Independent verification
scheme for stormwater
treatment devices
2013 Stormwater Victoria
Conference
Introduction
The Independent Verification Scheme (IVS)
project is a joint initiative of Melbourne Water and
Institute of Public Works Engineering (IPWEA) with
active participation and support from
Environmental Protection Authority Victoria (EPA
Vic), Victorian Department of Health (DOH VIC),
Victorian Civil Contractors federation, Stormwater
Victoria, Commonwealth Scientific and Industrial
Research Organization (CSIRO), Monash University
and other industry representatives.
Project Objectives
The overall aim of this project is to establish
the regulatory and administrative
framework, product testing and validation
protocols and performance database for
the storm water treatment devices to
enable the better utilization and broader
uptake of Integrated Water Cycle
Management (IWCM) in Victoria
Project delivery approach
Delivery of this complex and multifaceted project is
planned in three stages, where:
• Stage 1 of this project (currently in progress) should
deliver a road map discussion paper for the
development of an independent verification scheme for
stormwater treatment devices in Victoria.
• The subsequent stages of the project will involve
comprehensive industry consultation on the proposed
scheme and formation of the delivery strategy (stage2),
and
• Establishment of the administrative framework and
protocols for testing and validation of stormwater
treatment devices in VIC and the stormwater treatment
products database (stage 3).
Conceptual schematic
and key elements
REGULATIONS
ADMINISTRATION
TECHNICAL
Regulations
• Relevant legislation and acts (e.g. Water Act 1989 ,
Environment Protection Act 1970, State environment
protection policy (waters of Victoria))
• Environmental regulations (e.g. The Urban stormwater
best practice environmental management guidelines
(BPEMG))
• Planning regulations (e.g. clause 56 of the Victoria
Planning Provisions)
• Stormwater reuse regulations (e.g. Australian Guidelines
for Water Recycling: Stormwater Harvesting and Reuse )
• Current initiatives and collaborative actions (e.g.
Protecting our bays and waterways – a partnership
agreement between EPA, Melbourne Water and MAV)
Administration
• Overarching governance arrangements
• Establish and administer the Stormwater Treatment
Devices database
• Set the requirements for claims evaluation and
testing
• Form and administer Independent Technical Experts
panel
• Development of relevant guidelines and protocols
• Financial administration including fees, funding and
grants
• Promotion, education and training on the IVS
• Reporting to the relevant regulatory bodies on the
IVS
Technical
To assist with implementation of the IVS scheme, the
Administrator forms an Evaluation panel comprised of
industry, technical and regulatory specialists to:
• Set the definitions, categories and parameters for
Stormwater treatment devices and its performance
• Based on best industry practice prepare testing
procedures and protocols for verification of
performance claims as part of IVS
• Develop protocols and procedures for data evaluation
and reporting
• Review vendors’ applications and test plans and make
recommendations
• Audit tests for compliance
• Review the Verification reports submitted by vendors
and make recommendations
Road Map
Jurisdiction and extent
• The proposed IVS is developed and
implemented in the state of Victoria, Australia
serving as a pilot for the broader National
scheme.
Application
• Through Urban stormwater best practice
environmental management guidelines
(BPEMG) (potentially an Appendix).
• Stormwater performance is required through
planning (e.g. Clause 56 of the Victoria
Planning Provisions).
• Council sustainable water strategies, municipal
stormwater targets.
Deliverables
•Central database for information on Stormwater
Treatment Devices performance.
o Collates and allows access to verified performance
claims
o Allows greater clarity for selection of pre-validated
technologies to meet a required stormwater quality
objectives.
•A mechanism allowing the database to be
maintained and ensure integrity of information
provided.
•A defined pathway for testing, validation and
acceptance onto the database.
Administration
• Melbourne Water Corporation may assume the
position of the Administrator for the IVS scheme
and the role of Stormwater Treatment Devices
performance database manager. The
Administrator forms an Evaluation and Experts
panel to assist with the implementation of IVS.
Devices covered by the scheme
• This Independent Verification scheme applies to
pre-engineered, commercially-available
technologies for storm water treatment.
Governing principles
The IVS should be,-
o straightforward, practical and consistent in its
application
o avoid being overly prescriptive
o support innovation
Decision making should be transparent,
timely and accountable, with clear
mechanisms to leverage the knowledge
and experience of industry and the
broader scientific/research community
Discussions

More Related Content

What's hot

Cambridge July 2016 _Enkom
Cambridge July 2016 _EnkomCambridge July 2016 _Enkom
Cambridge July 2016 _EnkomMartyn Jenkins
 
Georgia
GeorgiaGeorgia
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
India UK Water Centre (IUKWC)
 
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
Денис Киркач
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
EU Water Initiative plus for Eastern Partnership
 
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
SevernEstuary
 
19. Role of Enforcement in Catchment Management
19. Role of Enforcement in Catchment Management19. Role of Enforcement in Catchment Management
19. Role of Enforcement in Catchment Management
Environmental Protection Agency, Ireland
 
Ching vcs methods ws oct 2011
Ching vcs methods ws oct 2011Ching vcs methods ws oct 2011
OECD/Brazil policy dialogue on water governance
OECD/Brazil policy dialogue on water governanceOECD/Brazil policy dialogue on water governance
OECD/Brazil policy dialogue on water governance
OECD Governance
 
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS) Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
STEP_scotland
 

What's hot (10)

Cambridge July 2016 _Enkom
Cambridge July 2016 _EnkomCambridge July 2016 _Enkom
Cambridge July 2016 _Enkom
 
Georgia
GeorgiaGeorgia
Georgia
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
tew (10.10.18) - Transmission tariff calculation for ukraine, using the capac...
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
 
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
2008 02 Tidal Power: Management & Mechanisms Gary Shanahan, BERR
 
19. Role of Enforcement in Catchment Management
19. Role of Enforcement in Catchment Management19. Role of Enforcement in Catchment Management
19. Role of Enforcement in Catchment Management
 
Ching vcs methods ws oct 2011
Ching vcs methods ws oct 2011Ching vcs methods ws oct 2011
Ching vcs methods ws oct 2011
 
OECD/Brazil policy dialogue on water governance
OECD/Brazil policy dialogue on water governanceOECD/Brazil policy dialogue on water governance
OECD/Brazil policy dialogue on water governance
 
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS) Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
Local Air Quality Management (LAQM) and Cleaner Air for Scotland (CAFS)
 

Viewers also liked

Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivsIouri Vaisman
 
Operation & maintenance of stormwater quality treatment assets
Operation & maintenance of stormwater quality treatment  assetsOperation & maintenance of stormwater quality treatment  assets
Operation & maintenance of stormwater quality treatment assets
Iouri Vaisman
 
Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015
Iouri Vaisman
 
Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015
Iouri Vaisman
 
Puncion intramuscular ppt
Puncion intramuscular pptPuncion intramuscular ppt
Puncion intramuscular pptmariateresazd
 
How to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanHow to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media Plan
Post Planner
 
Learn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionLearn BEM: CSS Naming Convention
Learn BEM: CSS Naming Convention
In a Rocket
 
SEO: Getting Personal
SEO: Getting PersonalSEO: Getting Personal
SEO: Getting Personal
Kirsty Hulse
 

Viewers also liked (8)

Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 
Operation & maintenance of stormwater quality treatment assets
Operation & maintenance of stormwater quality treatment  assetsOperation & maintenance of stormwater quality treatment  assets
Operation & maintenance of stormwater quality treatment assets
 
Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015Storm water practice in Australia – past, present and way forward iv water 2015
Storm water practice in Australia – past, present and way forward iv water 2015
 
Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015Water recycling with constraints of the built infrastructure ivw 2015
Water recycling with constraints of the built infrastructure ivw 2015
 
Puncion intramuscular ppt
Puncion intramuscular pptPuncion intramuscular ppt
Puncion intramuscular ppt
 
How to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media PlanHow to Build a Dynamic Social Media Plan
How to Build a Dynamic Social Media Plan
 
Learn BEM: CSS Naming Convention
Learn BEM: CSS Naming ConventionLearn BEM: CSS Naming Convention
Learn BEM: CSS Naming Convention
 
SEO: Getting Personal
SEO: Getting PersonalSEO: Getting Personal
SEO: Getting Personal
 

Similar to Ivs 2013 stormwater vic conference iouri draft 3

STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
JeremyMichaelWilson
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 
Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancyRiaz Zalil
 
CHRISCHUA_JOB DESCRIPTION 2016
CHRISCHUA_JOB DESCRIPTION 2016CHRISCHUA_JOB DESCRIPTION 2016
CHRISCHUA_JOB DESCRIPTION 2016Christopher Chua
 
Only new details of new phase ii permit
Only new details of new phase ii permitOnly new details of new phase ii permit
Only new details of new phase ii permitguest7dbf4
 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan Implementation
IRC
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christijeshaml10
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Nimonik
 
Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan Kleinschmidt
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
groundwatercop
 
Integrated Basin tools to enhance efficiency, productivity, and resilience
 Integrated Basin tools to enhance efficiency, productivity, and resilience Integrated Basin tools to enhance efficiency, productivity, and resilience
Integrated Basin tools to enhance efficiency, productivity, and resilience
International Water Management Institute (IWMI)
 
Resource Efficient Wales (REW)
Resource Efficient Wales (REW)Resource Efficient Wales (REW)
Updated Chronological CV of Gerard Pereira
Updated Chronological CV of Gerard PereiraUpdated Chronological CV of Gerard Pereira
Updated Chronological CV of Gerard PereiraGerard Pereira
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
Environmental Protection Agency, Ireland
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentationjnett
 
August 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare LindahlAugust 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare Lindahl
Soil and Water Conservation Society
 
Yass Valley Council Strategy for the Management of onsite sewage systems
Yass Valley Council Strategy for the Management of onsite sewage systemsYass Valley Council Strategy for the Management of onsite sewage systems
Yass Valley Council Strategy for the Management of onsite sewage systemstmdominko
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
sandeepprasad87
 

Similar to Ivs 2013 stormwater vic conference iouri draft 3 (20)

STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 
Pre proposal meeting - supervisory consultancy
Pre proposal meeting  - supervisory consultancyPre proposal meeting  - supervisory consultancy
Pre proposal meeting - supervisory consultancy
 
CHRISCHUA_JOB DESCRIPTION 2016
CHRISCHUA_JOB DESCRIPTION 2016CHRISCHUA_JOB DESCRIPTION 2016
CHRISCHUA_JOB DESCRIPTION 2016
 
Only new details of new phase ii permit
Only new details of new phase ii permitOnly new details of new phase ii permit
Only new details of new phase ii permit
 
Climate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan ImplementationClimate Resilient Water Safety Plan Implementation
Climate Resilient Water Safety Plan Implementation
 
Water presentation port of corpus christi
Water presentation port of corpus christiWater presentation port of corpus christi
Water presentation port of corpus christi
 
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
Calgary Oil & Gas Regulatory and Standards Day January 18th 2023
 
Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Integrated Basin tools to enhance efficiency, productivity, and resilience
 Integrated Basin tools to enhance efficiency, productivity, and resilience Integrated Basin tools to enhance efficiency, productivity, and resilience
Integrated Basin tools to enhance efficiency, productivity, and resilience
 
Resource Efficient Wales (REW)
Resource Efficient Wales (REW)Resource Efficient Wales (REW)
Resource Efficient Wales (REW)
 
Updated Chronological CV of Gerard Pereira
Updated Chronological CV of Gerard PereiraUpdated Chronological CV of Gerard Pereira
Updated Chronological CV of Gerard Pereira
 
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
EPA H2020 SC5 Info Day: Successful Horizon 2020 Project: CENTAUR - Will Sheph...
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
 
August 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare LindahlAugust 31 - 0216 - Clare Lindahl
August 31 - 0216 - Clare Lindahl
 
Yass Valley Council Strategy for the Management of onsite sewage systems
Yass Valley Council Strategy for the Management of onsite sewage systemsYass Valley Council Strategy for the Management of onsite sewage systems
Yass Valley Council Strategy for the Management of onsite sewage systems
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
 

Recently uploaded

Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
Bhaskar Mitra
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Product School
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
Abida Shariff
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
Safe Software
 

Recently uploaded (20)

Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptxIOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
IOS-PENTESTING-BEGINNERS-PRACTICAL-GUIDE-.pptx
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Essentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with ParametersEssentials of Automations: Optimizing FME Workflows with Parameters
Essentials of Automations: Optimizing FME Workflows with Parameters
 

Ivs 2013 stormwater vic conference iouri draft 3

  • 1. Independent verification scheme for stormwater treatment devices 2013 Stormwater Victoria Conference
  • 2. Introduction The Independent Verification Scheme (IVS) project is a joint initiative of Melbourne Water and Institute of Public Works Engineering (IPWEA) with active participation and support from Environmental Protection Authority Victoria (EPA Vic), Victorian Department of Health (DOH VIC), Victorian Civil Contractors federation, Stormwater Victoria, Commonwealth Scientific and Industrial Research Organization (CSIRO), Monash University and other industry representatives.
  • 3. Project Objectives The overall aim of this project is to establish the regulatory and administrative framework, product testing and validation protocols and performance database for the storm water treatment devices to enable the better utilization and broader uptake of Integrated Water Cycle Management (IWCM) in Victoria
  • 4. Project delivery approach Delivery of this complex and multifaceted project is planned in three stages, where: • Stage 1 of this project (currently in progress) should deliver a road map discussion paper for the development of an independent verification scheme for stormwater treatment devices in Victoria. • The subsequent stages of the project will involve comprehensive industry consultation on the proposed scheme and formation of the delivery strategy (stage2), and • Establishment of the administrative framework and protocols for testing and validation of stormwater treatment devices in VIC and the stormwater treatment products database (stage 3).
  • 7. Regulations • Relevant legislation and acts (e.g. Water Act 1989 , Environment Protection Act 1970, State environment protection policy (waters of Victoria)) • Environmental regulations (e.g. The Urban stormwater best practice environmental management guidelines (BPEMG)) • Planning regulations (e.g. clause 56 of the Victoria Planning Provisions) • Stormwater reuse regulations (e.g. Australian Guidelines for Water Recycling: Stormwater Harvesting and Reuse ) • Current initiatives and collaborative actions (e.g. Protecting our bays and waterways – a partnership agreement between EPA, Melbourne Water and MAV)
  • 8. Administration • Overarching governance arrangements • Establish and administer the Stormwater Treatment Devices database • Set the requirements for claims evaluation and testing • Form and administer Independent Technical Experts panel • Development of relevant guidelines and protocols • Financial administration including fees, funding and grants • Promotion, education and training on the IVS • Reporting to the relevant regulatory bodies on the IVS
  • 9. Technical To assist with implementation of the IVS scheme, the Administrator forms an Evaluation panel comprised of industry, technical and regulatory specialists to: • Set the definitions, categories and parameters for Stormwater treatment devices and its performance • Based on best industry practice prepare testing procedures and protocols for verification of performance claims as part of IVS • Develop protocols and procedures for data evaluation and reporting • Review vendors’ applications and test plans and make recommendations • Audit tests for compliance • Review the Verification reports submitted by vendors and make recommendations
  • 11. Jurisdiction and extent • The proposed IVS is developed and implemented in the state of Victoria, Australia serving as a pilot for the broader National scheme. Application • Through Urban stormwater best practice environmental management guidelines (BPEMG) (potentially an Appendix). • Stormwater performance is required through planning (e.g. Clause 56 of the Victoria Planning Provisions). • Council sustainable water strategies, municipal stormwater targets.
  • 12. Deliverables •Central database for information on Stormwater Treatment Devices performance. o Collates and allows access to verified performance claims o Allows greater clarity for selection of pre-validated technologies to meet a required stormwater quality objectives. •A mechanism allowing the database to be maintained and ensure integrity of information provided. •A defined pathway for testing, validation and acceptance onto the database.
  • 13. Administration • Melbourne Water Corporation may assume the position of the Administrator for the IVS scheme and the role of Stormwater Treatment Devices performance database manager. The Administrator forms an Evaluation and Experts panel to assist with the implementation of IVS. Devices covered by the scheme • This Independent Verification scheme applies to pre-engineered, commercially-available technologies for storm water treatment.
  • 14. Governing principles The IVS should be,- o straightforward, practical and consistent in its application o avoid being overly prescriptive o support innovation Decision making should be transparent, timely and accountable, with clear mechanisms to leverage the knowledge and experience of industry and the broader scientific/research community