SlideShare a Scribd company logo
Guyana Water Incorporated
Water Supply and Sanitation Infrastructure
Improvement Program
GY-L1040
Pre- Proposal meeting with short listed Consultants
3rd July, 2015
Supervision and Mentoring Consultancy required
for project execution phase for the Water Supply
and Sanitation Infrastructure Improvement
Program (WSSIIP)
WELCOME!
Programme Areas
Programme Objectives
The objective of WSSIIP is to enable the GWI to:
1. Improve pressure, quality and continuity of the water
supply service in the program areas
2. Reduce the level of Non-Revenue Water (NRW) in
the program areas
3. Improve access to adequate sanitation in the
program areas
4. Strengthen GWI performance in its operational and
management of water supply infrastructure
Component 1
Construction, rehab., &
expansion of WTPs
Construction of 3 new
WTPs inclusive of
transmission mains
to/from new treatment
plant sites
Water treatment plant
rehabilitated - Shelterbelt,
Central Ruimveldt &
Sophia
Component 2
Non- revenue water program
One diagnosis and action
plan for NRW reduction
developed and implemented
for each program area
(including designs)
Network rehab. Works –
transmission & distribution
mains
Installation of customer
water meters.
Component 3
Institutional Strengthening of GWI
Activities to strengthen GWI
administrative, financial and
commercial management
Capacity building activities on asset
management & NRW reduction
Activities to strengthen GWI’s water
resource management & Planning
capabilities
Support for the implementation of a
monitoring and evaluation system to
track the GWI performance in time
Activities to establish NRW functions
within GWI
Component 4
Improved access to
sanitation services for
low income households
in the program areas
One thousand pit
latrines upgraded to
efficient septic tanks.
At least three workshops
held on operation and
maintenance of septic
tanks.
Public Awareness
campaign on sanitation
and hygiene
implemented.
Scope of Services
1. Evaluation of bids and supervision of construction of
three new water treatment plants, storage tanks,
transmission and distribution mains within the
treatment plant areas, and rehabilitation of one surface
water plant at Shelterbelt based on the respective
contract documents
Scope of Services Con’t
2. Mentoring GWI staff on supervision of civil, mechanical
and electrical works based on the works implemented under
this program
3. Development of standard operating procedures for new
and upgraded systems
4. Training of GWI staff on:
 Design of WTP’s (inclusive of process design)
 Operation and maintenance of the new system
 Contract and construction management, environmental
and social issues and water quality monitoring
General Info
Procurement method: QCBS
Proposals must be submitted no later than the following date & time:
 Date: July 21, 2015
 09:00hrs
The proposal submission address is:
The Chairman
National Procurement & Tender Admin Board
Ministry of Finance
Main & Urquhart Streets
Georgetown, Guyana.
Expected commencement date for consulting services: October 26, 2015
Duration of Services: 42 months
Special Emphasis – Evaluation
Criteria
 Specific experience of the Consultants relevant to the
assignment: 10
 Adequacy of the proposed methodology and work
plan in responding to the Terms of Reference: 25
 Key professional staff qualifications and competence
for the assignment: 45
 Suitability of the transfer of knowledge (training)
program: 10
 Participation by nationals among proposed key staff:
10
 Minimum technical score required to pass: 70
points
General Discussion
 Questions - ?
 Comments - …..
 Concerns - ……

More Related Content

What's hot

Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
Advisian
 
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo BuenaventuraBuenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Aura Díaz
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Steve Williams
 
Guidelines on-flood-mgmt
Guidelines on-flood-mgmtGuidelines on-flood-mgmt
Guidelines on-flood-mgmtuyelinnbo
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportFesto Wasukira
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Ken Peartree
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
Fairfax County
 
Sea Water Intrusion - 90 day work plan
Sea Water Intrusion - 90 day work planSea Water Intrusion - 90 day work plan
Sea Water Intrusion - 90 day work plan
Val King
 
Powerpoint long term dredging plan using W.I.T.
Powerpoint long term dredging plan using W.I.T. Powerpoint long term dredging plan using W.I.T.
Powerpoint long term dredging plan using W.I.T.
JetzeGenee
 
Alameda County CA Strategic Plan FY 2017
Alameda County CA Strategic Plan FY 2017Alameda County CA Strategic Plan FY 2017
Alameda County CA Strategic Plan FY 2017
Tracy Quintana
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
LOWaterkeeper
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Kevin Perry
 
PEC Project Management Planning Achievements
PEC Project Management  Planning AchievementsPEC Project Management  Planning Achievements
PEC Project Management Planning AchievementsVernonRowe
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxyromualdez luis
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
The Texas Network, LLC
 
Act basin priority project
Act basin priority projectAct basin priority project
Act basin priority project
Woden Valley Community Council Inc
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resumeArun Goyle
 

What's hot (20)

Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo BuenaventuraBuenaventura Regasification Plant and Pipeline Yumbo Buenaventura
Buenaventura Regasification Plant and Pipeline Yumbo Buenaventura
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
Guidelines on-flood-mgmt
Guidelines on-flood-mgmtGuidelines on-flood-mgmt
Guidelines on-flood-mgmt
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement Report
 
Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)Resume for Kenneth Peartree (Full)
Resume for Kenneth Peartree (Full)
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
Giles Run Pump Station Rehabilitation
Giles Run Pump Station RehabilitationGiles Run Pump Station Rehabilitation
Giles Run Pump Station Rehabilitation
 
Sea Water Intrusion - 90 day work plan
Sea Water Intrusion - 90 day work planSea Water Intrusion - 90 day work plan
Sea Water Intrusion - 90 day work plan
 
Powerpoint long term dredging plan using W.I.T.
Powerpoint long term dredging plan using W.I.T. Powerpoint long term dredging plan using W.I.T.
Powerpoint long term dredging plan using W.I.T.
 
vijay cv
vijay cvvijay cv
vijay cv
 
Alameda County CA Strategic Plan FY 2017
Alameda County CA Strategic Plan FY 2017Alameda County CA Strategic Plan FY 2017
Alameda County CA Strategic Plan FY 2017
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
 
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
Gronstal Anderson, Ingrid, PAL Case Study Plant-Wide Applicability Limit for ...
 
PEC Project Management Planning Achievements
PEC Project Management  Planning AchievementsPEC Project Management  Planning Achievements
PEC Project Management Planning Achievements
 
Luis Romualdez_CRC_Oxy
Luis Romualdez_CRC_OxyLuis Romualdez_CRC_Oxy
Luis Romualdez_CRC_Oxy
 
WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014WHCRWA Town Hall Meeting 11-10-2014
WHCRWA Town Hall Meeting 11-10-2014
 
Act basin priority project
Act basin priority projectAct basin priority project
Act basin priority project
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 

Similar to Pre proposal meeting - supervisory consultancy

STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
JeremyMichaelWilson
 
water quality
water qualitywater quality
Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan Kleinschmidt
 
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
INFOGAIN PUBLICATION
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016Kushal Gowda
 
Towards The Result Based Utility Sector In Armenia
Towards The Result Based Utility Sector In ArmeniaTowards The Result Based Utility Sector In Armenia
Towards The Result Based Utility Sector In ArmeniaCRRC-Armenia
 
Resource Efficient Wales (REW)
Resource Efficient Wales (REW)Resource Efficient Wales (REW)
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
The Business Council of Mongolia
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationIwl Pcu
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPER
nuramiradayang
 
Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)Kudakwashe Mareya, Pr.Eng
 
Use of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to shareUse of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to share
Association for Project Management
 
Ivs 2013 stormwater vic conference iouri draft 3
Ivs   2013 stormwater vic conference iouri draft 3Ivs   2013 stormwater vic conference iouri draft 3
Ivs 2013 stormwater vic conference iouri draft 3Iouri Vaisman
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoringhydrologyproject001
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
India Water Portal
 
Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
San Diego County Water Authority
 
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
Environmental Protection Agency, Ireland
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
Abid Hussainy
 

Similar to Pre proposal meeting - supervisory consultancy (20)

30.UNEP_Kuwait
30.UNEP_Kuwait30.UNEP_Kuwait
30.UNEP_Kuwait
 
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdfSTREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
STREAM_1-Roshan_Iyadurai-DPIE_Water.pdf
 
water quality
water qualitywater quality
water quality
 
Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016Alan kleinschmidt Resume 15 November 2016
Alan kleinschmidt Resume 15 November 2016
 
31.UNEP_Oman
31.UNEP_Oman31.UNEP_Oman
31.UNEP_Oman
 
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
2 ijaems oct-2015-5-capacity building program for non-revenue water reduction...
 
CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016CV_Kushal Gowda_Dec 2016
CV_Kushal Gowda_Dec 2016
 
Towards The Result Based Utility Sector In Armenia
Towards The Result Based Utility Sector In ArmeniaTowards The Result Based Utility Sector In Armenia
Towards The Result Based Utility Sector In Armenia
 
Resource Efficient Wales (REW)
Resource Efficient Wales (REW)Resource Efficient Wales (REW)
Resource Efficient Wales (REW)
 
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
 
Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project Presentation
 
GUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPERGUIDELINES FOR DEVELOPER
GUIDELINES FOR DEVELOPER
 
Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)
 
Use of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to shareUse of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to share
 
Ivs 2013 stormwater vic conference iouri draft 3
Ivs   2013 stormwater vic conference iouri draft 3Ivs   2013 stormwater vic conference iouri draft 3
Ivs 2013 stormwater vic conference iouri draft 3
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014Master Plan EIR CAP Presentation - March 27, 2014
Master Plan EIR CAP Presentation - March 27, 2014
 
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
 
Performance Improvement Plan Water Utilities
Performance Improvement Plan  Water Utilities Performance Improvement Plan  Water Utilities
Performance Improvement Plan Water Utilities
 

Recently uploaded

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 

Recently uploaded (20)

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 

Pre proposal meeting - supervisory consultancy

  • 1. Guyana Water Incorporated Water Supply and Sanitation Infrastructure Improvement Program GY-L1040 Pre- Proposal meeting with short listed Consultants 3rd July, 2015
  • 2. Supervision and Mentoring Consultancy required for project execution phase for the Water Supply and Sanitation Infrastructure Improvement Program (WSSIIP) WELCOME!
  • 4. Programme Objectives The objective of WSSIIP is to enable the GWI to: 1. Improve pressure, quality and continuity of the water supply service in the program areas 2. Reduce the level of Non-Revenue Water (NRW) in the program areas 3. Improve access to adequate sanitation in the program areas 4. Strengthen GWI performance in its operational and management of water supply infrastructure
  • 5. Component 1 Construction, rehab., & expansion of WTPs Construction of 3 new WTPs inclusive of transmission mains to/from new treatment plant sites Water treatment plant rehabilitated - Shelterbelt, Central Ruimveldt & Sophia
  • 6. Component 2 Non- revenue water program One diagnosis and action plan for NRW reduction developed and implemented for each program area (including designs) Network rehab. Works – transmission & distribution mains Installation of customer water meters.
  • 7. Component 3 Institutional Strengthening of GWI Activities to strengthen GWI administrative, financial and commercial management Capacity building activities on asset management & NRW reduction Activities to strengthen GWI’s water resource management & Planning capabilities Support for the implementation of a monitoring and evaluation system to track the GWI performance in time Activities to establish NRW functions within GWI
  • 8. Component 4 Improved access to sanitation services for low income households in the program areas One thousand pit latrines upgraded to efficient septic tanks. At least three workshops held on operation and maintenance of septic tanks. Public Awareness campaign on sanitation and hygiene implemented.
  • 9. Scope of Services 1. Evaluation of bids and supervision of construction of three new water treatment plants, storage tanks, transmission and distribution mains within the treatment plant areas, and rehabilitation of one surface water plant at Shelterbelt based on the respective contract documents
  • 10. Scope of Services Con’t 2. Mentoring GWI staff on supervision of civil, mechanical and electrical works based on the works implemented under this program 3. Development of standard operating procedures for new and upgraded systems 4. Training of GWI staff on:  Design of WTP’s (inclusive of process design)  Operation and maintenance of the new system  Contract and construction management, environmental and social issues and water quality monitoring
  • 11. General Info Procurement method: QCBS Proposals must be submitted no later than the following date & time:  Date: July 21, 2015  09:00hrs The proposal submission address is: The Chairman National Procurement & Tender Admin Board Ministry of Finance Main & Urquhart Streets Georgetown, Guyana. Expected commencement date for consulting services: October 26, 2015 Duration of Services: 42 months
  • 12. Special Emphasis – Evaluation Criteria  Specific experience of the Consultants relevant to the assignment: 10  Adequacy of the proposed methodology and work plan in responding to the Terms of Reference: 25  Key professional staff qualifications and competence for the assignment: 45  Suitability of the transfer of knowledge (training) program: 10  Participation by nationals among proposed key staff: 10  Minimum technical score required to pass: 70 points
  • 13. General Discussion  Questions - ?  Comments - …..  Concerns - ……