the new dwelling.
Works
The work undertaken included:
•	 Design and Planning Approval
Application
•	 Demolishing of the existing house.
•	 Earthworks and drainage works.
•	 Concrete slab reinforcement and
pour
•	 Timber frame fabrication and
erection of the dwelling
•	 Electrical, plumbing and AC fitting
•	 1st and 2nd fix carpentry
•	 Kitchen and wardrobe fit-outs
•	 Painting and decorating
•	 Interior design work
Challenges
•	 Pedestrian management for
construction in an urban area
•	 Underground services
management with a frequent
presence of telecommunication
conduits, Electrical cables, water
mains and sewer pipes
•	 Inclement weather conditions
Our Management
Allconstruct were the principal
contractor of this project and in
charge of the project management,
subcontractor management and
engagement.
Allconstruct built a great relationship
with the client and were able to
complete the project ahead of time
and on budget.
There were highly qualified and
specialised staff managing the
project, who ensured that the project
was completed to the highest
standard.
www.allconstruct.com.au www.allconstruct.com.au
Project:			 Residential Project.
Location:		 Highgate Hill, Brisbane
Client:			 Private Investor
Contract Value:		 $1.3 million
Construction Period:	 September 2014 – May 2015
Project:			 Residential Project.
Location:		 Redhill, Brisbane
Client:			 Private Investor
Contract Value:		 $1.2 million
Construction Period:	 April 2015 to December 2015
North Pine Switch Room, QLD Design & Build Decking Project
our projects our projects
Description
The project was part of the North
Pine Waste Treatment Plant upgrade.
Allconstruct were contracted to
construct the Switch Room Building.
Works
The work undertaken included:
•	 • Clearing and grub of the site
•	 • Piling the building slab area
•	 • Detail excavation works of the
slab area
•	 • Formwork, steel fixing and
concrete works
•	 • Block laying of the building.
•	 • Roofing of the building.
•	 • Internal carpentry fit-out
•	 • Supply and fitting of external
fire doors
Our Management
The site team was divided into two
crews to manage program time
frames within the program were
achieved. Ongoing consultation with
the client addressed design issues
on a few of the changes that were
overcome with a good finish result.
Value Add
“The works have been completed to
a high standard. Indeed, this is one of
the best completed sites I have seen
on the North Pine Treatment Plant.”
Robert Bearne. North Pine GM.
Description
Allconstruct offer a complete
design and build package to all our
clients requiring quality carpentry
workmanship around their private
dwellings.
Works
Key elements included:
•	 Earthworks
•	 Foundation pier design and
construction
•	 Carpentry work
•	 Sanding and finish timberwork
Our Management
The Project and Management
Systems Team implemented a range
of safety, quality, and environmental
procedures on this site to improve
efficiency across each project.
The client acknowledged our
commitment and understanding of
controlling all documents, traceability
and overall project quality.
Value Add
Allconstruct carpentry workmanship
and knowledge of local council
requirements give our clients true
value for money
www.allconstruct.com.au www.allconstruct.com.au
Project: 			 North Pine Waste Treatment Plant
Location:		 North Pine, Queensland
Client:			 Comadin Infrastructure
Contract Value:		 $350k
Construction Period:	 November 2015 – March 2016
Projects: 		 Ongoing Projects in Brisbane Qld
Location:		 Brisbane
Client:			 Private Owners and Developers
Construction Period:	 October 2014 – Current
Parklands Commonwealth Games Village Rathdowney Reservoir Project
our projects our projects
Description
This high profile project based in the
Gold Coast is been constructed
to accommodate the sports
athletes competing in the 2018
Commonwealth Games. 1400
apartments in total.
Works
Key elements included:
•	 Sourcing and managing 60 to 80
personal for the duration of our
scope of works
•	 Supply skilled labour to fabricate
and erect all the internal stud
works for 7 building. Each building
with 85 apartments
•	 Supply skilled labour to erect all
ceiling framing
•	 Supply skilled labour to fit all the
external cladding framing and
sheeting
•	 Supply crews to patch, sand and
prep all the cladding sheets for
painting.
Our Management
Our experienced management team
recruited, managed and coordinated
all our tradesmen to deliver this
project in time and budget for our
customers Kenny Projects.
Value Add
Allconstruct client acknowledged our
commitment and understanding of
controlling all skilled labour, QA and
safety measures required on this high
profile commercial fit-out project.
Description
This project site was located at
Rathdowney Qld. The works program
included the widening of 2.4km of
existing entrance road to the reservoir,
stormwater upgrade, pavement
strengthening and landscaping.
Works
Key elements included:
• Earthworks
• Construct of all the concrete
structures i.e. reservoir foundation
footings, air and scour valve pits,
culvert precast fitting and in-situ
headwalls
• Drainage Works
• Traffic Management
Challenges
•	 Extreme Weather
•	 Traffic Management
Our Management
The Project and Management
Systems Team implemented a range
of safety, quality, and environmental
procedures on this site to improve
efficiency across the project
engagement.
The client acknowledged our
commitment and understanding of
controlling all documents, traceability
and overall project quality.
Value Add
Allconstruct engaged local
subcontractors to assist in the delivery
of the project which provided
economic benefit to the project and
flow on effect to the local community
www.allconstruct.com.au www.allconstruct.com.au
Project: 			 Parkland Commonwealth Games
			 Village Accommodation
Location:		 Southport, Gold Coast Qld
Client:			 Kenny Projects
Contract Value:		 $2.8m
Construction Period:	 May 2016 – Current

Project: 			 Rathdowney Reservoir Upgrade Project
Location:		 Rathdowney Qld
Client:			 Comdain Infrastructure
Contract Value:		 $480k
Construction Period:	 October 2015 – March 2016
Sunnybank Hills – Design and Build
our projects company details
Description
This project site was located at
Sunnybank Hills. Allconstruct were
contracted to complete the
full complete design and build
landscape package.
Works
Key elements included:
•	 Driveway  footpaths design and
build
•	 Construction of a quality
hardwood deck
•	 Landscape design and construct
•	 Front boundary wall construction.
Our Management
The Project and Management
Systems Team implemented a range
of safety, quality, and environmental
procedures on this site to improve
efficiency across the project.
The client acknowledged our quality
workmanship and dealing with the
local council representatives.
Value Add
Allconstruct workmanship and
management of all the works
onsite has very well arranged and
coordinated from start to finish.
www.allconstruct.com.au
Project: 			 Landscape, Driveway, Decking Project
Location:		 Sunnybank Hills
Client:			 Private Owner
Contract Value:		 $70k
Construction Period:	 June 2016 – Aug 2016
Company Name				 Allconstruct Pty Ltd
Year established				 2014
ABN					 50 601 503 986
ACN					 601 503 986
Registered Address			 5 The Yardarm Runaway Bay Q 4216	
Website					 www.allconstruct.com.au
Phone					 07 3814 6369
Postal Address				 5 The Yardarm Runaway Bay Q 4216
Contact					 Eamus Coote - Construction Manger			
					m. 0416 490 597
					 e. eamus@allconstruct.com.au
					 Keith Callanan - Project Manager				
					 m. 0406 917 991
					 e. keith@allconstruct.com.au
					 Ruwanthi Lekamge - Project Engineer			
					 m. 0433 773 812
					 e. ru@allconstruct.com.au
			
					 Gemma Callanan – Contracts Manager			
					 m. 0408 662 810
					 e. gemma@allconstruct.com.au
www.allconstruct.com.au

More Related Content

What's hot

GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company ProfileMartin Tobin
 
Master Brochure
Master BrochureMaster Brochure
Master Brochure
archengine
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyremeganraem
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
Derek Swift
 
Jozwel cv
Jozwel cvJozwel cv
Infrastructure Construction Proposal PowerPoint Presentation Slides
Infrastructure Construction Proposal PowerPoint Presentation SlidesInfrastructure Construction Proposal PowerPoint Presentation Slides
Infrastructure Construction Proposal PowerPoint Presentation Slides
SlideTeam
 
Alliance Construction & Design
Alliance Construction & DesignAlliance Construction & Design
Alliance Construction & Design
stilianag
 
Qualification Statement 1 15 10
Qualification Statement 1 15 10Qualification Statement 1 15 10
Qualification Statement 1 15 10
Brandon Pomish
 
CPR Draft OCT 10_2016_Chronological_Resume (1)
CPR Draft OCT 10_2016_Chronological_Resume (1)CPR Draft OCT 10_2016_Chronological_Resume (1)
CPR Draft OCT 10_2016_Chronological_Resume (1)Dan Mikalaski
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Backgroundguest470ea8
 
DvJ Design Capability Statement
DvJ Design Capability StatementDvJ Design Capability Statement
DvJ Design Capability Statement
David Davies
 
Deepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products CatalogsDeepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products Catalogs
DEEPBLUE SMARTHOUSE CO.,LTD.
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2David Seaward
 

What's hot (20)

GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company Profile
 
Master Brochure
Master BrochureMaster Brochure
Master Brochure
 
Resume - Megan McIntyre
Resume - Megan McIntyreResume - Megan McIntyre
Resume - Megan McIntyre
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
Jozwel cv
Jozwel cvJozwel cv
Jozwel cv
 
Infrastructure Construction Proposal PowerPoint Presentation Slides
Infrastructure Construction Proposal PowerPoint Presentation SlidesInfrastructure Construction Proposal PowerPoint Presentation Slides
Infrastructure Construction Proposal PowerPoint Presentation Slides
 
Alliance Construction & Design
Alliance Construction & DesignAlliance Construction & Design
Alliance Construction & Design
 
Qualification Statement 1 15 10
Qualification Statement 1 15 10Qualification Statement 1 15 10
Qualification Statement 1 15 10
 
CPR Draft OCT 10_2016_Chronological_Resume (1)
CPR Draft OCT 10_2016_Chronological_Resume (1)CPR Draft OCT 10_2016_Chronological_Resume (1)
CPR Draft OCT 10_2016_Chronological_Resume (1)
 
Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015
 
GEORGE CV
GEORGE CVGEORGE CV
GEORGE CV
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Rainbow Developers With Blue Background
Rainbow  Developers With  Blue  BackgroundRainbow  Developers With  Blue  Background
Rainbow Developers With Blue Background
 
DvJ Design Capability Statement
DvJ Design Capability StatementDvJ Design Capability Statement
DvJ Design Capability Statement
 
CV
CVCV
CV
 
Resume
ResumeResume
Resume
 
Andrew Quilaneta CV
Andrew Quilaneta CVAndrew Quilaneta CV
Andrew Quilaneta CV
 
IGNATIOUS RESUME
IGNATIOUS RESUMEIGNATIOUS RESUME
IGNATIOUS RESUME
 
Deepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products CatalogsDeepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products Catalogs
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 

Viewers also liked

A nonlinear approximation of the Bayesian Update formula
A nonlinear approximation of the Bayesian Update formulaA nonlinear approximation of the Bayesian Update formula
A nonlinear approximation of the Bayesian Update formula
Alexander Litvinenko
 
090210二十一世紀新素養
090210二十一世紀新素養090210二十一世紀新素養
090210二十一世紀新素養Jean Chow
 
051012企業內的混成訓練(行政中心)
051012企業內的混成訓練(行政中心)051012企業內的混成訓練(行政中心)
051012企業內的混成訓練(行政中心)
Jean Chow
 
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione CercaGuida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
caioturtle
 
PPT-ChallengesREVISED
PPT-ChallengesREVISEDPPT-ChallengesREVISED
PPT-ChallengesREVISED
melinda livas
 
Tabela fasefinal
Tabela fasefinalTabela fasefinal
Tabela fasefinal
impactoworld
 
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDODXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
Cesar Coronel
 
Modul alkimiya-f4-c09
Modul alkimiya-f4-c09Modul alkimiya-f4-c09
Modul alkimiya-f4-c09
Xin Yi RegiNe
 
CACA
CACACACA
CACA
jmanuel98
 
Geography of Europe
Geography of Europe Geography of Europe
Geography of Europe HeatherP
 
Driving Improvements Through Supply Chain Optimization.
Driving Improvements Through Supply Chain Optimization.Driving Improvements Through Supply Chain Optimization.
Driving Improvements Through Supply Chain Optimization.
Lora Cecere
 
Rits Brown Bag - Google AdWords Basics
Rits Brown Bag - Google AdWords BasicsRits Brown Bag - Google AdWords Basics
Rits Brown Bag - Google AdWords Basics
Right IT Services
 
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
關鍵數位行銷股份有限公司 Minmax Digital Consulting
 
20160419 網路星期二:天啊,我的資料被誰加密了?
20160419 網路星期二:天啊,我的資料被誰加密了?20160419 網路星期二:天啊,我的資料被誰加密了?
20160419 網路星期二:天啊,我的資料被誰加密了?
Net Tuesday Taiwan
 
Marche public en pratique dans le bâtiment - BTP
Marche public en pratique dans le bâtiment - BTPMarche public en pratique dans le bâtiment - BTP
Marche public en pratique dans le bâtiment - BTP
Frédéric Grevey
 
20161208 sem關鍵字廣告專案的執行
20161208 sem關鍵字廣告專案的執行20161208 sem關鍵字廣告專案的執行
20161208 sem關鍵字廣告專案的執行
煜庭 邱
 
Accelerate_impacts
Accelerate_impactsAccelerate_impacts
Accelerate_impacts
Accelerate Project
 
Plant Healthcare Client Report
Plant Healthcare Client ReportPlant Healthcare Client Report
Plant Healthcare Client Report
davkearn
 
F itness club business model
F itness club   business modelF itness club   business model
F itness club business modelRahul Hedau
 

Viewers also liked (20)

A nonlinear approximation of the Bayesian Update formula
A nonlinear approximation of the Bayesian Update formulaA nonlinear approximation of the Bayesian Update formula
A nonlinear approximation of the Bayesian Update formula
 
090210二十一世紀新素養
090210二十一世紀新素養090210二十一世紀新素養
090210二十一世紀新素養
 
051012企業內的混成訓練(行政中心)
051012企業內的混成訓練(行政中心)051012企業內的混成訓練(行政中心)
051012企業內的混成訓練(行政中心)
 
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione CercaGuida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
Guida al computer - Lezione 156 - Windows 8.1 Update – Funzione Cerca
 
Uniminuto gbi
Uniminuto gbiUniminuto gbi
Uniminuto gbi
 
PPT-ChallengesREVISED
PPT-ChallengesREVISEDPPT-ChallengesREVISED
PPT-ChallengesREVISED
 
Tabela fasefinal
Tabela fasefinalTabela fasefinal
Tabela fasefinal
 
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDODXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
DXN COLOMBIA EQUIPO ALFA OPORTUNIDAD DE NEGOCIO EN COLOMBIA Y EL MUNDO
 
Modul alkimiya-f4-c09
Modul alkimiya-f4-c09Modul alkimiya-f4-c09
Modul alkimiya-f4-c09
 
CACA
CACACACA
CACA
 
Geography of Europe
Geography of Europe Geography of Europe
Geography of Europe
 
Driving Improvements Through Supply Chain Optimization.
Driving Improvements Through Supply Chain Optimization.Driving Improvements Through Supply Chain Optimization.
Driving Improvements Through Supply Chain Optimization.
 
Rits Brown Bag - Google AdWords Basics
Rits Brown Bag - Google AdWords BasicsRits Brown Bag - Google AdWords Basics
Rits Brown Bag - Google AdWords Basics
 
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
【MMdc 分享】關鍵數位學堂 L.7 UI/UX_20130116_蔡柏文老師
 
20160419 網路星期二:天啊,我的資料被誰加密了?
20160419 網路星期二:天啊,我的資料被誰加密了?20160419 網路星期二:天啊,我的資料被誰加密了?
20160419 網路星期二:天啊,我的資料被誰加密了?
 
Marche public en pratique dans le bâtiment - BTP
Marche public en pratique dans le bâtiment - BTPMarche public en pratique dans le bâtiment - BTP
Marche public en pratique dans le bâtiment - BTP
 
20161208 sem關鍵字廣告專案的執行
20161208 sem關鍵字廣告專案的執行20161208 sem關鍵字廣告專案的執行
20161208 sem關鍵字廣告專案的執行
 
Accelerate_impacts
Accelerate_impactsAccelerate_impacts
Accelerate_impacts
 
Plant Healthcare Client Report
Plant Healthcare Client ReportPlant Healthcare Client Report
Plant Healthcare Client Report
 
F itness club business model
F itness club   business modelF itness club   business model
F itness club business model
 

Similar to Capability Statement REV 4

MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2ndmichael matthews
 
Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Resadamide
 
J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015Jesse Pena
 
Affix interiors catalog
Affix interiors catalogAffix interiors catalog
Affix interiors catalogMOHAMMAD AHSAN
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
Tom Stack
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016David Karim
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Tom Stack
 
Dicedge limited. Building and construction company.
Dicedge limited. Building and construction company. Dicedge limited. Building and construction company.
Dicedge limited. Building and construction company.
gichukianthony07
 
Perry Lieber Crafting Excellence in Construction and Remodeling
Perry Lieber Crafting Excellence in Construction and RemodelingPerry Lieber Crafting Excellence in Construction and Remodeling
Perry Lieber Crafting Excellence in Construction and Remodeling
Perry Lieber
 
Redwood Credentials Digital Version (1)
Redwood Credentials Digital Version (1)Redwood Credentials Digital Version (1)
Redwood Credentials Digital Version (1)Sam Graiche
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Benjamin Leavy
 
BBR Design
BBR DesignBBR Design
BBR Design
mikY9451
 
Perry Adam Lieber - Home Construction
Perry Adam Lieber - Home ConstructionPerry Adam Lieber - Home Construction
Perry Adam Lieber - Home Construction
Perry Lieber
 
Arcointerior Company Profile 2015 - COMPRESSED (2)
Arcointerior Company Profile 2015 - COMPRESSED (2)Arcointerior Company Profile 2015 - COMPRESSED (2)
Arcointerior Company Profile 2015 - COMPRESSED (2)Arco Interiors
 
Arco Interiors - company profile
Arco Interiors - company profileArco Interiors - company profile
Arco Interiors - company profileArco Interiors
 

Similar to Capability Statement REV 4 (20)

MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2nd
 
Brochure 2016
Brochure 2016Brochure 2016
Brochure 2016
 
Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Res
 
H2H- Architect Intro 2
H2H- Architect Intro 2 H2H- Architect Intro 2
H2H- Architect Intro 2
 
J. Pena Resume 12.2015
J. Pena Resume 12.2015J. Pena Resume 12.2015
J. Pena Resume 12.2015
 
Affix interiors catalog
Affix interiors catalogAffix interiors catalog
Affix interiors catalog
 
JVC Profile Jan 2016
JVC Profile Jan 2016JVC Profile Jan 2016
JVC Profile Jan 2016
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012
 
Dicedge limited. Building and construction company.
Dicedge limited. Building and construction company. Dicedge limited. Building and construction company.
Dicedge limited. Building and construction company.
 
Perry Lieber Crafting Excellence in Construction and Remodeling
Perry Lieber Crafting Excellence in Construction and RemodelingPerry Lieber Crafting Excellence in Construction and Remodeling
Perry Lieber Crafting Excellence in Construction and Remodeling
 
Redwood Credentials Digital Version (1)
Redwood Credentials Digital Version (1)Redwood Credentials Digital Version (1)
Redwood Credentials Digital Version (1)
 
sample brochure all jobs
sample brochure all jobssample brochure all jobs
sample brochure all jobs
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
 
BBR Design
BBR DesignBBR Design
BBR Design
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
Perry Adam Lieber - Home Construction
Perry Adam Lieber - Home ConstructionPerry Adam Lieber - Home Construction
Perry Adam Lieber - Home Construction
 
Arcointerior Company Profile 2015 - COMPRESSED (2)
Arcointerior Company Profile 2015 - COMPRESSED (2)Arcointerior Company Profile 2015 - COMPRESSED (2)
Arcointerior Company Profile 2015 - COMPRESSED (2)
 
Arco Interiors - company profile
Arco Interiors - company profileArco Interiors - company profile
Arco Interiors - company profile
 

Capability Statement REV 4

  • 2. “We combine flexibility, people, creativity and professionalism to achieve outstanding results.” “Our vision was to create a company where clients could depend on uncompromised high quality product.” about us our history We are a private company with two shareholders actively involved in the day to day corporate, project and administrative management of the business. From humble beginnings in 2014, we have grown to become a company operating on independent sites across regional and remote Australia. During this time, we have evolved into a company that has excelled in residential, commercial and civil construction delivering industry best practice solutions. Our specific areas of specialty include: • Civil infrastructure • Residential • Commercial works We have an excellent track record across a full range of disciplines including direct management, construction management, project management, and site management. Most importantly we work closely with our clients at all times never wavering from our commitment to deliver projects on time and within budget. We work side by side with our clients to ensure they receive maximum benefit from our involvement. It is this partnership approach with our clients and stakeholders that has contributed to the company’s growth and success. Allconstruct was established in 2014 in Brisbane, built around integrity and quality. The initial scope of work was based on providing general civil construction projects in regional and remote areas of Queensland. Relatively quickly the company also began to specialise on residential renovations and commercial fit-out work. From the start the company established two major commitments: to not compromise on providing a quality product, and prioritising good communications and relations. www.allconstruct.com.au www.allconstruct.com.au
  • 3. “Our staff is led by example from the Managing Director to the Leading Hands.” “Safety, Quality and the Environment is our Core Focus when delivering your project.” our people our management systems Flexibility creativity and innovation are derived from talented people working well together in a productive environment. We work across a multitude of disciplines from our highly skilled project managers, cutting edge systems engineers, specialist project teams through to our creative and productive support staff. Our range of disciplines requires a team- based approach with a flat management structure. This flat structure offers immense benefits. It promotes effective communication between our team and our clients and maximises the quality and efficiency of our projects. Teamwork, accountability and respect are the hallmarks of our company culture, both in our internal and external dealings. This approach provides our clients with a level of assurance that we will continually meet and exceed their expectations. We provide our team members with formal and on-the-job training. A system of continuous monitoring and performance appraisal ensures ongoing professional development. The team culture developed throughout the company is most important, and great care is taken in the recruitment of aspiring members. In addition to the investment we make in our people we ensure they have access to the latest equipment and technology. With these core elements we are driven to deliver successful outcomes for our clients and stakeholders. We are committed to partnering with our clients, local communities, subcontractors and all other relevant stakeholders to ensure appropriate consideration is given to all safety, quality and environmental factors relating to our projects. We offer our clients a comprehensive Third Party Certified Safety, Quality and Environmental Management System. We have a highly skilled management team that is dedicated to facilitating this system and developing comprehensive project specific management plans. This allows Allconstruct to literally hit the ground running upon the award of a project. When awarded a project, our team of professionals ensure the ongoing monitoring and review of each project to ensure all expectations are met to the best of our ability and to facilitate continual improvement throughout our business. Allconstruct in-depth understanding of the management systems review process that sets us apart from our competitors and has contributed to the company’s growth and success. www.allconstruct.com.au www.allconstruct.com.au “Safety, Quality and the Environment is our Core Focus when delivering your project.”
  • 4. Design & Build Project Design & Build Project our projects our projects Description This project was located at Highgate Hill, Brisbane. The site consisted of an old run down dwelling, which we had to demolish and take off site before the site earthworks could start. Then we commenced the earthworks and construction of the new dwelling. Works The work undertaken included: • Design and Planning Approval Application • Demolishing of the existing house. • Earthworks and drainage works. • Concrete slab reinforcement and pour • Timber frame fabrication and erection of the dwelling • Electrical, plumbing and AC fitting • 1st and 2nd fix carpentry • Kitchen and wardrobe fit-outs • Painting and decorating • Interior design work Challenges • Pedestrian management for construction in an urban area • Underground services management with a frequent presence of telecommunication conduits, Electrical cables, water mains and sewer pipes • Inclement weather conditions Our Management Allconstruct were the principal contractor of this project and in charge of the project management, subcontractor management and engagement. Allconstruct built a great relationship with the client and were able to complete the project ahead of time and on budget. There were highly qualified and specialised staff managing the project, who ensured that the project was completed to the highest standard. Value Add The Project reached practical completion early May, which was well ahead of contractual practical completion date. The project team took on a vigorous approach to tackle issues to go the extra mile to cater for our client’s special requirements. Description This project was located at Redhill, Brisbane. The site consisted of an old run down dwelling, which we had to demolish and take off site before the site earthworks could start. Then we commenced the earthworks and construction of the new dwelling. Works The work undertaken included: • Design and Planning Approval Application • Demolishing of the existing house. • Earthworks and drainage works. • Concrete slab reinforcement and pour • Timber frame fabrication and erection of the dwelling • Electrical, plumbing and AC fitting • 1st and 2nd fix carpentry • Kitchen and wardrobe fit-outs • Painting and decorating • Interior design work Challenges • Pedestrian management for construction in an urban area • Underground services management with a frequent presence of telecommunication conduits, Electrical cables, water mains and sewer pipes • Inclement weather conditions Our Management Allconstruct were the principal contractor of this project and in charge of the project management, subcontractor management and engagement. Allconstruct built a great relationship with the client and were able to complete the project ahead of time and on budget. There were highly qualified and specialised staff managing the project, who ensured that the project was completed to the highest standard. www.allconstruct.com.au www.allconstruct.com.au Project: Residential Project. Location: Highgate Hill, Brisbane Client: Private Investor Contract Value: $1.3 million Construction Period: September 2014 – May 2015 Project: Residential Project. Location: Redhill, Brisbane Client: Private Investor Contract Value: $1.2 million Construction Period: April 2015 to December 2015
  • 5. North Pine Switch Room, QLD Design & Build Decking Project our projects our projects Description The project was part of the North Pine Waste Treatment Plant upgrade. Allconstruct were contracted to construct the Switch Room Building. Works The work undertaken included: • • Clearing and grub of the site • • Piling the building slab area • • Detail excavation works of the slab area • • Formwork, steel fixing and concrete works • • Block laying of the building. • • Roofing of the building. • • Internal carpentry fit-out • • Supply and fitting of external fire doors Our Management The site team was divided into two crews to manage program time frames within the program were achieved. Ongoing consultation with the client addressed design issues on a few of the changes that were overcome with a good finish result. Value Add “The works have been completed to a high standard. Indeed, this is one of the best completed sites I have seen on the North Pine Treatment Plant.” Robert Bearne. North Pine GM. Description Allconstruct offer a complete design and build package to all our clients requiring quality carpentry workmanship around their private dwellings. Works Key elements included: • Earthworks • Foundation pier design and construction • Carpentry work • Sanding and finish timberwork Our Management The Project and Management Systems Team implemented a range of safety, quality, and environmental procedures on this site to improve efficiency across each project. The client acknowledged our commitment and understanding of controlling all documents, traceability and overall project quality. Value Add Allconstruct carpentry workmanship and knowledge of local council requirements give our clients true value for money www.allconstruct.com.au www.allconstruct.com.au Project: North Pine Waste Treatment Plant Location: North Pine, Queensland Client: Comadin Infrastructure Contract Value: $350k Construction Period: November 2015 – March 2016 Projects: Ongoing Projects in Brisbane Qld Location: Brisbane Client: Private Owners and Developers Construction Period: October 2014 – Current
  • 6. Parklands Commonwealth Games Village Rathdowney Reservoir Project our projects our projects Description This high profile project based in the Gold Coast is been constructed to accommodate the sports athletes competing in the 2018 Commonwealth Games. 1400 apartments in total. Works Key elements included: • Sourcing and managing 60 to 80 personal for the duration of our scope of works • Supply skilled labour to fabricate and erect all the internal stud works for 7 building. Each building with 85 apartments • Supply skilled labour to erect all ceiling framing • Supply skilled labour to fit all the external cladding framing and sheeting • Supply crews to patch, sand and prep all the cladding sheets for painting. Our Management Our experienced management team recruited, managed and coordinated all our tradesmen to deliver this project in time and budget for our customers Kenny Projects. Value Add Allconstruct client acknowledged our commitment and understanding of controlling all skilled labour, QA and safety measures required on this high profile commercial fit-out project. Description This project site was located at Rathdowney Qld. The works program included the widening of 2.4km of existing entrance road to the reservoir, stormwater upgrade, pavement strengthening and landscaping. Works Key elements included: • Earthworks • Construct of all the concrete structures i.e. reservoir foundation footings, air and scour valve pits, culvert precast fitting and in-situ headwalls • Drainage Works • Traffic Management Challenges • Extreme Weather • Traffic Management Our Management The Project and Management Systems Team implemented a range of safety, quality, and environmental procedures on this site to improve efficiency across the project engagement. The client acknowledged our commitment and understanding of controlling all documents, traceability and overall project quality. Value Add Allconstruct engaged local subcontractors to assist in the delivery of the project which provided economic benefit to the project and flow on effect to the local community www.allconstruct.com.au www.allconstruct.com.au Project: Parkland Commonwealth Games Village Accommodation Location: Southport, Gold Coast Qld Client: Kenny Projects Contract Value: $2.8m Construction Period: May 2016 – Current Project: Rathdowney Reservoir Upgrade Project Location: Rathdowney Qld Client: Comdain Infrastructure Contract Value: $480k Construction Period: October 2015 – March 2016
  • 7. Sunnybank Hills – Design and Build our projects company details Description This project site was located at Sunnybank Hills. Allconstruct were contracted to complete the full complete design and build landscape package. Works Key elements included: • Driveway footpaths design and build • Construction of a quality hardwood deck • Landscape design and construct • Front boundary wall construction. Our Management The Project and Management Systems Team implemented a range of safety, quality, and environmental procedures on this site to improve efficiency across the project. The client acknowledged our quality workmanship and dealing with the local council representatives. Value Add Allconstruct workmanship and management of all the works onsite has very well arranged and coordinated from start to finish. www.allconstruct.com.au Project: Landscape, Driveway, Decking Project Location: Sunnybank Hills Client: Private Owner Contract Value: $70k Construction Period: June 2016 – Aug 2016 Company Name Allconstruct Pty Ltd Year established 2014 ABN 50 601 503 986 ACN 601 503 986 Registered Address 5 The Yardarm Runaway Bay Q 4216 Website www.allconstruct.com.au Phone 07 3814 6369 Postal Address 5 The Yardarm Runaway Bay Q 4216 Contact Eamus Coote - Construction Manger m. 0416 490 597 e. eamus@allconstruct.com.au Keith Callanan - Project Manager m. 0406 917 991 e. keith@allconstruct.com.au Ruwanthi Lekamge - Project Engineer m. 0433 773 812 e. ru@allconstruct.com.au Gemma Callanan – Contracts Manager m. 0408 662 810 e. gemma@allconstruct.com.au