Engine and Turbine Power Plants Engineering and Commissioning ServicesBerr Industry
Power Plants Engineering and Commissioning Services
Diesel - HFO Engine Plants
Gas - Steam Turbine Plants
Combine Cycle Power Plants
Electrical - Automation & Mechanical:
Erection, Supervising, Commissioning, Operating and Maintenance Services
Especially Focused Middle East and Africa Countries
Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...Keith D. Patch
2nd International Seminar on ORC Power Systems: Turbo Expanders II, Rotterdam, The Netherlands
Publisher: ASME, International Gas Turbine Institute (IGTI)
Abstract
Concepts NREC has completed its design and development of an integrated high speed axial turbine and permanent magnet generator. The Turbine –Generator Unit (TGU) is ideal for ORC applications for its compactness, reliability, and versatility. The 20,000 rpm TGU does not use a shaft seal or gearbox and the generator is evaporatively cooled using the ORC working fluid. The TGU is designed with the intent of having the same turbine housing and generator used with a range of operating ORC fluid operating pressures and temperatures to enable its wide spread use in a variety of ORC heat recovery applications. The rotor and nozzle stators are changed to aerodynamically optimize the performance of the turbine at different ORC fluid operating conditions and flow rates. The output voltage of the generator can range from 300 to 480 VAC and at 50 hz and 60 hz. This facilitates its use in waste heat recovery applications throughout the world. This technical paper will review the mechanical and electrical design features of the turbine-generator unit.
Engine and Turbine Power Plants Engineering and Commissioning ServicesBerr Industry
Power Plants Engineering and Commissioning Services
Diesel - HFO Engine Plants
Gas - Steam Turbine Plants
Combine Cycle Power Plants
Electrical - Automation & Mechanical:
Erection, Supervising, Commissioning, Operating and Maintenance Services
Especially Focused Middle East and Africa Countries
Development of a 300 kWe Integrated Axial Turbine and Generator for ORC Appli...Keith D. Patch
2nd International Seminar on ORC Power Systems: Turbo Expanders II, Rotterdam, The Netherlands
Publisher: ASME, International Gas Turbine Institute (IGTI)
Abstract
Concepts NREC has completed its design and development of an integrated high speed axial turbine and permanent magnet generator. The Turbine –Generator Unit (TGU) is ideal for ORC applications for its compactness, reliability, and versatility. The 20,000 rpm TGU does not use a shaft seal or gearbox and the generator is evaporatively cooled using the ORC working fluid. The TGU is designed with the intent of having the same turbine housing and generator used with a range of operating ORC fluid operating pressures and temperatures to enable its wide spread use in a variety of ORC heat recovery applications. The rotor and nozzle stators are changed to aerodynamically optimize the performance of the turbine at different ORC fluid operating conditions and flow rates. The output voltage of the generator can range from 300 to 480 VAC and at 50 hz and 60 hz. This facilitates its use in waste heat recovery applications throughout the world. This technical paper will review the mechanical and electrical design features of the turbine-generator unit.
Currently I am working as Shift Charge Engineer at Hillah/Karbala Power Plant Ministry of Electricity (MOE) in Iraq. I am working with AEPL-OASIS team which have joint venture with Jordon based IFC(International Free Company) for O&M of this Frame 9E Gas Turbine power plants.
I previously worked with HYUNDAI ENGINEERING (THAILAND) CO, .LTD, at 404 MW CCPP UCH-II (GDF SUEZ) Expansion Project. During my stay, I worked in various departments like QA/QC Quality Engineer (E&I),Project Control Engineer, and Commission Engineer since August 2013.
I have strong background in the principles and practices of Electrical Engineering. I have sound knowledge about the installation, erection, operation and maintenance (O&M) of various large Power Plants such as 404MW UCH Power Limited (UPL) GDF SUEZ, 1370MW GENCO-III/PEPCO Thermal Power Station Muzaffargarh, and 1600MW Kot Addu Power Company Limited (KAPCO) IPR.
I always maintain a gracious and professional manner when communicating with people. In addition to my extensive retail experience, I have excellent communication skills. My experience and range of skills make me a superior candidate for this position.
I believe that with my coursework and past work experience, I can make an immediate and effective contribution to your company. Please find my attached resume which provides full details of Scope my work experience.
Feel free to contact me at (+964)7814677509 or (+92)3346929701 or engineerbilal506@gmail.com for any following up purposes.
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
performance evaluation of Solar PV plant ,in term of technology , financial investment , research and development is very important for growth of Solar PV Industry .
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...Keith D. Patch
Global Cleantech Meetup 2013
Tuesday, November 12, 2013
Boston, MA
Organic Rankine Cycle (ORC) Heat-to-Power Systems are Ideally Suited for Heat to Power Conversion of Natural Heat Sources (Biomass, Geothermal, etc.) or Waste Heat Recovery to Renewable Electricity
Currently I am working as Shift Charge Engineer at Hillah/Karbala Power Plant Ministry of Electricity (MOE) in Iraq. I am working with AEPL-OASIS team which have joint venture with Jordon based IFC(International Free Company) for O&M of this Frame 9E Gas Turbine power plants.
I previously worked with HYUNDAI ENGINEERING (THAILAND) CO, .LTD, at 404 MW CCPP UCH-II (GDF SUEZ) Expansion Project. During my stay, I worked in various departments like QA/QC Quality Engineer (E&I),Project Control Engineer, and Commission Engineer since August 2013.
I have strong background in the principles and practices of Electrical Engineering. I have sound knowledge about the installation, erection, operation and maintenance (O&M) of various large Power Plants such as 404MW UCH Power Limited (UPL) GDF SUEZ, 1370MW GENCO-III/PEPCO Thermal Power Station Muzaffargarh, and 1600MW Kot Addu Power Company Limited (KAPCO) IPR.
I always maintain a gracious and professional manner when communicating with people. In addition to my extensive retail experience, I have excellent communication skills. My experience and range of skills make me a superior candidate for this position.
I believe that with my coursework and past work experience, I can make an immediate and effective contribution to your company. Please find my attached resume which provides full details of Scope my work experience.
Feel free to contact me at (+964)7814677509 or (+92)3346929701 or engineerbilal506@gmail.com for any following up purposes.
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
performance evaluation of Solar PV plant ,in term of technology , financial investment , research and development is very important for growth of Solar PV Industry .
CN300: A 300 kWe Turbogenerator for Heat to Power Applications; Generate Ren...Keith D. Patch
Global Cleantech Meetup 2013
Tuesday, November 12, 2013
Boston, MA
Organic Rankine Cycle (ORC) Heat-to-Power Systems are Ideally Suited for Heat to Power Conversion of Natural Heat Sources (Biomass, Geothermal, etc.) or Waste Heat Recovery to Renewable Electricity
Developing a new generation of energy efficiency products for reciprocating e...Bowman Power
Learn how a new energy efficiency product gets made, from opportunity to concept, design, validation and production, with this free presentation from the 73rd Indonesia National Electricity Day & POWER-GEN Asia. #PGASIA
Channel Partner with Kirloskar Brothers Limited.
“Masters Distributors of KBL Process Pumps.”
Our evolution can be traced back to the year 1948.
From modest water pump supplier to an electro-mechanical solution
provider, this monumental transformation has made VEMC pioneer in the
field of electromechanical engineering products, allied equipment &
services.
VEMC in today’s time, provides complete fluid and energy management
solutions for a wide array of projects into Water Supply, Power Plants,
Irrigation, Oil & Gas, Industries, Building & Construction etc
VEMC is now an APOEM (Authorised Pump Original Equipment
APOEM (Authorized Pumpset Original Equipment Manufacturer) is the Pump set brand of Kirloskar Brothers Ltd (KBL) wherein the state-of-the-art pumps are engineered, manufactured & tested to develop a range of leading-edge solutions for Total Fluid Management.
VEMC provides complete fluid and energy management solutions for a wide array of projects into Water Supply, Power Plants, Irrigation, Oil & Gas, Industries, Building & Construction etc
https://www.slideserve.com/machineryvijayengineering/authorised-pumpset-original-equipment-menufacturer
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
3. TheartofEngineering
OUR VISION
WE TREAT OUR CLIENTS’ BUSINESS AS OURS, AND TRY TO CONTRIBUTE THEIR DEVELOPMENT BY
INNOVATIVE AND COST EFFECTIVE SOLUTIONS.
OUR MISSION
OUR MISSION IS TO HAVE A STRONG AND RELIABLE CORPORATE
IMAGE WITH;
CLOSE AND SUPPORTIVE CUSTOMER RELATIONS
PROVIDING EMINENT SERVICE AND CUSTOMER SATISFACTION
CREATIVE AND INNOVATIVE APPLICATION OF LAST TECHNOLOGY
GIVING THE BEST IN TECHNICAL ASSISTANCE, ERECTION,
COMMISSIONING, OPERATION AND MAINTENANCE WORKS.
4. TheartofEngineering
FOR “DIESEL & H.F.O. ENGINE – GAS TURBINE – STEAM TURBINE”POWER PLANTS
• POWER PLANT PROJECT CONSULTING AND MANAGEMENT SERVICES
• POWER PLANT MECHANICAL & ELECTRICAL ASSEMBLY / DISASSEMBLY
• POWER PLANT MECHANICAL & ELECTRICAL ERECTION SERVICES
• POWER PLANT MECHANICAL & ELECTRICAL COMMISSIONING SERVICES
• POWER PLANT MAINTENANCE & OVERHAUL SERVICES
• POWER PLANT AUTOMATION & CONTROL SYSTEM SOLUTIONS SERVICES
• POWER PLANT LONG-TERM OPERATING SERVICES
• POWER PLANT HIGH TECH ELECTRICAL TEST & MEASUREMENT SERVICES
• AUXILIARY & SPARE PARTS SUPPLY SERVICES FOR POWER PLANTS
• TRAINING SERVICES ABOUT PLANT MANAGERS, OPERATORS AND MAINTENANCE
5. TheartofEngineering
SCOPE OF STEAM AND GAS TURBINE MAINTENANCE
Maintenance and Repair Services
Casing Disassembly
Parts Repair
Parts Replacement
Rotor Justification
Flushing (Oil Cleaning)
Sand Blasting
Coating and Isolation
Corrosion Interception
Welding and Thermic Processing
Industrial Cleaning
Construction Works
Platform Installation
UnderFrame and Steel Base Installation
Rotor and Bearing Setting
Oil and Steam Line Piping
Equipment Replacement
Governor and Stop Ventiles Adjustment
Control Systems Installation
Commissioning And Start-Up
Maintenance Reporting
Commissioning Reporting
42. TheartofEngineering
ELECTRO – MECHANICAL MAINTENANCE & REPAIR WORKS
GENERATOR MAINTENANCE GENERATOR EQUIPMENT
ADJUSTMENT
GENERATOR SHAFT WORKS GEARBOX TEST
GENERATOR ELCID TEST GENERATOR TEST FIELD SERVICE GENERATOR COOLING