SlideShare a Scribd company logo
Control Products, Inc.Control Products, Inc.
Part-1Part-1
We are driven by challenging theWe are driven by challenging the
status quostatus quo inin difficult controldifficult control
applications, via creative switch and sensorapplications, via creative switch and sensor
solutions, to improve safety, efficiency andsolutions, to improve safety, efficiency and
reliability to our customers’ products.reliability to our customers’ products.
Status Quo: Water and electricity don’tStatus Quo: Water and electricity don’t
mix; any truly waterproof switchmix; any truly waterproof switch
solution will be cost prohibitive.solution will be cost prohibitive.
CPI switches are built to operate evenCPI switches are built to operate even
submerged in water. This productsubmerged in water. This product
evolved from strictly a military gradeevolved from strictly a military grade
switch to an industrial grade switch,switch to an industrial grade switch,
with a 40% cost reduction and nowith a 40% cost reduction and no
degradation in performance.degradation in performance.
Status Quo: Electro mechanicalStatus Quo: Electro mechanical
switches are prone to failure,switches are prone to failure,
particularly in harsh environments,particularly in harsh environments,
where high humidity, dust, salt,where high humidity, dust, salt,
temperature extremes, icing, hightemperature extremes, icing, high
shock and vibration are present.shock and vibration are present.
Eventually all contacting switches will beEventually all contacting switches will be
replaced with non-contacting devices.replaced with non-contacting devices.
Bring us all of your “unreasonable”Bring us all of your “unreasonable”
parameters, and we will bring a uniqueparameters, and we will bring a unique
approach to provide a reliable controlapproach to provide a reliable control
solution. Non-automotive vehicularsolution. Non-automotive vehicular
continues to push for improvedcontinues to push for improved
component reliability at an economicalcomponent reliability at an economical
price – a challenge CPI continues to meet.price – a challenge CPI continues to meet.
Status Quo: There is no practicalStatus Quo: There is no practical
solution to electro-hydraulicsolution to electro-hydraulic
control in harsh environments.control in harsh environments.
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
 Must be an absolute sensorMust be an absolute sensor
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
 Must be an absolute sensorMust be an absolute sensor
 Must easily install within a standard hydraulicMust easily install within a standard hydraulic
cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
 Must be an absolute sensorMust be an absolute sensor
 Must easily install within a standard hydraulicMust easily install within a standard hydraulic
cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling
 Must be a non-contacting sensor technologyMust be a non-contacting sensor technology
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
 Must be an absolute sensorMust be an absolute sensor
 Must easily install within a standard hydraulicMust easily install within a standard hydraulic
cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling
 Must be a non-contacting sensor technologyMust be a non-contacting sensor technology
 One sensor must be capable of working for anyOne sensor must be capable of working for any
stroke length within the sensing rangestroke length within the sensing range
Presented with a list of requirements for thisPresented with a list of requirements for this
control challenge, CPI has patented acontrol challenge, CPI has patented a
revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off
all of the requirements for such a sensor:all of the requirements for such a sensor:
 Must be an absolute sensorMust be an absolute sensor
 Must easily install within a standard hydraulicMust easily install within a standard hydraulic
cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling
 Must be a non-contacting sensor technologyMust be a non-contacting sensor technology
 One sensor must be capable of working for anyOne sensor must be capable of working for any
stroke length within the sensing rangestroke length within the sensing range
 Must be robust to shock and vibrationMust be robust to shock and vibration
Status Quo: Application-specificStatus Quo: Application-specific
components are not available for low-components are not available for low-
volume challenging applications.volume challenging applications.
Low-volume challenging applications tend to beLow-volume challenging applications tend to be
unanswered by most manufacturers, as there isunanswered by most manufacturers, as there is
up-front solution development, many pitfalls, allup-front solution development, many pitfalls, all
requiring attention to detail. These are in CPI’srequiring attention to detail. These are in CPI’s
wheelhouse.wheelhouse.
Low-volume challenging applications tend to beLow-volume challenging applications tend to be
unanswered by most manufacturers, as there isunanswered by most manufacturers, as there is
up-front solution development, many pitfalls, allup-front solution development, many pitfalls, all
requiring attention to detail. These are in CPI’srequiring attention to detail. These are in CPI’s
wheelhouse.wheelhouse.
Examples: AMOT, Roda Deaco, Supa Cat, Steyr,Examples: AMOT, Roda Deaco, Supa Cat, Steyr,
Terex (Germany) Allison Transmission,Terex (Germany) Allison Transmission,
Diamond Aircraft, long-stroke sensors, GEDiamond Aircraft, long-stroke sensors, GE
Air Shut-off Switch for Turbo-DieselAir Shut-off Switch for Turbo-Diesel
GeneratorsGenerators
Here’s how we get it done:Here’s how we get it done:
 DefineDefine application requirementsapplication requirements
 DesignDesign solutions to meet those requirementssolutions to meet those requirements
 CreateCreate product release programs to meetproduct release programs to meet
customer needscustomer needs
 ImplementImplement these programs, which includethese programs, which include
design, prototype fabrication, product testingdesign, prototype fabrication, product testing
and productionand production
Key performance characteristicsKey performance characteristics
contributing to our success:contributing to our success:
 Rapid responseRapid response here’shere’s >> team work, factory based RPM>> team work, factory based RPM
 Accurate, high quality workAccurate, high quality work why we’rewhy we’re >> ISO, outstanding,>> ISO, outstanding,
caring work forcecaring work force
 Complete follow-throughComplete follow-through goodgood >> cohesive management team,>> cohesive management team,
ISOISO

More Related Content

What's hot

COMPRION Corporate Brochure
COMPRION Corporate BrochureCOMPRION Corporate Brochure
COMPRION Corporate BrochureKathleen_Loeser
 
DGA to monitor your Transformer
DGA to monitor your TransformerDGA to monitor your Transformer
DGA to monitor your TransformerTRISIMAINDOPT
 
Tego's CEO Presentation at Woodside on August 15th, 2014
Tego's CEO Presentation at Woodside on August 15th, 2014Tego's CEO Presentation at Woodside on August 15th, 2014
Tego's CEO Presentation at Woodside on August 15th, 2014Kelly Stark
 
Sanidoor® Design Engineering by Craig Technologies
Sanidoor® Design Engineering by Craig TechnologiesSanidoor® Design Engineering by Craig Technologies
Sanidoor® Design Engineering by Craig TechnologiesCarol Craig
 
See the Invisible with Ultraviolet (UV) Inspection
See the Invisible with Ultraviolet (UV) InspectionSee the Invisible with Ultraviolet (UV) Inspection
See the Invisible with Ultraviolet (UV) InspectionOlympus IMS
 

What's hot (8)

Exit device-operators
Exit device-operatorsExit device-operators
Exit device-operators
 
COMPRION Corporate Brochure
COMPRION Corporate BrochureCOMPRION Corporate Brochure
COMPRION Corporate Brochure
 
DGA to monitor your Transformer
DGA to monitor your TransformerDGA to monitor your Transformer
DGA to monitor your Transformer
 
Tego's CEO Presentation at Woodside on August 15th, 2014
Tego's CEO Presentation at Woodside on August 15th, 2014Tego's CEO Presentation at Woodside on August 15th, 2014
Tego's CEO Presentation at Woodside on August 15th, 2014
 
Sanidoor® Design Engineering by Craig Technologies
Sanidoor® Design Engineering by Craig TechnologiesSanidoor® Design Engineering by Craig Technologies
Sanidoor® Design Engineering by Craig Technologies
 
See the Invisible with Ultraviolet (UV) Inspection
See the Invisible with Ultraviolet (UV) InspectionSee the Invisible with Ultraviolet (UV) Inspection
See the Invisible with Ultraviolet (UV) Inspection
 
Brosur mccb
Brosur mccbBrosur mccb
Brosur mccb
 
Acura systems on drilling rigs
Acura systems on drilling rigsAcura systems on drilling rigs
Acura systems on drilling rigs
 

Similar to Ipp training 09 18-18 part1

Corporate portfolio 2015
Corporate portfolio 2015Corporate portfolio 2015
Corporate portfolio 2015Bhairav Joshi
 
Emerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfEmerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfssuserd973fe
 
Sri Sai Engineering Company, Chennai, Engineering Products
Sri Sai Engineering Company, Chennai, Engineering ProductsSri Sai Engineering Company, Chennai, Engineering Products
Sri Sai Engineering Company, Chennai, Engineering ProductsIndiaMART InterMESH Limited
 
Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)NavinBurnwal1
 
Perfect Medical Product, Kolkata ,. Medical Equipments
Perfect Medical Product, Kolkata ,. Medical EquipmentsPerfect Medical Product, Kolkata ,. Medical Equipments
Perfect Medical Product, Kolkata ,. Medical EquipmentsIndiaMART InterMESH Limited
 
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...Orwind
 
Soldo control se limit switch box in exporters india
Soldo control se limit switch box in exporters indiaSoldo control se limit switch box in exporters india
Soldo control se limit switch box in exporters indiaYTC INDIA
 
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMS
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMSTechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMS
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMSHardway Hou
 
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,IndiaMART InterMESH Limited
 
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdf
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdfAllwin21 Product Brochures-Plasma Etcher-2024.5.pdf
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdfPeter Chen
 
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdf
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdfAllwin21 Product Brochures-Sputtering Deposition-2024.5.pdf
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdfPeter Chen
 
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...system_plus
 
Siddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering ComponentsSiddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering ComponentsIndiaMART InterMESH Limited
 
Digital Angle Meter by ACMAS Technologies Pvt Ltd.
Digital Angle Meter by ACMAS Technologies Pvt Ltd.Digital Angle Meter by ACMAS Technologies Pvt Ltd.
Digital Angle Meter by ACMAS Technologies Pvt Ltd.Acmas Technologies Pvt. Ltd.
 

Similar to Ipp training 09 18-18 part1 (20)

Corporate portfolio 2015
Corporate portfolio 2015Corporate portfolio 2015
Corporate portfolio 2015
 
Emerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfEmerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdf
 
Sri Sai Engineering Company, Chennai, Engineering Products
Sri Sai Engineering Company, Chennai, Engineering ProductsSri Sai Engineering Company, Chennai, Engineering Products
Sri Sai Engineering Company, Chennai, Engineering Products
 
PID Product Philosophy
PID Product PhilosophyPID Product Philosophy
PID Product Philosophy
 
The ultimate solution of bolting technology
The ultimate solution of bolting technologyThe ultimate solution of bolting technology
The ultimate solution of bolting technology
 
Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)
 
Perfect Medical Product, Kolkata ,. Medical Equipments
Perfect Medical Product, Kolkata ,. Medical EquipmentsPerfect Medical Product, Kolkata ,. Medical Equipments
Perfect Medical Product, Kolkata ,. Medical Equipments
 
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...
O6101-4-IN-1-CCTV-CAMERA-TESTER-CAMMYTEST-4000+-ORWIND-CAM-TESTING-EQUIPMENT-...
 
Soldo control se limit switch box in exporters india
Soldo control se limit switch box in exporters indiaSoldo control se limit switch box in exporters india
Soldo control se limit switch box in exporters india
 
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMS
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMSTechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMS
TechShanghai2016 - MODEL BASED DEVELOPMENT OF MECHATRONIC SYSTEMS
 
Keyence Company Profile - English
Keyence Company Profile - EnglishKeyence Company Profile - English
Keyence Company Profile - English
 
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,
Menzel Vision & Robotics Pvt Ltd, Mumbai,Infrared Spectroscopy,
 
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdf
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdfAllwin21 Product Brochures-Plasma Etcher-2024.5.pdf
Allwin21 Product Brochures-Plasma Etcher-2024.5.pdf
 
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdf
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdfAllwin21 Product Brochures-Sputtering Deposition-2024.5.pdf
Allwin21 Product Brochures-Sputtering Deposition-2024.5.pdf
 
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...
STMicroelectronics Proximity & Flood Illuminator in the Apple iPhone X - reve...
 
92001
9200192001
92001
 
Vertical autoclave economy
Vertical autoclave economyVertical autoclave economy
Vertical autoclave economy
 
Siddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering ComponentsSiddharth Engineers, Pune, Valve & Engineering Components
Siddharth Engineers, Pune, Valve & Engineering Components
 
Valve Feedback
Valve FeedbackValve Feedback
Valve Feedback
 
Digital Angle Meter by ACMAS Technologies Pvt Ltd.
Digital Angle Meter by ACMAS Technologies Pvt Ltd.Digital Angle Meter by ACMAS Technologies Pvt Ltd.
Digital Angle Meter by ACMAS Technologies Pvt Ltd.
 

Recently uploaded

İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...Amil baba
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfAyahmorsy
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsAtif Razi
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwoodseandesed
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdfKamal Acharya
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-IVigneshvaranMech
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 

Recently uploaded (20)

İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical SolutionsRS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
RS Khurmi Machine Design Clutch and Brake Exercise Numerical Solutions
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

Ipp training 09 18-18 part1

  • 1. Control Products, Inc.Control Products, Inc. Part-1Part-1
  • 2. We are driven by challenging theWe are driven by challenging the status quostatus quo inin difficult controldifficult control applications, via creative switch and sensorapplications, via creative switch and sensor solutions, to improve safety, efficiency andsolutions, to improve safety, efficiency and reliability to our customers’ products.reliability to our customers’ products.
  • 3. Status Quo: Water and electricity don’tStatus Quo: Water and electricity don’t mix; any truly waterproof switchmix; any truly waterproof switch solution will be cost prohibitive.solution will be cost prohibitive.
  • 4. CPI switches are built to operate evenCPI switches are built to operate even submerged in water. This productsubmerged in water. This product evolved from strictly a military gradeevolved from strictly a military grade switch to an industrial grade switch,switch to an industrial grade switch, with a 40% cost reduction and nowith a 40% cost reduction and no degradation in performance.degradation in performance.
  • 5. Status Quo: Electro mechanicalStatus Quo: Electro mechanical switches are prone to failure,switches are prone to failure, particularly in harsh environments,particularly in harsh environments, where high humidity, dust, salt,where high humidity, dust, salt, temperature extremes, icing, hightemperature extremes, icing, high shock and vibration are present.shock and vibration are present.
  • 6. Eventually all contacting switches will beEventually all contacting switches will be replaced with non-contacting devices.replaced with non-contacting devices.
  • 7. Bring us all of your “unreasonable”Bring us all of your “unreasonable” parameters, and we will bring a uniqueparameters, and we will bring a unique approach to provide a reliable controlapproach to provide a reliable control solution. Non-automotive vehicularsolution. Non-automotive vehicular continues to push for improvedcontinues to push for improved component reliability at an economicalcomponent reliability at an economical price – a challenge CPI continues to meet.price – a challenge CPI continues to meet.
  • 8. Status Quo: There is no practicalStatus Quo: There is no practical solution to electro-hydraulicsolution to electro-hydraulic control in harsh environments.control in harsh environments.
  • 9. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:
  • 10. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:  Must be an absolute sensorMust be an absolute sensor
  • 11. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:  Must be an absolute sensorMust be an absolute sensor  Must easily install within a standard hydraulicMust easily install within a standard hydraulic cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling
  • 12. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:  Must be an absolute sensorMust be an absolute sensor  Must easily install within a standard hydraulicMust easily install within a standard hydraulic cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling  Must be a non-contacting sensor technologyMust be a non-contacting sensor technology
  • 13. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:  Must be an absolute sensorMust be an absolute sensor  Must easily install within a standard hydraulicMust easily install within a standard hydraulic cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling  Must be a non-contacting sensor technologyMust be a non-contacting sensor technology  One sensor must be capable of working for anyOne sensor must be capable of working for any stroke length within the sensing rangestroke length within the sensing range
  • 14. Presented with a list of requirements for thisPresented with a list of requirements for this control challenge, CPI has patented acontrol challenge, CPI has patented a revolutionary sensor technology which ticks offrevolutionary sensor technology which ticks off all of the requirements for such a sensor:all of the requirements for such a sensor:  Must be an absolute sensorMust be an absolute sensor  Must easily install within a standard hydraulicMust easily install within a standard hydraulic cylinder – eliminate the need for gun drillingcylinder – eliminate the need for gun drilling  Must be a non-contacting sensor technologyMust be a non-contacting sensor technology  One sensor must be capable of working for anyOne sensor must be capable of working for any stroke length within the sensing rangestroke length within the sensing range  Must be robust to shock and vibrationMust be robust to shock and vibration
  • 15. Status Quo: Application-specificStatus Quo: Application-specific components are not available for low-components are not available for low- volume challenging applications.volume challenging applications.
  • 16. Low-volume challenging applications tend to beLow-volume challenging applications tend to be unanswered by most manufacturers, as there isunanswered by most manufacturers, as there is up-front solution development, many pitfalls, allup-front solution development, many pitfalls, all requiring attention to detail. These are in CPI’srequiring attention to detail. These are in CPI’s wheelhouse.wheelhouse.
  • 17. Low-volume challenging applications tend to beLow-volume challenging applications tend to be unanswered by most manufacturers, as there isunanswered by most manufacturers, as there is up-front solution development, many pitfalls, allup-front solution development, many pitfalls, all requiring attention to detail. These are in CPI’srequiring attention to detail. These are in CPI’s wheelhouse.wheelhouse. Examples: AMOT, Roda Deaco, Supa Cat, Steyr,Examples: AMOT, Roda Deaco, Supa Cat, Steyr, Terex (Germany) Allison Transmission,Terex (Germany) Allison Transmission, Diamond Aircraft, long-stroke sensors, GEDiamond Aircraft, long-stroke sensors, GE
  • 18. Air Shut-off Switch for Turbo-DieselAir Shut-off Switch for Turbo-Diesel GeneratorsGenerators
  • 19. Here’s how we get it done:Here’s how we get it done:  DefineDefine application requirementsapplication requirements  DesignDesign solutions to meet those requirementssolutions to meet those requirements  CreateCreate product release programs to meetproduct release programs to meet customer needscustomer needs  ImplementImplement these programs, which includethese programs, which include design, prototype fabrication, product testingdesign, prototype fabrication, product testing and productionand production
  • 20. Key performance characteristicsKey performance characteristics contributing to our success:contributing to our success:  Rapid responseRapid response here’shere’s >> team work, factory based RPM>> team work, factory based RPM  Accurate, high quality workAccurate, high quality work why we’rewhy we’re >> ISO, outstanding,>> ISO, outstanding, caring work forcecaring work force  Complete follow-throughComplete follow-through goodgood >> cohesive management team,>> cohesive management team, ISOISO