VOCATIONAL TRAINING PPT
ON
THERMAL POWER PLANT & ROLE OF C&I.
NATIONAL THERMAL POWER COORPORATION,
VINDHYANAGAR.
SUBMITTED BY:-
DHEERAJ ATULKAR
SGSITS INDORE
3RD YEAR
EC
CONTENT
INTRODUCTION OF NTPC VINDHYANAGAR
COAL-FIRED POWER STATION
PRODUCTION OF ELECTRICITY
DIAGRAMATIC REPRESENTATION
ABOUT C&I DEPARTMENT
FUNCTION OF C&I
HOW C&I WORKS?
SWITCHGEAR
SWITCHYARD
CONCLUSION
INTRODUCTION OF NTPC VINDhYANAGAR
 NTPC VINDHYANCHAL is located at Vindhyanagar in Singrauli
District of Madhya Pradesh.
 It is one of the coal-fired power station of NTPC and is the
largest power station in India.
 It is the 9th largest coal-fired power station in the world.
 Coal linkage for this station is from Nigahi Coal Mines(NCL).
 Water for the station is drawn from Rihand Reservoir.
 It has installed capacity of 4,760MW.
 It consist of 5 stages comprising 13 units i.e. 6 units of
210MW and 7 units of 500MW.
 The produced electricity is consumed by the following
stated:- Madhya
Pradesh,Gujrat,Maharastra,Goa,Chhattisgarh, Daman&Diu
and Dadar Nagar Haveli.
COAL-FIRED POWER STATION
It is a power station that burns coal or natural gas to
produce electricity.
coal heat energy mechanical energy electricity
Today, fossil fuel power station provides most of the
electrical energy used in the world.
PRODUCTION OF ELECTRICITY
Transportation of coal
 Using Wagon Trippler.
 Using Bottom Discharge Wagon.
Coal Stacking/ Feeding
The coal from wagon, follows the following path:-
Unload from wagon
On conveyor belt
To crusher house
Stack yard/Bunker
Bunker
CONVEYOR BELT CRUSHER HOUSE STACK YARD
CONTINUE…
Processing of Coal
After the crushed coal is passed to bunker, the coal undergo following processes:-
I. It is sent to mill to obtain powdered form of coal, to ensure complete combustion of coal.
II. The powdered coal is then passed to the furnace via a typical air draft system.
III. The firing of coal inside furnace maintains it to a very high temperature.
IV. This high temperature further heats the boiler that contains DM water and produces super
heated steam.
(Heat energy Pressure energy)
V. This super heated steam works on turbine blades which in turn moves the blade.
(Pressure Energy Kinetic Energy)
VI. Rotational kinetic energy of turbine is converted into electrical energy using
Turbo Generator.
VII. The produced electricity is then sent to switchyard (distribution sector) via
Generator Transformer (GT).
DIAGRAM OF ELECTRICITY GENERATION
ABOUT C&I DEPARTMENT
• C&I stands for CONTROL & INSTRUMENTATION.
• C&I department in thermal power plant is similar to the nerve
system in human being.
• C&I department controls the entire functioning and operation of
the power plant from the “CONTROL ROOM", that contains
control desks and auxiliary panels.
• In addition to control room C&I also consist of a server room
where various parameters are modified according to need.
Function of C&I
The main function of C&I department are as follows:-
o Measurement
o Control
o Operation
o Monitoring
o Protection
This department deals with observing ,controlling and manipulating quantities
like temperature ,pressure and vibration.
MEASURING POINTS & QUANTITIES
QUANTITIES/PARAMETERS Measuring Points Instrument used Pictures of the instrument
1. Pressure a. Boiler Pressure transmitter
b. Turbine
c. Furnace
2. Temperature a. Steam at superheater Thermocouple
inlet and outlet
b. Flue gases
c. Air preheater
d. Bearing of turbine
and generator
CONTINUE…
Parameters Measuring points Instruments used Pictures of instrument
3.Flow a. High pressure steam Venturi
b. Feed water inlet
c. Condensate
4. Vibration a. Turbine and generator Mass spring with
shaft &bearing shell potentiometric
capacitive
HOW C&I WORK?
The parameters such as pressure, temperature and vibration of various
component from the field is measured, using various instruments(-24V to 0,0 to
+24V).
CONTINUE...
The data (-24 to 0 or 0 to +24) is then transferred to
such panels, where various logical operations are done over these
data by the help of various programmable cards present within the
panel.
• Broadly the components of PLC can be categories as:-
 Processor (CPU)
 Input cards
 Output cards
• The processor is redundant with another processor.
CONTINUE…
• Both the processors contain three wires; Red(unit line A), blue(unit line B) and
gray(to assure the processor that it has another redundant processor).
• The panels also contains some special type of cards known as “Critical cards”.
• It’s data is then sent to Network Distributor Panel HMI through red and blue
wires present in each panel.
CONTINUE…
The red and blue wires from each panel is then sent to NETWORK DISTRIBUTOR
PANEL HMI.
CONTINUE…
• It contains various panels like:-
 LINE-A All the red wires coming from control panel is connected in this panel.
 LINE-B All the blues wires are connected in this panel.
 MMI It stands for MAN INTERFACE MACHINE.
It further distribute the data received from LINE-A & LINE-B to PC’s of control room and EWS.
LINE-A LINE-B MMI
CONTINUE…
The data from the network panel is sent to the control room and EWS present in
server room.
Control room is the room from where the entire functioning and operation of the
plant is observed and controlled.
EWS stands for Engineering Work Station that act as an admin PC which can make
any kind of modification needed in cards of control panel, network or parameters
such as pressure, temperature etc. of the thermal plant.
From control panel to control room the entire system is redundant so that in case
of any one network failure(A or B) we still get the result.
CONTROL ROOM
SERVER ROOM
SWITCHGEAR
• Switchgear is one which makes or breaks the electrical supply and operates in low
voltage.
• This is the protection device that control the equipment or machine(either heavy
or small) in power system.
• Switchgear equipment's are:-
a. Isolator
b. Switching Isolators
c. Circuit Breakers
d. Load Break Switches
e. Protection relay
SWITCH YARD
• Switch yard is also one of the main part of power
plant.
• Power generated can be worthful only if it is
successfully transmitted and received by its
consumers.
• It act as a channel/passage between the
generation and transmission of electricity.
• It is an open area where variety of equipment's
are present that are responsible for proper connection of transmission line as required.
• In VSTPS there are two interconnected switchyard:-
o 400KV switchyard
o 132KV switchyard
CONCLUSION
Industrial training exposes an individual to practical aspect of all things
which differ considerably from theoretical models.
During my training ,I gained a lot of practical knowledge which
otherwise could have been exclusive to me. This practical exposure will
help me a lot when I will set my foot as an engineer.
Overall this training was an excellent experience for me.
THANK YOU!!

More Related Content

Similar to INTERNSHIP DHEERAJ.pptx

Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
final ppt major.pdf
final ppt major.pdffinal ppt major.pdf
final ppt major.pdfmanojboura
 
Three-level modified sine wave inverter equipped with online temperature moni...
Three-level modified sine wave inverter equipped with online temperature moni...Three-level modified sine wave inverter equipped with online temperature moni...
Three-level modified sine wave inverter equipped with online temperature moni...TELKOMNIKA JOURNAL
 
Gsm based transformer fault detection system
Gsm based transformer fault detection systemGsm based transformer fault detection system
Gsm based transformer fault detection systemKabilesh K
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover IJSRED
 
Doc speed control of a dc motor using micro controller 8051
Doc speed control of a dc motor using micro controller 8051Doc speed control of a dc motor using micro controller 8051
Doc speed control of a dc motor using micro controller 8051embdnew
 
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Sheikh Imran
 
IRJET- Transformer Monitoring and Protection System using AVR Atmega16 Mi...
IRJET-  	  Transformer Monitoring and Protection System using AVR Atmega16 Mi...IRJET-  	  Transformer Monitoring and Protection System using AVR Atmega16 Mi...
IRJET- Transformer Monitoring and Protection System using AVR Atmega16 Mi...IRJET Journal
 
Digital energy meter
Digital energy meter Digital energy meter
Digital energy meter preeti naga
 
Temperature based fan speed control & monitoring using
Temperature based fan speed control & monitoring usingTemperature based fan speed control & monitoring using
Temperature based fan speed control & monitoring usingJagannath Dutta
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGIRJET Journal
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentationVSRAGHU
 
A Integrated Technique of SIDO PFC Fly back Converter in power system
A Integrated Technique of SIDO PFC Fly back Converter in power systemA Integrated Technique of SIDO PFC Fly back Converter in power system
A Integrated Technique of SIDO PFC Fly back Converter in power systemIJMTST Journal
 

Similar to INTERNSHIP DHEERAJ.pptx (20)

Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
Phase 4
Phase 4Phase 4
Phase 4
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
final ppt major.pdf
final ppt major.pdffinal ppt major.pdf
final ppt major.pdf
 
Three-level modified sine wave inverter equipped with online temperature moni...
Three-level modified sine wave inverter equipped with online temperature moni...Three-level modified sine wave inverter equipped with online temperature moni...
Three-level modified sine wave inverter equipped with online temperature moni...
 
Gsm based transformer fault detection system
Gsm based transformer fault detection systemGsm based transformer fault detection system
Gsm based transformer fault detection system
 
Siemens
SiemensSiemens
Siemens
 
Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover Implementation of a Microcontroller Base Single Phase Automatic Changeover
Implementation of a Microcontroller Base Single Phase Automatic Changeover
 
Doc speed control of a dc motor using micro controller 8051
Doc speed control of a dc motor using micro controller 8051Doc speed control of a dc motor using micro controller 8051
Doc speed control of a dc motor using micro controller 8051
 
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
 
I012455457
I012455457I012455457
I012455457
 
IRJET- Transformer Monitoring and Protection System using AVR Atmega16 Mi...
IRJET-  	  Transformer Monitoring and Protection System using AVR Atmega16 Mi...IRJET-  	  Transformer Monitoring and Protection System using AVR Atmega16 Mi...
IRJET- Transformer Monitoring and Protection System using AVR Atmega16 Mi...
 
Digital energy meter
Digital energy meter Digital energy meter
Digital energy meter
 
Temperature based fan speed control & monitoring using
Temperature based fan speed control & monitoring usingTemperature based fan speed control & monitoring using
Temperature based fan speed control & monitoring using
 
TRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORINGTRANSFORMER FAULT DETECTION AND MONITORING
TRANSFORMER FAULT DETECTION AND MONITORING
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentation
 
C&i systems
C&i systemsC&i systems
C&i systems
 
ritesh (2)
ritesh (2)ritesh (2)
ritesh (2)
 
A Integrated Technique of SIDO PFC Fly back Converter in power system
A Integrated Technique of SIDO PFC Fly back Converter in power systemA Integrated Technique of SIDO PFC Fly back Converter in power system
A Integrated Technique of SIDO PFC Fly back Converter in power system
 
PPT FOR COLLEGE.pptx
PPT FOR COLLEGE.pptxPPT FOR COLLEGE.pptx
PPT FOR COLLEGE.pptx
 

Recently uploaded

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxCHAIRMAN M
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfVinayVadlagattu
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Toolssoginsider
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...mikehavy0
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalSwarnaSLcse
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 

Recently uploaded (20)

SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
☎️Looking for Abortion Pills? Contact +27791653574.. 💊💊Available in Gaborone ...
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 

INTERNSHIP DHEERAJ.pptx

  • 1. VOCATIONAL TRAINING PPT ON THERMAL POWER PLANT & ROLE OF C&I. NATIONAL THERMAL POWER COORPORATION, VINDHYANAGAR. SUBMITTED BY:- DHEERAJ ATULKAR SGSITS INDORE 3RD YEAR EC
  • 2. CONTENT INTRODUCTION OF NTPC VINDHYANAGAR COAL-FIRED POWER STATION PRODUCTION OF ELECTRICITY DIAGRAMATIC REPRESENTATION ABOUT C&I DEPARTMENT FUNCTION OF C&I HOW C&I WORKS? SWITCHGEAR SWITCHYARD CONCLUSION
  • 3. INTRODUCTION OF NTPC VINDhYANAGAR  NTPC VINDHYANCHAL is located at Vindhyanagar in Singrauli District of Madhya Pradesh.  It is one of the coal-fired power station of NTPC and is the largest power station in India.  It is the 9th largest coal-fired power station in the world.  Coal linkage for this station is from Nigahi Coal Mines(NCL).  Water for the station is drawn from Rihand Reservoir.  It has installed capacity of 4,760MW.  It consist of 5 stages comprising 13 units i.e. 6 units of 210MW and 7 units of 500MW.  The produced electricity is consumed by the following stated:- Madhya Pradesh,Gujrat,Maharastra,Goa,Chhattisgarh, Daman&Diu and Dadar Nagar Haveli.
  • 4. COAL-FIRED POWER STATION It is a power station that burns coal or natural gas to produce electricity. coal heat energy mechanical energy electricity Today, fossil fuel power station provides most of the electrical energy used in the world.
  • 5. PRODUCTION OF ELECTRICITY Transportation of coal  Using Wagon Trippler.  Using Bottom Discharge Wagon. Coal Stacking/ Feeding The coal from wagon, follows the following path:- Unload from wagon On conveyor belt To crusher house Stack yard/Bunker Bunker CONVEYOR BELT CRUSHER HOUSE STACK YARD
  • 6. CONTINUE… Processing of Coal After the crushed coal is passed to bunker, the coal undergo following processes:- I. It is sent to mill to obtain powdered form of coal, to ensure complete combustion of coal. II. The powdered coal is then passed to the furnace via a typical air draft system. III. The firing of coal inside furnace maintains it to a very high temperature. IV. This high temperature further heats the boiler that contains DM water and produces super heated steam. (Heat energy Pressure energy) V. This super heated steam works on turbine blades which in turn moves the blade. (Pressure Energy Kinetic Energy) VI. Rotational kinetic energy of turbine is converted into electrical energy using Turbo Generator. VII. The produced electricity is then sent to switchyard (distribution sector) via Generator Transformer (GT).
  • 8. ABOUT C&I DEPARTMENT • C&I stands for CONTROL & INSTRUMENTATION. • C&I department in thermal power plant is similar to the nerve system in human being. • C&I department controls the entire functioning and operation of the power plant from the “CONTROL ROOM", that contains control desks and auxiliary panels. • In addition to control room C&I also consist of a server room where various parameters are modified according to need.
  • 9. Function of C&I The main function of C&I department are as follows:- o Measurement o Control o Operation o Monitoring o Protection This department deals with observing ,controlling and manipulating quantities like temperature ,pressure and vibration.
  • 10. MEASURING POINTS & QUANTITIES QUANTITIES/PARAMETERS Measuring Points Instrument used Pictures of the instrument 1. Pressure a. Boiler Pressure transmitter b. Turbine c. Furnace 2. Temperature a. Steam at superheater Thermocouple inlet and outlet b. Flue gases c. Air preheater d. Bearing of turbine and generator
  • 11. CONTINUE… Parameters Measuring points Instruments used Pictures of instrument 3.Flow a. High pressure steam Venturi b. Feed water inlet c. Condensate 4. Vibration a. Turbine and generator Mass spring with shaft &bearing shell potentiometric capacitive
  • 12. HOW C&I WORK? The parameters such as pressure, temperature and vibration of various component from the field is measured, using various instruments(-24V to 0,0 to +24V).
  • 13. CONTINUE... The data (-24 to 0 or 0 to +24) is then transferred to such panels, where various logical operations are done over these data by the help of various programmable cards present within the panel. • Broadly the components of PLC can be categories as:-  Processor (CPU)  Input cards  Output cards • The processor is redundant with another processor.
  • 14. CONTINUE… • Both the processors contain three wires; Red(unit line A), blue(unit line B) and gray(to assure the processor that it has another redundant processor). • The panels also contains some special type of cards known as “Critical cards”. • It’s data is then sent to Network Distributor Panel HMI through red and blue wires present in each panel.
  • 15. CONTINUE… The red and blue wires from each panel is then sent to NETWORK DISTRIBUTOR PANEL HMI.
  • 16. CONTINUE… • It contains various panels like:-  LINE-A All the red wires coming from control panel is connected in this panel.  LINE-B All the blues wires are connected in this panel.  MMI It stands for MAN INTERFACE MACHINE. It further distribute the data received from LINE-A & LINE-B to PC’s of control room and EWS. LINE-A LINE-B MMI
  • 17. CONTINUE… The data from the network panel is sent to the control room and EWS present in server room. Control room is the room from where the entire functioning and operation of the plant is observed and controlled. EWS stands for Engineering Work Station that act as an admin PC which can make any kind of modification needed in cards of control panel, network or parameters such as pressure, temperature etc. of the thermal plant. From control panel to control room the entire system is redundant so that in case of any one network failure(A or B) we still get the result.
  • 20. SWITCHGEAR • Switchgear is one which makes or breaks the electrical supply and operates in low voltage. • This is the protection device that control the equipment or machine(either heavy or small) in power system. • Switchgear equipment's are:- a. Isolator b. Switching Isolators c. Circuit Breakers d. Load Break Switches e. Protection relay
  • 21. SWITCH YARD • Switch yard is also one of the main part of power plant. • Power generated can be worthful only if it is successfully transmitted and received by its consumers. • It act as a channel/passage between the generation and transmission of electricity. • It is an open area where variety of equipment's are present that are responsible for proper connection of transmission line as required. • In VSTPS there are two interconnected switchyard:- o 400KV switchyard o 132KV switchyard
  • 22. CONCLUSION Industrial training exposes an individual to practical aspect of all things which differ considerably from theoretical models. During my training ,I gained a lot of practical knowledge which otherwise could have been exclusive to me. This practical exposure will help me a lot when I will set my foot as an engineer. Overall this training was an excellent experience for me.