INTERNET
OF THINGS
Name: POOJA BARASKAR
Email: pooja.barskar@outlook.com
Twitter Id: @PoojaBrs
University: Mahatma Gandhi University
Year/Semester: 3rd/5th
Branch: BCA
The Internet of Things (IoT) is a network of physical objects
that contain embedded technology to communicate and
interact with their internal states or external environment
 Dynamic control of industry and daily life
 Sophisticated algorithms via machine learning
 Improve the resource utilization ratio
 Integration human society and physical systems
 Flexible configuration
 Acts as technologies integrator
 Universal transport & internetworking
Why Internet of Things
Concept
 Rapid advancement in technology
 Ipv6 communication
 Protocol for M2M communication
 Smart sensors
 Cloud storage
 Sophisticated algorithms via machine learning
TRENDS
Before IoT
Delivery schedule set based on distance and
historical traffic patterns.
Equipment maintenance performed every 12
months or at time of failure
Sell replacement parts and provide repair
service
Static advertisement replaced monthly
Enabled by IoT
Real-time adjustments to routes and
proactive customer alerts of delays based
on actual truck location and traffic
Maintenance performed when a failure is
predicted based on real-time performance
Customers pay maintenance subscription
for services
Digital advertisement changes based on
demographics of closest shopper
IoT in Bussiness
Trend that will have big impact in next 5 years
Application in Agriculture:
Agriculture is the foundation of national economy, only the agricultural development is good, the
entire national economy can steadily forward. Today, more than ever, farmers have to more
effectively utilize and conserve their resources. That’s where the need for data comes in, and
M2M communication has made the ongoing collection of that info easy.
I am working currently on a project with an Intel Galileo board with special ability with internet
capability that will give information about weather information with sensors attached that will
sense the temperature as well as there will be input facility for entering farming data so it can
create a database repository for how changing environment is affecting the farming cultivation
and hence be prepared for future.
Interest Areas
If given an internship in this area I would like to share my ideas with the company
and willing to implement them with the help of seniors. I am also open to any
project/area that the company may feel suitable to put me in order to utilize my
capability.
For better living:
Road accidents are increasing day by day. Every year 1.2 million people dies by road
accidents. The main cause is driver's fault. A system can be made which can track drivers
activity while driving such as if they are not concentrating on road for a long time, talking on
call, texting or drunk. We can also track if the driver is tired while driving by sensing their pupil
movements and drivers age whether he is eligible to drive or not. If any suspicious activity is
detected an alarming message will be send to the nearest police station with the location of
vehicle. This will surely help in lessening road accidents.
THANK YOU
Pooja Baraskar
http://poojabaraskar.com/
Reference: Postscapes

Internet of Things

  • 1.
    INTERNET OF THINGS Name: POOJABARASKAR Email: pooja.barskar@outlook.com Twitter Id: @PoojaBrs University: Mahatma Gandhi University Year/Semester: 3rd/5th Branch: BCA
  • 2.
    The Internet ofThings (IoT) is a network of physical objects that contain embedded technology to communicate and interact with their internal states or external environment
  • 3.
     Dynamic controlof industry and daily life  Sophisticated algorithms via machine learning  Improve the resource utilization ratio  Integration human society and physical systems  Flexible configuration  Acts as technologies integrator  Universal transport & internetworking Why Internet of Things Concept  Rapid advancement in technology  Ipv6 communication  Protocol for M2M communication  Smart sensors  Cloud storage  Sophisticated algorithms via machine learning
  • 4.
  • 5.
    Before IoT Delivery scheduleset based on distance and historical traffic patterns. Equipment maintenance performed every 12 months or at time of failure Sell replacement parts and provide repair service Static advertisement replaced monthly Enabled by IoT Real-time adjustments to routes and proactive customer alerts of delays based on actual truck location and traffic Maintenance performed when a failure is predicted based on real-time performance Customers pay maintenance subscription for services Digital advertisement changes based on demographics of closest shopper IoT in Bussiness Trend that will have big impact in next 5 years
  • 6.
    Application in Agriculture: Agricultureis the foundation of national economy, only the agricultural development is good, the entire national economy can steadily forward. Today, more than ever, farmers have to more effectively utilize and conserve their resources. That’s where the need for data comes in, and M2M communication has made the ongoing collection of that info easy. I am working currently on a project with an Intel Galileo board with special ability with internet capability that will give information about weather information with sensors attached that will sense the temperature as well as there will be input facility for entering farming data so it can create a database repository for how changing environment is affecting the farming cultivation and hence be prepared for future. Interest Areas If given an internship in this area I would like to share my ideas with the company and willing to implement them with the help of seniors. I am also open to any project/area that the company may feel suitable to put me in order to utilize my capability. For better living: Road accidents are increasing day by day. Every year 1.2 million people dies by road accidents. The main cause is driver's fault. A system can be made which can track drivers activity while driving such as if they are not concentrating on road for a long time, talking on call, texting or drunk. We can also track if the driver is tired while driving by sensing their pupil movements and drivers age whether he is eligible to drive or not. If any suspicious activity is detected an alarming message will be send to the nearest police station with the location of vehicle. This will surely help in lessening road accidents.
  • 7.