AI
CH:01
Introduction to Artificial Intelligence
Vidya Vikas Education Trust’s
Universal College of Engineering, Vasai(E)
Content
• Artificial Intelligence (AI),
• AI Perspectives: Acting and Thinking humanly,
• Acting and Thinking rationally
• History of AI,
• Applications of AI,
• The present state of AI,
• Ethics in AI
• Intelligence: “ability to learn, understand and
think” (Oxford dictionary)
Artificial
• made by people, often as a copy of something
natural
– an artificial lake
– artificial flowers
What is AI
• Artificial intelligence (AI) is branch of
computer science concerned with building
smart machines/computer/device to simulate
human intelligence, to think like humans and
mimic their actions.
• https://www.youtube.com/watch?v=UFDOY1
wOOz0
• https://www.youtube.com/watch?v=ad79nYk
2keg
Applications of AI:
• Game playing: IBM developed chess playing
computer called “DEEP BLUE” which defeated
world champion Gary Kasparav in 1997.
• Autonomous planning and scheduling: NASA
developed” Remote Agent Program” to
control the scheduling of operation for a
spacecraft .Remote Agent Program
monitored operation of spaceship and
provided information to NASA.
• Autonomous Control: The ALVINN computer
vision system was trained to drive a car, this
system was fitted in minivan fitted with video
camera which transmit road images and
depending on images best direction to drive
was selected. (Example: TESLA autopilot
system)
• Diagnosis: Medical diagnosis program used
symptom analysis to predict disease and gave
result equivalent to expert physician.
Example:MYCIN
• ROBOTICS: Many surgeon use Robot called
HipNav to do microsurgery
• Logistics Planning: US forces developed a
Dynamic Analysis and Replanning Tool to do
automatic logistic planning and scheduling for
transportation. This tool allowed plan to be
generated in hours on providing start point
and end destination.
Google Voice based
assistant-Google Duplex
• https://www.youtube.com/watch?v=bh84hW
ukDdQ
Sophia –Social Humanoid-Live
Robot
Sophia –Social Humanoid-Live
Robot
• https://www.youtube.com/watch?v=ROlpqGc
UTFY
(6) Top 4 Newly Released AI and Robotics
Innovation That Will Change How We Live -
YouTube
• Alexa and Siri, Amazon and Apple's digital
voice assistants, are much more than a
convenient tool—they are very real
applications of artificial intelligence that is
increasingly integral to our daily life.
Applications
• https://www.youtube.com/watch?v=Y46zXHv
UB1s
Applications of AI
Sr.No. Research Areas Real Life Application
1 Expert Systems
Examples − Flight-tracking
systems, Clinical systems.
2 Natural Language
Processing
Examples: Google Now
feature, speech
recognition, Automatic
voice output.
3 Neural Networks
Examples − Pattern
recognition systems such
as face recognition,
character recognition,
handwriting recognition.
4 Robotics
Examples − Industrial
robots for moving,
spraying, painting,
precision checking, drilling,
cleaning, coating, carving,
etc.
5 Fuzzy Logic Systems
Examples − Consumer
electronics, automobiles,
etc.
History of AI
https://www.youtube.com/watch?reload=9&v=
056v4OxKwlI
History of AI
● Year 1943: The first work which is now recognized as AI was done by Warren
McCulloch and Walter pits in 1943. They proposed a model of artificial
neurons.
History of AI
● Year 1949: Donald Hebb demonstrated an updating rule for modifying
the connection strength between neurons. His rule is now called
Hebbian learning.
History of AI
● Year 1950: The Alan Turing who was an English mathematician and
pioneered Machine learning in 1950. The test can check the machine's
ability to exhibit intelligent behavior equivalent to human intelligence,
called a Turing test.
● Year 1956: The word "Artificial Intelligence" first adopted by American
Computer scientist John McCarthy at the Dartmouth Conference.
● Year 1966: Joseph Weizenbaum created the first chatbot in 1966,
which was named as ELIZA. First chatterbot.
Turing Test
• Turing defined intelligent behaviour as the ability by
machine to achieve human-level performance in all
decision making tasks and person must not know that
he is getting reply from human or machine .
• Allen Turing proposed a test in which computer is
interrogated by a human via a teletype, and passes
the test if the interrogator(human) cannot tell if there
is a computer or a human at the other end.
• Most of AI machine is expected to pass this test.
● Year 1972: The first intelligent humanoid robot was built in
Japan which was named as WABOT-1.
● Year 1980: After AI winter duration, AI came back with "Expert System".
● Year 1997: In the year 1997, IBM Deep Blue beats world chess champion, Gary
Kasparov, and became the first computer to beat a world chess champion.
● Year 2002: for the first time, AI entered the home in the form of Roomba, a vacuum
cleaner.
● Year 2006: AI came in the Business world till the year 2006. Companies like Facebook,
Twitter, and Netflix also started using AI.
AI
• Now AI has developed to a remarkable level.
• The concept of Deep learning, big data, and data science are now
trending like a boom.
• Nowadays companies like Google, Facebook, IBM, and Amazon
are working with AI and creating amazing devices.
• The future of Artificial Intelligence is inspiring and will come with
high intelligence.
Categorization of Intelligent system
Systems that think like humans
• Most of the time it is a black box where we are not clear about our thought
process.
• One has to know functioning of brain and its mechanism for possessing
information.
• It is an area of cognitive science.
• Cognitive processes manipulate representation to build new representations
that are used to generate actions.
• Neural network is a computing model for processing information similar to
brain.
Systems that act like humans
• The overall behaviour of the system should be human like.
• It could be achieved by observation.(Turing Test)
Systems that think rationally
• Such systems rely on logic rather than human to measure
correctness.
• For thinking rationally or logically, logic formulas and theories are
used for synthesizing outcomes.
For example,
given John is a human and all humans are mortal then one can conclude
logically that John is mortal
Systems that act rationally
• Rational behavior means doing right thing(Rationally).
• Even if method is illogical, the observed behavior must be rational.
Components of AI Program
AI program should have
1. Knowledge base
2. Navigational capability
3. Control strategy and Inference mechanism
Knowledge Base
AI programs should be learning in nature and update its knowledge
accordingly.
Knowledge base consists of facts and rules.
Characteristics of Knowledge:
• It is voluminous in nature and requires proper structuring
• It may be incomplete and imprecise
• It may keep on changing (dynamic)
Navigational Capability
• Navigational capability contains various control strategies.
• Control Strategy determines which rule to be applied.
• To know this rule some heuristics or thumb rule may be applied based
on the problem.
Inferencing
• Inferencing requires search through knowledge base and derive
new knowledge with the help of inference rule.
Foundations of AI
Foundation of AI is based on
1. Mathematics
2. Neuroscience
3. Control Theory
4. Linguistics
Ethics in AI
• Artificial Intelligence (AI) can innovate and build almost
anything.
• With the advancements in technology, we can expect AI to
make machines with learning and decision-making abilities.
• However, what it lacks is the awareness of a “moral
compass” or empathy to judge what is right and what is
wrong.
• Below are some elements of ethics which designers and
developers of AI can implement to mitigate biases within the
systems and instill a sense of responsibility among the
people who work with AI.
Transparency
• The development of every AI algorithm or AI-powered equipment must
be transparent and include a complete explanation, purpose, and
justification for its development.
• These disclosures are essential to monitoring the technology’s outcome
to ensure its compliance with the human moralities.
• The design should be in a way that humans can easily understand,
perceive, and detect its decision-making process.
Respect for human values
• It is based on the principle that every innovation by AI should respect
human values and lead to the overall growth of individuals and
communities.
• Extreme care is called for ensuring sensitivity to different cultural norms
and values.
Fairness
• It is vital to promote a workplace of equality with no discrimination based on
gender, race, caste, or creed.
Safety
• This refers to both the wellbeing of humans and the safety of the users’
data.
• Employing security practices like encryption and empowering users with
the control over what data is being used and in what context can protect
and preserve the users’ right over the data.
Accountability
• The teams working with AI must own the responsibility of the decisions
taken and the consequences.
• Decision-making processes must be reviewable, especially in cases
where AI is working with sensitive, confidential data like personal health
information, identifiable data, biometric data, national security
information, or intellectual property.
Privacy
• The privacy of the users should be a priority with any AI work-process.
• It is necessary to seek consent from the users to use and store their
data.
• Utmost care needs to be taken to ensure there is no leak of personal
confidential information.
Thank you !
51

Introduction to artificial intelligence and basic

  • 1.
    AI CH:01 Introduction to ArtificialIntelligence Vidya Vikas Education Trust’s Universal College of Engineering, Vasai(E)
  • 2.
    Content • Artificial Intelligence(AI), • AI Perspectives: Acting and Thinking humanly, • Acting and Thinking rationally • History of AI, • Applications of AI, • The present state of AI, • Ethics in AI
  • 3.
    • Intelligence: “abilityto learn, understand and think” (Oxford dictionary)
  • 4.
    Artificial • made bypeople, often as a copy of something natural – an artificial lake – artificial flowers
  • 5.
    What is AI •Artificial intelligence (AI) is branch of computer science concerned with building smart machines/computer/device to simulate human intelligence, to think like humans and mimic their actions.
  • 6.
  • 7.
    Applications of AI: •Game playing: IBM developed chess playing computer called “DEEP BLUE” which defeated world champion Gary Kasparav in 1997. • Autonomous planning and scheduling: NASA developed” Remote Agent Program” to control the scheduling of operation for a spacecraft .Remote Agent Program monitored operation of spaceship and provided information to NASA.
  • 8.
    • Autonomous Control:The ALVINN computer vision system was trained to drive a car, this system was fitted in minivan fitted with video camera which transmit road images and depending on images best direction to drive was selected. (Example: TESLA autopilot system) • Diagnosis: Medical diagnosis program used symptom analysis to predict disease and gave result equivalent to expert physician. Example:MYCIN
  • 9.
    • ROBOTICS: Manysurgeon use Robot called HipNav to do microsurgery • Logistics Planning: US forces developed a Dynamic Analysis and Replanning Tool to do automatic logistic planning and scheduling for transportation. This tool allowed plan to be generated in hours on providing start point and end destination.
  • 11.
    Google Voice based assistant-GoogleDuplex • https://www.youtube.com/watch?v=bh84hW ukDdQ
  • 12.
  • 13.
    Sophia –Social Humanoid-Live Robot •https://www.youtube.com/watch?v=ROlpqGc UTFY (6) Top 4 Newly Released AI and Robotics Innovation That Will Change How We Live - YouTube
  • 15.
    • Alexa andSiri, Amazon and Apple's digital voice assistants, are much more than a convenient tool—they are very real applications of artificial intelligence that is increasingly integral to our daily life.
  • 16.
  • 17.
    Applications of AI Sr.No.Research Areas Real Life Application 1 Expert Systems Examples − Flight-tracking systems, Clinical systems. 2 Natural Language Processing Examples: Google Now feature, speech recognition, Automatic voice output.
  • 18.
    3 Neural Networks Examples− Pattern recognition systems such as face recognition, character recognition, handwriting recognition. 4 Robotics Examples − Industrial robots for moving, spraying, painting, precision checking, drilling, cleaning, coating, carving, etc.
  • 19.
    5 Fuzzy LogicSystems Examples − Consumer electronics, automobiles, etc.
  • 20.
  • 21.
    History of AI ●Year 1943: The first work which is now recognized as AI was done by Warren McCulloch and Walter pits in 1943. They proposed a model of artificial neurons.
  • 22.
    History of AI ●Year 1949: Donald Hebb demonstrated an updating rule for modifying the connection strength between neurons. His rule is now called Hebbian learning.
  • 23.
    History of AI ●Year 1950: The Alan Turing who was an English mathematician and pioneered Machine learning in 1950. The test can check the machine's ability to exhibit intelligent behavior equivalent to human intelligence, called a Turing test. ● Year 1956: The word "Artificial Intelligence" first adopted by American Computer scientist John McCarthy at the Dartmouth Conference. ● Year 1966: Joseph Weizenbaum created the first chatbot in 1966, which was named as ELIZA. First chatterbot.
  • 24.
    Turing Test • Turingdefined intelligent behaviour as the ability by machine to achieve human-level performance in all decision making tasks and person must not know that he is getting reply from human or machine . • Allen Turing proposed a test in which computer is interrogated by a human via a teletype, and passes the test if the interrogator(human) cannot tell if there is a computer or a human at the other end. • Most of AI machine is expected to pass this test.
  • 26.
    ● Year 1972:The first intelligent humanoid robot was built in Japan which was named as WABOT-1.
  • 27.
    ● Year 1980:After AI winter duration, AI came back with "Expert System". ● Year 1997: In the year 1997, IBM Deep Blue beats world chess champion, Gary Kasparov, and became the first computer to beat a world chess champion.
  • 28.
    ● Year 2002:for the first time, AI entered the home in the form of Roomba, a vacuum cleaner. ● Year 2006: AI came in the Business world till the year 2006. Companies like Facebook, Twitter, and Netflix also started using AI.
  • 29.
    AI • Now AIhas developed to a remarkable level. • The concept of Deep learning, big data, and data science are now trending like a boom. • Nowadays companies like Google, Facebook, IBM, and Amazon are working with AI and creating amazing devices. • The future of Artificial Intelligence is inspiring and will come with high intelligence.
  • 31.
  • 32.
    Systems that thinklike humans • Most of the time it is a black box where we are not clear about our thought process. • One has to know functioning of brain and its mechanism for possessing information. • It is an area of cognitive science. • Cognitive processes manipulate representation to build new representations that are used to generate actions. • Neural network is a computing model for processing information similar to brain.
  • 33.
    Systems that actlike humans • The overall behaviour of the system should be human like. • It could be achieved by observation.(Turing Test)
  • 34.
    Systems that thinkrationally • Such systems rely on logic rather than human to measure correctness. • For thinking rationally or logically, logic formulas and theories are used for synthesizing outcomes. For example, given John is a human and all humans are mortal then one can conclude logically that John is mortal
  • 35.
    Systems that actrationally • Rational behavior means doing right thing(Rationally). • Even if method is illogical, the observed behavior must be rational.
  • 38.
    Components of AIProgram AI program should have 1. Knowledge base 2. Navigational capability 3. Control strategy and Inference mechanism
  • 39.
    Knowledge Base AI programsshould be learning in nature and update its knowledge accordingly. Knowledge base consists of facts and rules. Characteristics of Knowledge: • It is voluminous in nature and requires proper structuring • It may be incomplete and imprecise • It may keep on changing (dynamic)
  • 40.
    Navigational Capability • Navigationalcapability contains various control strategies. • Control Strategy determines which rule to be applied. • To know this rule some heuristics or thumb rule may be applied based on the problem.
  • 41.
    Inferencing • Inferencing requiressearch through knowledge base and derive new knowledge with the help of inference rule.
  • 42.
    Foundations of AI Foundationof AI is based on 1. Mathematics 2. Neuroscience 3. Control Theory 4. Linguistics
  • 43.
    Ethics in AI •Artificial Intelligence (AI) can innovate and build almost anything. • With the advancements in technology, we can expect AI to make machines with learning and decision-making abilities. • However, what it lacks is the awareness of a “moral compass” or empathy to judge what is right and what is wrong. • Below are some elements of ethics which designers and developers of AI can implement to mitigate biases within the systems and instill a sense of responsibility among the people who work with AI.
  • 45.
    Transparency • The developmentof every AI algorithm or AI-powered equipment must be transparent and include a complete explanation, purpose, and justification for its development. • These disclosures are essential to monitoring the technology’s outcome to ensure its compliance with the human moralities. • The design should be in a way that humans can easily understand, perceive, and detect its decision-making process.
  • 46.
    Respect for humanvalues • It is based on the principle that every innovation by AI should respect human values and lead to the overall growth of individuals and communities. • Extreme care is called for ensuring sensitivity to different cultural norms and values.
  • 47.
    Fairness • It isvital to promote a workplace of equality with no discrimination based on gender, race, caste, or creed.
  • 48.
    Safety • This refersto both the wellbeing of humans and the safety of the users’ data. • Employing security practices like encryption and empowering users with the control over what data is being used and in what context can protect and preserve the users’ right over the data.
  • 49.
    Accountability • The teamsworking with AI must own the responsibility of the decisions taken and the consequences. • Decision-making processes must be reviewable, especially in cases where AI is working with sensitive, confidential data like personal health information, identifiable data, biometric data, national security information, or intellectual property.
  • 50.
    Privacy • The privacyof the users should be a priority with any AI work-process. • It is necessary to seek consent from the users to use and store their data. • Utmost care needs to be taken to ensure there is no leak of personal confidential information.
  • 51.