JOB RESPONSIBILITY IN PRE- COMMISSIONING AND COMMISSIONING
• Preparations for the Commissioning and pre-commissioning procedures and operation manual.
• Function test and commissioning and pre-commissioning P&ID and procedure preparation.
• Organize and perform activities on commissioning and testing of all construction projects carried out by the Construction team.
• Develop programs and calendar schedules of commissioning work and testing, agree them with management.
• Run in of rotating equipment by bengin fluid, Final leak test, DCS emergency shutdown Testing. Punch listing before RFSU and Co-ordination with HSSE.
JOB RESPONSIBILITY IN PRE- COMMISSIONING AND COMMISSIONING
• Preparations for the Commissioning and pre-commissioning procedures and operation manual.
• Function test and commissioning and pre-commissioning P&ID and procedure preparation.
• Organize and perform activities on commissioning and testing of all construction projects carried out by the Construction team.
• Develop programs and calendar schedules of commissioning work and testing, agree them with management.
• Run in of rotating equipment by bengin fluid, Final leak test, DCS emergency shutdown Testing. Punch listing before RFSU and Co-ordination with HSSE.
I am Pravin Xavier, I had around 12 years experience in Oil and Gas. right now I am looking for a job. I have good knowledge in Production / Process and commissioning so If any openings kindly let me know. I ready to join immediately.
During the past and present career, experienced in the following areas.
1) Commissioning, 2) Jetty Operation, 3) Well Head Operations, 4) Separators, 5) Crude Oil Stabilization Unit, 6) Oil & Gas Gathering Station, 7) Gas Dehydration & Amine Sweetening unit, 8) Gas Plant Operation 9) Hot Oil Unit, 10) Boiler & heater Treatment 11) Central Production Facility and Tank Farm, 12) DCS experience, 13) Compressors, 14) Pump Operation 15) Pigging Operation 16) Chemicals Handled
Thanks & Regards
PRAVIN XAVIER .R
Mob. - 0091 9994774530
Skype - pravinxavier.r
1. M.VETRIVELVEERAN
contact: +96551219629
Email: Personnel:vetrisoma@gmail.com
Office:vv.mariyappan@azzourom.com
LinkedIn: VETRIVEL VEERAN MARIYAPPAN
POWER PLANT OPERATION ENGINEER
Optimising and reliableoperationin fast paced power generation environmental and preliminary commissioning activities associated with
commissioning professionals.To ensure operation safety also to be safe and environmentally responsiblemanner.
Increase commissioning activities,significantlyimprove operations tasks and provide efficientresolution ofproject
issues,excel at completing power projects accurately.To follow lockout/tag out procedures for (PTW) permitto work,
outstanding communication and coordination with material vendors,problem solving, trouble shooting,relationship
managementskills, risk factor and avoidance of operating machinery.
Areas of Expertise
o Heat recovery steam boiler commissioning and operation
o Control room operation,Field operation,grid electrical power operation
o Balancing ofplant auxiliary equipmentcommissioning and operation
o To following up gas turbine,steam turbine and heat recovery steam boilers, startup,shutdown and
safe recommended operation procedures
o Have experienced and assisted along with vendors during boilers chemical cleaning,steam blowing,
lube oil flushing,hydraulic oil flushing and steam turbine condensed bypass operation.
o HSBT, turning gear test, electrical trip test, main steam valves throttle test, generator hydrogen gas leak
test, HRSG & STG pipe line hydro testing,Steam blowing puffing& thermal cycle methods.
o Able to find out Mark6, Mark6e, distributed control system,human machine interface controllers logics
and loops and those entire hardware configuration
o Having experience in 400KV,110KV,13.8KV,4.16KV,6.6KV circuitbreakers and switch gear operation
o Having experience in 386 MVA,25MVA,25KVA step up and step down transformers operation
PROFESSIONAL EXPERIENCE
DESIGNATION: FIELD OPERATION ENGINEER (APRIL/2016 -present)
ENTITY: AZN (GDF-SUEZ INTERNATIONAL) OPERTAION AND MAINTENANCE COMPANY IN AZ-ZOUR NORTH
CCPP- KUWAIT
Having generating 1500 mw combined cycle power plant which contains five GE – 9FA GAS TURBINE and 2 GE-
single casing non condensable steam turbine,five Hyundai make heatrecovery steam generator,Hyundai make multi
effect desalination plant, also includes CO2 plant, REMIN plant, DUMP CONDENSER .
2. DESIGNATION: OPERATION ENGINEER IN QURAYYAH CCPP (June/2013 -present)
ENTITY: ARABIAN BEMCO contracting and power project corporation limited – Kingdom of SaudiArabia
Challenging with increasing reliable and safety operation of combine cycle power Plant and reduce abnormal
executions while pre commissioning on the equipment. Develop, evaluate and process through lean operation
techniques. The current working plant has been generating around 4600 MW load per day
To operate the Gas turbines,Steam turbines,Heatrecovery steam boilers and Balance of the plant & those auxiliary
plantsystems such as circulating water pumps,closed coolingwaters pumps, auxiliarycooling water pumps, condenser
and water box air removal systems, boiler feed pumps, recirculation pumps, instrument&process air compressors,
Electro chlorination generators,Steam and water analyzing systems, chillers,air dryers,chemical dozing and sampling
systems, lubrication pumps, lift oil pump, hydraulic and pneumatic systems whenever required, also have gained
experience at DM production, sanitary plant, waste water treatment plant, Multi stage flashes desalination plant.
Established instant power back up through emergency block start diesel generator and DC Batteries & UPS while
plant block out and also ensure optimal equipmentsafetyoperation significantlyreduce environmental pollutions and
station power consumption by control process methodology. Ensure all field equipment status prior to isolation or
normalization by using LOTO procedure.
Maintains daily operation logs and other plant activities that communicate status of plant, which will be submitted to
operational supervisor every shift once also written documentation on schedule and with clear, accurate and legible
writing, Identify typical and obvious potential or recurring problems in plant operating systems
Conduct preventive, predictive and corrective maintenance on plant mechanical equipment. To perform job hazard
analysis,faultfinding,rectificationand replacingofmechanical & electrical equipment.Maintaining safe andcontrollable
work place in work permit area and to obtain complete clearance from them
Assists with plantfield operators in the dailyoperation and maintenance in the field,investigate changes in instruments
parameter status and equipmentroutine change over. Notify to shiftsupervisor regarding operational consistencyand
other defects.The plantcapabilities in order to optimise plantoperation andreliability, Identifies and remedies abnormal
operating condition
Performs water testing and treatment using knowledge of boiler water chemistry, maintains set parameters and
laboratory procedures. Completes accurate and timely water tests and perform chemical adjustment along with
chemical specialists.Sodium hypo chlorite generators, which is making from power electrode plates. Dozing in sea
water intake area shilling basin –intake pipes drum screen and pump bays. To maintain the intake sea water quality
and remove fungus, bio debris from the sea water.
Check general operation have been noted, check prior to operation have been met,and operating condition of gas
turbine are sensed and utilized from the SPEEDTRONIC control systems. Which is speed, start up and temperature
those are major loops ofgas turbine and to establish the unique flamespread into the combustion chamber whileGTG
startup and keep watching those major parameters such as wheel space temperature,DLN,IGV, Exhaust temperature
control and protection, IBH, speed/droop constants, lubrication and trip oil systems and over temp protection, fire
protection.
what I have been contributed while commissioning:
Seal oil leaking discovered during firsttime hydrogen charging along with generator
Lift oil supplyline broken in generator drive end bearings
Condenser gotthermal shocking because ofhood spraycontrol valve not throttled properly
Turning gear got shutoff often because excessive power fed
Gas turbine diverting damper limit& position feedback controllers malfunctioned
Emergencylube & seal oil pumps notsubstituted when AC supply was failed
Boiler feed pumps bearings were broken because internal lube oil supplyline chocked
High pressure drums bound up leak found when the boiler startup
3. Recently Coordinate with Gas turbine specialist for upgrading GTG load ratings and fuel efficiency
PLANT CONFIGURATION:Six blocks (Each block contains 3GTG, 3HRSGand a STG)
o GE MAKE FRAME 7FA GAS TURBINE (advanced re engineering design 168 MW )
o DOOSAN&CMI MAKE Triple Pressure Reheated type boiler to 810 T/H gross steam flow
o GE MAKE D11 series TC2F-3.5”-LSB MODEL STEAM TURBINE with cross over LP steam
Admission(263.622 MW)
o DOOSAN MAKE Multi stage flashes -3*2000m3/day
o ALSTOM MAKE Generating step up transformers, station transformers and UAT
o Seven trent De Nora Electro Chlorination system (4*300 m3/hr)
o DOOSAN MAKE water cooled condenser (718725 kg/hr.steam exhaustflow)
o CATERPILLAR MAKE Emergencyblock start diesel generator (3*5MW)
o Centrifugal Master Station oil purification system
o GE MAKE GENERATORS 285MW, 335MVA@18KV,60HZ
o ATLAS COPCO make instrumentand process air compressors (530NM3/HR)
DESIGNATION: FIELD ENGINEER IN THIRUMAKKOTTAI GAS TURBINE POWER STATION(July/2009-march/2013)
ENTITY:Tamil Nadu Electricity Board- South India
The plantspecification isGE MAKE FRAME 6FA GAS TURBINE, BHEL MAKE triple pressure horizontal type steam
generators and SIEMENS MAKE STEAM TURBINE, Raw water cooled condenser ,DMplant, RO plant,waste water
treatment plant, cooling towers, station transformers, auxiliary and generating transformers, fuel compressors,
instrument air process air compressors and dryers. Whichhas been generating around 107 MW per hour
Developed accurate operation wide field measurements equipmentstandards to increase power generation, keep itto
be ready entire systems for startup and shut down. Make sure field instruments critical inspections regularly and as
described in preexisting procedures. Recognize and mitigate operating difficulties.To receive the gas fuel from GAIL
as per load dispatch center load demands
To prepare daily operation work done and equipment isolation, normalization report and also preparing monthly and
yearly power generation and station energyconsumption report. Following up and preparing work permitfor electrical
and mechanical isolation as per clearance and tagging authority procedures
Monitoring and control the MARK 5 TMR controller for gas turbine and Honeywell DCS for BOP systems. To merge
double bus bar connectionalongwith 110 KVgrid byswitch yard SCADA and HMI controllers.800 KVAdiesel generator
for emergency power back up and 125V UPS
Donaldson evaporative cooler for air intakeefficiency and water injections to establish NOX reduction, Online and off
line detergentwater wash to prevent from internal blades fouling in the compressor,To check & ensure fuel scrubber
, fuel compressor bearinglubrication,fuel surging,N2 purging, fuel primaryand intermediate coolers for fuel compressor
better performance prior to start up
Prepare& keep ready the following equipment such as High tension, low tension circuit breakers, upstream and
downstream modules, switch yard power feederSF6 & vacuum breakers for routine maintenance. To do Mainbus
isolation and normalization and bus coupler substitute operationand grid relay testing whenever required.
4. .
EDUCATION AND CREDENTIALS
Diploma in Electronics and Communication Engineering (2009 passed out)
PRIST UNIVERSITY–kumbakonam, Tamil Nadu -612703.
PROEFFESIONAL DEVLOPMENT
Industrial safety and compliance development
Operational safety & hold PTW/ LOTO Receiver certificate
Able to find out piping and instrumentation diagram
Microsoft excel, word, power point
Able to find out electrical and instrumentation terminal diagram, JB and wiring layouts
Hard work and learning curiosity
DECLARATION
I hereby mentioned thatthe above details given by me are true to the bestof my knowledge and if anything proves to
be wrong my candidature maycancelled
Place: kingdom ofSaudi Arabia (M.VETRIVEL VEERAN)