SlideShare a Scribd company logo
HRD-GA DEPARTMENT - PT. IRAWAN PRIMA UTAMA 
Jl. Pahlawan 99 Citeureup – Sentul, Bogor 16810, Indonesia Telp. (021) 87950310 
PT IRAWAN PRIMA UTAMA, a company engaged in the General Contractor and Steel Fabricator, specialize in the construction of industrial building projects and facilities. In our rapid business expansion, we open opportunity for candidates experienced and qualified to fill the position of: 
Responsibilities : 
 Mengawasi / menginstrusikan pemasangan scaffolding dengan baik dan benar, sesuai standar ISO yang berlaku. 
 Memastikan scaffolding terpasang sesuai dengan peraturan dan ketentuan yang berlaku, sesuai standar ISO yang berlaku 
 Memastikan keselamatan dan pekerjaan pemasangan scaffolding dengan benar dan aman bagi para pekerja yang akan menggunakan, sesuai standar ISO yang berlaku. 
Requirements : 
 Wajib memiliki Sertifikasi Scaffolding Depnaker / Migas 
 Usia max. 45 tahun 
 Pendidikan min. SMA/STM/Diploma 
 Bahasa English (min. pasif/dapat mengerti instruksi) 
 Pengalaman kerja dibidangnya min. 5-tahun 
 Lebih diutamakan bagi calon yang memiliki pengalaman dibidang Civil Construction / Structural / sejenisnya 
If you have the commitment to grow with PT. IRAWAN PRIMA UTAMA, please send your detail CV in English with the most recent photograph & indicate your position within 2 weeks to : taufik.waris@ipu.co.id & cc-mail : kandidat.ipu@gmail.com

More Related Content

Viewers also liked

What are we afraid of?
What are we afraid of?What are we afraid of?
Site Karawang
Site KarawangSite Karawang
Site Karawang
PT. IRAWAN PRIMA UTAMA
 
3D INTERIOR
3D INTERIOR3D INTERIOR
Drafter Civil Engineer
Drafter Civil EngineerDrafter Civil Engineer
Drafter Civil Engineer
PT. IRAWAN PRIMA UTAMA
 
Thinkers and Makers - Capabilities 2013
Thinkers and Makers - Capabilities 2013Thinkers and Makers - Capabilities 2013
Thinkers and Makers - Capabilities 2013
Thinkers and Makers
 
Project Tanjung Morawa
Project Tanjung MorawaProject Tanjung Morawa
Project Tanjung Morawa
PT. IRAWAN PRIMA UTAMA
 
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBSTugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
Wasi Widayadi
 
Checklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
Checklist Survey Instansional RTRW Kabupaten Minahasa TenggaraChecklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
Checklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
Fitri Indra Wardhono
 
Document Controller
Document ControllerDocument Controller
Document Controller
PT. IRAWAN PRIMA UTAMA
 
Civil-Supervisor (Structure)
Civil-Supervisor (Structure)Civil-Supervisor (Structure)
Civil-Supervisor (Structure)
PT. IRAWAN PRIMA UTAMA
 
CSR-Site Project
CSR-Site ProjectCSR-Site Project
CSR-Site Project
PT. IRAWAN PRIMA UTAMA
 
Concept Display 24x36
Concept Display 24x36Concept Display 24x36
Concept Display 24x36
Tyler Denning
 
Staff Admint Project
Staff Admint ProjectStaff Admint Project
Staff Admint Project
PT. IRAWAN PRIMA UTAMA
 
CV
CVCV
Innovation Suite - New York - March 04-06 2013
Innovation Suite - New York - March 04-06 2013Innovation Suite - New York - March 04-06 2013
Innovation Suite - New York - March 04-06 2013
AlonHarris
 
Perhitungan korosi standard NACE (AA)
Perhitungan korosi standard NACE (AA)Perhitungan korosi standard NACE (AA)
Perhitungan korosi standard NACE (AA)
Abrianto Akuan
 
Tourism sector take aways (for translation june 2012) en
Tourism sector take aways (for translation june 2012) enTourism sector take aways (for translation june 2012) en
Tourism sector take aways (for translation june 2012) en
Thùy Chi
 
introducing brandnography™
introducing brandnography™introducing brandnography™
introducing brandnography™
Thinkers and Makers
 
New Projects-2014
New Projects-2014New Projects-2014
New Projects-2014
PT. IRAWAN PRIMA UTAMA
 

Viewers also liked (20)

What are we afraid of?
What are we afraid of?What are we afraid of?
What are we afraid of?
 
Site Karawang
Site KarawangSite Karawang
Site Karawang
 
3D INTERIOR
3D INTERIOR3D INTERIOR
3D INTERIOR
 
Drafter Civil Engineer
Drafter Civil EngineerDrafter Civil Engineer
Drafter Civil Engineer
 
Thinkers and Makers - Capabilities 2013
Thinkers and Makers - Capabilities 2013Thinkers and Makers - Capabilities 2013
Thinkers and Makers - Capabilities 2013
 
Project Tanjung Morawa
Project Tanjung MorawaProject Tanjung Morawa
Project Tanjung Morawa
 
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBSTugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
Tugas 2: Perbedaan Quality Assurance Dengan Quality Control - S3 TIBS
 
Checklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
Checklist Survey Instansional RTRW Kabupaten Minahasa TenggaraChecklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
Checklist Survey Instansional RTRW Kabupaten Minahasa Tenggara
 
Document Controller
Document ControllerDocument Controller
Document Controller
 
Civil-Supervisor (Structure)
Civil-Supervisor (Structure)Civil-Supervisor (Structure)
Civil-Supervisor (Structure)
 
CSR-Site Project
CSR-Site ProjectCSR-Site Project
CSR-Site Project
 
05 pedoman mutu
05 pedoman mutu05 pedoman mutu
05 pedoman mutu
 
Concept Display 24x36
Concept Display 24x36Concept Display 24x36
Concept Display 24x36
 
Staff Admint Project
Staff Admint ProjectStaff Admint Project
Staff Admint Project
 
CV
CVCV
CV
 
Innovation Suite - New York - March 04-06 2013
Innovation Suite - New York - March 04-06 2013Innovation Suite - New York - March 04-06 2013
Innovation Suite - New York - March 04-06 2013
 
Perhitungan korosi standard NACE (AA)
Perhitungan korosi standard NACE (AA)Perhitungan korosi standard NACE (AA)
Perhitungan korosi standard NACE (AA)
 
Tourism sector take aways (for translation june 2012) en
Tourism sector take aways (for translation june 2012) enTourism sector take aways (for translation june 2012) en
Tourism sector take aways (for translation june 2012) en
 
introducing brandnography™
introducing brandnography™introducing brandnography™
introducing brandnography™
 
New Projects-2014
New Projects-2014New Projects-2014
New Projects-2014
 

More from PT. IRAWAN PRIMA UTAMA

PIPELINE CHECKER
PIPELINE CHECKERPIPELINE CHECKER
PIPELINE CHECKER
PT. IRAWAN PRIMA UTAMA
 
QS-Steel Structure Specialist
QS-Steel Structure SpecialistQS-Steel Structure Specialist
QS-Steel Structure Specialist
PT. IRAWAN PRIMA UTAMA
 
Estimator Bid Packages
Estimator Bid PackagesEstimator Bid Packages
Estimator Bid Packages
PT. IRAWAN PRIMA UTAMA
 
Drafter Architecture
Drafter ArchitectureDrafter Architecture
Drafter Architecture
PT. IRAWAN PRIMA UTAMA
 
Staff Admint Safety-AK3
Staff Admint Safety-AK3Staff Admint Safety-AK3
Staff Admint Safety-AK3
PT. IRAWAN PRIMA UTAMA
 
Senior Project-Manager
Senior Project-ManagerSenior Project-Manager
Senior Project-Manager
PT. IRAWAN PRIMA UTAMA
 
Project Support Team
Project Support TeamProject Support Team
Project Support Team
PT. IRAWAN PRIMA UTAMA
 
SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)
PT. IRAWAN PRIMA UTAMA
 
Receptionist
ReceptionistReceptionist
Foreman Fitter
Foreman FitterForeman Fitter
Foreman Fitter
PT. IRAWAN PRIMA UTAMA
 
Foreman Painting
Foreman PaintingForeman Painting
Foreman Painting
PT. IRAWAN PRIMA UTAMA
 
ISO (Quality Management System)
ISO (Quality Management System)ISO (Quality Management System)
ISO (Quality Management System)
PT. IRAWAN PRIMA UTAMA
 
Site manager and site engineer (senior level)
Site manager and site engineer (senior level)Site manager and site engineer (senior level)
Site manager and site engineer (senior level)
PT. IRAWAN PRIMA UTAMA
 
Project Coordinator
Project CoordinatorProject Coordinator
Project Coordinator
PT. IRAWAN PRIMA UTAMA
 
Workshop Supervisor
Workshop SupervisorWorkshop Supervisor
Workshop Supervisor
PT. IRAWAN PRIMA UTAMA
 
Workshop Manager
Workshop ManagerWorkshop Manager
Workshop Manager
PT. IRAWAN PRIMA UTAMA
 
Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)
PT. IRAWAN PRIMA UTAMA
 

More from PT. IRAWAN PRIMA UTAMA (17)

PIPELINE CHECKER
PIPELINE CHECKERPIPELINE CHECKER
PIPELINE CHECKER
 
QS-Steel Structure Specialist
QS-Steel Structure SpecialistQS-Steel Structure Specialist
QS-Steel Structure Specialist
 
Estimator Bid Packages
Estimator Bid PackagesEstimator Bid Packages
Estimator Bid Packages
 
Drafter Architecture
Drafter ArchitectureDrafter Architecture
Drafter Architecture
 
Staff Admint Safety-AK3
Staff Admint Safety-AK3Staff Admint Safety-AK3
Staff Admint Safety-AK3
 
Senior Project-Manager
Senior Project-ManagerSenior Project-Manager
Senior Project-Manager
 
Project Support Team
Project Support TeamProject Support Team
Project Support Team
 
SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)SM (Site Manager - Steel Civil Structure)
SM (Site Manager - Steel Civil Structure)
 
Receptionist
ReceptionistReceptionist
Receptionist
 
Foreman Fitter
Foreman FitterForeman Fitter
Foreman Fitter
 
Foreman Painting
Foreman PaintingForeman Painting
Foreman Painting
 
ISO (Quality Management System)
ISO (Quality Management System)ISO (Quality Management System)
ISO (Quality Management System)
 
Site manager and site engineer (senior level)
Site manager and site engineer (senior level)Site manager and site engineer (senior level)
Site manager and site engineer (senior level)
 
Project Coordinator
Project CoordinatorProject Coordinator
Project Coordinator
 
Workshop Supervisor
Workshop SupervisorWorkshop Supervisor
Workshop Supervisor
 
Workshop Manager
Workshop ManagerWorkshop Manager
Workshop Manager
 
Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)Site-Manager & Site-Engineer (Civil Engineer)
Site-Manager & Site-Engineer (Civil Engineer)
 

Recently uploaded

Materi Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
Materi Kuliah Pemasaran Teori RATOC - Resource Advantage TheoryMateri Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
Materi Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
NizaNurAzizah
 
akreditasi fktp bahan ajar dari lembaga.pptx
akreditasi fktp bahan ajar dari lembaga.pptxakreditasi fktp bahan ajar dari lembaga.pptx
akreditasi fktp bahan ajar dari lembaga.pptx
badzwow1
 
Kumpulan Latihan Soal SKD CPNS 2024 New Hot
Kumpulan Latihan Soal SKD CPNS 2024 New HotKumpulan Latihan Soal SKD CPNS 2024 New Hot
Kumpulan Latihan Soal SKD CPNS 2024 New Hot
MuhammadZufaldi
 
Biru simpel formal seminar proposal sidang presentasi.pptx
Biru simpel formal seminar proposal sidang presentasi.pptxBiru simpel formal seminar proposal sidang presentasi.pptx
Biru simpel formal seminar proposal sidang presentasi.pptx
NurKholifah569791
 
PEMBAGIAN hadits ditinjau dari segi penisbatan
PEMBAGIAN hadits ditinjau dari segi penisbatanPEMBAGIAN hadits ditinjau dari segi penisbatan
PEMBAGIAN hadits ditinjau dari segi penisbatan
muhammadwasi921
 
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminarDaniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
ppgdanielsianipar62
 
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptxMateri Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
nurmaladewiwatukila
 

Recently uploaded (7)

Materi Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
Materi Kuliah Pemasaran Teori RATOC - Resource Advantage TheoryMateri Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
Materi Kuliah Pemasaran Teori RATOC - Resource Advantage Theory
 
akreditasi fktp bahan ajar dari lembaga.pptx
akreditasi fktp bahan ajar dari lembaga.pptxakreditasi fktp bahan ajar dari lembaga.pptx
akreditasi fktp bahan ajar dari lembaga.pptx
 
Kumpulan Latihan Soal SKD CPNS 2024 New Hot
Kumpulan Latihan Soal SKD CPNS 2024 New HotKumpulan Latihan Soal SKD CPNS 2024 New Hot
Kumpulan Latihan Soal SKD CPNS 2024 New Hot
 
Biru simpel formal seminar proposal sidang presentasi.pptx
Biru simpel formal seminar proposal sidang presentasi.pptxBiru simpel formal seminar proposal sidang presentasi.pptx
Biru simpel formal seminar proposal sidang presentasi.pptx
 
PEMBAGIAN hadits ditinjau dari segi penisbatan
PEMBAGIAN hadits ditinjau dari segi penisbatanPEMBAGIAN hadits ditinjau dari segi penisbatan
PEMBAGIAN hadits ditinjau dari segi penisbatan
 
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminarDaniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
Daniel Riadi Sianipar (1).ppt ini digunakan untuk seminar
 
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptxMateri Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
Materi Sosialisasi Pengelolaan Kinerja Akademik Dosen 2829 Mei 24.pptx
 

Inspector Scaffolding

  • 1. HRD-GA DEPARTMENT - PT. IRAWAN PRIMA UTAMA Jl. Pahlawan 99 Citeureup – Sentul, Bogor 16810, Indonesia Telp. (021) 87950310 PT IRAWAN PRIMA UTAMA, a company engaged in the General Contractor and Steel Fabricator, specialize in the construction of industrial building projects and facilities. In our rapid business expansion, we open opportunity for candidates experienced and qualified to fill the position of: Responsibilities :  Mengawasi / menginstrusikan pemasangan scaffolding dengan baik dan benar, sesuai standar ISO yang berlaku.  Memastikan scaffolding terpasang sesuai dengan peraturan dan ketentuan yang berlaku, sesuai standar ISO yang berlaku  Memastikan keselamatan dan pekerjaan pemasangan scaffolding dengan benar dan aman bagi para pekerja yang akan menggunakan, sesuai standar ISO yang berlaku. Requirements :  Wajib memiliki Sertifikasi Scaffolding Depnaker / Migas  Usia max. 45 tahun  Pendidikan min. SMA/STM/Diploma  Bahasa English (min. pasif/dapat mengerti instruksi)  Pengalaman kerja dibidangnya min. 5-tahun  Lebih diutamakan bagi calon yang memiliki pengalaman dibidang Civil Construction / Structural / sejenisnya If you have the commitment to grow with PT. IRAWAN PRIMA UTAMA, please send your detail CV in English with the most recent photograph & indicate your position within 2 weeks to : taufik.waris@ipu.co.id & cc-mail : kandidat.ipu@gmail.com