Experience profile:
Approximately 1+years of Professional Experience in Protection, Testing &Commissioning of
Electrical infrastructure in private industry. Extensive hands on Experience in Electrical Power
Substation and Distribution Project.
ProfessionalStrength:
 Hand on experiences in the all Electrical schemes, Trip Circuit, Closing Circuit, Annunciation
& Indication Control Circuit, Event and Fault Recorder Circuits, Synchrocheck and Auxiliary
AC&DC supply Schemes.
 Expertise in Testing and Commissioning of Power Transformers, Circuits breakers, Isolator,
CT, CVT Functionality procedure to checks.
 Hands on Experience of Transformer and other Equipments functional testing.
 Execution Experience of Substation including installation and termination of
SWITCHTGEAR, Control, Fault Recorder, Event Recorder and Relay panel.
 Execution Experience of 500&220kV Substations and Transmission Lines Construction,
Testing and commissioning.
EXPERIENCE:
Internship at Thermal Power Plant Muzaffar Garh. (320 MW DCS Based control)
Work as an Internee Engineer for two month. Understanding Power Generation process and
familiarizing with electrical & electronicsinstrumentsi.e. temperature, pressure, level and flow
measurements and Distribution of Supply.Also familiar to calibrate the temperature, pressuregauges.
OCT 2015-Till Present. Site Engineer
Worked on the following projects;
Project Design, Manufacture, Supply, Installation, Testing & Commissioning Of
Plant for up gradation of the Existing 220KV Shikarpur Substation to
500KV level
Main Contractor NEIE (North East China International Electric Power Corporation)
Subcontractor Al-Hussain Traders & Contractors Lahore
Consultant BARQAAB CONSULTING SERVICES (PVT) LTD
Perform the following
activities:
1. Fixing of 500KV & 220KV Relay & Control Panels, AC/DC
Distribution panels.
2. Control Cable Laying, Glanding, Unshielding, piping and
termination of 220KV & 500KV Mk’s, Relay and Control Panels.
3. AC/DC Power Cable Laying and termination
4. Preparation of wiring as well as cable schedule based on
electricalDrawings.
5. Also perform circuit verification test, loop test and other like as:
i. Lockout circuit test.
ii. Closing circuit test.
iii. Breaker Failure initiation circuit test.
iv. Auto recloser Block circuit test.
v. Synchronization circuit test.
vi. Multiplication circuit test.
vii. Tripping circuit
6. Associated with the following testing and commissioning
activities:
7. Testing of 500 /220KV, 200MVA Auto Transformer,
Power Transformer and 11.5/0.415KV, 200KVA Auxiliary
Transformer.
i. Transformer Turns Ratio
ii. Short Circuit Test
iii. Open Circuit Test
iv. Insulation Resistance Test
v. Winding Resistance Test
vi. C&DF Test
vii. Stability Test
viii. Dielectric test
ix. Vector Group test
x. Zero Sequence Test
8. 220KV and 500KV Circuit Breakers Test
i. Contact Resistance Test
ii. Opening and closing TimTest
iii. SF6 Gas Purity and Dew Point Test
iv. SF6 Leakag
9. 220KV and 500KV Current Transformers
i. Polarity Test
ii. Winding Ratio Test
iii. Winding Resistance Test
iv. Saturation Test
v. Insulation Resistance Test
vi. C&DF Test
vii. CT circuit verification
10. 20KV and 500KV Capacitor Voltage Transforme
i. Winding Ratio Test
ii. Capacitance Test
iii. Insulation Resistance Test
iv. Polarity Test
v. CVT circuit verification
11. 220KV and 500KV Disconnector Switches
i. Contact Resistance Test
12. Grounding Mesh Integrity Test
13. Hipot Test of 220KV &500KV Busbar, and 11KV Cables
14. Relay testing, configuration and marshaling.
15. Functional Testing of Substation
16. Dehydration of Autotransformer
17. Testing and Commissioning of Nitrogen Injection Explosion
Prevention and Fire Fighting System for Tronsformers.
18. Now working on Telecom & SCADA system at 500/220kV
Shikarpur(Installation and Fixing of panels,LMU,interconnection
of Co-axial and Control cables.
OCT-2016-Till Present Worked as a Site Engineer on new project
Project Design, Manufacture, Supply, Installation, Testing & Commissioning Of
Plant for up gradation of the Existing 500KV Muzaffargarh Substation.
Contractor JV Of NEIE Al Hussain Traders & Contractors Lahore
Consultant National Engineering Services Pakistan(Pvt.) Limited
Perform the following
activities:
Switchyard cleaning as well as study the level of contour plan of yard and
other concrete of foundation work .
AREAS OF INTEREST
BachelorofScience (B.sc)in Electronic Engineering
Institute : University College of Engineering & Technology
The Islamia University of Bahawalpur, Pakistan
Marks : 3.08/4.00 CGPA (73.73%)
F.Sc (Pre-Engineering)BISE DG khan, Pakistan
Marks : 76.72%
Intermediate : 12 September-2011
MatriculationBISE DG khan, Pakistan
Marks : 90.47%
Matriculation : 01 August-2009
PROFICIENCY IN:
1. Graphical Packages : Adobe Photoshop CS6, AutoCAD 2012
Ulead Video Studio,Picasa,Camtasia Studio
2. Operating Systems : Windows XP , Windows 7 & Windows 8 ,Windows 8.1
3.Computer Skills : MS Office (MS Word, Excel, Power Point) Internet web searching.
Installation of software in electrical devices
CAREER OBJECTIVE:
Seeking excellence in the chosen professional field through self-motivation, hard work and
augmentation of core skills required to effectively deliver goods. Determined to achieve excellence through
selective and focused pursuit of the short and long-term goals and trying to create an environment through
my chosen organization and work field where knowledge and excellence are given their due.
FAVORABLE PERSONALITY TRAITS:
Leadership Skills (Always group leader of Labs work and Project tasks).
 Digital System Design
 Programmable Logic Control
 Analog & Digital Communication
 Digital Signal Processing
 Computer Networking
 Control system
Managerial skills like planning, organization and time management.
Excellent communicational skills.
Goal- oriented and self-motivated & hard working.
REFERENCES:
will be furnished on request

More Related Content

What's hot

Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)BALA CHANDRU
 
OIL GAS Sr. instrumentation and Telecoms Commissioning CV
OIL GAS Sr. instrumentation and Telecoms Commissioning CVOIL GAS Sr. instrumentation and Telecoms Commissioning CV
OIL GAS Sr. instrumentation and Telecoms Commissioning CVafsar Sayed
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerjohn britto
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companiesbala madhu
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foremansyed meraj
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Sanil Balakrishnan
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 

What's hot (20)

Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)Chandru_-_Testing_&_Commissioning_Engineer (1)
Chandru_-_Testing_&_Commissioning_Engineer (1)
 
OIL GAS Sr. instrumentation and Telecoms Commissioning CV
OIL GAS Sr. instrumentation and Telecoms Commissioning CVOIL GAS Sr. instrumentation and Telecoms Commissioning CV
OIL GAS Sr. instrumentation and Telecoms Commissioning CV
 
JOHN- Senior Electrical engineer
JOHN- Senior Electrical engineerJOHN- Senior Electrical engineer
JOHN- Senior Electrical engineer
 
CV_2016
CV_2016CV_2016
CV_2016
 
my Resume
my Resumemy Resume
my Resume
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
BAHAELDIN CV.
BAHAELDIN CV.BAHAELDIN CV.
BAHAELDIN CV.
 
madhu resume for core companies
madhu resume for core companiesmadhu resume for core companies
madhu resume for core companies
 
CV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_ForemanCV_Meraj_Electrical_Foreman
CV_Meraj_Electrical_Foreman
 
MY CV
MY CVMY CV
MY CV
 
Gokul resume
Gokul resumeGokul resume
Gokul resume
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
CV
CVCV
CV
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
asaires
asairesasaires
asaires
 
Abdul samad cv_
Abdul samad cv_Abdul samad cv_
Abdul samad cv_
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
syed jaffer aafaq Resume
syed jaffer aafaq Resumesyed jaffer aafaq Resume
syed jaffer aafaq Resume
 

Viewers also liked

Accidentes laboralres
Accidentes laboralresAccidentes laboralres
Accidentes laboralresluisvera95
 
xrMonitor - oracle performance monitoring tool from Texora
xrMonitor - oracle performance monitoring tool from TexoraxrMonitor - oracle performance monitoring tool from Texora
xrMonitor - oracle performance monitoring tool from TexoraAnne Rousseau
 
How to make your wife happy
How to make your wife happyHow to make your wife happy
How to make your wife happyHareem Naz
 
How to make your wife happy
How to make your wife happyHow to make your wife happy
How to make your wife happyHareem Naz
 
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...Riccardo Pallecchi
 
11. Αποθήκευση και συντήρηση τροφίμων
11. Αποθήκευση και συντήρηση τροφίμων11. Αποθήκευση και συντήρηση τροφίμων
11. Αποθήκευση και συντήρηση τροφίμωνkat3rjna
 
General neurological assessment
General neurological assessmentGeneral neurological assessment
General neurological assessmentDavid Paraide
 
Cartilla Código Nacional de Policía y Convivencia
Cartilla Código Nacional de Policía y ConvivenciaCartilla Código Nacional de Policía y Convivencia
Cartilla Código Nacional de Policía y ConvivenciaProBogotá Región
 
Copia de el poder de las redes 2.0
Copia de el poder de  las redes                   2.0Copia de el poder de  las redes                   2.0
Copia de el poder de las redes 2.0romina pozo
 
Busqueda de informacion
Busqueda de informacionBusqueda de informacion
Busqueda de informacionUNAH
 
$500 budget scenario
$500 budget scenario$500 budget scenario
$500 budget scenariojaylee1229
 
Amol Resume 07012015
Amol Resume 07012015Amol Resume 07012015
Amol Resume 07012015Amol Deshmukh
 
Bond Trailer analysis
Bond Trailer analysisBond Trailer analysis
Bond Trailer analysissamasmedia
 
John Searle's Critique of Cognitive Science: A Critical Study
John Searle's Critique of Cognitive Science: A Critical StudyJohn Searle's Critique of Cognitive Science: A Critical Study
John Searle's Critique of Cognitive Science: A Critical StudyMohammad Manzoor Malik
 
мальчики и девочки два разных мира
мальчики и девочки два разных мирамальчики и девочки два разных мира
мальчики и девочки два разных мираzharhaevaa
 

Viewers also liked (20)

Accidentes laboralres
Accidentes laboralresAccidentes laboralres
Accidentes laboralres
 
xrMonitor - oracle performance monitoring tool from Texora
xrMonitor - oracle performance monitoring tool from TexoraxrMonitor - oracle performance monitoring tool from Texora
xrMonitor - oracle performance monitoring tool from Texora
 
How to make your wife happy
How to make your wife happyHow to make your wife happy
How to make your wife happy
 
FOOTBALL JOURNEY
FOOTBALL JOURNEYFOOTBALL JOURNEY
FOOTBALL JOURNEY
 
How to make your wife happy
How to make your wife happyHow to make your wife happy
How to make your wife happy
 
Defender direct ywam san diego baja-2582
Defender direct ywam san diego baja-2582Defender direct ywam san diego baja-2582
Defender direct ywam san diego baja-2582
 
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...
#GREENPMI è un progetto che ha come fine quello di rendere energeticamente pi...
 
11. Αποθήκευση και συντήρηση τροφίμων
11. Αποθήκευση και συντήρηση τροφίμων11. Αποθήκευση και συντήρηση τροφίμων
11. Αποθήκευση και συντήρηση τροφίμων
 
Ley 1801 de 2016
Ley 1801 de 2016Ley 1801 de 2016
Ley 1801 de 2016
 
General neurological assessment
General neurological assessmentGeneral neurological assessment
General neurological assessment
 
Email Forensics
Email ForensicsEmail Forensics
Email Forensics
 
Cartilla Código Nacional de Policía y Convivencia
Cartilla Código Nacional de Policía y ConvivenciaCartilla Código Nacional de Policía y Convivencia
Cartilla Código Nacional de Policía y Convivencia
 
Copia de el poder de las redes 2.0
Copia de el poder de  las redes                   2.0Copia de el poder de  las redes                   2.0
Copia de el poder de las redes 2.0
 
Busqueda de informacion
Busqueda de informacionBusqueda de informacion
Busqueda de informacion
 
Ssf-english
Ssf-englishSsf-english
Ssf-english
 
$500 budget scenario
$500 budget scenario$500 budget scenario
$500 budget scenario
 
Amol Resume 07012015
Amol Resume 07012015Amol Resume 07012015
Amol Resume 07012015
 
Bond Trailer analysis
Bond Trailer analysisBond Trailer analysis
Bond Trailer analysis
 
John Searle's Critique of Cognitive Science: A Critical Study
John Searle's Critique of Cognitive Science: A Critical StudyJohn Searle's Critique of Cognitive Science: A Critical Study
John Searle's Critique of Cognitive Science: A Critical Study
 
мальчики и девочки два разных мира
мальчики и девочки два разных мирамальчики и девочки два разных мира
мальчики и девочки два разных мира
 

Similar to ishfaq ahmed

Similar to ishfaq ahmed (20)

Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
Yousuf Resume
Yousuf ResumeYousuf Resume
Yousuf Resume
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
Testing & Commissioning Engineer
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
 
LATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV RLATEST UPDATED CV OF MR SAJEEV R
LATEST UPDATED CV OF MR SAJEEV R
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Engineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resume
 
Resume-Sudhin
Resume-SudhinResume-Sudhin
Resume-Sudhin
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
Asad Ali Shah cv
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
Resume
ResumeResume
Resume
 
vijay new resume[1].DOC
vijay new resume[1].DOCvijay new resume[1].DOC
vijay new resume[1].DOC
 
Electrical & Instrument Engineer
Electrical & Instrument EngineerElectrical & Instrument Engineer
Electrical & Instrument Engineer
 
Rana Maqsood Alam Resume (E&I)
Rana Maqsood Alam  Resume (E&I)Rana Maqsood Alam  Resume (E&I)
Rana Maqsood Alam Resume (E&I)
 
Rana maqsood alam resume (e&i) and construction
Rana maqsood alam  resume (e&i) and constructionRana maqsood alam  resume (e&i) and construction
Rana maqsood alam resume (e&i) and construction
 
Mukhtiar Ahmed Unar_CV
Mukhtiar Ahmed Unar_CVMukhtiar Ahmed Unar_CV
Mukhtiar Ahmed Unar_CV
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 

ishfaq ahmed

  • 1. Engr. Hafiz Ishfaq Ahmed PERSONAL DETAILS Postal Address: Mouza Kot Dadan P/O Wesende wali, Teh&Dist Muzaffargarh,Punjab, Pakistan PEC No: ELECTRO/23270 Cell phone # +923045493093 Email: hafizishfaq96@yahoo.com Experience profile: Approximately 1+years of Professional Experience in Protection, Testing &Commissioning of Electrical infrastructure in private industry. Extensive hands on Experience in Electrical Power Substation and Distribution Project. ProfessionalStrength:  Hand on experiences in the all Electrical schemes, Trip Circuit, Closing Circuit, Annunciation & Indication Control Circuit, Event and Fault Recorder Circuits, Synchrocheck and Auxiliary AC&DC supply Schemes.  Expertise in Testing and Commissioning of Power Transformers, Circuits breakers, Isolator, CT, CVT Functionality procedure to checks.  Hands on Experience of Transformer and other Equipments functional testing.  Execution Experience of Substation including installation and termination of SWITCHTGEAR, Control, Fault Recorder, Event Recorder and Relay panel.  Execution Experience of 500&220kV Substations and Transmission Lines Construction, Testing and commissioning. EXPERIENCE: Internship at Thermal Power Plant Muzaffar Garh. (320 MW DCS Based control) Work as an Internee Engineer for two month. Understanding Power Generation process and familiarizing with electrical & electronicsinstrumentsi.e. temperature, pressure, level and flow measurements and Distribution of Supply.Also familiar to calibrate the temperature, pressuregauges. OCT 2015-Till Present. Site Engineer Worked on the following projects; Project Design, Manufacture, Supply, Installation, Testing & Commissioning Of Plant for up gradation of the Existing 220KV Shikarpur Substation to 500KV level Main Contractor NEIE (North East China International Electric Power Corporation) Subcontractor Al-Hussain Traders & Contractors Lahore Consultant BARQAAB CONSULTING SERVICES (PVT) LTD Perform the following activities: 1. Fixing of 500KV & 220KV Relay & Control Panels, AC/DC Distribution panels. 2. Control Cable Laying, Glanding, Unshielding, piping and termination of 220KV & 500KV Mk’s, Relay and Control Panels. 3. AC/DC Power Cable Laying and termination 4. Preparation of wiring as well as cable schedule based on electricalDrawings.
  • 2. 5. Also perform circuit verification test, loop test and other like as: i. Lockout circuit test. ii. Closing circuit test. iii. Breaker Failure initiation circuit test. iv. Auto recloser Block circuit test. v. Synchronization circuit test. vi. Multiplication circuit test. vii. Tripping circuit 6. Associated with the following testing and commissioning activities: 7. Testing of 500 /220KV, 200MVA Auto Transformer, Power Transformer and 11.5/0.415KV, 200KVA Auxiliary Transformer. i. Transformer Turns Ratio ii. Short Circuit Test iii. Open Circuit Test iv. Insulation Resistance Test v. Winding Resistance Test vi. C&DF Test vii. Stability Test viii. Dielectric test ix. Vector Group test x. Zero Sequence Test 8. 220KV and 500KV Circuit Breakers Test i. Contact Resistance Test ii. Opening and closing TimTest iii. SF6 Gas Purity and Dew Point Test iv. SF6 Leakag 9. 220KV and 500KV Current Transformers i. Polarity Test ii. Winding Ratio Test iii. Winding Resistance Test iv. Saturation Test v. Insulation Resistance Test vi. C&DF Test vii. CT circuit verification 10. 20KV and 500KV Capacitor Voltage Transforme i. Winding Ratio Test ii. Capacitance Test iii. Insulation Resistance Test iv. Polarity Test v. CVT circuit verification 11. 220KV and 500KV Disconnector Switches i. Contact Resistance Test 12. Grounding Mesh Integrity Test 13. Hipot Test of 220KV &500KV Busbar, and 11KV Cables 14. Relay testing, configuration and marshaling. 15. Functional Testing of Substation 16. Dehydration of Autotransformer 17. Testing and Commissioning of Nitrogen Injection Explosion Prevention and Fire Fighting System for Tronsformers. 18. Now working on Telecom & SCADA system at 500/220kV
  • 3. Shikarpur(Installation and Fixing of panels,LMU,interconnection of Co-axial and Control cables. OCT-2016-Till Present Worked as a Site Engineer on new project Project Design, Manufacture, Supply, Installation, Testing & Commissioning Of Plant for up gradation of the Existing 500KV Muzaffargarh Substation. Contractor JV Of NEIE Al Hussain Traders & Contractors Lahore Consultant National Engineering Services Pakistan(Pvt.) Limited Perform the following activities: Switchyard cleaning as well as study the level of contour plan of yard and other concrete of foundation work . AREAS OF INTEREST BachelorofScience (B.sc)in Electronic Engineering Institute : University College of Engineering & Technology The Islamia University of Bahawalpur, Pakistan Marks : 3.08/4.00 CGPA (73.73%) F.Sc (Pre-Engineering)BISE DG khan, Pakistan Marks : 76.72% Intermediate : 12 September-2011 MatriculationBISE DG khan, Pakistan Marks : 90.47% Matriculation : 01 August-2009 PROFICIENCY IN: 1. Graphical Packages : Adobe Photoshop CS6, AutoCAD 2012 Ulead Video Studio,Picasa,Camtasia Studio 2. Operating Systems : Windows XP , Windows 7 & Windows 8 ,Windows 8.1 3.Computer Skills : MS Office (MS Word, Excel, Power Point) Internet web searching. Installation of software in electrical devices CAREER OBJECTIVE: Seeking excellence in the chosen professional field through self-motivation, hard work and augmentation of core skills required to effectively deliver goods. Determined to achieve excellence through selective and focused pursuit of the short and long-term goals and trying to create an environment through my chosen organization and work field where knowledge and excellence are given their due. FAVORABLE PERSONALITY TRAITS: Leadership Skills (Always group leader of Labs work and Project tasks).  Digital System Design  Programmable Logic Control  Analog & Digital Communication  Digital Signal Processing  Computer Networking  Control system
  • 4. Managerial skills like planning, organization and time management. Excellent communicational skills. Goal- oriented and self-motivated & hard working. REFERENCES: will be furnished on request