University of Sulaimani
College of Engineering
Architectural Department
4th stage
Bauhaus / international movement
Preparedby: Supervised by:
Shanyar Awat L.Handreen Hamid
Shnay shamal L. Raz Kamaran
Barzi Wrya
9/28/2021 1
Contents :
 Introduction 3
 The history of Bauhaus periods 5
 The teachers of Bauhaus 13
 Characteristics and highlights of Bauhaus movement 16
 Use of color 27
 Lighting atthe Bauhaus 29
 Outdoor and indoor connections 33
 Stripand linear windows 37
 Furniture design concept 45
 Materials used 76
 Analyzed example 104
9/28/2021 2
Introduction :
 The Bauhaus was founded bythe architect Walter Gropius .
 Gropius combined two schools, the Weimar Academyof Artsand the Weimar School of Arts and Crafts.
 Gropius called the Bauhaus, or house of building
 Gropius , who combined nineteenth -century idealism with twentieth - century realism
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
Walter Gropius office in Dessau Bauhaus interior design
9/28/2021 3
Introduction :
 In 1914when it was firstsuggested that Gropius might take over the arts and craftsschool in Weimar .
 Bauhaus This idea of the fundamental unity under lying all branches of design was Walter Gropius
guiding in founding the original Bauhaus .
 In the spring of 1919Gropius ' specialized ' classes under the name of Das Staatliche Bauhaus Weimar .
Reference: the Bauhaus book by Gillian Naylor & The new architecture and Bauhaus book by Walter Gropius
Bauhaus interior design
9/28/2021 4
The history ofBauhaus periods
Bauhaus, in full Staatliches Bauhaus, school of design, architecture, and applied arts that existed
in Germany from1919to1933.
Weimar until Dessau through Berlin in its final months
1925 1932 1933
Reference:https://biblus.accasoftware.com/
9/28/2021 5
Weimar Bauhaus 1919 -1925
• The contractfor thedirection of theBauhauswascon colluded at WeimarApril I, 1919.
• BetweenthearchitectWalterGropius of Berlinandthe office of the Hofmarschallof Weimar.
Staatliche Bauhaus Weimar
BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius
9/28/2021 6
Weimar Bauhaus 1919 - 1925
Staatliche Bauhaus Weimar interior
https://www.pinterest.com/
9/28/2021 7
The Dessau period 1925 -1929
• The Bauhaus moved fromWeimar toDessau, where Gropius had designed the new building tohost the
school. The main building elements.
• Dessau From 1925until Gropius left the school in 1929, the Bauhaus was building on the foundations
that had been laid down in Weimar .
Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor
9/28/2021 8
The Dessau period 1925 -1929
• Accordingto thesame philosophy,the architect’s job isto carefullyanalyzethefunctionsof
thebuilding thatwill bekey to designits shape.
• Theprinciples ofthe Bauhauswere againclarified: TheBauhausisanadvancedschoolfor
creative work.
Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor
9/28/2021 9
Bauhaus schoolinterior
https://www.dezeen.com/2018/11/05/bauhaus-dessau-school-building-walter-gropius-germany-architecture/
9/28/2021 10
The Berlin period
• Meyer resigned in 1930and was replaced byLudwig Mies Van der Rohe, famous for his saying “lessis
more”.
• Mies Van der Rohe impressedthe school with a strictlydisciplinarycharacter, more focused on
architecture.
• Mies transfer the school toBerlin in 1930,operating on a smaller scale. Ultimately, the Bauhaus closed
down in 1933.
Reference: https://biblus.accasoftware.com/
Bauhaus archive – museum of design
9/28/2021 11
Bauhaus archive – museum of design
Reference: https://biblus.accasoftware.com/
9/28/2021 12
The teachers of Bauhaus
• During the war some vacancies
occurred on the staffs of the two
schools (the Academy of Pictorial Art
and the Academy of Artsand Crafts)
which Gropius later united in the
Bauhaus.
• This enabled him tohave three
masters appointed atthe very
beginning:
1. Johannes Itten
2. Lyonel Feininger
3. Gerhard Marcks in May, 1919.
BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius(Chairmanof the Departmentof Architecture, HarvardUniversity)
9/28/2021 13
The teachers of Bauhaus
• Adolf Meyer, 1919,, 1920,
• Paul Klee, January, 1921,
• Oskar Schlemmer, April, 1921,
• Wassily Kandinsky, June, 1922,
• Laszlo Moholy-Nagy,1923.
BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius(Chairmanof the Departmentof Architecture, HarvardUniversity)
9/28/2021 14
Bauhaus movementseal
the Bauhaus in education An organization basedon new
principles easily becomesisolated ifit doesnot constantly The
later Bauhaus seal, designed byOskar Schlemmer, 1922
Thefirst Bauhaus seal , LyonelFeininger: Woodcut
from the first proclamation, 1919
9/28/2021 15
Characteristics and highlights ofBauhaus
movement
 Simplicityand Effectiveness :There is no need for additionalornamenting and making things more and more
‘beautiful’. Theyare just fine as they are.
 Minimalism : Bauhaus artists favored linear and geometrical forms, avoiding floral or curvilinear shapes (lines, smooth
gentle lines andshapes)
 Form follows function : According tothis idea,simplebutelegant geometric shapes were designed basedon the
intended function or purposeof a building or an object
Reference:https://art.art/blog/
fransworth house byle Corbusier
9/28/2021 16
Characteristics and highlights ofBauhaus
movement
 Flat surface
 Asymmetricalbalance
 Monochromatic
Reference:https://art.art/blog/
fransworth house byle Corbusier
9/28/2021 17
Characteristics and highlights ofBauhaus
movement
 Open plan
makes use of large, openspaces andminimizes the use of
small, enclosed rooms such as private offices.
combining the kitchen, living room, and dining room into a
single great room.
Reference:https://art.art/blog/
fransworth house byle Corbusier
9/28/2021 18
Characteristics and highlights ofBauhaus
movement
 Open plan
Reference:https://art.art/blog/
Open plan examples
9/28/2021 19
Characteristics and highlights ofBauhaus
movement
 Smart use of resources (economy) Therepresentatives of the Bauhaus movement wanted to achieve a controlled
finance, productive time-consuming projects
 Constant development (modern ) Bauhaus is allabout new techniques, new materials, new ways of construction, new
attitude , Bauhaus also ledtothe emergence of new forms of interior design.
 Emphasis's on technology (mass production ) Bauhaus workshops were used for developing prototypes of products
for mass production. The artists embracedthe new possibilities of modern technologies .
Reference:https://art.art/blog/
9/28/2021 20
Characteristics and highlights of Bauhaus
movement
 Angularity
 Abstraction
 Unity
 Continuity
Reference:https://art.art/blog/
Regularity
Anti-ornament
Modern materials
(plastic, chrome and other metals)
9/28/2021 21
Bauhaus school – Dessau
characters
1. Openplan
2. Simple
3. Geometrical shape
Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor
9/28/2021 22
Bauhaus schoolin Dessau elevation
1. steel frame construction
2. a glass curtain wall wrapping around the corners and an
asymmetricpinwheel plan.
3. It has a symmetricalfaçade also have a typicalsmooth,
white plaster also have a base of rough plaster in grey
Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor
9/28/2021 23
Bauhaus schoolinterior
• Marianne Brandt: Lighting fixture. Frosted and
plain glass globe.. 1925
• Symmetrical use of light
• Using The Wassily Chair By marcel
bruer
• Clear line
https://www.dezeen.com/2018/11/05/bauhaus-dessau-school-building-walter-gropius-germany-architecture/
9/28/2021 24
Bauhaus school– Dessau interior
 such asreinforcedconcrete,
 rolled steel
 large-scaleglasspanels.
https://www.dezeen.com/2018/11/05/bauhaus-dessau-school-building-walter-gropius-germany-architecture/
Brno chair
Designer : mies
van der rohe
Steel legged baseof rough plaster in grey
whiteplaster.
9/28/2021 25
Bauhaus archive – museum of design
Reference: https://biblus.accasoftware.com/
characters
1.Openplan
2.Simple
3.Geometricalshape
9/28/2021 26
Use of color
Reference:Primarycolorsand shapesattheBauhaus
 color sphere comprised of twelve colors (three
primary,three secondary, and six tertiary)that
shows the relationship among colors.
Bauhaus Color According To:
 Johannes Itten
methodsofcontrast:
 light and dark
 complementary contrast
 contrast of hue
 contrast between warm
and cool colors
Using black and whitecontrast
colors and geometricshapes
complementary contrast
9/28/2021 27
Bauhaus Color According To:
 Paul Klee
 Klee tended to think of color in musical
terms,making the connection between
harmonious sounds and complementary
colors
Use of color
Reference:Primarycolorsand shapesattheBauhaus
 Using purple
and yellow
complementar
y And
harmonyof
purple and
blue shades
BauhausColor AccordingTo:
 Josef Albers
All colors have twokeyelements–brightness(which
canbe understoodasthecolor intensity)and lightness
(a light’sintensity).
9/28/2021 28
Lighting at the Bauhaus
 Bauhaus bring together all the artistic disciplines tocreate buildings focused on functionality and
design.
Walter Gropius lighting in Bauhaus school Dessau spot lights
https://www.lamp.es/en/news/lighting-at-the-bauhaus-rationalism-at-the-service-of-design_388511
9/28/2021 29
Lighting at the Bauhaus
 lighting is one of the points of greatest interest within the architectural approaches of the school.
Tablelamp byChristian dell
https://www.lamp.es/en/news/lighting-at-the-bauhaus-rationalism-at-the-service-of-design_388511
9/28/2021 30
Natural Lighting at the Bauhaus
 using large glass panels for more natural lighting
Large glass panelsin Bauhaus interiors
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
9/28/2021 31
Natural Lighting at the Bauhaus
 using skylights
Large glass panelsin Bauhaus school –berlin Bauhaus museum
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
9/28/2021 32
9/28/2021
Outdoor and indoors connection
Reference:Importanceofbalancing indoorand outdoorspaces
 connectionbetween outdoorandindoor
The way of converting the transitional spaces into an open
environment
 exterior staircases
Walter Gropiushouse Walter Gropiushouse
33
9/28/2021 33
9/28/2021
Outdoor and indoors connection
Reference:Importanceofbalancing indoorand outdoorspaces
Walter Gropiushouse Bauhausuniversity
 outdoor pathways
34
9/28/2021 34
 Visual connection is alsoanother way
9/28/2021
Outdoor and indoors connection
Reference:Importanceofbalancing indoorand outdoorspaces 35
The Bauhaus shifted perspectives further afield. Modernism turned familiar perforatedfaçades into
glass envelopes – thereby providing an unobstructed view
Mie'svan der Rohe'sFarnsworthHouse Mie'svan der Rohe'sFarnsworthHouse
9/28/2021 35
9/28/2021
Outdoor and indoors connection
Reference:Importanceofbalancingindoorandoutdoorspaces 36
9/28/2021 Reference:Importanceofbalancingindoorandoutdoorspaces 36
Materials andcolors usedfor outsidecanbeused forinterior placesto connectinside to
outside.
 Concrete,steel
 Gray, white color
Bauhausuniversity
Bauhausuniversity
9/28/2021 36
streamline strip windowsarea commondesign patterninthe 1930s Bauhaus/International
Style.
Itwas used widely inBauhausdesigns
https://www.jerudesign.org/item/strip-windows-i-2/
Bauhaus strip windows
9/28/2021 37
Bauhaus strip windows
http://gropius.house/location/furniture-and-art/
Someof thekey elements of Bauhausarchitecture had tobe adaptedtothe localenvironment,
primarily becauseofthe climate.One ofthe keyelements ofthe InternationalStyleinEurope was a
large window.However, ina hotclimate –large windows thatlet great amountsof light shine into
therooms – donot makesense. Locally,glass wasused sparinglyandlong,narrow, horizontal
windows are visibleon manyofthe Bauhausbuildings
9/28/2021 38
Bauhaus strip windows
https://medium.com/@dannfielding/modern-industrial-design-bauhaus-844018ab726f
Masters housebyWalterGropius
vertical strip windowson theside of thebuilding whichallowed
for light tobe seen onthestaircases
9/28/2021 39
Bauhaus strip windows
http://gropius.house/location/furniture-and-art/
House byWalterGropius
horizontalstrip windows
arenarrower on the
principalelevation on the
north for privacyand
weather protection
9/28/2021 40
Bauhaus strip windows
Weissenhof museum
Strip windows
9/28/2021 41
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
Bauhaus strip windows
Frank House,byMarcel Breue
Strip windows
9/28/2021 42
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
Bauhaus linear windows
These types ofwindows are similar to strip
windows but windows
are separate from oneanother
Italso was used a lot inBauhausdesigns
Farnsworth house
bymies vander rohe
9/28/2021 43
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
Bauhaus linear windows
BauhausDessauDormitory BauhausDessau
9/28/2021 44
https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
Bauhaus furniture
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
• Bauhaus furniture was designed tobe functional above all other qualities.
• Bauhaus designers wanted tocreate aesthetically pleasing objects, but also wanted
their products tobe available toa mass public
9/28/2021 45
• They used steel and leather widely in their furnitures
• Most of the furnitures lines are clearly straight or curve line
• The furnitures are without any decoration
• For furnitures they used geometrical shapes,,,and some times they combined those geometrical shapes
with main colors
Bauhaus furniture
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
9/28/2021 46
The Wassily Chair (Model B3 Chair)
• Designer : Marcel Breur
Year :1925
• Materials :tubularsteel and
leather were combinedto create
this Bauhausiconchair
• Dimensions:79-80cmW
70-73cmD
71-74cmH
42cmseatH
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
9/28/2021 47
The Wassily Chair (Model B3 Chair)
79-80cm
70-74cm
42cm
70-73cm
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
9/28/2021 48
Concept
While teaching at the Bauhaus, Breuer
often rode a bicycle, a pastime that led him
towhat is perhaps the single most
important innovation in furniture design
in the twentieth century: the use of tubular
steel. The tubular steel of his bicycle’s
handlebars was strong and lightweight,
and lent itself tomass-production. Breuer
reasoned that if it could be bent into
handlebars, it could be bent into furniture
forms.
The Wassily Chair (Model B3 Chair)
Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius
Marcel bruer sitting on his designed chair
9/28/2021 49
The Wassily Chair (Model B3 Chair)
Wassily chairs examples in bed rooms Wassily chairs examples in office rooms
ReferencePinterest
9/28/2021 50
The Wassily Chair (Model B3 Chair)
Wassily chairs examples in living rooms
ReferencePinterest
9/28/2021 51
The Barcelona chair
• Designer : Mies van der Rohe
Lilly Reich
• Year : 1929
• Materials : leather and steel The
leather cushion is divided into
squares with buttons
• Dimensions :74-76cm H
75-78cm W
75-78cm D
flyingarchitecture.com • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
9/28/2021 52
The Barcelona chair
76cm
74cm
43cm
34cm
flyingarchitecture.com
9/28/2021 53
The Barcelona chair
Concept
An icon of modernism, the
Barcelona chair's design was
inspired bythe campaign and
folding chairs of ancient times.
was designed for the German
Pavilion
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
9/28/2021 54
Designer : mies van der roh , lily Reich
Year : 1929
Material :Chrome on steel frame.Leather cushions
filled with foam
Dimensions : 42cm H-97cm D-196cm L
• Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
Barcelona daybed
mies van der rohe
lily Reich
9/28/2021 55
The Barcelona set
Barcelona daybed The Barcelona chair Barcelona daybed
ReferencePinterest
9/28/2021 56
The Barcelona set
The Barcelona chair in living room The Barcelona chair in bedroom
ReferencePinterest
9/28/2021 57
Designer : mies van der roh
Year : 1930
Material :tubular stained steel , leather
Dimensions : 80cmH-58cmW-58cmD
Concept : The design is based on the idea that it is
not necessary for a chair tohave four legs when it can
be built in a cantilever-style, using a single C-shaped
bartosupport the entire seat.
• Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
Brnochair
9/28/2021 58
Brno chair
The brno chair in dining room The brno chair in office room
ReferencePinterest
9/28/2021 59
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
JosefAlbers:minimal means, maximum effect
Designer : mies van der rohe
Material : Tubular steel, painted caning
Year : 1927
Dimensions : 80x 55.9x 94cm
The-Bauhaus-by-Gillian-Naylor
Cantilever chair
Cantilever chair in dining room
9/28/2021 60
Designer : Josef albers
Material : a chair made of four curved strips of
laminated wood connected bytwo steel tubes
Year : 1926
Dimensions : 69x 61x 71cm
Josef albers
• Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
Armchair by albers
9/28/2021 61
Bauhaus lamp
• Designer : Wilhelm Wagenfeld
• Year : 1924
• Materials : glass and metal
• Dimensions :36cm (height),
15.2 cm (Øbase),
18cm (Øhead)
• Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
Wilhelm Wagenfeld
9/28/2021 62
Bauhaus lamp
The glass shade and metal parts
create an interesting contrast,
but they go together very well.
Every partof the lamp has a
purpose and is functional and
not just decorative. It produces a
very pleasing light that creates a
wonderful light ambiance
glass
metal
• Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.
9/28/2021 63
Bauhaus lamp
Bauhaus lamp in bedrooms
Bauhaus lamp in living rooms
ReferencePinterest
9/28/2021 64
Nesting tables
• Designer : Josef albert
Year : 1927
• Materials : black lacquer and painted glass , Oak
• Dimensions : 39.7Hx 41.6Wx40Dcm
47.3Hx47.9Wx 40Dcm
55.2Hx53.3Wx40Dcm
62.5Hx 60Wx40.3Dcm
Josef Albers: minimal means, maximum effect
9/28/2021 65
Nesting tables
yellow table 55.2Hx53.3Wx 40Dcm
green table 62.5Hx60Wx40.3Dcm
39.7cm
41.6cm
40cm
47.3cm
47.9cm
40cm
Painted glass
black lacquer
Oak
Josef Albers: minimal means, maximum effect
9/28/2021 66
Nesting tables
Albers conceived the Nesting
Tables forthe private Berlin
apartment of his and his wife
Annie's closest friends.
alters is known forhis
compositions that explore the
relationship of color through
simple forms, such as the square.
and his logic and passion for
color are applied to these tables.
Josef Albers: minimal means, maximum effect
9/28/2021 67
Baby Cradle
• Designer : Peter Keler
Year : 1922
• Materials : Steel tube painted, natural
wicker work . MDF lacquered
• Dimensions : 98Lx 91DIAMETER cm
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
Peter Keler
9/28/2021 68
91cm
98cm
His design reflects a Bauhaus trademark:
the primarycolors red,yellow and blue assigned
toa square, triangle and circle as elementary shapes.
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 https://www.dezeen.com/
9/28/2021 69
Metal Workshop
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
Tea Glass
Designer : Josef Albers
Year : 1925
Material : Heat-resistant glass, steel, ebony, and
porcelain
Fish casserole
Designer : Marianne Brandt:
Year : 1926
Material : Silver-bronze
lined with silver
9/28/2021 70
Teainfuser
• Designer : Marianne Brandt
Year : 1924
• Materials : metal
• Dimensions : Seven cm high
The-Bauhaus-by-Gillian-Naylor-z-lib
Marianne Brandt
9/28/2021 71
Carpentry Workshop
MarcelBreuer:
Dressing table.
1923
Josef Albers:
Shelves for magazines.
Light and dark oak.
1923
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
9/28/2021 72
AlmaBuscher:
Playcupboardinuse.
Storagecabinetscanalso
beused astables, chairs,
andcarts
Carpentry Workshop
Josef Pohl
Wardrobe onrollers
therectangularwardrobe ismountedon
castors wheels, makingit easy tomoveinto
different locations.
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
9/28/2021 73
Weaving Workshop
OttiBerger: Rug.
White,
black, brilliant
blues, red,
yellow.
wool and hemp
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
AnnieAlbers:
Black and white.
Cotton, rayonand
wool
9/28/2021 74
Pottery workshop
Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192
O.Lindig: 1922
Glazed earthenware cocoa pot.
O.Lindig: 1922
Coffee set.
9/28/2021 75
Materials used:
 Tubularsteel
wasthestarof theBauhausdesignmovement.
 Plastic
 Wood
 Iron
 Textile
 Leather
• Allthematerialthatcouldbe used formass production,were light-weightandcouldbe handled
bymachinery.
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
9/28/2021 76
Wall:
 Concrete
 wasanessential componentofmuchBauhausarchitecture forits strength andresistance
 Thetruth tomaterials principle wasprevalent inBauhaus.
Reference: theBauhausbookbyGillianNaylor &ThenewarchitectureandBauhausbook byWalterGropius
Bauhaus interior design
 Concretewalls
 Truthto materials
9/28/2021 77
wall
 Wallpaper
 wallpaper productionwas plannedunder Gropiusbytaking dimensions,preparing estimates,
bookkeeping
 .the emphasiswas noton patternbut ontexture .
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
Bauhaus interior design
Different
textures
solid colorswere
used
9/28/2021 78
wall
 Plasticwall panel
 neo-plasticworks ofart asdirect transformations oftheoptical impression ofnature.
Thearchitectural designs depictedare composed sculptures
Using circles andstraight and diagonal line hatches
Reference;BAUHAUS|TRUTHTOMATERIALS ASACENTRALPRINCIPLE
9/28/2021 79
wall
Plastic wall panel
Bauhaus, Dessau
Reference;BAUHAUS|TRUTHTOMATERIALS ASACENTRALPRINCIPLE
 Worked as a partition wall
9/28/2021 80
wall
 Tile
Using wall tiles because it is easy to clean’ hygiene material and also protective , most of the time they
came in simple and plain colors .
Reference;BAUHAUS|TRUTHTO MATERIALSAS A CENTRALPRINCIPLE
Bauhaus interior design Bauhaus interior design
9/28/2021 81
wall
Reference;BAUHAUS |TRUTH TO MATERIALSAS A CENTRAL PRINCIPLE
Bauhaus interior design
Tile
 Using white
tiles as main
color for the
bathroom
 Using dark
color tobalance
the white
wall,ceiling
The haus amhorn (Bauhaus)
9/28/2021 82
wall
Reference:theinteriorsvila tugendhat
 Marble tile wall
Marbletileis crafted from highly durablestone that exists in almost every color due tothe variability of component minerals.
Vila tugendha
9/28/2021 83
wall
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 Painting
 byusing (airbrush) on plaster and mineral
paints watercolor, oil paint,metallic paint
chemical nature of oils, varnishes
 Use of color
Bauhaus members studied primary colors and shapes.
the yellow triangle, the blue circle, and the redsquare
9/28/2021 84
Wall painting
Reference:Primarycolorsand shapesattheBauhaus
 Thethree
primary colors
 harmony
colors
 Geometric
shapes
 Composition of
straights and curves
lines
 harmony colors
9/28/2021 85
Window and door
Reference:Villatugendhat
 Large regular glass panels
Reading area
office
Dining
room
kitchen
9/28/2021 86
Window and door
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 Stained glass
1920–1925
stained glass window, using a mixof
colors abstractshapes.
josef Albers, who entered the Bauhaus
in 1920as a student, he created the best-
known artworks of the glass painting
workshop. Due toa lack of commissions.
Glass and Mural Painting Workshop atthe Bauhaus in Weimar, around 1923
9/28/2021 87
The SommerfeldHouse
Window and door
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 Stainedglass
1920–1925
9/28/2021 88
 the doors, and the joists on the interior of
the house with crystalline geometries
triangles
 Entrance hall door of the Somerfield House
with wood carvings, door
The SomerfieldHouse
 Using geometries triangles
Window and door
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 wood
 Wood door
9/28/2021 89
Flooring
Reference:GrandTourderModerne|Orte
 Tile
1923
 The colors and graphics are influenced
byBauhaus style.The goal of this
flooring tile was tocreate a decorative
design element from something that is
usually discarded after use
The hausamhorn (Bauhaus)
Kitchen
9/28/2021 90
Flooring
 Wood
 Gropius affordedan explicitly spiritual quality
tothe material, arguing that “wood is the
building material of the present
 quickly and economically were the reasons to
use wooden roof in this house
 advanced thermal insulation
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
Usingwoodforfloor
The SommerfeldHouse
9/28/2021 91
Flooring
9/28/2021
 Concrete
 Minimalism
 Less is more
Bauhaus interior design
Using concretefor
wall
Using concretefor
floor
Using concretefor
floor
Using simple white
color wall
Reference;BAUHAUS|TRUTHTOMATERIALS ASA CENTRALPRINCIPLE
9/28/2021 92
Ceiling (roof , beam)
9/28/2021
 Beamceiling
 Beam ceilings are typically found in hallways and
corridors forcommercial settings and living and dining
rooms for residential settings.
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
Bauhaus school Bauhaus school
Using concretefor
ceiling andbeams
9/28/2021 93
Ceiling (roof , beam)
9/28/2021
 Aconventionalceiling
 constructiontype is commonlyfoundin homes.
 These ceilings havea standarddrywall finish
 madeof lower-cost materials
 requiring easy installation.
Reference:https://www.9wood.com/blog/eight-different-types-of-ceilings
 flatroof system
 Concrete ceiling painted
with yellow
Bauhaus interior design
9/28/2021 94
staircase
9/28/2021
• Oskar Schlemmer
German, 1888–1943
Bauhaus Stairwaydepicts these interactions in
 the contrast between static architectural forms and
dynamically shifting figures, epitomized by the dancer
balancing in point.
 Schlemmer’s bodies are spheres, and cylinders—simplified
into almost modular geometric units rather than rendered
as individual identities
Reference:https://www.moma.org/collection/works/80049?artist_id=5219&page=1&sov
static elements
9/28/2021 95
staircase
9/28/2021
 Wood
The SommerfeldHouse
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
9/28/2021 96
staircase
9/28/2021 Reference:bauhausstaircasematerials
 Tile
curved line
landing
tile
Straight line
landing
Metal handrail
9/28/2021 97
9/28/2021
Furniture material
 Leather
 Leather doesn't stain like cloth does, cleans more easily, and it doesn't hold
odors like cloth. That being said, leather is a good option tobe used for
furniture materials design
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
Vila tugendhat
9/28/2021 98
9/28/2021
Furniture material
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 wood
The SommerfeldHouse
Wooden
folding door
9/28/2021 99
9/28/2021
Furniture material
 Plastic
Using plastic table
The haus am horn (Bauhaus)
Reference:GrandTourderModerne|Orte
9/28/2021 100
9/28/2021
Furniture material
 Wallhangings
 Made of Mercerized cotton, silk
 In the sketches forher wall hangings, Albers
reveals this combination of weaving technique
and modernist design. Her limiteduse ofcolor
 Using a frequency as a planfor the weaving
andusing limited colors
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
 Using different textures and
designs
9/28/2021 101
9/28/2021
Furniture material
 tubularsteel
 Tubular steel chair, inspired bybicycle frames and made
with the latest in steel-bending technology
 Tubular steel was the starof the Bauhaus design movement.
http://bauhausinteriors.com/blog/the-bauhaus-movement/
9/28/2021 102
9/28/2021
Furniture material
 Metal
ebony heat resistant handle
 Steel tea pot
simple shapes circles, semi-circles and
built a sculptural yet very functional
object. The functionality of the piece is
the in built tea strainer non drip nozzle
and ebony heat resistant handle.
Steeland nickeledbrassfloor lamp.
Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf
9/28/2021 103
Analyzed example (Gropius House)
 Designed byfirstdirector of Bauhaus ( Walter Gropius) .
 Located at68 Baker Bridge Road in Lincoln , Massachusetts , United States.
 5.51acres (22,300m2)
https://en.wikipedia.org/wiki/Gropius_House
9/28/2021 104
Introduction (Gropius House)
• Gropius House is a historic house museum owned
byhistoric new England located in united states .
• Gropius was concerned with combining modern
technologies with consumer needs.
• placing equal emphasis on architectural integrity
and decorative arts.
https://en.wikipedia.org/wiki/Gropius_House
9/28/2021 105
Plan (Gropius House)
characters
1. Open plan
2. Simple
3. Geometrical shape
4.Regularity
https://en.wikipedia.org/wiki/Gropius_House
9/28/2021 106
Elevation , section(Gropius House)
characters
1.Simple
2. Geometrical shape
3.Regularity
4.Asymmetrical
5.Monochromatic
https://en.wikipedia.org/wiki/Gropius_House
9/28/2021 107
Structural plan, material
(Gropius House)
http://gropius.house/location/furniture-and-art/
9/28/2021 108
Study – room(Gropius House)
furniture
http://gropius.house/location/furniture-and-art/
DoubleDesk
In 1921, MarcelBreuer
enrolled as a student in the
Bauhaus. Gropius
immediately recognized
Breuer's talent and quickly
promoted him tothe headof
the carpentryshop.
TheGropius's specifically
requested a tandem and
equitablydivideddesk
layout so that Walter andIse
could work side byside.
9/28/2021 109
Study – room(Gropius House)
study- furniture
http://gropius.house/location/furniture-and-art/
Chair,Eero Saarinen,1960s
9/28/2021 110
Study – room(Gropius House)
study- furniture
http://gropius.house/location/furniture-and-art/
TaskLamps
Marianne Brandt designedthis pair of task lamps for the Gropius
house
Created specificallyfor the doubledesk, these task lamps are
designed for usewith a typewriter.
9/28/2021 111
Study –room (Gropius House)
• Material
.
 Moquette(textile)
 Wooden
 Fabric chair
 Large glass pannel
 Concrete wall
Minimalism, simplicity , true material
http://gropius.house/location/furniture-and-art/
9/28/2021 112
Living – room(Gropius House)
furniture
http://gropius.house/location/furniture-and-art/
9/28/2021 113
Living – room(Gropius House)
furniture
Nesting table MarcelBreuer
Tubular steel, linoleum, wood,
1927
http://gropius.house/location/furniture-and-art/
9/28/2021 114
Living – room(Gropius House)
furniture
Womb Chair
Finnish architect Eero Saarinen designed this “womb chair” in 1946. IseGropius said that it was given toWalter Gropius on his
seventieth birthday..
http://gropius.house/location/furniture-and-art/
9/28/2021 115
Living – room(Gropius House)
furniture
ButterflyStools
http://gropius.house/location/furniture-and-art/
9/28/2021 116
Living – room(Gropius House)
furniture
Long Chair
There were always two of these chairs in the house. Onein the living room andone in the study
http://gropius.house/location/furniture-and-art/
9/28/2021 117
Living – room(Gropius House)
furniture
Day bed
Gropius’ preferred this evening sitting area which heoccupiedevery
evening, together with mountains of architecture magazines andbooks
http://gropius.house/location/furniture-and-art/
9/28/2021 118
Living –room (Gropius House)
• Material
 Concrete ceiling
Minimalism, simplicity , true
material
 Concrete wall
Unity of material
 Glass
 Wood
 Dark brown moquette
contrast to the wall,roof’s
light color
http://gropius.house/location/furniture-and-art/
9/28/2021 119
Dining – room(Gropius House)
furniture
Dining room-atnight Dining room-daytime
http://gropius.house/location/furniture-and-art/
9/28/2021 120
Dining – room(Gropius House)
furniture
SideChairs
Theset of dining room chairs,
builtfor the Director’s House at
the Dessau Bauhaus, consists of
three sections of continuous
chrome platedtubular steel
with a “sleigh” basewhich
facilitates mobility andcanvas
covers.
The circular dining tablewas
also part of the original
furnishings of the Directors’
House.
http://gropius.house/location/furniture-and-art/
9/28/2021 121
dinning –room (Gropius House)
• Material
 Mdfwood circular table
 Steel andcanvas chair
 Glass
 Using white color
 Using glass panel as partition
wall between two spaces
http://gropius.house/location/furniture-and-art/
9/28/2021 122
kitchen– room(Gropius House)
furniture
http://gropius.house/location/furniture-and-art/
it is accessible fromthe outside –
tobring the groceries in, as well
as from the inside, from the
maid’s room and the kitchen.
white, galley-style kitchen.
9/28/2021 123
Kitchen –room (Gropius House)
• Material
 Exposedfloor It’s one flat surface Cleanablewith no grooves
Anty bacterial for kitchen
 White cabinet
 Using white andblackcolor contrast .
http://gropius.house/location/furniture-and-art/
9/28/2021 124
Master bedroom– room(Gropius House)
masterbedroom and dressingroom-furniture
Master bed-Dressingroom
Master bed-bathroom
http://gropius.house/location/furniture-and-art/
9/28/2021 125
Master bedroom– room(Gropius House)
masterbedroom and dressingroom-furniture
Night Stands
MarcelBreuer, (Plywood, Glass, Chromed steel, Paint) 1925
http://gropius.house/location/furniture-and-art/
9/28/2021 126
Master bedroom– room(Gropius House)
masterbedroom and dressingroom-furniture
TableLamps
From 1923 to 1925 Wilhelm Wagenfeld studied at Bauhaus in Weimar.
During this timehe designedsome of his famous works, such as the
Bauhaus WA24 'Wagenfeld lamp' in 1924.
http://gropius.house/location/furniture-and-art/
9/28/2021 127
Master bedroom– room(Gropius House)
• Material
 Using white tilefor wall
 Using blacktile for floor
 Contrast
 Semisymmetrical balancebyvision andin
terms of quantity
http://gropius.house/location/furniture-and-art/
9/28/2021 128
Master bedroom– room(Gropius House)
• Material
 Simplicity
 Contrast between the greycolor anda touch of orange color
of the table andthe wall hanging
 Greywall painting
http://gropius.house/location/furniture-and-art/
9/28/2021 129
guest– room(Gropius House)
Guest room-furniture
DeskandBed Table
This desk was designedfor this room andinstalled when the
house was built.
http://gropius.house/location/furniture-and-art/
9/28/2021 130
guest– room(Gropius House)
Guest room-furniture
Guest RoomBeds
These bedswere originally madefor the Director’s House in Dessau. The Gropius's always
covered them with redHungarian woven bedspreads..
http://gropius.house/location/furniture-and-art/
9/28/2021 131
guest– room(Gropius House)
• Material
 Greywall painting
 Using steel for the table,chair , lamp
 Greymoquette
http://gropius.house/location/furniture-and-art/
9/28/2021 132
Single bed– room (Gropius House)
His daughterroom-furniture
Desk
Designed byWalter Gropius for his officein theWeimar Bauhaus,
this piece of furniture isthe oldest in the house. It was handcrafted in
the woodwork shop of the Bauhaus school in 1923.
http://gropius.house/location/furniture-and-art/
9/28/2021 133
Single bed– room (Gropius House)
His daughterroom-furniture
Chair,MarcelBreuer
Chromed Steel, Caneand Pine,
1928
http://gropius.house/location/furniture-and-art/
9/28/2021 134
Single bed– room (Gropius House)
His daughterroom-furniture
Nesting table
MarcelBreuer
Tubular steel, linoleum, wood,
1927
http://gropius.house/location/furniture-and-art/
9/28/2021 135
Single bed– room (Gropius House)
His daughterroom-furniture
Table
This low table is from Alvar Aalto’s Nesting Table
http://gropius.house/location/furniture-and-art/
9/28/2021 136
Single bed– room (Gropius House)
• Material
 greyPlaster wall
 Natural wood
 steel
 Brown moquette
 Minimalism of colors andmaterials
http://gropius.house/location/furniture-and-art/
9/28/2021 137
Staircase, corridor(Gropius House)
http://gropius.house/location/furniture-and-art/
 Wooden corridor floor
 Plaster wall
 Wooden ,white stair case
 Steel handrails
9/28/2021 138
Walter Gropius houseinterior video
https://youtu.be/2bBtdkv_fhQ
9/28/2021 139
Conclusion:
1. The Bauhaus was founded bythe architect Walter Gropius
2. Bauhaus, in full Staatliches Bauhaus, school of design, architecture, and applied arts that existed
in Germany from1919to1933.
Weimar until Dessau through Berlin in its final months
1925 1932 1933
9/28/2021 140
Conclusion:
3.Form follows function : According tothis idea,simple but elegant geometric shapes were designed based
on the intended function or purpose of a building or an object
4.Open plan : makes use of large, open spaces and minimizes the use of small, enclosed rooms such as
private offices.
5. Using Flat surface.
6.Asymmetrical balance is very clear in the simple elevations and plans .
9/28/2021 141
Conclusion:
7.Emphasis's on technology ( mass production ) Bauhaus workshops were used fordeveloping prototypes
of productsfor mass production.
9/28/2021 142
Conclusion:
8.Using geometrical shapesfor planbecauseofthe functionandit wassimple andopenplan
Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor
9/28/2021 143
Conclusion:
9.Bauhaus Color According To Johannes Itten methods of contrast:
o light and dark
o complementary contrast
o contrast of hue
o contrast between warm and cool colors
10.Bauhaus bring together all the artistic disciplines to create
buildings focused on functionality and design.
complementary contrast
9/28/2021 144
11. using large glass panels for more natural lighting .
12.The connection of the indoor and outdoor spaces doesn’t
only mean that they need tobe connected physicallythey
can be connected by Visual connection
9/28/2021
Conclusion:
9/28/2021 145
Conclusion:
13.Material for furniture : mostlysteel , leather and wood
14.Shapes of furniture : geometrical shapes like rectangle , circle and triangle
15.Most famous furniture : wassily chair , Barcelona set ,nesting table …
16.All Bauhaus furniture followed a slogan : form follows function
( simple and comfortable touse)
9/28/2021 146
9/28/2021
Conclusion:
17.Materials used for wall are: concrete ,wall paper ,paint,wood , tile,plastic
18.Materials used for flooring are :tile , wood , concrete
9/28/2021 147
9/28/2021
Conclusion:
19.Beam ceilings are typically found in hallways and corridors for commercial settings and
living
20.A conventional ceiling this construction typeis commonly found in homes.
9/28/2021 148
9/28/2021
Conclusion:
21.Using circular and straight staircases with tile ,steel , paint , wood
22.Leather , wood , plastic , steel for furnitures
9/28/2021 149
Thank you
9/28/2021 150

interior design - bauhaus school style

  • 1.
    University of Sulaimani Collegeof Engineering Architectural Department 4th stage Bauhaus / international movement Preparedby: Supervised by: Shanyar Awat L.Handreen Hamid Shnay shamal L. Raz Kamaran Barzi Wrya 9/28/2021 1
  • 2.
    Contents :  Introduction3  The history of Bauhaus periods 5  The teachers of Bauhaus 13  Characteristics and highlights of Bauhaus movement 16  Use of color 27  Lighting atthe Bauhaus 29  Outdoor and indoor connections 33  Stripand linear windows 37  Furniture design concept 45  Materials used 76  Analyzed example 104 9/28/2021 2
  • 3.
    Introduction :  TheBauhaus was founded bythe architect Walter Gropius .  Gropius combined two schools, the Weimar Academyof Artsand the Weimar School of Arts and Crafts.  Gropius called the Bauhaus, or house of building  Gropius , who combined nineteenth -century idealism with twentieth - century realism Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius Walter Gropius office in Dessau Bauhaus interior design 9/28/2021 3
  • 4.
    Introduction :  In1914when it was firstsuggested that Gropius might take over the arts and craftsschool in Weimar .  Bauhaus This idea of the fundamental unity under lying all branches of design was Walter Gropius guiding in founding the original Bauhaus .  In the spring of 1919Gropius ' specialized ' classes under the name of Das Staatliche Bauhaus Weimar . Reference: the Bauhaus book by Gillian Naylor & The new architecture and Bauhaus book by Walter Gropius Bauhaus interior design 9/28/2021 4
  • 5.
    The history ofBauhausperiods Bauhaus, in full Staatliches Bauhaus, school of design, architecture, and applied arts that existed in Germany from1919to1933. Weimar until Dessau through Berlin in its final months 1925 1932 1933 Reference:https://biblus.accasoftware.com/ 9/28/2021 5
  • 6.
    Weimar Bauhaus 1919-1925 • The contractfor thedirection of theBauhauswascon colluded at WeimarApril I, 1919. • BetweenthearchitectWalterGropius of Berlinandthe office of the Hofmarschallof Weimar. Staatliche Bauhaus Weimar BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius 9/28/2021 6
  • 7.
    Weimar Bauhaus 1919- 1925 Staatliche Bauhaus Weimar interior https://www.pinterest.com/ 9/28/2021 7
  • 8.
    The Dessau period1925 -1929 • The Bauhaus moved fromWeimar toDessau, where Gropius had designed the new building tohost the school. The main building elements. • Dessau From 1925until Gropius left the school in 1929, the Bauhaus was building on the foundations that had been laid down in Weimar . Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor 9/28/2021 8
  • 9.
    The Dessau period1925 -1929 • Accordingto thesame philosophy,the architect’s job isto carefullyanalyzethefunctionsof thebuilding thatwill bekey to designits shape. • Theprinciples ofthe Bauhauswere againclarified: TheBauhausisanadvancedschoolfor creative work. Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor 9/28/2021 9
  • 10.
  • 11.
    The Berlin period •Meyer resigned in 1930and was replaced byLudwig Mies Van der Rohe, famous for his saying “lessis more”. • Mies Van der Rohe impressedthe school with a strictlydisciplinarycharacter, more focused on architecture. • Mies transfer the school toBerlin in 1930,operating on a smaller scale. Ultimately, the Bauhaus closed down in 1933. Reference: https://biblus.accasoftware.com/ Bauhaus archive – museum of design 9/28/2021 11
  • 12.
    Bauhaus archive –museum of design Reference: https://biblus.accasoftware.com/ 9/28/2021 12
  • 13.
    The teachers ofBauhaus • During the war some vacancies occurred on the staffs of the two schools (the Academy of Pictorial Art and the Academy of Artsand Crafts) which Gropius later united in the Bauhaus. • This enabled him tohave three masters appointed atthe very beginning: 1. Johannes Itten 2. Lyonel Feininger 3. Gerhard Marcks in May, 1919. BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius(Chairmanof the Departmentof Architecture, HarvardUniversity) 9/28/2021 13
  • 14.
    The teachers ofBauhaus • Adolf Meyer, 1919,, 1920, • Paul Klee, January, 1921, • Oskar Schlemmer, April, 1921, • Wassily Kandinsky, June, 1922, • Laszlo Moholy-Nagy,1923. BAUHAUS1919-1928editedby HerbertBayer, IseGropius,WalterGropius(Chairmanof the Departmentof Architecture, HarvardUniversity) 9/28/2021 14
  • 15.
    Bauhaus movementseal the Bauhausin education An organization basedon new principles easily becomesisolated ifit doesnot constantly The later Bauhaus seal, designed byOskar Schlemmer, 1922 Thefirst Bauhaus seal , LyonelFeininger: Woodcut from the first proclamation, 1919 9/28/2021 15
  • 16.
    Characteristics and highlightsofBauhaus movement  Simplicityand Effectiveness :There is no need for additionalornamenting and making things more and more ‘beautiful’. Theyare just fine as they are.  Minimalism : Bauhaus artists favored linear and geometrical forms, avoiding floral or curvilinear shapes (lines, smooth gentle lines andshapes)  Form follows function : According tothis idea,simplebutelegant geometric shapes were designed basedon the intended function or purposeof a building or an object Reference:https://art.art/blog/ fransworth house byle Corbusier 9/28/2021 16
  • 17.
    Characteristics and highlightsofBauhaus movement  Flat surface  Asymmetricalbalance  Monochromatic Reference:https://art.art/blog/ fransworth house byle Corbusier 9/28/2021 17
  • 18.
    Characteristics and highlightsofBauhaus movement  Open plan makes use of large, openspaces andminimizes the use of small, enclosed rooms such as private offices. combining the kitchen, living room, and dining room into a single great room. Reference:https://art.art/blog/ fransworth house byle Corbusier 9/28/2021 18
  • 19.
    Characteristics and highlightsofBauhaus movement  Open plan Reference:https://art.art/blog/ Open plan examples 9/28/2021 19
  • 20.
    Characteristics and highlightsofBauhaus movement  Smart use of resources (economy) Therepresentatives of the Bauhaus movement wanted to achieve a controlled finance, productive time-consuming projects  Constant development (modern ) Bauhaus is allabout new techniques, new materials, new ways of construction, new attitude , Bauhaus also ledtothe emergence of new forms of interior design.  Emphasis's on technology (mass production ) Bauhaus workshops were used for developing prototypes of products for mass production. The artists embracedthe new possibilities of modern technologies . Reference:https://art.art/blog/ 9/28/2021 20
  • 21.
    Characteristics and highlightsof Bauhaus movement  Angularity  Abstraction  Unity  Continuity Reference:https://art.art/blog/ Regularity Anti-ornament Modern materials (plastic, chrome and other metals) 9/28/2021 21
  • 22.
    Bauhaus school –Dessau characters 1. Openplan 2. Simple 3. Geometrical shape Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor 9/28/2021 22
  • 23.
    Bauhaus schoolin Dessauelevation 1. steel frame construction 2. a glass curtain wall wrapping around the corners and an asymmetricpinwheel plan. 3. It has a symmetricalfaçade also have a typicalsmooth, white plaster also have a base of rough plaster in grey Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor 9/28/2021 23
  • 24.
    Bauhaus schoolinterior • MarianneBrandt: Lighting fixture. Frosted and plain glass globe.. 1925 • Symmetrical use of light • Using The Wassily Chair By marcel bruer • Clear line https://www.dezeen.com/2018/11/05/bauhaus-dessau-school-building-walter-gropius-germany-architecture/ 9/28/2021 24
  • 25.
    Bauhaus school– Dessauinterior  such asreinforcedconcrete,  rolled steel  large-scaleglasspanels. https://www.dezeen.com/2018/11/05/bauhaus-dessau-school-building-walter-gropius-germany-architecture/ Brno chair Designer : mies van der rohe Steel legged baseof rough plaster in grey whiteplaster. 9/28/2021 25
  • 26.
    Bauhaus archive –museum of design Reference: https://biblus.accasoftware.com/ characters 1.Openplan 2.Simple 3.Geometricalshape 9/28/2021 26
  • 27.
    Use of color Reference:PrimarycolorsandshapesattheBauhaus  color sphere comprised of twelve colors (three primary,three secondary, and six tertiary)that shows the relationship among colors. Bauhaus Color According To:  Johannes Itten methodsofcontrast:  light and dark  complementary contrast  contrast of hue  contrast between warm and cool colors Using black and whitecontrast colors and geometricshapes complementary contrast 9/28/2021 27
  • 28.
    Bauhaus Color AccordingTo:  Paul Klee  Klee tended to think of color in musical terms,making the connection between harmonious sounds and complementary colors Use of color Reference:Primarycolorsand shapesattheBauhaus  Using purple and yellow complementar y And harmonyof purple and blue shades BauhausColor AccordingTo:  Josef Albers All colors have twokeyelements–brightness(which canbe understoodasthecolor intensity)and lightness (a light’sintensity). 9/28/2021 28
  • 29.
    Lighting at theBauhaus  Bauhaus bring together all the artistic disciplines tocreate buildings focused on functionality and design. Walter Gropius lighting in Bauhaus school Dessau spot lights https://www.lamp.es/en/news/lighting-at-the-bauhaus-rationalism-at-the-service-of-design_388511 9/28/2021 29
  • 30.
    Lighting at theBauhaus  lighting is one of the points of greatest interest within the architectural approaches of the school. Tablelamp byChristian dell https://www.lamp.es/en/news/lighting-at-the-bauhaus-rationalism-at-the-service-of-design_388511 9/28/2021 30
  • 31.
    Natural Lighting atthe Bauhaus  using large glass panels for more natural lighting Large glass panelsin Bauhaus interiors https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped 9/28/2021 31
  • 32.
    Natural Lighting atthe Bauhaus  using skylights Large glass panelsin Bauhaus school –berlin Bauhaus museum https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped 9/28/2021 32
  • 33.
    9/28/2021 Outdoor and indoorsconnection Reference:Importanceofbalancing indoorand outdoorspaces  connectionbetween outdoorandindoor The way of converting the transitional spaces into an open environment  exterior staircases Walter Gropiushouse Walter Gropiushouse 33 9/28/2021 33
  • 34.
    9/28/2021 Outdoor and indoorsconnection Reference:Importanceofbalancing indoorand outdoorspaces Walter Gropiushouse Bauhausuniversity  outdoor pathways 34 9/28/2021 34
  • 35.
     Visual connectionis alsoanother way 9/28/2021 Outdoor and indoors connection Reference:Importanceofbalancing indoorand outdoorspaces 35 The Bauhaus shifted perspectives further afield. Modernism turned familiar perforatedfaçades into glass envelopes – thereby providing an unobstructed view Mie'svan der Rohe'sFarnsworthHouse Mie'svan der Rohe'sFarnsworthHouse 9/28/2021 35
  • 36.
    9/28/2021 Outdoor and indoorsconnection Reference:Importanceofbalancingindoorandoutdoorspaces 36 9/28/2021 Reference:Importanceofbalancingindoorandoutdoorspaces 36 Materials andcolors usedfor outsidecanbeused forinterior placesto connectinside to outside.  Concrete,steel  Gray, white color Bauhausuniversity Bauhausuniversity 9/28/2021 36
  • 37.
    streamline strip windowsareacommondesign patterninthe 1930s Bauhaus/International Style. Itwas used widely inBauhausdesigns https://www.jerudesign.org/item/strip-windows-i-2/ Bauhaus strip windows 9/28/2021 37
  • 38.
    Bauhaus strip windows http://gropius.house/location/furniture-and-art/ Someofthekey elements of Bauhausarchitecture had tobe adaptedtothe localenvironment, primarily becauseofthe climate.One ofthe keyelements ofthe InternationalStyleinEurope was a large window.However, ina hotclimate –large windows thatlet great amountsof light shine into therooms – donot makesense. Locally,glass wasused sparinglyandlong,narrow, horizontal windows are visibleon manyofthe Bauhausbuildings 9/28/2021 38
  • 39.
    Bauhaus strip windows https://medium.com/@dannfielding/modern-industrial-design-bauhaus-844018ab726f MastershousebyWalterGropius vertical strip windowson theside of thebuilding whichallowed for light tobe seen onthestaircases 9/28/2021 39
  • 40.
    Bauhaus strip windows http://gropius.house/location/furniture-and-art/ HousebyWalterGropius horizontalstrip windows arenarrower on the principalelevation on the north for privacyand weather protection 9/28/2021 40
  • 41.
    Bauhaus strip windows Weissenhofmuseum Strip windows 9/28/2021 41 https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
  • 42.
    Bauhaus strip windows FrankHouse,byMarcel Breue Strip windows 9/28/2021 42 https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
  • 43.
    Bauhaus linear windows Thesetypes ofwindows are similar to strip windows but windows are separate from oneanother Italso was used a lot inBauhausdesigns Farnsworth house bymies vander rohe 9/28/2021 43 https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
  • 44.
    Bauhaus linear windows BauhausDessauDormitoryBauhausDessau 9/28/2021 44 https://www.pinterest.com/search/pins/?q=bauhaus&rs=typed&term_meta[]=bauhaus%7Ctyped
  • 45.
    Bauhaus furniture Reference: theBauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius • Bauhaus furniture was designed tobe functional above all other qualities. • Bauhaus designers wanted tocreate aesthetically pleasing objects, but also wanted their products tobe available toa mass public 9/28/2021 45
  • 46.
    • They usedsteel and leather widely in their furnitures • Most of the furnitures lines are clearly straight or curve line • The furnitures are without any decoration • For furnitures they used geometrical shapes,,,and some times they combined those geometrical shapes with main colors Bauhaus furniture Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius 9/28/2021 46
  • 47.
    The Wassily Chair(Model B3 Chair) • Designer : Marcel Breur Year :1925 • Materials :tubularsteel and leather were combinedto create this Bauhausiconchair • Dimensions:79-80cmW 70-73cmD 71-74cmH 42cmseatH Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius 9/28/2021 47
  • 48.
    The Wassily Chair(Model B3 Chair) 79-80cm 70-74cm 42cm 70-73cm Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius 9/28/2021 48
  • 49.
    Concept While teaching atthe Bauhaus, Breuer often rode a bicycle, a pastime that led him towhat is perhaps the single most important innovation in furniture design in the twentieth century: the use of tubular steel. The tubular steel of his bicycle’s handlebars was strong and lightweight, and lent itself tomass-production. Breuer reasoned that if it could be bent into handlebars, it could be bent into furniture forms. The Wassily Chair (Model B3 Chair) Reference: the Bauhaus book by Gillian Naylor &The new architecture and Bauhaus book by Walter Gropius Marcel bruer sitting on his designed chair 9/28/2021 49
  • 50.
    The Wassily Chair(Model B3 Chair) Wassily chairs examples in bed rooms Wassily chairs examples in office rooms ReferencePinterest 9/28/2021 50
  • 51.
    The Wassily Chair(Model B3 Chair) Wassily chairs examples in living rooms ReferencePinterest 9/28/2021 51
  • 52.
    The Barcelona chair •Designer : Mies van der Rohe Lilly Reich • Year : 1929 • Materials : leather and steel The leather cushion is divided into squares with buttons • Dimensions :74-76cm H 75-78cm W 75-78cm D flyingarchitecture.com • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. 9/28/2021 52
  • 53.
  • 54.
    The Barcelona chair Concept Anicon of modernism, the Barcelona chair's design was inspired bythe campaign and folding chairs of ancient times. was designed for the German Pavilion Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. 9/28/2021 54
  • 55.
    Designer : miesvan der roh , lily Reich Year : 1929 Material :Chrome on steel frame.Leather cushions filled with foam Dimensions : 42cm H-97cm D-196cm L • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. Barcelona daybed mies van der rohe lily Reich 9/28/2021 55
  • 56.
    The Barcelona set Barcelonadaybed The Barcelona chair Barcelona daybed ReferencePinterest 9/28/2021 56
  • 57.
    The Barcelona set TheBarcelona chair in living room The Barcelona chair in bedroom ReferencePinterest 9/28/2021 57
  • 58.
    Designer : miesvan der roh Year : 1930 Material :tubular stained steel , leather Dimensions : 80cmH-58cmW-58cmD Concept : The design is based on the idea that it is not necessary for a chair tohave four legs when it can be built in a cantilever-style, using a single C-shaped bartosupport the entire seat. • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. Brnochair 9/28/2021 58
  • 59.
    Brno chair The brnochair in dining room The brno chair in office room ReferencePinterest 9/28/2021 59
  • 60.
    Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. JosefAlbers:minimal means, maximumeffect Designer : mies van der rohe Material : Tubular steel, painted caning Year : 1927 Dimensions : 80x 55.9x 94cm The-Bauhaus-by-Gillian-Naylor Cantilever chair Cantilever chair in dining room 9/28/2021 60
  • 61.
    Designer : Josefalbers Material : a chair made of four curved strips of laminated wood connected bytwo steel tubes Year : 1926 Dimensions : 69x 61x 71cm Josef albers • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. Armchair by albers 9/28/2021 61
  • 62.
    Bauhaus lamp • Designer: Wilhelm Wagenfeld • Year : 1924 • Materials : glass and metal • Dimensions :36cm (height), 15.2 cm (Øbase), 18cm (Øhead) • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. Wilhelm Wagenfeld 9/28/2021 62
  • 63.
    Bauhaus lamp The glassshade and metal parts create an interesting contrast, but they go together very well. Every partof the lamp has a purpose and is functional and not just decorative. It produces a very pleasing light that creates a wonderful light ambiance glass metal • Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928. 9/28/2021 63
  • 64.
    Bauhaus lamp Bauhaus lampin bedrooms Bauhaus lamp in living rooms ReferencePinterest 9/28/2021 64
  • 65.
    Nesting tables • Designer: Josef albert Year : 1927 • Materials : black lacquer and painted glass , Oak • Dimensions : 39.7Hx 41.6Wx40Dcm 47.3Hx47.9Wx 40Dcm 55.2Hx53.3Wx40Dcm 62.5Hx 60Wx40.3Dcm Josef Albers: minimal means, maximum effect 9/28/2021 65
  • 66.
    Nesting tables yellow table55.2Hx53.3Wx 40Dcm green table 62.5Hx60Wx40.3Dcm 39.7cm 41.6cm 40cm 47.3cm 47.9cm 40cm Painted glass black lacquer Oak Josef Albers: minimal means, maximum effect 9/28/2021 66
  • 67.
    Nesting tables Albers conceivedthe Nesting Tables forthe private Berlin apartment of his and his wife Annie's closest friends. alters is known forhis compositions that explore the relationship of color through simple forms, such as the square. and his logic and passion for color are applied to these tables. Josef Albers: minimal means, maximum effect 9/28/2021 67
  • 68.
    Baby Cradle • Designer: Peter Keler Year : 1922 • Materials : Steel tube painted, natural wicker work . MDF lacquered • Dimensions : 98Lx 91DIAMETER cm Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 Peter Keler 9/28/2021 68
  • 69.
    91cm 98cm His design reflectsa Bauhaus trademark: the primarycolors red,yellow and blue assigned toa square, triangle and circle as elementary shapes. Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 https://www.dezeen.com/ 9/28/2021 69
  • 70.
    Metal Workshop Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 Tea Glass Designer: Josef Albers Year : 1925 Material : Heat-resistant glass, steel, ebony, and porcelain Fish casserole Designer : Marianne Brandt: Year : 1926 Material : Silver-bronze lined with silver 9/28/2021 70
  • 71.
    Teainfuser • Designer :Marianne Brandt Year : 1924 • Materials : metal • Dimensions : Seven cm high The-Bauhaus-by-Gillian-Naylor-z-lib Marianne Brandt 9/28/2021 71
  • 72.
    Carpentry Workshop MarcelBreuer: Dressing table. 1923 JosefAlbers: Shelves for magazines. Light and dark oak. 1923 Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 9/28/2021 72
  • 73.
    AlmaBuscher: Playcupboardinuse. Storagecabinetscanalso beused astables, chairs, andcarts CarpentryWorkshop Josef Pohl Wardrobe onrollers therectangularwardrobe ismountedon castors wheels, makingit easy tomoveinto different locations. Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 9/28/2021 73
  • 74.
    Weaving Workshop OttiBerger: Rug. White, black,brilliant blues, red, yellow. wool and hemp Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-192 AnnieAlbers: Black and white. Cotton, rayonand wool 9/28/2021 74
  • 75.
  • 76.
    Materials used:  Tubularsteel wasthestaroftheBauhausdesignmovement.  Plastic  Wood  Iron  Textile  Leather • Allthematerialthatcouldbe used formass production,were light-weightandcouldbe handled bymachinery. Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf 9/28/2021 76
  • 77.
    Wall:  Concrete  wasanessentialcomponentofmuchBauhausarchitecture forits strength andresistance  Thetruth tomaterials principle wasprevalent inBauhaus. Reference: theBauhausbookbyGillianNaylor &ThenewarchitectureandBauhausbook byWalterGropius Bauhaus interior design  Concretewalls  Truthto materials 9/28/2021 77
  • 78.
    wall  Wallpaper  wallpaperproductionwas plannedunder Gropiusbytaking dimensions,preparing estimates, bookkeeping  .the emphasiswas noton patternbut ontexture . Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf Bauhaus interior design Different textures solid colorswere used 9/28/2021 78
  • 79.
    wall  Plasticwall panel neo-plasticworks ofart asdirect transformations oftheoptical impression ofnature. Thearchitectural designs depictedare composed sculptures Using circles andstraight and diagonal line hatches Reference;BAUHAUS|TRUTHTOMATERIALS ASACENTRALPRINCIPLE 9/28/2021 79
  • 80.
    wall Plastic wall panel Bauhaus,Dessau Reference;BAUHAUS|TRUTHTOMATERIALS ASACENTRALPRINCIPLE  Worked as a partition wall 9/28/2021 80
  • 81.
    wall  Tile Using walltiles because it is easy to clean’ hygiene material and also protective , most of the time they came in simple and plain colors . Reference;BAUHAUS|TRUTHTO MATERIALSAS A CENTRALPRINCIPLE Bauhaus interior design Bauhaus interior design 9/28/2021 81
  • 82.
    wall Reference;BAUHAUS |TRUTH TOMATERIALSAS A CENTRAL PRINCIPLE Bauhaus interior design Tile  Using white tiles as main color for the bathroom  Using dark color tobalance the white wall,ceiling The haus amhorn (Bauhaus) 9/28/2021 82
  • 83.
    wall Reference:theinteriorsvila tugendhat  Marbletile wall Marbletileis crafted from highly durablestone that exists in almost every color due tothe variability of component minerals. Vila tugendha 9/28/2021 83
  • 84.
    wall Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf  Painting  byusing(airbrush) on plaster and mineral paints watercolor, oil paint,metallic paint chemical nature of oils, varnishes  Use of color Bauhaus members studied primary colors and shapes. the yellow triangle, the blue circle, and the redsquare 9/28/2021 84
  • 85.
    Wall painting Reference:Primarycolorsand shapesattheBauhaus Thethree primary colors  harmony colors  Geometric shapes  Composition of straights and curves lines  harmony colors 9/28/2021 85
  • 86.
    Window and door Reference:Villatugendhat Large regular glass panels Reading area office Dining room kitchen 9/28/2021 86
  • 87.
    Window and door Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf Stained glass 1920–1925 stained glass window, using a mixof colors abstractshapes. josef Albers, who entered the Bauhaus in 1920as a student, he created the best- known artworks of the glass painting workshop. Due toa lack of commissions. Glass and Mural Painting Workshop atthe Bauhaus in Weimar, around 1923 9/28/2021 87
  • 88.
    The SommerfeldHouse Window anddoor Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf  Stainedglass 1920–1925 9/28/2021 88
  • 89.
     the doors,and the joists on the interior of the house with crystalline geometries triangles  Entrance hall door of the Somerfield House with wood carvings, door The SomerfieldHouse  Using geometries triangles Window and door Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf  wood  Wood door 9/28/2021 89
  • 90.
    Flooring Reference:GrandTourderModerne|Orte  Tile 1923  Thecolors and graphics are influenced byBauhaus style.The goal of this flooring tile was tocreate a decorative design element from something that is usually discarded after use The hausamhorn (Bauhaus) Kitchen 9/28/2021 90
  • 91.
    Flooring  Wood  Gropiusaffordedan explicitly spiritual quality tothe material, arguing that “wood is the building material of the present  quickly and economically were the reasons to use wooden roof in this house  advanced thermal insulation Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf Usingwoodforfloor The SommerfeldHouse 9/28/2021 91
  • 92.
    Flooring 9/28/2021  Concrete  Minimalism Less is more Bauhaus interior design Using concretefor wall Using concretefor floor Using concretefor floor Using simple white color wall Reference;BAUHAUS|TRUTHTOMATERIALS ASA CENTRALPRINCIPLE 9/28/2021 92
  • 93.
    Ceiling (roof ,beam) 9/28/2021  Beamceiling  Beam ceilings are typically found in hallways and corridors forcommercial settings and living and dining rooms for residential settings. Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf Bauhaus school Bauhaus school Using concretefor ceiling andbeams 9/28/2021 93
  • 94.
    Ceiling (roof ,beam) 9/28/2021  Aconventionalceiling  constructiontype is commonlyfoundin homes.  These ceilings havea standarddrywall finish  madeof lower-cost materials  requiring easy installation. Reference:https://www.9wood.com/blog/eight-different-types-of-ceilings  flatroof system  Concrete ceiling painted with yellow Bauhaus interior design 9/28/2021 94
  • 95.
    staircase 9/28/2021 • Oskar Schlemmer German,1888–1943 Bauhaus Stairwaydepicts these interactions in  the contrast between static architectural forms and dynamically shifting figures, epitomized by the dancer balancing in point.  Schlemmer’s bodies are spheres, and cylinders—simplified into almost modular geometric units rather than rendered as individual identities Reference:https://www.moma.org/collection/works/80049?artist_id=5219&page=1&sov static elements 9/28/2021 95
  • 96.
  • 97.
    staircase 9/28/2021 Reference:bauhausstaircasematerials  Tile curvedline landing tile Straight line landing Metal handrail 9/28/2021 97
  • 98.
    9/28/2021 Furniture material  Leather Leather doesn't stain like cloth does, cleans more easily, and it doesn't hold odors like cloth. That being said, leather is a good option tobe used for furniture materials design Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf Vila tugendhat 9/28/2021 98
  • 99.
  • 100.
    9/28/2021 Furniture material  Plastic Usingplastic table The haus am horn (Bauhaus) Reference:GrandTourderModerne|Orte 9/28/2021 100
  • 101.
    9/28/2021 Furniture material  Wallhangings Made of Mercerized cotton, silk  In the sketches forher wall hangings, Albers reveals this combination of weaving technique and modernist design. Her limiteduse ofcolor  Using a frequency as a planfor the weaving andusing limited colors Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf  Using different textures and designs 9/28/2021 101
  • 102.
    9/28/2021 Furniture material  tubularsteel Tubular steel chair, inspired bybicycle frames and made with the latest in steel-bending technology  Tubular steel was the starof the Bauhaus design movement. http://bauhausinteriors.com/blog/the-bauhaus-movement/ 9/28/2021 102
  • 103.
    9/28/2021 Furniture material  Metal ebonyheat resistant handle  Steel tea pot simple shapes circles, semi-circles and built a sculptural yet very functional object. The functionality of the piece is the in built tea strainer non drip nozzle and ebony heat resistant handle. Steeland nickeledbrassfloor lamp. Reference:Bayer_Herbert_Gropius_Walter_Gropius_Ise_eds_Bauhaus_1919-1928.pdf 9/28/2021 103
  • 104.
    Analyzed example (GropiusHouse)  Designed byfirstdirector of Bauhaus ( Walter Gropius) .  Located at68 Baker Bridge Road in Lincoln , Massachusetts , United States.  5.51acres (22,300m2) https://en.wikipedia.org/wiki/Gropius_House 9/28/2021 104
  • 105.
    Introduction (Gropius House) •Gropius House is a historic house museum owned byhistoric new England located in united states . • Gropius was concerned with combining modern technologies with consumer needs. • placing equal emphasis on architectural integrity and decorative arts. https://en.wikipedia.org/wiki/Gropius_House 9/28/2021 105
  • 106.
    Plan (Gropius House) characters 1.Open plan 2. Simple 3. Geometrical shape 4.Regularity https://en.wikipedia.org/wiki/Gropius_House 9/28/2021 106
  • 107.
    Elevation , section(GropiusHouse) characters 1.Simple 2. Geometrical shape 3.Regularity 4.Asymmetrical 5.Monochromatic https://en.wikipedia.org/wiki/Gropius_House 9/28/2021 107
  • 108.
    Structural plan, material (GropiusHouse) http://gropius.house/location/furniture-and-art/ 9/28/2021 108
  • 109.
    Study – room(GropiusHouse) furniture http://gropius.house/location/furniture-and-art/ DoubleDesk In 1921, MarcelBreuer enrolled as a student in the Bauhaus. Gropius immediately recognized Breuer's talent and quickly promoted him tothe headof the carpentryshop. TheGropius's specifically requested a tandem and equitablydivideddesk layout so that Walter andIse could work side byside. 9/28/2021 109
  • 110.
    Study – room(GropiusHouse) study- furniture http://gropius.house/location/furniture-and-art/ Chair,Eero Saarinen,1960s 9/28/2021 110
  • 111.
    Study – room(GropiusHouse) study- furniture http://gropius.house/location/furniture-and-art/ TaskLamps Marianne Brandt designedthis pair of task lamps for the Gropius house Created specificallyfor the doubledesk, these task lamps are designed for usewith a typewriter. 9/28/2021 111
  • 112.
    Study –room (GropiusHouse) • Material .  Moquette(textile)  Wooden  Fabric chair  Large glass pannel  Concrete wall Minimalism, simplicity , true material http://gropius.house/location/furniture-and-art/ 9/28/2021 112
  • 113.
    Living – room(GropiusHouse) furniture http://gropius.house/location/furniture-and-art/ 9/28/2021 113
  • 114.
    Living – room(GropiusHouse) furniture Nesting table MarcelBreuer Tubular steel, linoleum, wood, 1927 http://gropius.house/location/furniture-and-art/ 9/28/2021 114
  • 115.
    Living – room(GropiusHouse) furniture Womb Chair Finnish architect Eero Saarinen designed this “womb chair” in 1946. IseGropius said that it was given toWalter Gropius on his seventieth birthday.. http://gropius.house/location/furniture-and-art/ 9/28/2021 115
  • 116.
    Living – room(GropiusHouse) furniture ButterflyStools http://gropius.house/location/furniture-and-art/ 9/28/2021 116
  • 117.
    Living – room(GropiusHouse) furniture Long Chair There were always two of these chairs in the house. Onein the living room andone in the study http://gropius.house/location/furniture-and-art/ 9/28/2021 117
  • 118.
    Living – room(GropiusHouse) furniture Day bed Gropius’ preferred this evening sitting area which heoccupiedevery evening, together with mountains of architecture magazines andbooks http://gropius.house/location/furniture-and-art/ 9/28/2021 118
  • 119.
    Living –room (GropiusHouse) • Material  Concrete ceiling Minimalism, simplicity , true material  Concrete wall Unity of material  Glass  Wood  Dark brown moquette contrast to the wall,roof’s light color http://gropius.house/location/furniture-and-art/ 9/28/2021 119
  • 120.
    Dining – room(GropiusHouse) furniture Dining room-atnight Dining room-daytime http://gropius.house/location/furniture-and-art/ 9/28/2021 120
  • 121.
    Dining – room(GropiusHouse) furniture SideChairs Theset of dining room chairs, builtfor the Director’s House at the Dessau Bauhaus, consists of three sections of continuous chrome platedtubular steel with a “sleigh” basewhich facilitates mobility andcanvas covers. The circular dining tablewas also part of the original furnishings of the Directors’ House. http://gropius.house/location/furniture-and-art/ 9/28/2021 121
  • 122.
    dinning –room (GropiusHouse) • Material  Mdfwood circular table  Steel andcanvas chair  Glass  Using white color  Using glass panel as partition wall between two spaces http://gropius.house/location/furniture-and-art/ 9/28/2021 122
  • 123.
    kitchen– room(Gropius House) furniture http://gropius.house/location/furniture-and-art/ itis accessible fromthe outside – tobring the groceries in, as well as from the inside, from the maid’s room and the kitchen. white, galley-style kitchen. 9/28/2021 123
  • 124.
    Kitchen –room (GropiusHouse) • Material  Exposedfloor It’s one flat surface Cleanablewith no grooves Anty bacterial for kitchen  White cabinet  Using white andblackcolor contrast . http://gropius.house/location/furniture-and-art/ 9/28/2021 124
  • 125.
    Master bedroom– room(GropiusHouse) masterbedroom and dressingroom-furniture Master bed-Dressingroom Master bed-bathroom http://gropius.house/location/furniture-and-art/ 9/28/2021 125
  • 126.
    Master bedroom– room(GropiusHouse) masterbedroom and dressingroom-furniture Night Stands MarcelBreuer, (Plywood, Glass, Chromed steel, Paint) 1925 http://gropius.house/location/furniture-and-art/ 9/28/2021 126
  • 127.
    Master bedroom– room(GropiusHouse) masterbedroom and dressingroom-furniture TableLamps From 1923 to 1925 Wilhelm Wagenfeld studied at Bauhaus in Weimar. During this timehe designedsome of his famous works, such as the Bauhaus WA24 'Wagenfeld lamp' in 1924. http://gropius.house/location/furniture-and-art/ 9/28/2021 127
  • 128.
    Master bedroom– room(GropiusHouse) • Material  Using white tilefor wall  Using blacktile for floor  Contrast  Semisymmetrical balancebyvision andin terms of quantity http://gropius.house/location/furniture-and-art/ 9/28/2021 128
  • 129.
    Master bedroom– room(GropiusHouse) • Material  Simplicity  Contrast between the greycolor anda touch of orange color of the table andthe wall hanging  Greywall painting http://gropius.house/location/furniture-and-art/ 9/28/2021 129
  • 130.
    guest– room(Gropius House) Guestroom-furniture DeskandBed Table This desk was designedfor this room andinstalled when the house was built. http://gropius.house/location/furniture-and-art/ 9/28/2021 130
  • 131.
    guest– room(Gropius House) Guestroom-furniture Guest RoomBeds These bedswere originally madefor the Director’s House in Dessau. The Gropius's always covered them with redHungarian woven bedspreads.. http://gropius.house/location/furniture-and-art/ 9/28/2021 131
  • 132.
    guest– room(Gropius House) •Material  Greywall painting  Using steel for the table,chair , lamp  Greymoquette http://gropius.house/location/furniture-and-art/ 9/28/2021 132
  • 133.
    Single bed– room(Gropius House) His daughterroom-furniture Desk Designed byWalter Gropius for his officein theWeimar Bauhaus, this piece of furniture isthe oldest in the house. It was handcrafted in the woodwork shop of the Bauhaus school in 1923. http://gropius.house/location/furniture-and-art/ 9/28/2021 133
  • 134.
    Single bed– room(Gropius House) His daughterroom-furniture Chair,MarcelBreuer Chromed Steel, Caneand Pine, 1928 http://gropius.house/location/furniture-and-art/ 9/28/2021 134
  • 135.
    Single bed– room(Gropius House) His daughterroom-furniture Nesting table MarcelBreuer Tubular steel, linoleum, wood, 1927 http://gropius.house/location/furniture-and-art/ 9/28/2021 135
  • 136.
    Single bed– room(Gropius House) His daughterroom-furniture Table This low table is from Alvar Aalto’s Nesting Table http://gropius.house/location/furniture-and-art/ 9/28/2021 136
  • 137.
    Single bed– room(Gropius House) • Material  greyPlaster wall  Natural wood  steel  Brown moquette  Minimalism of colors andmaterials http://gropius.house/location/furniture-and-art/ 9/28/2021 137
  • 138.
    Staircase, corridor(Gropius House) http://gropius.house/location/furniture-and-art/ Wooden corridor floor  Plaster wall  Wooden ,white stair case  Steel handrails 9/28/2021 138
  • 139.
    Walter Gropius houseinteriorvideo https://youtu.be/2bBtdkv_fhQ 9/28/2021 139
  • 140.
    Conclusion: 1. The Bauhauswas founded bythe architect Walter Gropius 2. Bauhaus, in full Staatliches Bauhaus, school of design, architecture, and applied arts that existed in Germany from1919to1933. Weimar until Dessau through Berlin in its final months 1925 1932 1933 9/28/2021 140
  • 141.
    Conclusion: 3.Form follows function: According tothis idea,simple but elegant geometric shapes were designed based on the intended function or purpose of a building or an object 4.Open plan : makes use of large, open spaces and minimizes the use of small, enclosed rooms such as private offices. 5. Using Flat surface. 6.Asymmetrical balance is very clear in the simple elevations and plans . 9/28/2021 141
  • 142.
    Conclusion: 7.Emphasis's on technology( mass production ) Bauhaus workshops were used fordeveloping prototypes of productsfor mass production. 9/28/2021 142
  • 143.
    Conclusion: 8.Using geometrical shapesforplanbecauseofthe functionandit wassimple andopenplan Reference: https://biblus.accasoftware.com & the Bauhaus book by Gillian Naylor 9/28/2021 143
  • 144.
    Conclusion: 9.Bauhaus Color AccordingTo Johannes Itten methods of contrast: o light and dark o complementary contrast o contrast of hue o contrast between warm and cool colors 10.Bauhaus bring together all the artistic disciplines to create buildings focused on functionality and design. complementary contrast 9/28/2021 144
  • 145.
    11. using largeglass panels for more natural lighting . 12.The connection of the indoor and outdoor spaces doesn’t only mean that they need tobe connected physicallythey can be connected by Visual connection 9/28/2021 Conclusion: 9/28/2021 145
  • 146.
    Conclusion: 13.Material for furniture: mostlysteel , leather and wood 14.Shapes of furniture : geometrical shapes like rectangle , circle and triangle 15.Most famous furniture : wassily chair , Barcelona set ,nesting table … 16.All Bauhaus furniture followed a slogan : form follows function ( simple and comfortable touse) 9/28/2021 146
  • 147.
    9/28/2021 Conclusion: 17.Materials used forwall are: concrete ,wall paper ,paint,wood , tile,plastic 18.Materials used for flooring are :tile , wood , concrete 9/28/2021 147
  • 148.
    9/28/2021 Conclusion: 19.Beam ceilings aretypically found in hallways and corridors for commercial settings and living 20.A conventional ceiling this construction typeis commonly found in homes. 9/28/2021 148
  • 149.
    9/28/2021 Conclusion: 21.Using circular andstraight staircases with tile ,steel , paint , wood 22.Leather , wood , plastic , steel for furnitures 9/28/2021 149
  • 150.