Gallipoli Barracks Enhanced Land Force Stage 2B - HV Distribution
Inspection & Test Plan - Electrical Power Distribution System - Q1447-CS-PCP-6025-08
1. L290-AQ-PLN-10850
Status
LCPL QA (Sub Contractor) Leightons - LCPL (Sub Contractor) JKC (Contractor)
Name: Name: Name:
Date: Date: Date:
Signature: Signature: Signature:
IVB
1.0
1.1 Issued for Construction - IFC Drawings (IFI drawing for temporary works) PE Each activity
L290-AB-PRC-0004_0 Instruction for Vendor
Documentation-Section 6.4
Stamped / Approved Drawings
Stamped Code: A=Approved without Comment B=Approved with minor
Comment N=Not Approved F= Not subject to review
N/A Stamped IFC drawing
1.2 Calibration of Equipment PE
As per equipment calibration
register
L290-AQ-SPC-0009: Quality Control
Requirements for subcontractor
Clause 4.6.3 of L290-AQ-SPC-0009 Documentation sighted, for inclusion into MDR, Approved ITP N/A calibration certificates
1.3 Relevant codes & Specifications sighted / Correct revision PE Each activity
Section H Contract. Contract Exhibit E Drawings
& Specifications
Section H Contract. Contract Exhibit E Drawings &
Specifications
Documents sighted / Approved ITP / Check Sheet SSF01 N/A Approved ITP
1.4 Development and approval of ITP prior to construction activities PE Each activity
L290-AQ-SPC-0009: Quality Control
requirements for Subcontractors
Clause 4.5 of L290-AQ-SPC-0009 Documentation sighted on approved ITP N/A Approved ITP
1.5
Pre-Inspection Meeting Minutes of Meeting (PIM MOM) if required as per the
criticality matrix
QM Each activity as required
L290-AQ-SPC-0009: Quality Control
requirements for Subcontractors, L290- AB-PRC-
0004:INSTRUCTION FOR VENDOR
DOCUMENTATION
Clause 4.4.3 of L290-AQ-SPC-0009, Clause 5.1 of L290-AB-
PRC-0004
MOM Documentation sighted N/A PIM- MOM
1.6 QC Inspector Qualification - Electrical QM Once per person L290-AQ-SPC-0009
L290-AQ-SPC-0009 Section 4.14.1.3: working knowledge os
AS 2381: “Electrical Equipment for Hazardous Areas”,
AS/NZS 60079.17: “Explosive atmospheres –Electrical...,
and AS/NZS 60079.18: “Explosive atmospheres – ...
Sighted approval of Inspector document N/A Approval document
1.7 Verify SHEWMS available and approved PE Each activity Relevant Specification As Per Schedule Approved SHEWMS N/A Approved SWEHMS
2.0
2.1 Material Certificates received for all components SUP Each Delivery Contract Exhibit H and L290-AQ-SPC-0010
Section 4.11 of Exhibit H and clause 2.2 for L290-AQ-SPC-
0010
Material Register & Material Certificates sighted, for inclusion into MDR N/A material certificates
2.2 Inspection of received goods SUP Each Delivery
L290-AQ-PRC-0008: QUALITY CONTROL
COORDINATION PROCEDURE FOR
SUBCONTRACTOR
Clause 4.5.2 of L290-AQ-PRC-0008 Material Register & Material Certificates sighted, for inclusion into MDR N/A Material inspection report
3.0
3.1 Installations as per gneral arrangement and layouts SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.5.5 of AS 3000: 2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30
3.2 Equipment is tagged correctly against drawings and project specification PE Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
IFC Drawings/ Clause 5.5.1.3 of AS 3000:2007 Inspection Test Record EP08, EP01, EP30 (L290-AR-FRM-10002) N/A ITR EP08, EP01, EP30
3.3
Verify Earthing straps and Conductors cross section as per drawings and
specification
SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.3 of AS 3000: 2007 Inspection Test Record EP08, EP01,(L290-AR-FRM-10002) N/A ITR EP08, EP01
3.5 Main earthing cable and earthing boss checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.3.4 of AS 3000: 2007 Inspection Test Record EP01 (L290-AR-FRM-10002) N/A ITR EP01
3.6 Main earthing bar checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.2.1 of AS 3000:2007 Inspection Test Record EP29 (L290-AR-FRM-10002) N/A ITR EP29
3.7 Main earthing rod checked SUP/ENG Each Lot
IFC drawing, AS 3000, L290-AQ-TAC-0005
(Inspection and Test Plan for Electrical Works)
Clause 5.3.6 of AS 3000:2007 Inspection Test Record EP30 (L290-AR-FRM-10002) N/A ITR EP30
4.0
4.1 Check type of cable tray, conduits, ladders, junction boxes & fittings. SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 IFC Drawings/ AS /NZS 3000:2007 Clause 3.8
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.2 Check conduit and cable tray size, routing for no obstructions and elevation. SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3, Section 7 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9, 7.4
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.3
Check coupler plates, elbows, dropout tees, conduit fittings and accessories are
properly installed.
SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.4
Check tray and conduit supports are correct and tightened using the appropriate
tool ensuring no deflection.
SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 .9 IFC Drawings/ AS /NZS 3000:2007 Clause 3.9.6
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.5 Check tray covers and protection is provided. SUP/ENG Each Lot IFC Drawings/ AS 3000 Clause 3.2 to 3.4 IFC Drawings/ AS /NZS 3000:2007 Clause 3.3.2.6 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10
4.6 Check pulling guide rope in concealed conduit is installed. SUP/ENG Each Lot AS 3000 Section 3 AS /NZS 3000:2007 Clause 3.9 Field Inspection Check Sheet ELC19 (L290-AR-FRM-10002) N/A FIC- ELC19
4.7 Check all wall penetrations are completely sealed and fire rated. SUP/ENG Each Lot AS 3000 Clause 3.9.9 AS /NZS 3000:2007 Clause 3.9.9.3 Inspection Test Record EP10 (290-AR-FRM-10002) N/A ITR - EP10
4.8 Check tray and conduit sharp edges have been removed. SUP/ENG Each Lot AS 3000 Clause 3.10.1 to 3.10.4 AS /NZS 3000:2007 Clause 3.10.3.5
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.9 Check cable tray, conduits are properly cleaned prior to cable pulling. SUP/ENG Each Lot AS 3000 Clause 3.10 to 3.11 AS /NZS 3000:2007 Clause 3.10.3.5, 3.6
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
4.10 Verify complete cable tray installation against drawings and specifications SUP/ENG Each Lot IFC Drawings/ AS 3000 Section 3 IFC Drawings/ AS 3000 Section 3
Field Inspection Check Sheet ELC19 and Inspection Test Record
EP10 (L290-AR-FRM-10002)
N/A FIC- ELC19, ITR - EP10
5.0
5.1 Visual inspection of cable type, size & tag no. SUP/ENG Each Lot AS 3000 Clause 8.2 AS /NZS 3000:2007 Clause 8.2.1, 8.2.2(d)
Inspection Test Record EP40 and EP01 for single cables only if
relevant (L290-AR-FRM-10002)
N/A ITR - EP40, EP01
Date:
Signature:
H W
Name:
H H S S
BUILDING EARTHING
Date:
Signature:
Record Remarks
Subcontractor
H
W
W
H H R S
W
H
CABLEWAYS & CONDUITS
W S S S
Acceptance Criteria/Specification Verifying Documents
Package Name: EPC BUILDING WORKS (P-31D-BLD-1), Subcontractor's Document Number: Q1447-CS-PCP-6025
ITP Title: INSPECTION AND TEST PLAN - ELECTRICAL - POWER DISTRIBUTION SYSTEMS - EPC BUILDING WORKS
ITP Number: L290-AQ-PLN-10850 Contractor's Number: V-31D1-BLD-1-Z40124
H
H H W S
Lower Tier Sub Contractor (LTSC)
Name:ITP Accepted:
No.
W S
Independent Verification Body (IVB)
W S S
W S S
SR S
H
W S S S
W S
H
H H
W
SSW
SW
W S S
Quality Verification Activity/Stage Reference Procedure
H
Contractor Company
APPROVALS AND OTHER PRELIMINARY REQUIREMENTS
LTSC
Required Inspection
S S
H W S S
H W S S
H
ABOVE GROUND CABLING
SS
9
H H W R
SH
H
W
W
S
S
S
S
W S S
W
S
S S
MATERIAL RECEIVING/DOCUMENT INSPECTION
H W S
H W
H H
H W W S
Responsibility Frequency
H
H
H
H
H
Q1447-CS-PCP-6025-08 (1).xlsx:Page 1/2