Smarter Collaboration:
Working smarter across
your business for software
delivery that exceeds
expectations

Kathy Mandelstein, Director Lotus
Collaboration & WebSphere Portal
WW Programs, Web & Events
kmandel@us.ibm.com
Anthony Fiorot, Lotus Program Manager,
RAD PTK Product Manager
afiorot@us.ibm.com




                                                    SDP - 2294


The premiere software and product delivery event.
June 6–10 Orlando, Florida
Smarter Collaboration: Working smarter across your business for software
delivery that exceeds expectations

Session Abstract:


In todays global economy development teams are becoming more distributed,
    making it increasingly more difficult to work across cohesively across multiple
    time zones and geographical boundaries. The speed in which LOB expect
    applications to be delivered poses greater strain on IT, requiring greater
    collaboration and real-time feedback for faster delivery cycles. Crowd sourcing,
    integrating partners, customers, etc in the development process offers greater
    opportunity for delivering functionality that align with customer and business
    requirements. In this session we will demonstrate how Lotus and Rational have
    teamed up to deliver a collaborative software delivery platform that integrates all
    the benefits of Lotus' social software and collaborative services leveraging
    Rational Software Development Platform and using Rational Team Concert.




                                                                                          2
The information on the new product is intended to outline our
general product direction and it should not be relied on in making a
purchasing decision. The information on the new product is for
informational purposes only and may not be incorporated into any
contract. The information on the new product is not a commitment,
promise, or legal obligation to deliver any material, code or
functionality. The development, release, and timing of any features
or functionality described for our products remains at our sole
discretion.
4




     Agenda
    ● Why is collaboration essential in helping you deliver applications
      that meet the business needs

    ● Collaboration beyond your own development & delivery team

    ● Collaboration from Lessons Learned

    ● Lotus Connections and Rational Team Concert

    ● “Real World” Use Case

    ● Summary & Questions




                                                •   “
Collaboration is critical with your team & business stakeholders


  How do we effectively
  collaborate across 3
       continents?




                           Two-thirds of development organizations have teams
                           that work in multiple locations.1 Studies show that
                           teams with more than twelve members rapidly
                           lose effectiveness.2

                                      Graphic: Coplien, Organizational Patterns of Agile Development
                                      1
                                          Evans Data Corporation North American Development Survey, Vol II, 2007
                                       2
                                          Knowledge@Wharton. “Is Your Team Too Big? Too Small? What’s the Right Number?” June 14, 2006.



                                                                                                                                          5
Smart Work . . . is about people and collaboration

    500 Million
       social networking
          users by 2012


        1 Trillion
   connected intelligent
    devices in the world


                42%
    make decisions with
 the wrong input at least
           once a week


  $650 Billion
       in productivity is
        lost because of
  unnecessary business
    process interruption

                                                     6
Collaborative Services to help people and teams to work smart

      E-mail,          Documents,       Instant       Telephony,      Shared           Electronic
     Calendar,        Presentations, Messaging,       Video, VOIP    Documents           forms
     Contacts         Spreadsheets Web Conferencing




       Contact          Shared       Communities,      Activities/   Scorecards,       Composite
    Information,      Bookmarking    Discussions        Project       Business        Applications
  Skills, Expertise                   Blogs/Wikis     Management     Intelligence   Business Mashups




                                                                                                       7
In the context of how people work
...An adaptive environment




                                    8
To leverage global resources more effectively, Jazz enables collaboration
across software delivery teams and geographies


                            Leverage social networking capabilities to enable
                            broader and richer participation in software
                            projects

                            Virtualize "team memory" to overcome
                            geographic and temporal gaps in the software
                            lifecycle
        Collaborate
                            Enable flexible, global resourcing and
       Achieve common       energy-saving workplace models
      goals by optimizing
       how people work
The IBM Lotus & Websphere Portal Portfolio
designed to help Teams Build Better Outcomes
   Workforce flexibility
   Enabling employee mobility
   Leveraging expertise
   Finding and connecting
   Streamlining decision making
   Coordinating activities
   Communicating with employees as individuals
   Agregation and personalization of content
   The right in formation at the right time.., in context
   Tailored applications for niche audiences
   Magnifying the value of content
   Capturing and repackaging content

                                                             10
People access collaborative services in many ways
..hence IBM delivers in many ways
    Collaboration as an application             Collaboration “Inside”




  Desktop Appliance   Web       Mobile           Middleware
                                                          Business Applications


                            Collaboration as a Service



                            Hosted                SaaS




                                                                                  11
Multiple Delivery Models




                  On-Premise                                        Cloud Delivered
  MANAGED BY IT DEPARTMENT OR PARTNER                                   IBM MANAGED

                                                       Dedicated Hosted
        Software                 Appliance                                               SaaS
                                                         Environment

                                                      Negotiated SLAs           Low cost of entry
                           Easy to install/maintain
 Allows for advanced
 customization to meet     Managed by customer        Monthly pricing available Zero infrastructure –
                                                      for hosting               reduced overhead
 customer needs            or partner
                           Toolkits available for                               Flexible contracts
                                                    Can leverage toolkits
 Managed by IT dept        customization by partner available for               Scales to meet
                           or customer              customization               customer demand
 All data resides local
 and inside the firewall   All data inside your       Updates are applied       Immediate access to the
                           firewall                   transparently             latest innovations


                                                                                                          12
Collaboration Applications in the Cloud
 Amazon Web Services
  Beta release
  License-free images for ISVs and SIs
  Lotus images for Domino, Portal, Forms, Mashups


 IBM Development and Test Cloud
  Beta release
  Public cloud designed for enterprise customers
  Opportunity to take “first step”into Cloud
  Lotus images planned


 Partners
  GROUP Live: Domino Cloud PaaS
  Connectria and Prominic: Hosted applications
   and services


                                                     13
Collaboration to go: Whenever & Wherever You May Be
                       New for 2010
                        Android       Mobile Capabilities:
                                      
                                          Contact List & Business
                                          Cards
                                      
                                          Wireless instant messaging
                                      
                                          Email & Calendar
                                      
                                          Web conferencing &
                                          Meetings
                                      
                                          Document Creation
                                      
                                          File Sharing
                                      
                                          Knowledge Expertise
                                      
                                          Social Community


                                                                       14
IBM Collaboration – a Business Architecture




        Messaging and      Unified Communications   Situational Applications
         Collaboration       and Social Software        and Integration
      Content Management




                                                                               On-Premise




                                                                                                            Appliance
                                                                                                   Hosted
                                                                                            SaaS
                                                                                                                        15
Core Collaboration Product Offerings


        Notes                                  LotusLive



    UC2                                                Portal
                         deployment


          Quickr                            Social
                                            Software

                   On-premises deployment


                                                                16
Extending integration with the collaborationmobile, desktop & cloud
Web 2.0 the IBM Collaboration Platform on desktop: a wealth of
opportunity




                                                                      17
Technology Based on Lessons Learned and Best Practices!




                                                          18
Lotus Connections Development Team


                 Westford, MA   Dublin, Ireland


          Raleigh, NC
                                                                 Beijing, China

                                                                  Shanghai, China

                                                          Gurgaon, India
 ● 100+ practitioners across 6 sites and 3 continents
 ● Different teams building and testing an integrated product
 ● Diverse stakeholders
  ▬ Product marketing           ▬ Sales
  ▬ Executives                  ▬ Other SWG teams
  ▬ Customer Council            ▬ IBM Business Partners
Business Challenges We Faced

 ● Very aggressive development plan
    ▬ Multiple major releases and numerous minor releases in ~26 months
    ▬ Multiple check points with all stakeholders for each release


 ● Frequently changing requirements
    ▬ Active contribution from all stakeholders
    ▬ Reacting to changes in a new market


 ● Optimize and Maintain high productivity in a
   distributed environment
    ▬ Competing with smaller firms
    ▬ New teams joining the core team
21




     What we needed


              Improve collaboration across all
              teams and functions


               An agile development process




        Time to Innovate and use our best available tools!


                 21
– Social software for business


                                           Profiles
Lotus Connections is
social software for
business that empowers
you to be more innovative
and helps you execute
                            Blogs                            Dogear
more quickly by using
dynamic networks of                        Home page
coworkers, partners and
customers.

                              Activities               Communities




                                                                      22
Lotus Connections:

           Find expertise                                                                         Communities
Quickly find the person with the skill                                                 Share information and work with
or project experience you need with                Share knowledge                     communities of project stake holders:
                                                                                       Testers, project managers, business
Profiles. Create stronger                                                              analysts, managers.
relationships with micro-blogging
                                         Experts can use blogs to efficiently share
                                         their expertise and experience across the
                                         organization                                             Get things done
             Discover
             information                                                              Organize your work, plan next steps, and
                                                                                      easily tap your expanding professional
Save, organize, and share bookmarks;                                                  network to help execute project related
discover information that have been                                                   tasks such as project status presentations.
qualified by others with similar                    Share Files
interests & expertise.

                                         Upload and share any type of file with
           Stay in the loop              colleagues and communities. Store                        Create content
                                         versions and view downloads, comments                    faster
                                         and ratings.
Understand what folks are working on                                                   Use wiki to edit best practices, project
and what information is changing using                                                 documentation, or frequently asked
the homepage view                                                                      questions. View changes across pages,
                                                                                       ratings, and comments.
Rational Team Concert:

● A collaborative development tool built on Rational Jazz Platform


● Work item tracking


● Source code management


● Agile planning


● Process customization
Direct benefits of RTC and Connections
● Better communications improved productivity across sites
● Faster authoring and approval of software documents
● Used a community to define agile process and implemented that in
  RTC
● Visibility and tracking of cross function work items to improve quality
● Adjusted product plans based on new requirements
● Quickly finding the right expert across the extended Connections
  team
● Assess project status and trends in real-time with RTC's web-based
  dashboards

  Good, what but would be even better….
Social Software in Context of Software Development
 ● Direct access to Lotus Connections from the
   Rational Team Concert (RTC) Web UI
    ▬ Find people across the enterprise based on skills and
      experience.
    ▬ Project communities – incl. user profiles, blogs, forums,
      activities, bookmarks, wikis, and files - integrated into the
      software development environment.
    ▬ Stay up-to-date using Microblogging.
    ▬ RTC team members are always within reach.
 ● Document Collaboration provides easy access
   to shared documents from within RTC
    ▬ Document workflows connect people across divisions.
    ▬ Create dependencies between development work items and
      document approvals.
 ● Business and technical roles communicate using
   Lotus Connections and Lotus Quickr
29




     “Jazz Connections” Technology Preview
     Integrating Lotus Connections with Rational Team Concert

       Social network profiles:
       contact details, photo, time
       zone where he works,
       expertise, interests, what he’s
       working on, etc.




                                         Find enterprise contacts on
                                         their experience, skills, or
                                         key relationships.
30




     “Jazz Connections” Technology Preview
     Integrating Lotus Connections with Rational Team Concert

     Social viewlet on the Jazz dashboard:
     Find out what’s new in the project
     community. Browse wikis, blogs,
     communities, activities, bookmarks,
     files, and profiles.




     Create new activity entries, directly
     from the Team Concert Work Item
     view; microblog status updates.
31




     Document Collaboration for Rational Jazz
     Lotus Quickr Integration           Quickr document
                                        libraries

     Rational
     Team Concert
     client
32




     Document Collaboration for Rational Jazz
     Lotus Quickr Integration

     •   Collaboration in context: extend
         development teams’ collaboration toolkit
         with direct, per-project document linkages   Personal
                                                      document
                                                      artifacts

     •   End-to-end governance: improve the
         transparency of software deliveries, and     Team
                                                      document
         automate and enforce project governance      artifacts



                                                      Direct access to
                                                      document libraries
                                                      from an Eclipse view
33




     Document Collaboration for Rational Jazz
     Lotus Quickr Integration
      Business stakeholders:
     participate in software deliveries
     using Lotus Quickr, their day-
     to-day document collaboration                      Personal
     tool                                               document
                                                        artifacts


                                                        Team
                                                        document
                                                        artifacts




                                  Work Items can
                                  depend on the
                                  approval of related
                                  documents.
34




     Lotus Quickr Document Collaboration




                      Personal
                      document
                      artifacts
                                  Direct access to
                                  document
                                  libraries from
                     Team         an Eclipse view
                     document
                     artifacts
35




     Lotus Quickr Document Collaboration



     Filter document     Navigation bar:
     libraries,          • Forward/backwards
     subscribe to RSS    • Favorites
     document feeds      • Search
36




     Lotus Quickr Document Collaboration




          Drag a document
          link into the
          Sametime chat
          window

                              Presence
                              awareness is
                              integrated in the
                              document view
37




     Lotus Quickr Document Collaboration




                                  Link a Quickr
                                  document to a
                                  Work Item
38




     Lotus Quickr Document Collaboration


                                     Documents using an
                                     approval process must
                                     be approved before the
                                     Work Item can be
                                     completed
39




     Lotus Quickr Document Collaboration


      Define document
      reviews as part of the
      Team Concert process
      enactment
40




     Lotus Quickr Document Collaboration

          Business stakeholders
          receive review alerts in
          Lotus Notes




                                     Alerts link to the
                                     document in Quickr’s
                                     web interface
Use Case:
Social Software Development Delivery


Roles:

Shelley: Offering Manager for ZetaBank tasked with redesigning
eCommerce site to support additional online banking features & a
user-friendly interface; uses MS Word and Quickr.

Saurabh: Site / Project Manager, uses Rational tools, including
Team Concert, to deliver software.

Jaspreet: Web architect responsible for making changes to the site.
Step 1: Requirements
• Shelley creates a new project and ACTIVITY on Lotus
  Connections, for creating the new web site.
• Shelley writes the Requirements Document for the product’s
  new Web UI in Word and saves it to Lotus Quickr.
• She sends the document link to Saurabh...
• …and blogs about the
  upcoming Web UI
  improvements on the project
  community, linking to the
  Business Requirements.

                  The project
                  community on Lotus
                  Connections
Step 2: RTC Work Item
● Saurabh creates a new project in Rational Team Concert (RTC).
● He links the social network project community to the RTC project.
● He creates a Work Item in Rational Team Concert’s Web UI.
● He links the Requirements Document to the Work Item.
● Saurabh drags and drops / links the Work Item to the Lotus Connections
  Activity: “New Web UI”
● …and assigns the task to Jaspreet

                          Linking the
                          RTC project to
                          the community


                          Linking the
                          Work Item to
                          the social
                          activity
Step 3: Design Document
● Jaspreet is notified about the new Work Item via email and starts to
  work on it.
● He creates a Design Document in the Quickr “UI Design” library,
  directly from the Rational Team Concert’s Documents View.
● …and links the Design Document to the Work Item.




                                                  Linking the Design
                                                  Document to the Work Item
                                                  in the Eclipse-based IDE
Step 4: Document Workflow Precondition
● If Jaspreet were to try and resolve the work item at this stage, it
  would fail.
●     This is because the Jazz precondition checks that linked
    documents in libraries requiring approval are actually approved.




        Document      Problem,
        was not       reason, and
        approved      solution
Step 5: Document Approval
● Shelley is notified in an email alert that the Design Document
  awaits her approval.
● She reviews the document, and approves it.




                                                  Alerts link to the
                                                  document in Quickr’s
                                                  web interface
Step 6: Implementation
● Jaspreet’s team starts to work on
  the new design.
● They run into a browser issue
  working with the jQuery library.
● Jaspreet posts a Lotus
  Connections status update about
  the problem.


                  Posting a Twitter-like
                  update on Lotus
                  Connections, directly
                  from the RTC Web UI
Step 7: People Search
● Jaspreet uses the project Dashboard viewlet in RTC to search for
  colleagues in Lotus Connections with jQuery experience.
● He finds Vijay.




         Posting a Twitter-like
         update on Lotus
         Connections, directly
         from the RTC Web UI
Step 8: The RTC Business Card
● The business card shows Vijay’s Lotus Connections user profile.
● Jaspreet finds out that Vijay works in a different time zone and will
  be available in a couple of hours.
● Meanwhile, Jaspreet learns more about jQuery from Vijay’s Lotus
  Connections blog.




        The business card
        gives quick user
        information from
        Lotus Connections
Step 9: Resolution

 Jaspreet’s team learns from Vijay how to solve the jQuery bug as
  they get ready for the first release.
 The team completes the Work Item.
28




     Integration Architecture

                                                                           Single Sign-on

                                                                       Blogs Wikis Forums    …
                                               HTTP calls to
               Rational                        Connections              Lotus Connections
             Team Concert     Mainsoft          REST API                      (LC)
                            Web UI Plugins
                (RTC)                           Results in
                                                Atom feed
                             Websphere,
              App Server     Tomcat or Jetty     format                       WebSphere



     RTC                   RTC                                    LC                        LC
     Users                 Data                                  Users                      Data
                       DB2, Oracle                                 LDAP                DB2, Oracle
                       or Derby                                directory server        MS-SQL




                       28
Summary
Software development teams      Rational Team Concert, Lotus Quickr and
  need to …                       Lotus Connections deliver….
•     Improve communications    •    Blogs, wikis, communities, and activities,
     and collaboration within        enable people to connect and participate
     development team and            in projects from applications they already
     with enterprise                 use
     stakeholders
•    Increase productive        •    Discover expertise and utilize best
     across distributed teams        practices stored in social data

                                •    Eliminate duplicate work through
                                     discovery and better planning

•    Improve development        •    Document workflows and automate
     quality and planning            approvals /policies/ procedures

•     Meet changing business    •     Collaborate on a custom agile
     requirements                    development process and execute an
                                     iterative release plan
51
54




     Additional Resources
       Learn more about Lotus Connections PED 2
        Latest product info, research, documentation, podcasts, and more
        http:/www.ibm.com/lotus/connections
        Developer Works
        http://www.ibm.com/developerworks/lotus/products/connections/
        Synch.rono.us blog – keep up to date on Social Software activities @ IBM!
        http://synch.rono.us/
        MyDeveloperWorks– experience the software ‘live’
        https://www.ibm.com/developerworks/mydeveloperworks/
         Learn more about Rational Team Concert… PED 50 -52
         Latest product info, research, documentation, podcasts, and more
         www.ibm.com/software/awdtools/rtc/
         Learn more about Lotus Quickr…
        Overview
        www.ibm.com/lotus/quickr
      Preview Lotus Connections Integration with Team Concert
        Features, use cases, recorded demo and links to download the software Booth C
        https://jazz.net
Additional Resources
 Download Mainsoft’s Rational Jazz Integration
 products

 Document Collaboration for Rational Jazz, Lotus Quickr
 Integration
             tinyurl.com/jazzquickr

 Technology Preview : Lotus Connections Integration with
 Rational Team Concert
             tinyurl.com/jazzconnections



Contacts : chrislam@us.ibm.com and yaacovc@mainsoft.com
Learn more at:
  IBM Rational software                                                  Ensure Web security & compliance                                        Rational trial downloads
  Rational launch announcements                                          Improve project success                                                 developerWorks Rational
  Rational Software Delivery Platform  Manage architecture                                                                                       Leading Innovation
  Accelerate change & delivery         Manage evolving requirements                                                                              IBM Rational TV
  Deliver enduring quality                                               Small & midsized business                                               IBM Business Partners
  Enable enterprise modernization                                        Targeted solutions                                                      IBM Rational Case Studies
© Copyright IBM Corporation 2010. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind,
express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have
the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM
software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature
availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines
Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.


                                                                                                                                                                                                     54
57




     Legal Disclaimer
     © IBM Corporation 2009. All Rights Reserved.
     The information contained in this publication is provided for informational purposes only. While efforts were
     made to verify the completeness and accuracy of the information contained in this publication, it is provided
     AS IS without warranty of any kind, express or implied. In addition, this information is based on IBM’s
     current product plans and strategy, which are subject to change by IBM without notice. IBM shall not be
     responsible for any damages arising out of the use of, or otherwise related to, this publication or any other
     materials. Nothing contained in this publication is intended to, nor shall have the effect of, creating any
     warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of
     the applicable license agreement governing the use of IBM software.
     References in this presentation to IBM products, programs, or services do not imply that they will be
     available in all countries in which IBM operates. Product release dates and/or capabilities referenced in this
     presentation may change at any time at IBM’s sole discretion based on market opportunities or other
     factors, and are not intended to be a commitment to future product or feature availability in any way.
     Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any
     activities undertaken by you will result in any specific sales, revenue growth or other results.
     IBM, the IBM logo, Lotus, Lotus Notes, Notes, Domino, Quickr, Sametime, WebSphere, UC2,
     PartnerWorld and Lotusphere are trademarks of International Business Machines Corporation in the United
     States, other countries, or both. Unyte is a trademark of WebDialogs, Inc., in the United States, other
     countries, or both.

     Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other
     countries, or both.

     Microsoft and Windows are trademarks of Microsoft Corporation in the United States, other countries, or
     both.

     All references to Zetabank refer to a fictitious company and are used for illustration purposes only.
Leveraging the Lotus Connections API
● Uses HTTP protocol as transport.
● Uses XML syntax as format.
● Various language libraries/helpers available for parsing Atom feeds and
  creating publishing protocol requests.
● Utilized by all Lotus Connections services as the API.
58




     Integration technologies

      ● Integration implemented as set of Web UI Plugins for Team
        Concert
         ▬ Server-side logic is implemented in Java
         ▬ Clients-side UI extensions written in JavaScript, uses Dojo library
         ▬ Integration also includes a Social “Viewlet” designed to run in the
           Team Concert Dashboard


      ● Team Concert Accesses Lotus Connections via RESTful web
        services
         ▬ Connections provides extensive RESTful web services for each
           component




                   58

Innovate Sdp 2294 Final

  • 1.
    Smarter Collaboration: Working smarteracross your business for software delivery that exceeds expectations Kathy Mandelstein, Director Lotus Collaboration & WebSphere Portal WW Programs, Web & Events kmandel@us.ibm.com Anthony Fiorot, Lotus Program Manager, RAD PTK Product Manager afiorot@us.ibm.com SDP - 2294 The premiere software and product delivery event. June 6–10 Orlando, Florida
  • 2.
    Smarter Collaboration: Workingsmarter across your business for software delivery that exceeds expectations Session Abstract: In todays global economy development teams are becoming more distributed, making it increasingly more difficult to work across cohesively across multiple time zones and geographical boundaries. The speed in which LOB expect applications to be delivered poses greater strain on IT, requiring greater collaboration and real-time feedback for faster delivery cycles. Crowd sourcing, integrating partners, customers, etc in the development process offers greater opportunity for delivering functionality that align with customer and business requirements. In this session we will demonstrate how Lotus and Rational have teamed up to deliver a collaborative software delivery platform that integrates all the benefits of Lotus' social software and collaborative services leveraging Rational Software Development Platform and using Rational Team Concert. 2
  • 3.
    The information onthe new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion.
  • 4.
    4 Agenda ● Why is collaboration essential in helping you deliver applications that meet the business needs ● Collaboration beyond your own development & delivery team ● Collaboration from Lessons Learned ● Lotus Connections and Rational Team Concert ● “Real World” Use Case ● Summary & Questions • “
  • 5.
    Collaboration is criticalwith your team & business stakeholders How do we effectively collaborate across 3 continents? Two-thirds of development organizations have teams that work in multiple locations.1 Studies show that teams with more than twelve members rapidly lose effectiveness.2 Graphic: Coplien, Organizational Patterns of Agile Development 1 Evans Data Corporation North American Development Survey, Vol II, 2007 2 Knowledge@Wharton. “Is Your Team Too Big? Too Small? What’s the Right Number?” June 14, 2006. 5
  • 6.
    Smart Work .. . is about people and collaboration 500 Million social networking users by 2012 1 Trillion connected intelligent devices in the world 42% make decisions with the wrong input at least once a week $650 Billion in productivity is lost because of unnecessary business process interruption 6
  • 7.
    Collaborative Services tohelp people and teams to work smart E-mail, Documents, Instant Telephony, Shared Electronic Calendar, Presentations, Messaging, Video, VOIP Documents forms Contacts Spreadsheets Web Conferencing Contact Shared Communities, Activities/ Scorecards, Composite Information, Bookmarking Discussions Project Business Applications Skills, Expertise Blogs/Wikis Management Intelligence Business Mashups 7
  • 8.
    In the contextof how people work ...An adaptive environment 8
  • 9.
    To leverage globalresources more effectively, Jazz enables collaboration across software delivery teams and geographies Leverage social networking capabilities to enable broader and richer participation in software projects Virtualize "team memory" to overcome geographic and temporal gaps in the software lifecycle Collaborate Enable flexible, global resourcing and Achieve common energy-saving workplace models goals by optimizing how people work
  • 10.
    The IBM Lotus& Websphere Portal Portfolio designed to help Teams Build Better Outcomes  Workforce flexibility  Enabling employee mobility  Leveraging expertise  Finding and connecting  Streamlining decision making  Coordinating activities  Communicating with employees as individuals  Agregation and personalization of content  The right in formation at the right time.., in context  Tailored applications for niche audiences  Magnifying the value of content  Capturing and repackaging content 10
  • 11.
    People access collaborativeservices in many ways ..hence IBM delivers in many ways Collaboration as an application Collaboration “Inside” Desktop Appliance Web Mobile Middleware Business Applications Collaboration as a Service Hosted SaaS 11
  • 12.
    Multiple Delivery Models On-Premise Cloud Delivered MANAGED BY IT DEPARTMENT OR PARTNER IBM MANAGED Dedicated Hosted Software Appliance SaaS Environment Negotiated SLAs Low cost of entry Easy to install/maintain Allows for advanced customization to meet Managed by customer Monthly pricing available Zero infrastructure – for hosting reduced overhead customer needs or partner Toolkits available for Flexible contracts Can leverage toolkits Managed by IT dept customization by partner available for Scales to meet or customer customization customer demand All data resides local and inside the firewall All data inside your Updates are applied Immediate access to the firewall transparently latest innovations 12
  • 13.
    Collaboration Applications inthe Cloud  Amazon Web Services  Beta release  License-free images for ISVs and SIs  Lotus images for Domino, Portal, Forms, Mashups  IBM Development and Test Cloud  Beta release  Public cloud designed for enterprise customers  Opportunity to take “first step”into Cloud  Lotus images planned  Partners  GROUP Live: Domino Cloud PaaS  Connectria and Prominic: Hosted applications and services 13
  • 14.
    Collaboration to go:Whenever & Wherever You May Be New for 2010 Android Mobile Capabilities:  Contact List & Business Cards  Wireless instant messaging  Email & Calendar  Web conferencing & Meetings  Document Creation  File Sharing  Knowledge Expertise  Social Community 14
  • 15.
    IBM Collaboration –a Business Architecture Messaging and Unified Communications Situational Applications Collaboration and Social Software and Integration Content Management On-Premise Appliance Hosted SaaS 15
  • 16.
    Core Collaboration ProductOfferings Notes LotusLive UC2 Portal deployment Quickr Social Software On-premises deployment 16
  • 17.
    Extending integration withthe collaborationmobile, desktop & cloud Web 2.0 the IBM Collaboration Platform on desktop: a wealth of opportunity 17
  • 18.
    Technology Based onLessons Learned and Best Practices! 18
  • 19.
    Lotus Connections DevelopmentTeam Westford, MA Dublin, Ireland Raleigh, NC Beijing, China Shanghai, China Gurgaon, India ● 100+ practitioners across 6 sites and 3 continents ● Different teams building and testing an integrated product ● Diverse stakeholders ▬ Product marketing ▬ Sales ▬ Executives ▬ Other SWG teams ▬ Customer Council ▬ IBM Business Partners
  • 20.
    Business Challenges WeFaced ● Very aggressive development plan ▬ Multiple major releases and numerous minor releases in ~26 months ▬ Multiple check points with all stakeholders for each release ● Frequently changing requirements ▬ Active contribution from all stakeholders ▬ Reacting to changes in a new market ● Optimize and Maintain high productivity in a distributed environment ▬ Competing with smaller firms ▬ New teams joining the core team
  • 21.
    21 What we needed Improve collaboration across all teams and functions An agile development process Time to Innovate and use our best available tools! 21
  • 22.
    – Social softwarefor business Profiles Lotus Connections is social software for business that empowers you to be more innovative and helps you execute Blogs Dogear more quickly by using dynamic networks of Home page coworkers, partners and customers. Activities Communities 22
  • 23.
    Lotus Connections: Find expertise Communities Quickly find the person with the skill Share information and work with or project experience you need with Share knowledge communities of project stake holders: Testers, project managers, business Profiles. Create stronger analysts, managers. relationships with micro-blogging Experts can use blogs to efficiently share their expertise and experience across the organization Get things done Discover information Organize your work, plan next steps, and easily tap your expanding professional Save, organize, and share bookmarks; network to help execute project related discover information that have been tasks such as project status presentations. qualified by others with similar Share Files interests & expertise. Upload and share any type of file with Stay in the loop colleagues and communities. Store Create content versions and view downloads, comments faster and ratings. Understand what folks are working on Use wiki to edit best practices, project and what information is changing using documentation, or frequently asked the homepage view questions. View changes across pages, ratings, and comments.
  • 24.
    Rational Team Concert: ●A collaborative development tool built on Rational Jazz Platform ● Work item tracking ● Source code management ● Agile planning ● Process customization
  • 25.
    Direct benefits ofRTC and Connections ● Better communications improved productivity across sites ● Faster authoring and approval of software documents ● Used a community to define agile process and implemented that in RTC ● Visibility and tracking of cross function work items to improve quality ● Adjusted product plans based on new requirements ● Quickly finding the right expert across the extended Connections team ● Assess project status and trends in real-time with RTC's web-based dashboards Good, what but would be even better….
  • 26.
    Social Software inContext of Software Development ● Direct access to Lotus Connections from the Rational Team Concert (RTC) Web UI ▬ Find people across the enterprise based on skills and experience. ▬ Project communities – incl. user profiles, blogs, forums, activities, bookmarks, wikis, and files - integrated into the software development environment. ▬ Stay up-to-date using Microblogging. ▬ RTC team members are always within reach. ● Document Collaboration provides easy access to shared documents from within RTC ▬ Document workflows connect people across divisions. ▬ Create dependencies between development work items and document approvals. ● Business and technical roles communicate using Lotus Connections and Lotus Quickr
  • 27.
    29 “Jazz Connections” Technology Preview Integrating Lotus Connections with Rational Team Concert Social network profiles: contact details, photo, time zone where he works, expertise, interests, what he’s working on, etc. Find enterprise contacts on their experience, skills, or key relationships.
  • 28.
    30 “Jazz Connections” Technology Preview Integrating Lotus Connections with Rational Team Concert Social viewlet on the Jazz dashboard: Find out what’s new in the project community. Browse wikis, blogs, communities, activities, bookmarks, files, and profiles. Create new activity entries, directly from the Team Concert Work Item view; microblog status updates.
  • 29.
    31 Document Collaboration for Rational Jazz Lotus Quickr Integration Quickr document libraries Rational Team Concert client
  • 30.
    32 Document Collaboration for Rational Jazz Lotus Quickr Integration • Collaboration in context: extend development teams’ collaboration toolkit with direct, per-project document linkages Personal document artifacts • End-to-end governance: improve the transparency of software deliveries, and Team document automate and enforce project governance artifacts Direct access to document libraries from an Eclipse view
  • 31.
    33 Document Collaboration for Rational Jazz Lotus Quickr Integration Business stakeholders: participate in software deliveries using Lotus Quickr, their day- to-day document collaboration Personal tool document artifacts Team document artifacts Work Items can depend on the approval of related documents.
  • 32.
    34 Lotus Quickr Document Collaboration Personal document artifacts Direct access to document libraries from Team an Eclipse view document artifacts
  • 33.
    35 Lotus Quickr Document Collaboration Filter document Navigation bar: libraries, • Forward/backwards subscribe to RSS • Favorites document feeds • Search
  • 34.
    36 Lotus Quickr Document Collaboration Drag a document link into the Sametime chat window Presence awareness is integrated in the document view
  • 35.
    37 Lotus Quickr Document Collaboration Link a Quickr document to a Work Item
  • 36.
    38 Lotus Quickr Document Collaboration Documents using an approval process must be approved before the Work Item can be completed
  • 37.
    39 Lotus Quickr Document Collaboration Define document reviews as part of the Team Concert process enactment
  • 38.
    40 Lotus Quickr Document Collaboration Business stakeholders receive review alerts in Lotus Notes Alerts link to the document in Quickr’s web interface
  • 39.
    Use Case: Social SoftwareDevelopment Delivery Roles: Shelley: Offering Manager for ZetaBank tasked with redesigning eCommerce site to support additional online banking features & a user-friendly interface; uses MS Word and Quickr. Saurabh: Site / Project Manager, uses Rational tools, including Team Concert, to deliver software. Jaspreet: Web architect responsible for making changes to the site.
  • 40.
    Step 1: Requirements •Shelley creates a new project and ACTIVITY on Lotus Connections, for creating the new web site. • Shelley writes the Requirements Document for the product’s new Web UI in Word and saves it to Lotus Quickr. • She sends the document link to Saurabh... • …and blogs about the upcoming Web UI improvements on the project community, linking to the Business Requirements. The project community on Lotus Connections
  • 41.
    Step 2: RTCWork Item ● Saurabh creates a new project in Rational Team Concert (RTC). ● He links the social network project community to the RTC project. ● He creates a Work Item in Rational Team Concert’s Web UI. ● He links the Requirements Document to the Work Item. ● Saurabh drags and drops / links the Work Item to the Lotus Connections Activity: “New Web UI” ● …and assigns the task to Jaspreet Linking the RTC project to the community Linking the Work Item to the social activity
  • 42.
    Step 3: DesignDocument ● Jaspreet is notified about the new Work Item via email and starts to work on it. ● He creates a Design Document in the Quickr “UI Design” library, directly from the Rational Team Concert’s Documents View. ● …and links the Design Document to the Work Item. Linking the Design Document to the Work Item in the Eclipse-based IDE
  • 43.
    Step 4: DocumentWorkflow Precondition ● If Jaspreet were to try and resolve the work item at this stage, it would fail. ● This is because the Jazz precondition checks that linked documents in libraries requiring approval are actually approved. Document Problem, was not reason, and approved solution
  • 44.
    Step 5: DocumentApproval ● Shelley is notified in an email alert that the Design Document awaits her approval. ● She reviews the document, and approves it. Alerts link to the document in Quickr’s web interface
  • 45.
    Step 6: Implementation ●Jaspreet’s team starts to work on the new design. ● They run into a browser issue working with the jQuery library. ● Jaspreet posts a Lotus Connections status update about the problem. Posting a Twitter-like update on Lotus Connections, directly from the RTC Web UI
  • 46.
    Step 7: PeopleSearch ● Jaspreet uses the project Dashboard viewlet in RTC to search for colleagues in Lotus Connections with jQuery experience. ● He finds Vijay. Posting a Twitter-like update on Lotus Connections, directly from the RTC Web UI
  • 47.
    Step 8: TheRTC Business Card ● The business card shows Vijay’s Lotus Connections user profile. ● Jaspreet finds out that Vijay works in a different time zone and will be available in a couple of hours. ● Meanwhile, Jaspreet learns more about jQuery from Vijay’s Lotus Connections blog. The business card gives quick user information from Lotus Connections
  • 48.
    Step 9: Resolution Jaspreet’s team learns from Vijay how to solve the jQuery bug as they get ready for the first release.  The team completes the Work Item.
  • 49.
    28 Integration Architecture Single Sign-on Blogs Wikis Forums … HTTP calls to Rational Connections Lotus Connections Team Concert Mainsoft REST API (LC) Web UI Plugins (RTC) Results in Atom feed Websphere, App Server Tomcat or Jetty format WebSphere RTC RTC LC LC Users Data Users Data DB2, Oracle LDAP DB2, Oracle or Derby directory server MS-SQL 28
  • 50.
    Summary Software development teams Rational Team Concert, Lotus Quickr and need to … Lotus Connections deliver…. • Improve communications • Blogs, wikis, communities, and activities, and collaboration within enable people to connect and participate development team and in projects from applications they already with enterprise use stakeholders • Increase productive • Discover expertise and utilize best across distributed teams practices stored in social data • Eliminate duplicate work through discovery and better planning • Improve development • Document workflows and automate quality and planning approvals /policies/ procedures • Meet changing business • Collaborate on a custom agile requirements development process and execute an iterative release plan
  • 51.
  • 52.
    54 Additional Resources Learn more about Lotus Connections PED 2 Latest product info, research, documentation, podcasts, and more http:/www.ibm.com/lotus/connections Developer Works http://www.ibm.com/developerworks/lotus/products/connections/ Synch.rono.us blog – keep up to date on Social Software activities @ IBM! http://synch.rono.us/ MyDeveloperWorks– experience the software ‘live’ https://www.ibm.com/developerworks/mydeveloperworks/ Learn more about Rational Team Concert… PED 50 -52 Latest product info, research, documentation, podcasts, and more www.ibm.com/software/awdtools/rtc/ Learn more about Lotus Quickr… Overview www.ibm.com/lotus/quickr Preview Lotus Connections Integration with Team Concert Features, use cases, recorded demo and links to download the software Booth C https://jazz.net
  • 53.
    Additional Resources DownloadMainsoft’s Rational Jazz Integration products Document Collaboration for Rational Jazz, Lotus Quickr Integration tinyurl.com/jazzquickr Technology Preview : Lotus Connections Integration with Rational Team Concert tinyurl.com/jazzconnections Contacts : chrislam@us.ibm.com and yaacovc@mainsoft.com
  • 54.
    Learn more at:  IBM Rational software  Ensure Web security & compliance  Rational trial downloads  Rational launch announcements  Improve project success  developerWorks Rational  Rational Software Delivery Platform  Manage architecture  Leading Innovation  Accelerate change & delivery  Manage evolving requirements  IBM Rational TV  Deliver enduring quality  Small & midsized business  IBM Business Partners  Enable enterprise modernization  Targeted solutions  IBM Rational Case Studies © Copyright IBM Corporation 2010. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others. 54
  • 55.
    57 Legal Disclaimer © IBM Corporation 2009. All Rights Reserved. The information contained in this publication is provided for informational purposes only. While efforts were made to verify the completeness and accuracy of the information contained in this publication, it is provided AS IS without warranty of any kind, express or implied. In addition, this information is based on IBM’s current product plans and strategy, which are subject to change by IBM without notice. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this publication or any other materials. Nothing contained in this publication is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in this presentation may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results. IBM, the IBM logo, Lotus, Lotus Notes, Notes, Domino, Quickr, Sametime, WebSphere, UC2, PartnerWorld and Lotusphere are trademarks of International Business Machines Corporation in the United States, other countries, or both. Unyte is a trademark of WebDialogs, Inc., in the United States, other countries, or both. Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both. Microsoft and Windows are trademarks of Microsoft Corporation in the United States, other countries, or both. All references to Zetabank refer to a fictitious company and are used for illustration purposes only.
  • 56.
    Leveraging the LotusConnections API ● Uses HTTP protocol as transport. ● Uses XML syntax as format. ● Various language libraries/helpers available for parsing Atom feeds and creating publishing protocol requests. ● Utilized by all Lotus Connections services as the API.
  • 57.
    58 Integration technologies ● Integration implemented as set of Web UI Plugins for Team Concert ▬ Server-side logic is implemented in Java ▬ Clients-side UI extensions written in JavaScript, uses Dojo library ▬ Integration also includes a Social “Viewlet” designed to run in the Team Concert Dashboard ● Team Concert Accesses Lotus Connections via RESTful web services ▬ Connections provides extensive RESTful web services for each component 58