This document is a curriculum vitae for Prakasam Selvarasu, an electrical engineer from India. It summarizes his personal details, education, training experience, work history, professional experience, and qualifications. He has a bachelor's degree in electrical engineering and over 3 years of experience testing and commissioning high voltage substations in the UAE and India. He is proficient in testing various types of protection relays and switchgear equipment.
1. Currículum Vitae
Q` c
cxcccccfcffffffffffffii8i8jiu8iiuiyyyyyyyyy
yyyyyyyyyyyyyyyttyyyuytyyyttyghnjkl’l
;’k]
I70```
Phone : +971 568465587
E-mail: prakasams92@gmail.com
Name: PRAKASAM SELVARASU
Date of birth: 13nd
June 1992
Place of birth: Valasupalayam, Tamilnadu.
Marital Status: Single
Nationality: Indian
Foreign languages: English, Tamil
Permanent address:
33/3,North Valasupalayam
Irukkur(po),P.Velur(tk)
Namakkal-637204
TamilNadu, India
Education: • Graduate in Electrical and Electronics Engineering from K RAMAKRISHNAN
COLLEGE OF ENGINEERING with 87% aggregate in May 2013.
• Achieved University Gold Medal ( 31st
Rank ) in 2013 Batch of Electrical Department,
Anna University, Chennai
Training Experience: • I had undergone the training of “SUPERVISORY SKILLS” trained by NADIA Institute at
Abu dhabi.
• I had undergone the training of “BASIC FIRST AID” trained by
EmiratesTechnical&Safety
Development Centre at Abu dhabi.
• I had undergone the training of “BASIC FIRE FIGHTING” trained by Emirates Technical
&Safety Development Centre at Abu dhabi.
Carrier Profile: Organization INTERNATIONAL POWER ENGINEERING L.L.C
Designation Testing and Commissioning Engineer
Period June 2015 to Till Date
Country UAE
Organization Elsytec Engineers and Consultants Pvt Ltd
Designation Protection Testing and Commissioning Engineer
Period Jan 2013 to June 2015
Country India
Total Experience 3 and half Years
2. Professional experience: • Testing of Overall Protection Scheme of Overhead Lines (up to 400kV)
• Testing of Protection Scheme of Transformer Feeders (up to 500MVA)
• Overall Functional Checks of Local Control Cubicle
• .• Integrated Trip logic Test for all Line and Cable, Transformer feeders.
• Secondary Injection test for CT and VT Circuits
• Bus bar Protection Stability and Sensitivity Checks.
• All Components like CT,VT and Switchgear Equipments Testing.
• Testing and Commissioning of Siemens AG DCDB and UPS system
• Trouble shooting of all Electrical circuits, control and protection circuits.
• Co-ordination with client in As Built Scheme drawing submission, test report
submission, as build cable schedule submission etc.
Project 400/220/33kV Grid Station at Mirfa, Abudhabi.
Client Abu Dhabi Water and Electricity Authority (Transco/ADDC)
400kV, 220kV Protection scheme checks
400kV, 220kV CT Testing.
400kV, 220kV VT Testing.
220kV Feeders TCS Scheme & Function Checks
400kV, 220kV Secondary Injection Testing for CT & VT.
400kV Primary Injection Testing.
400kV LCC Alarm and Indications Checks.
400kV Bus duct Stability Test by Current and Voltage Method.
100MVA Transformer AVR Scheme checks
500MVA transformer Mechanical Protection Scheme Checks
Project 132/33kV AL Nadha Primary Substation, Abudhabi.
Client Abu Dhabi Water and Electricity Authority (Transco/ADDC)
132KV Common alarm scheme checks.
132kV Primary Injection Testing.
120MVA AVR Function checks
132/33kV SCMS,LDC Signal Simulation.
132kV GIS GDM Calibration Checks
33kV BCU Interlock Checks
132/33kV DCDB Scheme Checks and Commissioning
Domestic Experience
Testing & commissioning of 6*660MW and 400kV Switchgear Substation ITPCL Ltd at Cuddalore
Through SEPCO.
Testing & commissioning of 318MW and 220KV Substation Maharastra Electricity Ltd at Pune Through
M/s Tata Power Ltd.
Testing & commissioning of 110/11 KV Switchyard cum Switchgear Substation at Thirunelveli
Testing Equipments Used: Omicron CMC 256 &356 , Omicron CPC 100, CT analyzer
SVERKAR 650 &750 & ODEN AT Primary test system
The Following test cards used in Omicron CMC 356:
• QuickMC,State Sequencer,advance Distance,Ramp
• Ability to create Omicron control Centre file for Line Protection and Backup Protection
Relay
Relay Configuration software Handled in India:
a. Siemens – DIGSI – Version – 4.89,4.90
b. ABB – PCM 600 – Version 1.5sp2 &Version 2.6
c. Areva/Alstom – Micom S1,Micom S1 Studio ,Micom S1Agile -Version 1.0.0
3. d. GE Multilin - EnerVista UR Setup software 7.11.,EnerVista745-Version 5.21
e. Schweitzer Engineering Laboratories, Inc - ACSELeratorQuickSet-Version 5.13.6.0
Protection RelayTest Handled in india:
Line protection Relays : ABB – RAZOA,REL670,
Areva/Alstom– PD521,P430C, P442,
SIEMENS – 7SA5,7SA6
Schweitzer Engineering Laboratories – 311C
Transformer Protection relays : ABB-SPAD346C,RET543,RET615,RET670,
Areva/Alstom-KBCH120,P632,633
SIEMENS – 7UT612,
GE Muiltilin – SR 745,T60
Generator Protection Relays : ABB – REM-543,545
AREVA –P343
SIEMENS 7UM62,
GE Muiltilin – G60,
Vaasa electronics Group – Vamp 210
Wood Ward – Gen2000
Bus Bar Protection Relay : AREVA P740
Multifunction Protection relays : ABB-REF610,REF615,REF542+,
AREVA –Micom P120 Series P141,P341
SIEMENS- 7SJ61, 7SJ62,
Schweitzer Engineering Laboratories–SEL751A
Schneider Electric –Sapam S10,20,40,80
GE- MIF - II
Vaasa electronics Group – Vamp140
Motor Protection relays : ABB - RAMDE ,REM543,REM610,REM615
AREVA - Micom- P220,P211,P225,P241
Schweitzer Engineering Laboratories – SEL749M
REYROLL – RHO 3
L&T - MM30,
SEPAM – M40
Declaration:
I do hereby declare that the above information furnished by me is authentic to the best of my
knowledge and belief.
Place :
Date: ( Prakasam S )