Monitoring and Evaluation
Charles Katende PhD.
Director of Monitoring, Evaluation and Research
JHPIEGO (An affiliate of John Hopkins University)
Session Objective
• To increase participants understanding of
the concepts used in designing M&E
Frameworks and Plans
• To build participants competence in
designing Program M&E Plans
Expected Results
• At the end of the sessions participants will know
about Program frameworks, M&E frameworks
and the difference between the two frameworks
• Participants will be able to identify and select
appropriate indicators for a program.
• Participants will be able to produce a program
monitoring and evaluation framework.
Introduction…
• Write the health problem addressed by a major
public health program in your country
• Write at up to three specific objectives of a
public health program that addresses the above
mentioned health problem.
• Write down two indicators the program
mentioned above uses to monitor it progress or
performance towards its objectives.
What is Program Monitoring, Evaluation?
Monitoring is the
routine process of
data collection and
measurement of
progress toward
program objectives.
Evaluation is the use of
social research
methods to
systematically
investigate a
achievement of a
program’s results
Key Questions
• What is the purpose of carrying out M&E
• Who needs, uses M&E Information
• Who carries out M&E?
• How is M&E carried out?
• When should M&E be carried out?
What is the purpose….?
• Improve program implementation
– Data on program progress and implementation
– Improve program management and decision making
• Inform future programming
• Inform stakeholders
– Accountability (donors, beneficiaries)
– Advocacy
Who needs, uses M&E Information?
To Improve program
implementation…
To Inform and improve
future programs
Inform stakeholders
• Managers
• Donors
• Governments
• Technocrats
• Donors
• Governments
• Communities
• Beneficiaries
Who conducts M&E….?
Program implementer
Stakeholders
Beneficiary
Remember ..
M&E Technical skills
Participatory process
How to carry out M&E…?
Key Features
1. Program Framework: Analyze and systematically lay out
program elements
2. Identify key elements to monitor and evaluate.
3. Determine and describe the measures to be used for
monitoring and evaluation
4. Develop M&E Framework and action plans, including
data collection and analysis, reporting and dissemination
of findings.
Program Framework
What do you know about your program….?
Program Framework
• Systematic lay out of the program
elements and path showing what
the program plans to:
do ……………..achieve!
Program Framework
• Based on a theoretical, empirical model, or
general understanding
Public health Problem
Population, system level factors that cause the public
health problem
Action/interventions that can change the factors and ultimately
alleviate/eliminate the problem
Results Framework
Improved Health Status
Improved (Sustained) Use of Key Health Services
and Practices/Behaviors
Strategic Objective:
Intermediate Result:
Increased quality
of…
Increased
availability/ access
to…
Strategies (Sub IR):
Strategies: Strategies:
Improved social /
policy
environment…
Strategies:
Impact:
Example: Result Framework for a
Family Planning Project
GOAL: REDUCED FERTILITY
SO: Increased FP use and improved FP/RH practices
Increased knowledge of,
improved attitudes toward,
and acceptance of key
services and behavior
Increased quality of FP
counseling and services
for
Increased
availability/access to
FP/RH
Strategies:
Increase availability of
educational materials at
clinic and community
level
• Community
mobilization (using
PRA and PDI)
including men
• Implement mass media
strategy
• Mobilize opinion
leaders at national and
local level
Design/ implement
supportive supervision
System
• Train service providers
(in-service and
preservice in FP
counseling and
management of side
effects
• Remodel clinic to allow
for privacy
• Design and implement
quality improvement
program
Strengthen logistics
management
• Mobilize private sector
providers
• Mobilize CHWs/CBDs
• Encourage socially
marketed pills
Improved social and
policy environment for
FP
Advocate for community
based distribution of
pills
Promote addition of
Depo injections to EPI
outreach strategy
Pilot social marketing of
pills
Basic Logic Model
26
VCT Program Implementation Logic Model
VCT Program Implementation Logic Model
Train nurses &
lab techs in VCT
ACTIVITIES OUTPUTS
IMMEDIATE
OUTCOMES
INTERMEDIATE
OUTCOMES
IMPACTS
INPUTS
Risk behaviors
decreased
HIV treatment
increased
Nurses
Lab techs
Provide pre-test
counseling
Conduct HIV test
Provide post-test
counseling to all
clients tested
Refer pregnant
HIV+ women to
PMTCT svcs
Govt. funds
GAP funds
Other donor
funds
Counseling
protocol
HIV test kits
Referral
system for
prevention &
Tx services
Refer HIV+
clients to Tx
services
Clients are
counseled for
HIV testing
Clients are
tested
Clients receive
results and post-
test counseling
Pregnant HIV+
women referred
to PMTCT svcs
HIV+ clients
referred to ARV,
support & HBC
Quality of VCT
increased
Access to VCT
increased
Knowledge of
HIV status
increased
Knowledge
about & access
to prevention
resources
increased
Access to HIV
treatment
resources
increased
HIV transmission
rates decreased
HIV prevalence
decreased
HIV morbidity &
mortality
decreased
Nurses & lab
techs trained
PROJECT DESIGN FRAMEWORK LABELS
Labels Used By Various Organizations
Project Design Level USAID Others
Impact Impact Goal
Strategic Objectives Purpose
Intermediate Results (IR)
Specific Objectives
Startegies (Sub-IR)
Outputs
Activities
Outputs
Activity Clusters
Activities
Inputs
Level A:
Improvement
in Health
Status
Level B:
Use of
Services
Level C:
Demand for
Services
Capacity to
Deliver
Services
Level D:
Interventions
Case 1: To decrease maternal mortality, a 10-year program plan to
improve to train midwifes to Delivery and ANC services at health
facilities, and to train and deploy CHWs to increase the community’s
awareness about, and use of the improved services at the health
facilities.
Case 2: To reduce high fertility, a 5-year program plans to work with
the Government to change policies in order to allow and promote
use of modern family planning methods, train family planning
providers to provide better FP services, and to launch public
campaigns that promote family planning methods.
Case 3: To reduce HIV infection among adolescents, a five-year
program plans to implement income generation activities for the
youth, provide and promote universal secondary education, and
build adolescent-friendly reproductive health service delivery points.
Exercise
• Identify and state is the Public Health problem
implied in the case study.
• What are population level factors will the
program target to change in order to alleviate
the public health problem
• Prepare a Program Framework for the scase
study
Monitoring and Evaluations
Framework
M&E Questions
• Monitoring questions
– What is being done?
– By whom?
– Target population?
– When?
– How much?
– How often?
– Additional outputs?
– Resources used? (Staff,
funds, materials, etc.)
M&E Questions
• Evaluation Questions?
– Is the content of the
intervention or the activity
being delivered as
planned?
– Does the content of the
intervention or the activity
reflect the requisite
standards?
– Have the intervention
achieved the expected
results?
What do we need to answer these questions…?
INDICATORS …to take measurements.
Indicators: Definition
• Markers that help to measure change by
showing progress towards meeting
objectives
• Observable, measurable, and agreed upon
as valid markers of a less well-defined
concept or objective
• Indicators differ from objectives in that they
address specific criteria that will be used to
judge the success of the project or program.
See comment for examples
Type and Level of Each Indicator
• Type
–Input/Process (Monitoring)
–Outcome / Impact (Evaluation)
• Level
–Global level
–Country level
–Program level
Exercise: Group work
• Use your case study and identify at least
two indicators for program monitoring and
two indicators for program evaluation.
What Is a Good Indicator?
• Valid: Measures the effect it is supposed to measure
• Reliable: Gives same result if measured in the same way
• Precise: Is operationally defined so people are clear about what
they are measuring
• Timely: Can be measured at an interval that is appropriate to the
level of change expected
• Comparable: Can be compared across different target groups or
project approaches
Criteria for Indicator Selection
• Consistent with project design—measure the desired
result
• Useful—contributes to project design, management, and
evaluation
• Available
• Affordable
Standard Indicators
Where possible, a project should select
standard indicators.
• They have been tested for validity and
reliability.
• They allow comparison between projects
or sites.
• They tend to be available for SOs and
some IRs.
How Many Indicators?
• Choose at least one or two indicators per intermediate
result, as well as the SO for evaluation purposes.
• Choose one or two indicators per result for program
monitoring.
• Choose indicators that may be able to “cover” more than
one element.
• For management, think about basic activities that you
need to monitor to judge if you are implementing
activities as planned; include indicators that help you
make decisions.
Exercise: Group work
Refer to the indicators you selected..
• Were the good indicators ?
• Did you select a minimum number
recommended given the type and size of
your program?
M&E Framework
Sample M&E Framework
Result Indicator Definition Data
source
Collection
Method
Freq-
uency
Respons-
ible Party
Active
Management
of the Third
Stage of
labor
increased
Proportion
of trained
clinicians
performing
AMTSL to
standard
# of
trained
midwives
performin
g all steps
of AMTSL
on all
patients/
AMTSL
observa-
tion
checklist
Clinical
observation
Annual Zambia
JHPIEGO
staff
Preventing Post Partum Hemorrhage :
Increase Active Management of the Third Stage of Labor
See comment for examples
M&E Plan
• The plan is a managerial tool that specifies the schedule, resources,
responsibilities, for your M&E activities (data collection, data quality
control, reporting, dissemination and use of data)
• Note:
– The plan should specify the time points when evaluations will be carried
out, for example: Midterm, and End term.
– Outcome/Impact evaluation is reserved for large longer term programs
that can make impact at public health status level.
– Your plan should include activities to monitor and evaluate the
implementation, as planned, of the M&E plan.
Strategic Planning for M&E: Setting Realistic
Expectations
Most Some Few *
All
Monitoring and Evaluation Pipeline
Adaptation of Rehle/Rugg M&E Pipeline Model, FHI 2001
Input/Output
Monitoring
Process
Evaluation
Outcome
Monitoring/
Evaluation
Impact Monitoring/
Evaluation
Levels of Monitoring & Evaluation Effort
Number of
Projects
* Supplemented with impact
indicators from surveillance data.
Source: CDC. Global AIDS program monitoring
and evaluation (M&E) field guide
Question
If funding for your case study program was
cut off and the program closed in two years.
What changes would you make to you M&E
Plan?
Sources of Information
• http://www.cpc.unc.edu/measure
• http://www.unaids.org/DocOrder/OrderFor
m.aspx
• http://www.fhi.org/en/Publications/index.ht
m
THE END

Assessment MEAL Frameworks in scientific field.ppt

  • 1.
    Monitoring and Evaluation CharlesKatende PhD. Director of Monitoring, Evaluation and Research JHPIEGO (An affiliate of John Hopkins University)
  • 2.
    Session Objective • Toincrease participants understanding of the concepts used in designing M&E Frameworks and Plans • To build participants competence in designing Program M&E Plans
  • 3.
    Expected Results • Atthe end of the sessions participants will know about Program frameworks, M&E frameworks and the difference between the two frameworks • Participants will be able to identify and select appropriate indicators for a program. • Participants will be able to produce a program monitoring and evaluation framework.
  • 4.
    Introduction… • Write thehealth problem addressed by a major public health program in your country • Write at up to three specific objectives of a public health program that addresses the above mentioned health problem. • Write down two indicators the program mentioned above uses to monitor it progress or performance towards its objectives.
  • 5.
    What is ProgramMonitoring, Evaluation? Monitoring is the routine process of data collection and measurement of progress toward program objectives. Evaluation is the use of social research methods to systematically investigate a achievement of a program’s results
  • 6.
    Key Questions • Whatis the purpose of carrying out M&E • Who needs, uses M&E Information • Who carries out M&E? • How is M&E carried out? • When should M&E be carried out?
  • 7.
    What is thepurpose….? • Improve program implementation – Data on program progress and implementation – Improve program management and decision making • Inform future programming • Inform stakeholders – Accountability (donors, beneficiaries) – Advocacy
  • 8.
    Who needs, usesM&E Information? To Improve program implementation… To Inform and improve future programs Inform stakeholders • Managers • Donors • Governments • Technocrats • Donors • Governments • Communities • Beneficiaries
  • 9.
    Who conducts M&E….? Programimplementer Stakeholders Beneficiary Remember .. M&E Technical skills Participatory process
  • 10.
    How to carryout M&E…? Key Features 1. Program Framework: Analyze and systematically lay out program elements 2. Identify key elements to monitor and evaluate. 3. Determine and describe the measures to be used for monitoring and evaluation 4. Develop M&E Framework and action plans, including data collection and analysis, reporting and dissemination of findings.
  • 11.
    Program Framework What doyou know about your program….?
  • 12.
    Program Framework • Systematiclay out of the program elements and path showing what the program plans to: do ……………..achieve!
  • 13.
    Program Framework • Basedon a theoretical, empirical model, or general understanding Public health Problem Population, system level factors that cause the public health problem Action/interventions that can change the factors and ultimately alleviate/eliminate the problem
  • 14.
    Results Framework Improved HealthStatus Improved (Sustained) Use of Key Health Services and Practices/Behaviors Strategic Objective: Intermediate Result: Increased quality of… Increased availability/ access to… Strategies (Sub IR): Strategies: Strategies: Improved social / policy environment… Strategies: Impact:
  • 15.
    Example: Result Frameworkfor a Family Planning Project GOAL: REDUCED FERTILITY SO: Increased FP use and improved FP/RH practices Increased knowledge of, improved attitudes toward, and acceptance of key services and behavior Increased quality of FP counseling and services for Increased availability/access to FP/RH Strategies: Increase availability of educational materials at clinic and community level • Community mobilization (using PRA and PDI) including men • Implement mass media strategy • Mobilize opinion leaders at national and local level Design/ implement supportive supervision System • Train service providers (in-service and preservice in FP counseling and management of side effects • Remodel clinic to allow for privacy • Design and implement quality improvement program Strengthen logistics management • Mobilize private sector providers • Mobilize CHWs/CBDs • Encourage socially marketed pills Improved social and policy environment for FP Advocate for community based distribution of pills Promote addition of Depo injections to EPI outreach strategy Pilot social marketing of pills
  • 16.
  • 17.
    26 VCT Program ImplementationLogic Model VCT Program Implementation Logic Model Train nurses & lab techs in VCT ACTIVITIES OUTPUTS IMMEDIATE OUTCOMES INTERMEDIATE OUTCOMES IMPACTS INPUTS Risk behaviors decreased HIV treatment increased Nurses Lab techs Provide pre-test counseling Conduct HIV test Provide post-test counseling to all clients tested Refer pregnant HIV+ women to PMTCT svcs Govt. funds GAP funds Other donor funds Counseling protocol HIV test kits Referral system for prevention & Tx services Refer HIV+ clients to Tx services Clients are counseled for HIV testing Clients are tested Clients receive results and post- test counseling Pregnant HIV+ women referred to PMTCT svcs HIV+ clients referred to ARV, support & HBC Quality of VCT increased Access to VCT increased Knowledge of HIV status increased Knowledge about & access to prevention resources increased Access to HIV treatment resources increased HIV transmission rates decreased HIV prevalence decreased HIV morbidity & mortality decreased Nurses & lab techs trained
  • 18.
    PROJECT DESIGN FRAMEWORKLABELS Labels Used By Various Organizations Project Design Level USAID Others Impact Impact Goal Strategic Objectives Purpose Intermediate Results (IR) Specific Objectives Startegies (Sub-IR) Outputs Activities Outputs Activity Clusters Activities Inputs Level A: Improvement in Health Status Level B: Use of Services Level C: Demand for Services Capacity to Deliver Services Level D: Interventions
  • 19.
    Case 1: Todecrease maternal mortality, a 10-year program plan to improve to train midwifes to Delivery and ANC services at health facilities, and to train and deploy CHWs to increase the community’s awareness about, and use of the improved services at the health facilities. Case 2: To reduce high fertility, a 5-year program plans to work with the Government to change policies in order to allow and promote use of modern family planning methods, train family planning providers to provide better FP services, and to launch public campaigns that promote family planning methods. Case 3: To reduce HIV infection among adolescents, a five-year program plans to implement income generation activities for the youth, provide and promote universal secondary education, and build adolescent-friendly reproductive health service delivery points.
  • 20.
    Exercise • Identify andstate is the Public Health problem implied in the case study. • What are population level factors will the program target to change in order to alleviate the public health problem • Prepare a Program Framework for the scase study
  • 21.
  • 22.
    M&E Questions • Monitoringquestions – What is being done? – By whom? – Target population? – When? – How much? – How often? – Additional outputs? – Resources used? (Staff, funds, materials, etc.)
  • 23.
    M&E Questions • EvaluationQuestions? – Is the content of the intervention or the activity being delivered as planned? – Does the content of the intervention or the activity reflect the requisite standards? – Have the intervention achieved the expected results?
  • 24.
    What do weneed to answer these questions…? INDICATORS …to take measurements.
  • 25.
    Indicators: Definition • Markersthat help to measure change by showing progress towards meeting objectives • Observable, measurable, and agreed upon as valid markers of a less well-defined concept or objective • Indicators differ from objectives in that they address specific criteria that will be used to judge the success of the project or program. See comment for examples
  • 26.
    Type and Levelof Each Indicator • Type –Input/Process (Monitoring) –Outcome / Impact (Evaluation) • Level –Global level –Country level –Program level
  • 27.
    Exercise: Group work •Use your case study and identify at least two indicators for program monitoring and two indicators for program evaluation.
  • 28.
    What Is aGood Indicator? • Valid: Measures the effect it is supposed to measure • Reliable: Gives same result if measured in the same way • Precise: Is operationally defined so people are clear about what they are measuring • Timely: Can be measured at an interval that is appropriate to the level of change expected • Comparable: Can be compared across different target groups or project approaches
  • 29.
    Criteria for IndicatorSelection • Consistent with project design—measure the desired result • Useful—contributes to project design, management, and evaluation • Available • Affordable
  • 30.
    Standard Indicators Where possible,a project should select standard indicators. • They have been tested for validity and reliability. • They allow comparison between projects or sites. • They tend to be available for SOs and some IRs.
  • 31.
    How Many Indicators? •Choose at least one or two indicators per intermediate result, as well as the SO for evaluation purposes. • Choose one or two indicators per result for program monitoring. • Choose indicators that may be able to “cover” more than one element. • For management, think about basic activities that you need to monitor to judge if you are implementing activities as planned; include indicators that help you make decisions.
  • 32.
    Exercise: Group work Referto the indicators you selected.. • Were the good indicators ? • Did you select a minimum number recommended given the type and size of your program?
  • 33.
  • 34.
    Sample M&E Framework ResultIndicator Definition Data source Collection Method Freq- uency Respons- ible Party Active Management of the Third Stage of labor increased Proportion of trained clinicians performing AMTSL to standard # of trained midwives performin g all steps of AMTSL on all patients/ AMTSL observa- tion checklist Clinical observation Annual Zambia JHPIEGO staff Preventing Post Partum Hemorrhage : Increase Active Management of the Third Stage of Labor See comment for examples
  • 35.
    M&E Plan • Theplan is a managerial tool that specifies the schedule, resources, responsibilities, for your M&E activities (data collection, data quality control, reporting, dissemination and use of data) • Note: – The plan should specify the time points when evaluations will be carried out, for example: Midterm, and End term. – Outcome/Impact evaluation is reserved for large longer term programs that can make impact at public health status level. – Your plan should include activities to monitor and evaluate the implementation, as planned, of the M&E plan.
  • 36.
    Strategic Planning forM&E: Setting Realistic Expectations Most Some Few * All Monitoring and Evaluation Pipeline Adaptation of Rehle/Rugg M&E Pipeline Model, FHI 2001 Input/Output Monitoring Process Evaluation Outcome Monitoring/ Evaluation Impact Monitoring/ Evaluation Levels of Monitoring & Evaluation Effort Number of Projects * Supplemented with impact indicators from surveillance data. Source: CDC. Global AIDS program monitoring and evaluation (M&E) field guide
  • 37.
    Question If funding foryour case study program was cut off and the program closed in two years. What changes would you make to you M&E Plan?
  • 38.
    Sources of Information •http://www.cpc.unc.edu/measure • http://www.unaids.org/DocOrder/OrderFor m.aspx • http://www.fhi.org/en/Publications/index.ht m
  • 39.