Partial discharge occurs when high voltage insulation breaks down, and can be detected and measured in units of charge. Partial discharge testing identifies defects in electrical insulation that could lead to failures, and can be performed on energized equipment with specialized sensors and equipment. Regular partial discharge surveys can predict failures, prioritize maintenance needs, and prevent outages by identifying problems before catastrophic failures occur.
Tools and Techniques for Commissioning and Maintaining PV SystemsTranscat
This course will review the tests to perform, the science behind why they are necessary, and the appropriate tools to conduct them, including digital multimeters, clamp meters, thermal imaging, insulation resistance, I-V curve tracers, irradiance meters, power quality, and solar asset management software.
Tools and Techniques for Commissioning and Maintaining PV SystemsTranscat
This course will review the tests to perform, the science behind why they are necessary, and the appropriate tools to conduct them, including digital multimeters, clamp meters, thermal imaging, insulation resistance, I-V curve tracers, irradiance meters, power quality, and solar asset management software.
Overhead & Underground Electric Safety Webinar Presented by AmprobeTranscat
Join presenter Marco Rossi from Amprobe to learn more about overhead and underground electric safety. This webinar will offer a comprehensive look at the current safety guidelines, discuss best practices, and teach you the basics of underground tracing techniques and equipment functionality.
Lightning and Surge Protection Strategy for InstrumentationRekaNext Capital
When Sensors are deployed outdoor, they need to be protected from Lightning voltage Surges. These are basic simple devices used to protect expensive sensors as voltage surges can occur anytime. This increase longivity of sensors and instruments
Katalog fluke-oscilloscope-the-toughest-scopes-ever-built-by-tridinamika,
jual fluke oscilloscope, harga, beli, info, spesifikasi dan review
untuk informasi lebih lanjut kunjungi
www.tridinamika.com
untuk pemesanan dan pertanyaan hubungi via email
sales@tridinamika.com
MV Switchgear provides centralized control and protection of medium-voltage power equipment and circuits in industrial, commercial, and utility installations involving generators, motors, feeder circuits, and transmission and distribution lines.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Overhead & Underground Electric Safety Webinar Presented by AmprobeTranscat
Join presenter Marco Rossi from Amprobe to learn more about overhead and underground electric safety. This webinar will offer a comprehensive look at the current safety guidelines, discuss best practices, and teach you the basics of underground tracing techniques and equipment functionality.
Lightning and Surge Protection Strategy for InstrumentationRekaNext Capital
When Sensors are deployed outdoor, they need to be protected from Lightning voltage Surges. These are basic simple devices used to protect expensive sensors as voltage surges can occur anytime. This increase longivity of sensors and instruments
Katalog fluke-oscilloscope-the-toughest-scopes-ever-built-by-tridinamika,
jual fluke oscilloscope, harga, beli, info, spesifikasi dan review
untuk informasi lebih lanjut kunjungi
www.tridinamika.com
untuk pemesanan dan pertanyaan hubungi via email
sales@tridinamika.com
MV Switchgear provides centralized control and protection of medium-voltage power equipment and circuits in industrial, commercial, and utility installations involving generators, motors, feeder circuits, and transmission and distribution lines.
Similar to IQ_Partial_Discharge_Presentation.ppt (20)
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
block diagram and signal flow graph representation
IQ_Partial_Discharge_Presentation.ppt
1. I Q S e r vic e s
An Introduction to On-line
Partial Discharge Surveys
2. I Q S e r vic e s
PARTIAL DISCHARGE
When high voltage insulating material
breaks down Partial Discharges are
created, measured in units of charge
known as pico-Coulombs or millivolts.
3. I Q S e r vic e s
WHAT IS PARTIAL
DISCHARGE?
• Electrical discharges occurring inside medium and
high voltage insulation (flaws, cracks, voids,
irregularities).
• These imperfections create voltage stresses and
cause eventual failure of the insulation.
• Insulation failures begin with and are characterized
by small but detectable releases of energy or Partial
Discharge.
4. I Q S e r vic e s
• For many years partial discharge testing has been
an IEEE/ANSI standard to identify insulation
problems in electrical apparatus before it leaves
the factory floor.
• Many U.S. and International standards have been
developed for partial discharge testing.
• Until recently Partial Discharge testing was
limited to testing at manufacturer’s laboratories.
• Now computers and sophisticated equipment can
isolate and detect Partial Discharge occurrences in
the field.
PARTIAL DISCHARGE
TESTING USED FOR QUALITY
ASSURANCE
6. I Q S e r vic e s
NO OUTAGE EVALUATION
These proven technologies exist today to evaluate medium or
high voltage systems while the system is energized.
1. Oil testing/DGA – limited to oil transformers
2. Infrared testing – visible loose connections only
3. Visual inspections – problems may not be visible
4. Power Quality – cannot detect insulation failures
5. Vibration – limited to motors and transformers
6. Partial Discharge Testing – single best all-around test
7. I Q S e r vic e s
PARTIAL DISCHARGE
VS. INFRARED
How are Partial Discharge Inspections
different from Infrared Inspections?
• Infrared identifies electrical current problems (loose
connections) that result in heat. The specimen must be
visible to the naked eye for the infrared camera to detect a
problem.
• Partial Discharge identifies voltage problems that result in
insulation breakdown and generation of Partial Discharges.
The specimen does not need to be visible for Partial
Discharges to be detected.
12. I Q S e r vic e s
INSULATION BREAKDOWN
Why should we be concerned with insulation
breakdown and Partial Discharges?
13. I Q S e r vic e s
• NFPA 70B states that insulation breakdown
is the number one cause of electrical
failures.
• In medium and high voltage equipment,
partial discharges are the first indication of
insulation breakdown.
INSULATION BREAKDOWN
14. I Q S e r vic e s
Component Percentage of insulation failure
Transformers 84%
Circuit Breakers 21%
Disconnect Switches 15%
Insulated Switchgear Bus 95%
Bus duct 90%
Cable 89%
Cable Joints (splices) 91%
Cable Terminations 87%
Based on IEEE Gold Book Table 36
Total Failures due to Insulation
Breakdown
15. I Q S e r vic e s
WHAT TYPE OF FACILITES
ARE AFFECTED?
• INDUSTRIAL - Large Manufacturing,
Cogeneration
• COMMERCIAL - Research Parks, High Rises
• INSTITUTIONAL - Campuses, Hospitals
• GOVERNMENTAL - Military Bases, Large
Office Complexes
• UTILITY - Investor Owned, Municipalities
16. I Q S e r vic e s
WHERE DO PARTIAL
DISCHARGES OCCUR?
• Electrical Systems > 600V (2.4KV, 4.16 KV,
12KV, etc.)
• Types of Equipment Subject to Partial
Discharge
-Cables -Transformers
-Circuit Breakers - Instrument Transformers
-Switchgear (CT’s, PT’s)
-Insulators - Bushings
-Generators - Motors
-Surge Arrestors - Capacitors
17. I Q S e r vic e s
ADVANTAGES OF PARTIAL
DISCHARGE SURVEYS
• PREDICTIVE - failures can be prevented.
• NO OUTAGE NECESSARY - does not interrupt
operations.
• NON-DESTRUCTIVE - no damage to electrical
system.
• TRENDING - comparison to previous tests
possible
• PRIORITIZE MAINTENANCE ACTIVITIES -
determine which equipment to service first.
• PLANNING - allows time to schedule repairs.
• FINANCIAL CONTROL – repairs can be budgeted.
18. I Q S e r vic e s
TYPICAL MEDIUM VOLTAGE
POWER CABLE
CONSTRUCTION
19. I Q S e r vic e s
Source
Switchgear
Ground Level
Underground Cable in Conduit (not visible)
Visible Cable
Terminations
Load
Unit Substation
Visible Cable
Terminations
TYPICAL HIGH VOLTAGE
UNDERGROUND CABLE
SYSTEM
20. I Q S e r vic e s
3 STAGES OF CABLE
INSULATION FAILURE
21. I Q S e r vic e s
STAGE 1
Imperfections
and voids
voids
INSULATION
/ / / /CONDUCTOR / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
INSULATION
No problems, minor voids therefore minor partial discharges
Jacket, Shield, Semi-conducting shield
Jacket, Shield, Semi-conducting shield
24. I Q S e r vic e s
HOW CAN PARTIAL
DISCHARGES BE DETECTED?
Discharges are detected by special signal processing equipment designed to
eliminate outside interference.
Capacitive Methods - For Unshielded Components
- Dry Type Transformers
- Instrument Transformers
- Switchgear
Inductive Methods - metal enclosed components
- Shielded Cables and Components
- Oil Filled Transformers
- Rotating Apparatus
Acoustic Emission Methods
- Dry & Oil Transformers
- Switchgear
- Unshielded Cables
26. I Q S e r vic e s
Partial Discharge detection of a flaw
in a dry type transformer using
capacitive coupling
flaw
Transformer Coil
Capacitive
sensor
Detector
27. I Q S e r vic e s
High Voltage Bus
Metallic Switchgear
cover (signal detected
outside)
Partial discharge
site (inside)
Propagation of Transient Earth
Voltages (TEV) in Switchgear
28. I Q S e r vic e s
Measurements
using
Capacitive PD
sensors
29. I Q S e r vic e s
Switchgear failure due to internal tracking
30. I Q S e r vic e s
Tracking on epoxy resin busbar
31. I Q S e r vic e s
Start of tracking on insulation
32. I Q S e r vic e s
Failed Switchgear Insulation
33. I Q S e r vic e s
Detecting PD Using Airborne
Acoustic (Ultrasonic) Sensors
Insulator
Busbar
Sensor
36. I Q S e r vic e s
Partial Discharge detection of a void in a
shielded cable using inductive coupling.
Insulation
+
Void
Shield (grounded)
Conductor
Detector
Inductive Sensor
42. I Q S e r vic e s
Shield Delamination Causing
Partial Discharge
43. I Q S e r vic e s
Poor Workmanship Causing
Partial Discharge
44. I Q S e r vic e s
Testing 15kV cables
On-line testing of cables PD damage to termination
Case Study
45. I Q S e r vic e s
Identifying & Prioritising Circuits Most at Risk
Using On-Line PD Survey
L IV E L INE P ART IAL D IS C HARG E S URV E Y RE S UL T S
O F 6 2 9 HV F E E D E RS
0
100
200
300
400
500
600
700
800
900
1000
1
2
1
4
2
6
3
8
4
1
0
5
1
2
6
1
4
7
1
6
8
1
9
0
2
1
1
2
3
2
2
5
3
2
7
4
2
9
5
3
1
6
3
3
7
3
5
8
3
7
9
4
0
0
4
2
1
4
4
2
4
6
3
4
8
4
5
0
5
5
2
6
5
4
7
5
6
8
5
8
9
6
1
0
FEEDERS
m
V
D
i
s
c
h
a
rg
e
A C TIO N
C O N C E RN
46. I Q S e r vic e s
PD Survey - Worst 30 Results
47. I Q S e r vic e s
PERFORMING A PARTIAL
DISCHARGE SURVEY
• Analyze the single line drawing to develop plan
• Onsite Measurement
– Removal of equipment covers.
– Record field data.
– Obtain signatures of atypical components.
• Offsite Data Analysis
– Correlate measurements to single line drawing.
– Compare atypical results to like insulation from database.
– Analyze signatures.
– Trend Results.
• Report Generation
– Recognize immediate failure possibilities.
– Recommend possible repairs.
– Recommend possible resurvey frequency.
48. I Q S e r vic e s
SUMMARY
• Electric Insulation will fail.
• Predicting failures is now possible through
Partial Discharge Analysis.
• No outage is required to survey the
equipment.
• Results can be prioritized and trended.
• Partial Discharge Surveys should be
performed annually.
49. I Q S e r vic e s
We apologize to every electrical professional for taking 252 years
to prevent your failures.
Benjamin Franklin discovered electricity
in 1752. This year we launched an easy
to use, cost effective “no-outage” electrical
inspection technology that detects
medium and high voltage equipment
problems before they fail!