IE 271 OPERATION ANALYSIS AND DESIGN Aşır Sezgen Ensar Emirali Tugay Torun
Company profile System description Symptoms Problem definition Short and medium term solutions proposals Conclusion Agenda
 
Example: Design of Profile “2042”
 
Current  Flow Process Diagram
Material Handling Layout of company Long distances  to transport Places of machines Material Handling Unnecessary loading /unloading Cross traffic Wastage Scraps and dust Defective profiles Work and psychological conditions Motivation  of workers Health security  of workers
 
Scraps Improvement of Storage Unused machines
 
Material Handling Improvement of Painting Department Improvement of Cutting Department
Proposed Layout
As a result, we reduced the distance traveled from 356 meters to   89 meters which means 75%  improvement and in the process time, there is reduction from 924 minutes to 692 minutes. The improvement rate for process time is 26.2%.  To sum up, in the light of all analysis and calculations, we proposed to the company   to apply the solution which answers their immediate needs. With the help of our  improvements, MorAl will reach the break-even point in 156 day   and starts to profit for each product. Conclusion

industrial analysis

  • 1.
    IE 271 OPERATIONANALYSIS AND DESIGN Aşır Sezgen Ensar Emirali Tugay Torun
  • 2.
    Company profile Systemdescription Symptoms Problem definition Short and medium term solutions proposals Conclusion Agenda
  • 3.
  • 4.
    Example: Design ofProfile “2042”
  • 5.
  • 6.
    Current FlowProcess Diagram
  • 7.
    Material Handling Layoutof company Long distances to transport Places of machines Material Handling Unnecessary loading /unloading Cross traffic Wastage Scraps and dust Defective profiles Work and psychological conditions Motivation of workers Health security of workers
  • 8.
  • 9.
    Scraps Improvement ofStorage Unused machines
  • 10.
  • 11.
    Material Handling Improvementof Painting Department Improvement of Cutting Department
  • 12.
  • 13.
    As a result,we reduced the distance traveled from 356 meters to 89 meters which means 75% improvement and in the process time, there is reduction from 924 minutes to 692 minutes. The improvement rate for process time is 26.2%. To sum up, in the light of all analysis and calculations, we proposed to the company to apply the solution which answers their immediate needs. With the help of our improvements, MorAl will reach the break-even point in 156 day and starts to profit for each product. Conclusion