SlideShare a Scribd company logo
1 of 2
Curriculum Vitae
REZA BADIEE
Marital status: Marriedone child Sex:Male Date of born: 1972
Militarystatus: Done ID No.:122 Email: rezabadiee007@yahoo.com
Address:No.8-ShahidBehestAlley- EdalatSq.-Shiraz-Iran
Tel: +98-0711-8423892
Mobile No.: +98-09173172148
Objective: QA/QCENGINEER, PIPING/PIPELINE EXPERT,
MECHANICAL & CONSTRUCTION SUPERINTENDENT
 Experiences:
1. May 2013 Up To Now, Sinopec InternationalPetroleum Company
YADAVARAN Oil Field Development Project/Ahvaz
Senior QA/QC Engineer
 Pipeline Supervision, Fabrication And Execution Of Pipeline, Pre-Commissioning And Commissioning
Activities.
2. Jun 2011 Up To May 2013, ARIA NAFT SHAHAB COMPANY (ANS)
South Pars GAS Field Development, Phases 15 & 16, GAS Refinery/ASSALUYEH
Piping Expert
 Piping Supervision, Fabrication And Erection, Document Control, Hydrostatic Test Packages Also Pre-
CommissioningAnd CommissioningActivities.
3. September 2010 Up To April 2011, China National Petroleum Company International (CNPCI)
Masjed-I-Soleiman (MIS) Oil Field Development/Masjed Soleiman
Mechanical Engineer
 Supervision Of Static And Rotary Equipment, Storage Tank, Piping Supervision, Final Book And Hand
Over Package.
4. August 2009 Up To July 2010,Persian Gulf Star – Oil Company (PGSOC)
Bandar Abbas Condensate Oil Refinery/Bandar Abbas
Head Of Mechanical Section (Mechanical Superintendent)
 Supervision Of Construction Activities In Static Equipment, Storage Tank, Preparing Documents And
Procedures.
5. April 2008 Up To June 2009,Pars Oil & Gas Company (POGC)
South Pars GAS Field Development, Phases 9 & 10, GAS Refinery/ASSALUYEH
Senior QA/QC Engineer
 Supervision Of Piping Fabrication, Welding, Mechanical, Static Equipment, Double Wall And
Atmospheric Storage Tank, Hydrostatic Package Also Pre-Commissioning And Commissioning
Activities.
6. February 2005 Up To December 2007, Technical Inspection & Corrosion Control Management Company (CCM)
Ghadir UREA & Ammonia Petrochemical Company/ASSALUYEH
QA/QC Engineer
 Supervision Of Piping Fabrication, Welding, Static Equipment, Storage Tank, NDT Interpreter And
ProvidingPunch ListAnd CommissioningActivities.
7. April 2003 Up To January 2005, ENI IRAN B.V Company (Italian Co.)
South Pars GAS Field Development, Phases 4 & 5, GAS Refinery/ASSALUYEH
QC Welding & Piping Field Supervisor – High Supervision
 Supervision Of U/G & A/G Piping Fabrication, Installation, Utility & Process Unit, Hydrostatic Packages,
Storage Tank, High Supervision Of 56"Pipeline(From Phases 4 & 5 To JAM Gas Refinery)
8. July 2001 Up To April 2003, Consortium Of Daelim & IDRO Company
South Pars Gas Field Development, Phase 1, GAS Refinery/ASSALUYEH
QA/QC Engineer
 Piping Engineering, Execution And Installation, Fabrication And Welding Of Piping And Pipeline, Hydro
Static Test PackageAlso CommissioningActivities.
9. January 2000 Up To July 2001,TECHINCO Company
Bandar Imam Petrochemical Company/Bandar Imam
QC Welding Engineer
 Supervision Of PipingFabrication,WeldingAnd NDT
10. January 1999 Up To January 2000,Shegerf Abzar Company
Bandar Imam Petrochemical Complex/Bandar Imam
Technical Office Manager
 Technical OfficePipingSections,PipingSupervision And Fabrication Also WeldingActivities.
11. February 1997 Up To December 1998, Ministry Of Defense
Bandar Abbas
Technical Office, Welding Supervisor
 WeldingAnd NDT Supervision
 Educational Status :
B.Sc. Degree in metallurgy Engineering, Shiraz University (1991-1995)
 Skills :
 Fluent in English Language(Writing & Reading & Speaking)
 Radiographic testing Interpretation (RTI), ASNT-TC Level ll
 Full Knowledgeof material used in refinery, petrochemical and powergeneration plant
 Good Ability with ComputerProgram Such MS office and so On
 Familiar with code& Standards (ASME , ANSI , API , AWS , BS … )

More Related Content

What's hot

Resume A Julius Linkedin
Resume A Julius LinkedinResume A Julius Linkedin
Resume A Julius LinkedinA Julius Achu
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICRoy Encallado
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014James Perkins
 
JamesMcLaren_CV 2016 (1) (1)
JamesMcLaren_CV 2016 (1) (1)JamesMcLaren_CV 2016 (1) (1)
JamesMcLaren_CV 2016 (1) (1)james mclaren
 
Chris potts resume; new
Chris potts resume; newChris potts resume; new
Chris potts resume; newseagate112
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume pShane C. Romero
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor Ahmed
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor Ahmed
 
WaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newWaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newGary Willmore
 
Sriganesh-Resume
Sriganesh-ResumeSriganesh-Resume
Sriganesh-Resumesri ganesh
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Ibrahim
 
2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.Suzanne Monahan
 
Fritz Ansel resume word(12-14)
Fritz Ansel resume word(12-14)Fritz Ansel resume word(12-14)
Fritz Ansel resume word(12-14)Fritz Ansel
 

What's hot (20)

Resume A Julius Linkedin
Resume A Julius LinkedinResume A Julius Linkedin
Resume A Julius Linkedin
 
NEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATICNEW UPDATE CV QC ROTATING & STATIC
NEW UPDATE CV QC ROTATING & STATIC
 
SWO&G
SWO&GSWO&G
SWO&G
 
Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014Resume - Perkins James.docx-2014
Resume - Perkins James.docx-2014
 
JamesMcLaren_CV 2016 (1) (1)
JamesMcLaren_CV 2016 (1) (1)JamesMcLaren_CV 2016 (1) (1)
JamesMcLaren_CV 2016 (1) (1)
 
RESUME
RESUMERESUME
RESUME
 
Sakil-resume
Sakil-resumeSakil-resume
Sakil-resume
 
Chris potts resume; new
Chris potts resume; newChris potts resume; new
Chris potts resume; new
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
 
Shane connely romero 2016 resume p
Shane connely romero 2016 resume pShane connely romero 2016 resume p
Shane connely romero 2016 resume p
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
WaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016newWaveCrest Inc Profile 4May2016new
WaveCrest Inc Profile 4May2016new
 
Sriganesh-Resume
Sriganesh-ResumeSriganesh-Resume
Sriganesh-Resume
 
res 2
res 2res 2
res 2
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.2018 Merit General Contractors, Inc.
2018 Merit General Contractors, Inc.
 
Fritz Ansel resume word(12-14)
Fritz Ansel resume word(12-14)Fritz Ansel resume word(12-14)
Fritz Ansel resume word(12-14)
 

Viewers also liked

Viewers also liked (13)

PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017
 
Certified piping design engineer
Certified piping  design engineerCertified piping  design engineer
Certified piping design engineer
 
Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1Yuthasil cv-june-2016-pp-1
Yuthasil cv-june-2016-pp-1
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Prasenjit Chaliha 2014
Prasenjit Chaliha 2014Prasenjit Chaliha 2014
Prasenjit Chaliha 2014
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Design Engineer .
Design Engineer .Design Engineer .
Design Engineer .
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Muhammed RAFI 2016 SD
Muhammed RAFI 2016 SDMuhammed RAFI 2016 SD
Muhammed RAFI 2016 SD
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
Piping design Engineer_1 (1)
Piping design Engineer_1 (1)Piping design Engineer_1 (1)
Piping design Engineer_1 (1)
 

Similar to CV TITLE (20)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
CV
CVCV
CV
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
navjay
navjaynavjay
navjay
 
new cv
new cvnew cv
new cv
 
Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016Willy Jr CV - Sept 2016
Willy Jr CV - Sept 2016
 
yusuf resume new
yusuf resume newyusuf resume new
yusuf resume new
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
CV - 3.4U and ROV - Chengchuan Luo
CV - 3.4U and ROV - Chengchuan LuoCV - 3.4U and ROV - Chengchuan Luo
CV - 3.4U and ROV - Chengchuan Luo
 
Navin singh cv
Navin singh cvNavin singh cv
Navin singh cv
 
Faheem CV
Faheem CVFaheem CV
Faheem CV
 
photo&i.fitter resume
photo&i.fitter resumephoto&i.fitter resume
photo&i.fitter resume
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
C.V- 2015 Last
C.V- 2015 LastC.V- 2015 Last
C.V- 2015 Last
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
CV 2015.07.15
CV 2015.07.15CV 2015.07.15
CV 2015.07.15
 
CV FAISAL
CV FAISALCV FAISAL
CV FAISAL
 
LOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAINLOTAN_KHAJA_HUSSAIN
LOTAN_KHAJA_HUSSAIN
 
GANESH WI...with sign
GANESH WI...with signGANESH WI...with sign
GANESH WI...with sign
 

CV TITLE

  • 1. Curriculum Vitae REZA BADIEE Marital status: Marriedone child Sex:Male Date of born: 1972 Militarystatus: Done ID No.:122 Email: rezabadiee007@yahoo.com Address:No.8-ShahidBehestAlley- EdalatSq.-Shiraz-Iran Tel: +98-0711-8423892 Mobile No.: +98-09173172148 Objective: QA/QCENGINEER, PIPING/PIPELINE EXPERT, MECHANICAL & CONSTRUCTION SUPERINTENDENT  Experiences: 1. May 2013 Up To Now, Sinopec InternationalPetroleum Company YADAVARAN Oil Field Development Project/Ahvaz Senior QA/QC Engineer  Pipeline Supervision, Fabrication And Execution Of Pipeline, Pre-Commissioning And Commissioning Activities. 2. Jun 2011 Up To May 2013, ARIA NAFT SHAHAB COMPANY (ANS) South Pars GAS Field Development, Phases 15 & 16, GAS Refinery/ASSALUYEH Piping Expert  Piping Supervision, Fabrication And Erection, Document Control, Hydrostatic Test Packages Also Pre- CommissioningAnd CommissioningActivities. 3. September 2010 Up To April 2011, China National Petroleum Company International (CNPCI) Masjed-I-Soleiman (MIS) Oil Field Development/Masjed Soleiman Mechanical Engineer  Supervision Of Static And Rotary Equipment, Storage Tank, Piping Supervision, Final Book And Hand Over Package. 4. August 2009 Up To July 2010,Persian Gulf Star – Oil Company (PGSOC) Bandar Abbas Condensate Oil Refinery/Bandar Abbas Head Of Mechanical Section (Mechanical Superintendent)  Supervision Of Construction Activities In Static Equipment, Storage Tank, Preparing Documents And Procedures. 5. April 2008 Up To June 2009,Pars Oil & Gas Company (POGC) South Pars GAS Field Development, Phases 9 & 10, GAS Refinery/ASSALUYEH Senior QA/QC Engineer  Supervision Of Piping Fabrication, Welding, Mechanical, Static Equipment, Double Wall And Atmospheric Storage Tank, Hydrostatic Package Also Pre-Commissioning And Commissioning Activities. 6. February 2005 Up To December 2007, Technical Inspection & Corrosion Control Management Company (CCM) Ghadir UREA & Ammonia Petrochemical Company/ASSALUYEH QA/QC Engineer  Supervision Of Piping Fabrication, Welding, Static Equipment, Storage Tank, NDT Interpreter And ProvidingPunch ListAnd CommissioningActivities.
  • 2. 7. April 2003 Up To January 2005, ENI IRAN B.V Company (Italian Co.) South Pars GAS Field Development, Phases 4 & 5, GAS Refinery/ASSALUYEH QC Welding & Piping Field Supervisor – High Supervision  Supervision Of U/G & A/G Piping Fabrication, Installation, Utility & Process Unit, Hydrostatic Packages, Storage Tank, High Supervision Of 56"Pipeline(From Phases 4 & 5 To JAM Gas Refinery) 8. July 2001 Up To April 2003, Consortium Of Daelim & IDRO Company South Pars Gas Field Development, Phase 1, GAS Refinery/ASSALUYEH QA/QC Engineer  Piping Engineering, Execution And Installation, Fabrication And Welding Of Piping And Pipeline, Hydro Static Test PackageAlso CommissioningActivities. 9. January 2000 Up To July 2001,TECHINCO Company Bandar Imam Petrochemical Company/Bandar Imam QC Welding Engineer  Supervision Of PipingFabrication,WeldingAnd NDT 10. January 1999 Up To January 2000,Shegerf Abzar Company Bandar Imam Petrochemical Complex/Bandar Imam Technical Office Manager  Technical OfficePipingSections,PipingSupervision And Fabrication Also WeldingActivities. 11. February 1997 Up To December 1998, Ministry Of Defense Bandar Abbas Technical Office, Welding Supervisor  WeldingAnd NDT Supervision  Educational Status : B.Sc. Degree in metallurgy Engineering, Shiraz University (1991-1995)  Skills :  Fluent in English Language(Writing & Reading & Speaking)  Radiographic testing Interpretation (RTI), ASNT-TC Level ll  Full Knowledgeof material used in refinery, petrochemical and powergeneration plant  Good Ability with ComputerProgram Such MS office and so On  Familiar with code& Standards (ASME , ANSI , API , AWS , BS … )