SlideShare a Scribd company logo
1 of 13
Implementing Outcome Budget
2017-18
Planning Department, GNCTD
February 14, 2017
• Why Outcome Budget?
• Key Concepts in Outcome Budgeting
– Outputs
– Outcomes
– Long-term goals/Impact
– Choosing Indicators
• Detailed Template for Outcome Budget 2017-18
• Monitoring vs Evaluation
• Implementing Outcome Budget
Contents
• Outcome Budgeting is a comprehensive management
system
– Used inter-changeably with Results-Based Management
(RBM) or Managing for Development Results (MfDR) approach
• Benefits of Outcome Budget or RBM
– Improves internal management
– Share successes and win public support
– Accountability (Results as important as processes)
Why Outcome Budget?
Traditional
Management Approach
Focused mainly on
inputs and activities.
Asks: “Did they do it?”
Results-Based Management
Approach
Focus on the results obtained
rather than just on the inputs used
or the activities conducted.
Asks: “So what?”
Key Concepts in
Outcome Budgeting
Stages of any Project/Scheme
Inputs Outputs Outcomes
Long-term
Goals/Impact
What are the
resources used
–funds, staff,
equipment,
curriculum, all
materials
Tangible
products or
services
produced as
a result of the
Project
Short-term
behavioral
changes that
result from the
outputs –
uptake of
services
Long-term
changes that
result from
outcomes – the
final result of the
Project
E.g. Funds for
computer lab in
schools
allocated,
Staff
sanctioned
- Computers
purchased and
installed in
schools
- Staff positions
filled
- Number of
children using
computer lab
- Avg. time per
child using
computer lab
- Increase in
computer
literacy
- Increase in
learning
achievement
THEORY OF CHANGE
Stages of any Project/Scheme
Inputs Outputs Outcomes
Long-term
Goals/Impact
What are the
resources used
–funds, staff,
equipment,
curriculum, all
materials
Tangible
products or
services
produced as
a result of the
Project
Short-term
behavioral
changes that
result from the
outputs –
uptake of
services
Long-term
changes that
result from
outcomes – the
final result of the
Project
Traditional M&E
Results-Based M&E
Attribution Gap
• Indicators are signals of change, measures of
progress
• Pick SMART indicators
– Specific - Ask (answer) one question at a time
– Measurable - Quantifiable, accurate, unambiguous
– Attributable - Is it attributable to your programme?
– Realistic - Is this the most relevant and practical indicator
given the needs
– Targeted – should be specific about the targeted
population/area
Choosing Indicators
Choosing SMART Indicators
Specific: measure as closely as possible what is intended to measure
Measurable: clear and unambiguous about what is measured
Outcome Indicator
Parents insure that 1.Increased utilization of clinics
children get treatment for 2. Increased use of malaria
Malaria drugs
2. % of health centers with availability of drugs
1. % of health centers without stock out of drugs x, y & z for
more than a week at a time
Which indicator is
more specific ?
Which indicator is
measurable ?
Choosing SMART Indicators
2. HIV prevalence among the total population
1. HIV prevalence among 15-24 year old pregnant women
1. Percent increase in employment
Realistic: data obtained at reasonable cost with enough frequency
Which
indicator is
more
realistic?
Targeted: it should be specific about the targeted population/area
2. Percent increase in employment of graduate of technical
training center X in the first year after completion of training.
Which indicator
is targeted ?
1. Life expectancy
Attributable: attributable to the project’s or program’s efforts
2. % of children fully immunized at 1 year
Which indicator is
attributable ?
Detailed Template for Use in Outcome Budget
2017-18
Name of
Programme
/Scheme
Progra
mme
Object
ive
Quantifiable Deliverables
OUTPUTS OUTCOMES
Indicator
Descriptio
n
Base-
line
03/17
Target
03/18
Frequ
ency
Indicator
Descriptio
n
Base-
line
03/17
Target
03/18
Frequ
ency
Annexure IVA
At departmental level, maintain at least two more columns against
each indicator:
• Data source (MIS, internal survey, external survey etc.)
• Responsibility for data collection
Detailed Template for 2017-18: Example
Quantifiable Deliverables
OUTPUTS OUTCOMES
Indicator
Description
Base-
line
03/17
Target
03/18
Freq
uenc
y
Indicator
Description
Base-
line
03/17
Target
03/18
Freque
ncy
Schools with
CCTV
cameras
0 200 Q Improvement
in teacher
scores
20% Q
Teacher
feedback
reports/mth
0 8000 Q
Name of Programme: Installation of CCTV cameras in schools
In Outcome Budget 2015-16, OUTCOME has been defined as
- To provide better academic atmosphere for students
Detailed Template for 2017-18: Example
Quantifiable Deliverables
OUTPUTS OUTCOMES
Indicator
Description
Base-
line
03/17
Target
03/18
Freque
ncy
Indicator
Description
Base-
line
03/17
Target
03/18
Frequen
cy
Sections of
skywalks
constructed
0 5 Q Weekly
average use of
skywalk by
pedestrians
0 20,000 Q
Maintenance
staff posted
110 1000 Q
Name of Programme: Building of Skywalk at ITO
Implementing
Outcome Budgeting
• Step 1: Finalize list of output and outcome indicators and
targets for 2017-18
• Full draft from departments
• Review and feedback by Planning dept
• Final draft from departments with baseline/target data
• Step 2: Linking outcome indicators with long-term goals
• Step 3: Quarterly monitoring of indicators against targets

More Related Content

What's hot

M&e+for+ifc+clients+jan+2006
M&e+for+ifc+clients+jan+2006M&e+for+ifc+clients+jan+2006
M&e+for+ifc+clients+jan+2006
Mohamed Rafique
 
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
COP_HHA
 
Workshop: Monitoring, evaluation and impact assessment
Workshop: Monitoring, evaluation and impact assessmentWorkshop: Monitoring, evaluation and impact assessment
Workshop: Monitoring, evaluation and impact assessment
WorldFish
 
Monitoring and Evaluation of Health Services
Monitoring and Evaluation of Health ServicesMonitoring and Evaluation of Health Services
Monitoring and Evaluation of Health Services
Nayyar Kazmi
 

What's hot (20)

PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
 
Monitoring and Evaluation System for Adaptation Projects
 Monitoring and Evaluation System for Adaptation Projects Monitoring and Evaluation System for Adaptation Projects
Monitoring and Evaluation System for Adaptation Projects
 
Monitoring and evaluation
Monitoring and evaluationMonitoring and evaluation
Monitoring and evaluation
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of Plan
 
M&E handout for module 8
M&E handout for module 8M&E handout for module 8
M&E handout for module 8
 
Capacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationCapacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And Evaluation
 
United Way or Erie County - Programs, Program Monitoring and Evaluation, and ...
United Way or Erie County - Programs, Program Monitoring and Evaluation, and ...United Way or Erie County - Programs, Program Monitoring and Evaluation, and ...
United Way or Erie County - Programs, Program Monitoring and Evaluation, and ...
 
The role of evaluation in a Monitoring, Evaluation, and Impact Assessment Fra...
The role of evaluation in a Monitoring, Evaluation, and Impact Assessment Fra...The role of evaluation in a Monitoring, Evaluation, and Impact Assessment Fra...
The role of evaluation in a Monitoring, Evaluation, and Impact Assessment Fra...
 
Models and approaches to decentralized evaluation system - considerations for...
Models and approaches to decentralized evaluation system - considerations for...Models and approaches to decentralized evaluation system - considerations for...
Models and approaches to decentralized evaluation system - considerations for...
 
Presentation, Bangkok Apr Workshop, 2009 Deepak Mohanty
Presentation, Bangkok   Apr Workshop, 2009 Deepak MohantyPresentation, Bangkok   Apr Workshop, 2009 Deepak Mohanty
Presentation, Bangkok Apr Workshop, 2009 Deepak Mohanty
 
M&e+for+ifc+clients+jan+2006
M&e+for+ifc+clients+jan+2006M&e+for+ifc+clients+jan+2006
M&e+for+ifc+clients+jan+2006
 
monitoring and evaluation
monitoring and evaluationmonitoring and evaluation
monitoring and evaluation
 
European Board of Medical Assessors 2017
European Board of Medical Assessors 2017European Board of Medical Assessors 2017
European Board of Medical Assessors 2017
 
evaluation
evaluationevaluation
evaluation
 
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
Session 8 Human Factors Predicting Failure and Success in Hospital Informatio...
 
Monitoring and evaluation for hiv
Monitoring and evaluation for hivMonitoring and evaluation for hiv
Monitoring and evaluation for hiv
 
Workshop: Monitoring, evaluation and impact assessment
Workshop: Monitoring, evaluation and impact assessmentWorkshop: Monitoring, evaluation and impact assessment
Workshop: Monitoring, evaluation and impact assessment
 
Monitoring and Evaluation of Health Services
Monitoring and Evaluation of Health ServicesMonitoring and Evaluation of Health Services
Monitoring and Evaluation of Health Services
 
Panel Debate: An Uncertain Future - TEF, Retention, and Student Success
Panel Debate: An Uncertain Future - TEF, Retention, and Student SuccessPanel Debate: An Uncertain Future - TEF, Retention, and Student Success
Panel Debate: An Uncertain Future - TEF, Retention, and Student Success
 
Monitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentMonitoring and evaluation Learning and Development
Monitoring and evaluation Learning and Development
 

Viewers also liked

Socio economic problems presentation
Socio economic problems presentationSocio economic problems presentation
Socio economic problems presentation
IQra BaShir
 

Viewers also liked (20)

actividad 1
actividad 1actividad 1
actividad 1
 
Outcome budget
Outcome budgetOutcome budget
Outcome budget
 
No david
No davidNo david
No david
 
ESDEMC CDE IEEE Symposium 2014
ESDEMC CDE IEEE Symposium 2014ESDEMC CDE IEEE Symposium 2014
ESDEMC CDE IEEE Symposium 2014
 
02 vaya rabieta
02 vaya rabieta02 vaya rabieta
02 vaya rabieta
 
Development in Indian Education Sector
Development in Indian Education SectorDevelopment in Indian Education Sector
Development in Indian Education Sector
 
Kelompok 3
Kelompok 3Kelompok 3
Kelompok 3
 
Research paper competition- "Recent Developments in Indian Higher Education"
Research paper competition- "Recent Developments in Indian Higher Education"Research paper competition- "Recent Developments in Indian Higher Education"
Research paper competition- "Recent Developments in Indian Higher Education"
 
Asuhan kebidanan pada neonatus, bayi dan anak yang berlandaskan aetika ydan p...
Asuhan kebidanan pada neonatus, bayi dan anak yang berlandaskan aetika ydan p...Asuhan kebidanan pada neonatus, bayi dan anak yang berlandaskan aetika ydan p...
Asuhan kebidanan pada neonatus, bayi dan anak yang berlandaskan aetika ydan p...
 
2.0 oshad-sf administration v3.0 english (1)
2.0   oshad-sf administration v3.0 english (1)2.0   oshad-sf administration v3.0 english (1)
2.0 oshad-sf administration v3.0 english (1)
 
The structure of the research paper
The structure of the research paperThe structure of the research paper
The structure of the research paper
 
Input – output model of economic development
Input – output model of economic developmentInput – output model of economic development
Input – output model of economic development
 
Socio economic impact analysis
Socio economic impact analysisSocio economic impact analysis
Socio economic impact analysis
 
The Basics of Economic Impact Analysis
The Basics of Economic Impact AnalysisThe Basics of Economic Impact Analysis
The Basics of Economic Impact Analysis
 
Socio economic ppt
Socio economic  pptSocio economic  ppt
Socio economic ppt
 
Orientacion familiar final
Orientacion familiar finalOrientacion familiar final
Orientacion familiar final
 
Візитка 11-А класу
Візитка 11-А класуВізитка 11-А класу
Візитка 11-А класу
 
ПрезентацІя 6 - Б
ПрезентацІя 6 - БПрезентацІя 6 - Б
ПрезентацІя 6 - Б
 
Еженедельный геологический обзор №6
Еженедельный геологический обзор №6Еженедельный геологический обзор №6
Еженедельный геологический обзор №6
 
Socio economic problems presentation
Socio economic problems presentationSocio economic problems presentation
Socio economic problems presentation
 

Similar to Implementing Outcome Budget_Key Concepts_20Feb

Results Monitoring Reporting 18 1 16
Results Monitoring  Reporting 18 1 16Results Monitoring  Reporting 18 1 16
Results Monitoring Reporting 18 1 16
Joseph Banda
 
Session_24_-_Monitoring_and_Evaluat_238.ppt
Session_24_-_Monitoring_and_Evaluat_238.pptSession_24_-_Monitoring_and_Evaluat_238.ppt
Session_24_-_Monitoring_and_Evaluat_238.ppt
PriyankaSharma89719
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluation
Carlo Magno
 

Similar to Implementing Outcome Budget_Key Concepts_20Feb (20)

Labor Markets Core Course 2013: Monitoring and evaluation
Labor Markets Core Course 2013: Monitoring and evaluation Labor Markets Core Course 2013: Monitoring and evaluation
Labor Markets Core Course 2013: Monitoring and evaluation
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
 
ME_Katende (2).ppt
ME_Katende (2).pptME_Katende (2).ppt
ME_Katende (2).ppt
 
Assessment MEAL Frameworks in scientific field.ppt
Assessment MEAL Frameworks in scientific field.pptAssessment MEAL Frameworks in scientific field.ppt
Assessment MEAL Frameworks in scientific field.ppt
 
Results Monitoring Reporting 18 1 16
Results Monitoring  Reporting 18 1 16Results Monitoring  Reporting 18 1 16
Results Monitoring Reporting 18 1 16
 
Unit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptxUnit IV_Monitoring_and_Evaluation.pptx
Unit IV_Monitoring_and_Evaluation.pptx
 
Developing State Monitoring Systems
Developing State Monitoring SystemsDeveloping State Monitoring Systems
Developing State Monitoring Systems
 
first-batch-me-training.pptx
first-batch-me-training.pptxfirst-batch-me-training.pptx
first-batch-me-training.pptx
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
Session_24_-_Monitoring_and_Evaluat_238.ppt
Session_24_-_Monitoring_and_Evaluat_238.pptSession_24_-_Monitoring_and_Evaluat_238.ppt
Session_24_-_Monitoring_and_Evaluat_238.ppt
 
Evaluation_Training.pptx
Evaluation_Training.pptxEvaluation_Training.pptx
Evaluation_Training.pptx
 
The Basics of Monitoring, Evaluation and Supervision of Health Services in Nepal
The Basics of Monitoring, Evaluation and Supervision of Health Services in NepalThe Basics of Monitoring, Evaluation and Supervision of Health Services in Nepal
The Basics of Monitoring, Evaluation and Supervision of Health Services in Nepal
 
M&E Concepts.pptx
M&E Concepts.pptxM&E Concepts.pptx
M&E Concepts.pptx
 
Project monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino MokayaProject monitoring and evaluation by Samuel Obino Mokaya
Project monitoring and evaluation by Samuel Obino Mokaya
 
Chapter 8 Education Indicators
Chapter 8 Education IndicatorsChapter 8 Education Indicators
Chapter 8 Education Indicators
 
8 phe monitoring
8 phe monitoring8 phe monitoring
8 phe monitoring
 
Monitoring evaluation
Monitoring evaluationMonitoring evaluation
Monitoring evaluation
 
Ngo project management
Ngo project managementNgo project management
Ngo project management
 
MEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptxMEAL WORKSHOP ON ETH1224-draft.pptx
MEAL WORKSHOP ON ETH1224-draft.pptx
 
CPE Monitoring and Evaluation
CPE Monitoring and EvaluationCPE Monitoring and Evaluation
CPE Monitoring and Evaluation
 

Implementing Outcome Budget_Key Concepts_20Feb

  • 1. Implementing Outcome Budget 2017-18 Planning Department, GNCTD February 14, 2017
  • 2. • Why Outcome Budget? • Key Concepts in Outcome Budgeting – Outputs – Outcomes – Long-term goals/Impact – Choosing Indicators • Detailed Template for Outcome Budget 2017-18 • Monitoring vs Evaluation • Implementing Outcome Budget Contents
  • 3. • Outcome Budgeting is a comprehensive management system – Used inter-changeably with Results-Based Management (RBM) or Managing for Development Results (MfDR) approach • Benefits of Outcome Budget or RBM – Improves internal management – Share successes and win public support – Accountability (Results as important as processes) Why Outcome Budget? Traditional Management Approach Focused mainly on inputs and activities. Asks: “Did they do it?” Results-Based Management Approach Focus on the results obtained rather than just on the inputs used or the activities conducted. Asks: “So what?”
  • 5. Stages of any Project/Scheme Inputs Outputs Outcomes Long-term Goals/Impact What are the resources used –funds, staff, equipment, curriculum, all materials Tangible products or services produced as a result of the Project Short-term behavioral changes that result from the outputs – uptake of services Long-term changes that result from outcomes – the final result of the Project E.g. Funds for computer lab in schools allocated, Staff sanctioned - Computers purchased and installed in schools - Staff positions filled - Number of children using computer lab - Avg. time per child using computer lab - Increase in computer literacy - Increase in learning achievement THEORY OF CHANGE
  • 6. Stages of any Project/Scheme Inputs Outputs Outcomes Long-term Goals/Impact What are the resources used –funds, staff, equipment, curriculum, all materials Tangible products or services produced as a result of the Project Short-term behavioral changes that result from the outputs – uptake of services Long-term changes that result from outcomes – the final result of the Project Traditional M&E Results-Based M&E Attribution Gap
  • 7. • Indicators are signals of change, measures of progress • Pick SMART indicators – Specific - Ask (answer) one question at a time – Measurable - Quantifiable, accurate, unambiguous – Attributable - Is it attributable to your programme? – Realistic - Is this the most relevant and practical indicator given the needs – Targeted – should be specific about the targeted population/area Choosing Indicators
  • 8. Choosing SMART Indicators Specific: measure as closely as possible what is intended to measure Measurable: clear and unambiguous about what is measured Outcome Indicator Parents insure that 1.Increased utilization of clinics children get treatment for 2. Increased use of malaria Malaria drugs 2. % of health centers with availability of drugs 1. % of health centers without stock out of drugs x, y & z for more than a week at a time Which indicator is more specific ? Which indicator is measurable ?
  • 9. Choosing SMART Indicators 2. HIV prevalence among the total population 1. HIV prevalence among 15-24 year old pregnant women 1. Percent increase in employment Realistic: data obtained at reasonable cost with enough frequency Which indicator is more realistic? Targeted: it should be specific about the targeted population/area 2. Percent increase in employment of graduate of technical training center X in the first year after completion of training. Which indicator is targeted ? 1. Life expectancy Attributable: attributable to the project’s or program’s efforts 2. % of children fully immunized at 1 year Which indicator is attributable ?
  • 10. Detailed Template for Use in Outcome Budget 2017-18 Name of Programme /Scheme Progra mme Object ive Quantifiable Deliverables OUTPUTS OUTCOMES Indicator Descriptio n Base- line 03/17 Target 03/18 Frequ ency Indicator Descriptio n Base- line 03/17 Target 03/18 Frequ ency Annexure IVA At departmental level, maintain at least two more columns against each indicator: • Data source (MIS, internal survey, external survey etc.) • Responsibility for data collection
  • 11. Detailed Template for 2017-18: Example Quantifiable Deliverables OUTPUTS OUTCOMES Indicator Description Base- line 03/17 Target 03/18 Freq uenc y Indicator Description Base- line 03/17 Target 03/18 Freque ncy Schools with CCTV cameras 0 200 Q Improvement in teacher scores 20% Q Teacher feedback reports/mth 0 8000 Q Name of Programme: Installation of CCTV cameras in schools In Outcome Budget 2015-16, OUTCOME has been defined as - To provide better academic atmosphere for students
  • 12. Detailed Template for 2017-18: Example Quantifiable Deliverables OUTPUTS OUTCOMES Indicator Description Base- line 03/17 Target 03/18 Freque ncy Indicator Description Base- line 03/17 Target 03/18 Frequen cy Sections of skywalks constructed 0 5 Q Weekly average use of skywalk by pedestrians 0 20,000 Q Maintenance staff posted 110 1000 Q Name of Programme: Building of Skywalk at ITO
  • 13. Implementing Outcome Budgeting • Step 1: Finalize list of output and outcome indicators and targets for 2017-18 • Full draft from departments • Review and feedback by Planning dept • Final draft from departments with baseline/target data • Step 2: Linking outcome indicators with long-term goals • Step 3: Quarterly monitoring of indicators against targets

Editor's Notes

  1. To get your started, left go over a definiation: DYNAMIC, LIVING document, COME BACK to during the course of your evaluation, INTEGRATED Theory of change is an on-going process of reflection to explore change and how it happens – and what that means in a particular context, sector, and/or group of people. Bring in example of education – before I jump into another long example, let’s just think about a remedial education example for instance – I want to identify the causal pathway from how I get from gathering resources to run my program, actually delivering these classes to students on the ground, and then getting to seeing changes in behavior – are the students paying better attention, showing up to class more often, and does this then lead to children learning more This sequence or chain of thought forms my causal hypothesis
  2. To get your started, left go over a definiation: DYNAMIC, LIVING document, COME BACK to during the course of your evaluation, INTEGRATED Theory of change is an on-going process of reflection to explore change and how it happens – and what that means in a particular context, sector, and/or group of people. Bring in example of education – before I jump into another long example, let’s just think about a remedial education example for instance – I want to identify the causal pathway from how I get from gathering resources to run my program, actually delivering these classes to students on the ground, and then getting to seeing changes in behavior – are the students paying better attention, showing up to class more often, and does this then lead to children learning more This sequence or chain of thought forms my causal hypothesis
  3. Now, if to map this causal pathway to a theory of change – we can break it down to four parts, beginning with Inputs- Trained teachers, teaching materials Outputs – Teachers conduct the classes as planned, students attend classes and participate as intended Intermediate outcomes, softer changes – students begin showing interest in what is being taught, student learning/knowledge begins to increase Goal, what we’ve been working towards, our intended result of the programme – Student learning improves   Components: Activity versus outputs: Output is the good or service delivered as a result of the Programme; activities support outputs but cannot alone deliver outcomes Intermediate versus high level outcomes: Example: student knowledge has increased is IO, but a stronger economy because of higher educated workforce is a high level outcome. IO will lead to HLO