SlideShare a Scribd company logo
1 of 25
Download to read offline
C O R P O R AT E P R E S E N T AT I O N
T S X – V : I P T │ F R AN K F U R T : I K L
Cautionary Disclaimer
Forward Looking Statements


Except for historical information, this presentation may contain certain “ forward-looking” statements and information relating to
IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available
to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including
but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating
hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and
strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events.
Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual
results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to
update any forward-looking statement.


The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic
conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which
the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes
to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and
efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding
for the continued exploration and development of the Company’s exploration properties.


This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance
on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such
future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy
and completeness of these forward-looking statements.


NI43-101 QUALIFIED PERSON
George Gorzynski, P.Eng., Vice President, Exploration and a Qualified Person under the meaning of
Canadian National Instrument 43-101, is responsible for the technical information in this presentation.
Why IMPACT Silver?

    Profitable silver production from two 100%-owned adjacent mineral districts in south-central Mexico

    Corporate focus is on profits: 1,390% increase in net earnings from 2006 to 2011

    A strong cash position of $19.6M as of Q3 2012, no debt and 90% of revenues from silver

    Construction of new mining district and open-pit operation, the Capire Production Centre, is now complete

    Many attractive exploration targets within land package to drive organic growth

    Investor-friendly, tightly managed share structure (72M Shares FD)


                 30,000,000

                 25,000,000

                 20,000,000
                                                                                   Revenues
                 15,000,000
                                                                                   Earnings before taxes
                 10,000,000

                  5,000,000                                                        Operating cash flow before changes in
                                                                                   non-cash working capital
                         0
                              2006   2007   2008   2009   2010   2011    As of
                                                                        Sept. 30
1                                                                        2012
Financial Highlights – Nine Months Ended Sept 30, 2012


    • Market cap: C$70 Million                                                 •     Warrants: Nil
    • Cash position: C$19.6 Million                                            •     Debt: Nil
    • Shares outstanding: 68M (FD 72M)                                         •     Cash flow per share²: $0.04
                                                Nine months
     ($000’000’s CDN except of EPS)            ended Sept. 30,                  2011                  2010                  2009
                                                    2012

     Revenue                                            $11.3                  $24.3                 $16.7                  $12.2
     Mine operating earnings                              $3.6                 $12.9                   $7.4                  $4.2
     Net earnings (loss) after taxes                    $(0.3)                  $7.6                   $3.4                  $1.6
     EBITDA                                               $2.1                 $13.0                   $6.5                  $3.4
     Operating cash flows¹                                $2.4                 $10.2                   $5.4                  $3.7
     Cash                                               $19.6                  $30.8                 $18.7                   $5.3
     Working capital                                    $26.9                  $31.9                 $20.2                   $6.3
     Earnings per share                                 $0.00                  $0.12                 $0.07                  $0.02
    ¹Before changes in non-cash working capital
    ²Non GAAP working measure; operating cash flow before changes in non-cash working capital divided by weighted average
2   number of common shares outstanding
Board of Directors

    Frederick W. Davidson, CA – President & CEO, Director
      • 35+ years mining & corporate finance experience
      • Founding President of IMPACT Silver Corp. & Energold Drilling Corp.
      • Held senior management positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines.
    George A. Gorzynski, P. Eng – VP Exploration, Director
      • 30+ years of international mineral exploration and mining experience. Currently Director of Tirex Resources Ltd.,
        Defiance Silver Corp. and Berkwood Resources Ltd.
    H. Walter Sellmer, P. Geo – Director
      • Held senior management positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp.

    Victor A. Tanaka, P. Geo – Director
      • Held senior positions in mineral exploration at Cominco, Asamera, Freeport McMoRan, Aber, Major General, Fjordland
        and Pathfinder. Currently President & CEO of Bayswater Uranium.
    Richard J. Mazur, P. Geo, MBA – Director
      • Held senior management positions at Canamax Resources Inc. and IMPACT. Currently CEO of Alto Ventures Ltd. and
        President & CEO of Forum Uranium Corp.
    Peter N. Tredger, P. Eng, MBA – Director
      • Held senior management positions at Glencairn Gold Corp., Wheaton River Minerals Ltd. and Blue Pearl Mining Ltd.
        Currently VP of Thompson Creek Metals Company Inc.
    Jean-Pierre Bourtin, MBA – Director
      • Former Treasurer of Xerox Corp., Latin America & Emerging Markets. Currently President & Money Manager of a
3       private investment firm in Wilton, Connecticut.
Project Location & Overview




    District Location in Mexico     Central zone of land package
4
Growth in Production

    Silver Mines in Production:
           •   San Ramon Mine                                            •   Capire Mine (open-pit)
           •   Noche Buena Mine                                          •   Chivo Mine (stand-by)
           •   Cuchara-Oscar Mine


                                Nine Months Ended           Dec 31                Dec 31               Dec 31
                                   Sept 30, 2012*           2011                 2010                  2009
    Silver production (oz)                472,182              833,607              750,259               823,571
    Gold production (oz)                       465                    676                  600                   810
    Lead production (t)                        384                    731                  734                   969
    Zinc production (t)                        611                   1,248             1,212                    1,098
    Total tonnes milled                   125,956              154,289              131,348               114,340
    Tonnes milled per day                      463                    424                  360                   313
    Revenue per tonne                          $98                   $171                  $123                 $110
    Direct Cost per tonne                      $63                    $70                  $63                   $60
    *Production decreased as operations transition from older, lower grade mines to new high grade mines during 2012
5
Zacualpan & Capire Silver Districts

                                                                   Capire District

                                                                   Zacualpan District

                                                                   Valle de Oro Area

                                                              Production in 2013:
                                                              •   San Ramon Mine
                                                              •   Noche Buena Mine
                                                              •   Cuchara-Oscar Mine
                                                              •   Capire Mine


                                                              Exploration:
                                                              • Valle de Oro area
                                                                  El Gigante Vein
                                                                  Carlos Pacheco Vein
                                                                  Huatecosco Vein

                                                              • Zacualpan District
                                                                  La Condesa Vein
                                                                  Mirasol Prospect

                                                              • Capire District
                                                                  Cruz Blanca
                                                                  Santa Rita

6   This map is reproduced in miniature on following slides
Royal Mines of Zacualpan – Prolific Mining History




The Royal Mines of Zacualpan is one of the
oldest mining districts in the Americas, with
485 years of recorded mining history



IMPACT bought the Zacualpan assets in
2006 and consolidated ownership of the
entire district for the first time in its history


IMPACT’s intensive exploration work has
catalogued over 3,000 old mine workings in
the GIS database, forming an invaluable
basis for modern and effective exploration
                                                    One of 42 historic processing plants found in the
                                                    district attesting to a long history of silver mining



7
One Land Package, Two Production Centres

      Guadalupe Production Centre                                   Capire Production Centre
    The Guadalupe Processing Plant is rated at 500            The Capire pilot plant is rated at 200 tpd with the
    tpd and has been the main production centre               potential to produce 200,000 ounces of silver per
    since 2006.                                               year, with plans for future expansion                         .




    Fed by three underground silver mines: the San            Capire Mine is an open-pit VMS deposit with
    Ramon, Noche Buena, Cuchara-Oscar                         NI43-101 measured and indicated resources of
                                                              7.2M oz Ag and 30,446 oz Au (January, 2011)




    Guadalupe Mill - 500 TPD crushing and flotation circuit   Capire Pilot Plant - 200 TPD crushing and flotation circuit
8
One Land Package, Multiple Mines

               San Ramon Mine – Restarted production in early 2008. Currently 50% of total
               production. Large veins and stockworks of high grade epithermal mineralization.


               Noche Buena Mine – Commenced production in 2010. Currently 30% of total
               production. Large epithermal veins located in the Valle de Oro area.

               Cuchara-Oscar Mine – Corridor of many wide and high-grade silver veins linking
               the legacy Cuchara Mine and the Santa Lucia zone. Commenced production in
               February 2013, currently 20% of total production.


               Chivo Mine & Gallega Mine – Both mines currently on stand-by; will be
               periodically mined for lead and zinc.



               Capire Mine – Open-pit, VMS deposit with high grade polymetallic mineralization.
               Commissioning of the 200 tpd pilot plan began in March 2013.


               Valle de Oro – Current exploration area. Widespread mesothermal veins indicate
               potential gold-copper subdistrict lying beneath the Zacualpan Silver District. Initial high
               grade drill results at the Carlos Pacheco and Huatecosco veins.
9
New Mine Production: Cuchara-Oscar Mine



     Oscar is a high-grade silver vein
     corridor linking the past-producing
     Cuchara Mine and the Santa
     Lucia zone



     Production at Cuchara-Oscar
     began in February 2013, with
     mineralization feeding the nearby
     Guadalupe Mill



     Utilizing the legacy Cuchara Mine
     infrastructure allowed for lower
     capital costs and rapid mine
     development at Oscar




10
Cuchara-Oscar & Santa Lucia Zone Drill Highlights


                                  A Selection of Oscar Vein Drill Highlights
     Drill Hole      To (m)        From (m)       Interval (m)      Ag (g/t)        Au (g/t)       Pb (%)       Zn (%)
     Z11-64        36.60          43.20          6.60              223              0.08       0.18         0.52

     Z11-69        0.70           3.35           2.65              408              0.62       0.73         1.12

     Z11-74        21.35          22.35          1.00              1,875            0.74       2.65         6.88

     Z12-05        92.50          97.60          5.10              234              0.05       0.14         0.49

                                  A Selection of Santa Lucia Drill Highlights
     Z09-35        81.42          82.85          1.43              600              0.08       -            -

     Z09-47        60.60          66.90          6.30              278              0.01       0.15         0.70

     including     63.72          66.90          3.18              467              0.01       0.24         1.11

     Z09-53        216.13         218.52         2.39              419              0.03       0.28         0.32
     See News Releases dated: April 23, 2012, December 16, 2009 & October 6, 2009



11
New Capire Mine and Production Centre


      Area of defined                             N
                                                          Open-pit
      NI 43-101 Resource                                                      200 tpd pilot mill

      3D model of                        Remains
      planned                            open for
      open-pit                           expansion

                                     Mill
                                   Tailings facility


     Capire open-pit 3D model                           Capire open-pit Mine and Pilot Plant


            2012                                                         2015 & 2016
                                    2013 & 2014
        Construction                                                    Define plans to
                                Began production to
         of 200 tpd                                                    construct a large,
                                  optimize design
         pilot plant;                                                 permanent plant at
                                parameters for future
                                                                      Capire; size will be
        11,850m drill             plant expansion;
                                                                        determined by
          program                minimum 10,000m
                                                                     exploration and pilot
        (completed)                 drill program
12                                                                       plant results
NI 43-101 Mineral Resource Estimate – Capire Mine

                                                                                                 Published: February 2011

 Metal Content for Capire Mine              Ag (oz)       Au (oz)      Cu (lb)       Pb (lbs)          Zn (lbs)
 Measured                                  3,529,969       14,146     3,389,275    18,234,678        46,140,820
 Indicated                                 3,694,066       16,300     3,693,733    19,029,800        49,522,173
 Measured & Indicated (M&I)                7,224,035       30,446     7,083,007    37,264,478        95,662,993
 Inferred                                    435,959        1,919      475,594       2,260,089         5,823,490
     Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred
         Zone           Classification       Tonnes         Ag g/t     Au g/t     Cu (%)    Pb (%)         Zn (%)
 Capire                M&I                   3,104,944        46.46       0.19       0.06       0.33            0.93
 Aurora 1              M&I                   1,807,302        44.50     0.199        0.07       0.36            0.80
                       M&I                   4,912,246        45.74     0.193        0.06       0.34            0.88
 Total
                       Inferred                371,066        36.54     0.161        0.06       0.28            0.71

 •    Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire
 •    Initial mining grades anticipated to be 150 g/t silver
13
Recent Capire Drill Highlights


         Drill      From           To       Interval        Ag           Au           Pb          Zn          Cu
         Hole        (m)          (m)          (m)         (g/t)        (g/t)        (%)         (%)          (%)
     C12-06          78.25       80.30         2.05         507         1.81         2.20         4.02        0.41

     including       79.30       80.30         1.00         929         3.27         2.77         5.27        0.63

     and            105.70       110.80        5.10         183         0.20         1.05         2.45        0.13

     C12-21          83.35       110.10       16.75         153         0.40         1.14         2.71        0.21

     including       92.40       97.00         4.60         435         0.71         3.13         5.99        0.48

     C12-25          13.20       23.35        10.15         107         0.58         0.90         2.43        0.10

     including       13.20       15.25         2.05         315         0.91         2.93         8.19        0.25

     •     Drill holes listed above were drilled vertically and all intersections are estimated to be close to true
           width
     •     These holes expanded to the extent of the Capire mineralization to the north and south; the zone
           remains open for further expansion to the east and northeast
     •     Exploration drilling in 2013 will initially be on the Cruz Blanca and Santa Rita prospects
14
Capire Exploration


                          VMS mineralization in
                          Capire District is
                          predominantly silver-rich
                          with zinc, lead, copper
                          and gold credits


                          District covers the same
                          stratigraphy as the Campo
                          Morado VMS belt, where
                          Nyrstar N.V. is in
                          commercial production on
                          the G-9 deposit


                          Several VMS targets in
                          close proximity to Capire
                          will be drilled: Guadalupe,
                          Cruz Blanca, Santa Rita &
                          Aurora II

15
Geology


          Veins in the                       METAL ZONING IN ORE SHOOTS
           Zacualpan                    Depth             Strike Length         Mining Level
       District tend to be                            150-420 m (500-1400 ft)
        silver-rich near        Surface (0m / 0 ft)
                                                       Silver-rich at top       Cuchara-Oscar Mine
             the top
        (commonly 1,000+ g/t)                         200 – 1,000+ g/t Ag
                                                                                Noche Buena Mine


            Increasing
                                                                                San Ramon Mine
          lead and zinc              150 m (500 ft)
          & decreasing
               silver
           towards the
              bottom                                   Lead & Zinc rich
                                                          at bottom             Chivo Mine

                                   300 m (1,000 ft)     60 – 150 g/t Ag
            Significant                                                         Valle do Oro Area
             gold and                 Typical
              copper               Mining Width          Gold-Copper
            may lie at              3 m (10 ft)            at depth
               depth

16
Valle de Oro – Drill Highlights


                             A Selection of Carlos Pacheco Drill Highlights
     Drill Hole      From (m)            To (m)      Interval (m)        Au (g/t)      Ag (g/t)          Cu (%)
     Z08-68         Top of intercept -    85.74            2.90             19.6             68           0.29
     including      Top of intercept -    85.74            1.0              49.7             59           0.31
     Z12-13         192.30               199.00            6.70             3.84             28           0.54
     including      192.30               195.05            2.75             8.47             56           1.12
     Z12-23         229.85               230.95            1.10             3.82             84           0.54

                                 A Selection of Huatecosco Drill Highlights
                                                                                                   Pb
     Drill Hole      From (m)            To (m)     Interval (m)       Au (g/t)     Ag (g/t)               Zn (%)
                                                                                                  (%)
     Z11-17             54.51            59.25            4.74            3.44       117.6        0.59      0.81
     Z11-19             114.65           117.40           2.75            3.53       320.8        0.43      0.57
     Z11-20             167.90           178.20          10.30            3.97        48.7        1.69      2.62
     including          167.90           172.50           4.60            6.96        84.3        2.89      5.11
     Z11-48             351.70           355.80           4.10            5.22       30.10        0.69      1.78
     including          353.75           354.50           0.75            25.0       50.10        0.49      1.59

17    See News Releases dated July 11, 2012, October 12, 2011 and June 2, 2011
Rapid Exploration To Mine Development


         A cornerstone of IMPACT’s success has been rapid mine development to
                increase mill throughput and generate near-term cash flow

     EXPLORATION AND MINE DEVELOPMENT PROCESS FLOWCHART:

      RESEARCH        FIELD WORK        DRILLING              MINE
                                                          DEVELOPMENT         MINE
       Compile old     Surface &         Drilling in                       PRODUCTION
          mines/      underground         phases          Mine Planning,
                                                                             & CASH
     prospects from    sampling,         based on         Permitting and
                                                                              FLOW
      historic maps     mapping          success           Construction


                                       • Capire (East)                     • San Ramon
      More than                        • Mirasol
                      Prioritize and                                       • Noche
       3,000 old                                          • Capire Mine
                          select       • El Gigante                          Buena
      mines and                                           and Plant
       prospects       areas and       • Condesa &                         • Cuchara-
                                                          Expansion
      catalogued       prospects         Cuchara North
                                                                           Oscar
        to date        for drilling    • Carlos Pacheco
                                                                           • Capire




18
Exploration Targets

       An abundance of attractive exploration targets to drive organic growth
       and potentially advance into production


             Zacualpan District                       Capire District
                    • Mirasol                           • Cruz Blanca
                  • La Condesa                            • Santa Rita
                 • Santa Efigenia                        • Manto Rico
                                                         • Guadalupe




              Valle de Oro Area                   Dominican Republic
                • Carlos Pacheco                   • Early stage exploration
                  • Huatecosco                         on legacy claims
                     • Pilarica
                   • El Gigante
19
Summary of Operations

        IMPACT’s goal is to build a multimillion ounce precious metals producer with multiple
                             mines feeding multiple processing centers

       1. Zacualpan District
      • The San Ramon, Noche Buena, Cuchara-
      Oscar Mines currently feed the 500-tpd
      Guadalupe Processing Plant                                    1
      2. Capire Production Centre
      • New production centre in new district
      • Initial production through 200-tpd pilot plant
      • Multiple silver targets in area


      3. Valle De Oro Area
      • Area of both silver and gold-copper veins
                                                             3
      • Drilling currently underway at El Gigante
      • Potential site of a third processing plant
                                                         2                         4
      4. Southeast Exploration Area
      • Currently mapping numerous old
        mine workings, early stage exploration

20
Future Plans & Goals


                                                   2014 & Onward
                                                   • Define expansion plan
            2013                                     for the Capire Mine and
                                                     Processing Centre
            • Begin production at both the
              Cuchara-Oscar Mine (completed)
              and the Capire Mine and Processing   • Continue exploration and
              Centre (completed)                     expansion of mining
                                                     activities with the aim to
                                                     establish IMPACT as a
            • Continue aggressive exploration        multimillion ounce
              across expansive land package to       precious metals
              accelerate organic growth              producer

            • Pursue accretive M&A
              opportunities of advanced stage
              assets




21
Why IMPACT Silver?



                                                                                  Strong cash
                                                                                 position & zero
                                                                                       debt           Expanding
                                                                                                         silver
                                                             Proven history of                        production
                                                             profitable mining                       with two new
                                                                  success                             mines put
                                                                                                     production in
                                                                                 Explore.              Q1 2013

                                                                                 Produce.
                                                                                  Profit!
                                                                   Tight share                  Numerous
                                                              structure and small               exploration
                                                               market cap for a                  targets to
         This statue of a miner is located in front of the
         church in the town of Zacualpan, signifying the        profitable junior              drive organic
         importance and acceptance of mining within              silver producer                   growth
         the community and the surrounding areas.



22
Contact Us
  Telephone: 1 604 681 0172
Email: inquiries@impactsilver.com
      www.impactsilver.com
            TSX-V: IPT

More Related Content

What's hot

2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentationAgnico Eagle Mines
 
Silvercrest january 2013 [compatibility mode]
Silvercrest january 2013 [compatibility mode]Silvercrest january 2013 [compatibility mode]
Silvercrest january 2013 [compatibility mode]Silvercrestmines
 
Q1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationQ1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
urs annual reports 2004
urs annual reports 2004urs annual reports 2004
urs annual reports 2004finance38
 
AEM Corporate Update Presentation
AEM Corporate Update PresentationAEM Corporate Update Presentation
AEM Corporate Update PresentationAgnico Eagle Mines
 
Wesdome 2009 Annual Report
Wesdome 2009 Annual ReportWesdome 2009 Annual Report
Wesdome 2009 Annual Reportdonovan_pollitt
 
occidental petroleum 2005 Annual Report
occidental petroleum 2005 Annual Reportoccidental petroleum 2005 Annual Report
occidental petroleum 2005 Annual Reportfinance13
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc.
 
newmont mining Paydirt_Conference
newmont mining Paydirt_Conferencenewmont mining Paydirt_Conference
newmont mining Paydirt_Conferencefinance37
 
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate PresentationEdgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate PresentationViral Network Inc
 
Claude Resources Inc. 2010 Annual Report
 Claude Resources Inc. 2010 Annual Report Claude Resources Inc. 2010 Annual Report
Claude Resources Inc. 2010 Annual ReportClaude Resources Inc.
 
May 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate PresentationMay 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate PresentationAgnico Eagle Mines
 

What's hot (20)

2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation
 
Silvercrest january 2013 [compatibility mode]
Silvercrest january 2013 [compatibility mode]Silvercrest january 2013 [compatibility mode]
Silvercrest january 2013 [compatibility mode]
 
Stifel report
Stifel reportStifel report
Stifel report
 
Q1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast PresentationQ1 2012 Conference Call and Webcast Presentation
Q1 2012 Conference Call and Webcast Presentation
 
Q3 2012 Conference Call and Webcast Presentation
Q3  2012 Conference Call and Webcast PresentationQ3  2012 Conference Call and Webcast Presentation
Q3 2012 Conference Call and Webcast Presentation
 
urs annual reports 2004
urs annual reports 2004urs annual reports 2004
urs annual reports 2004
 
AEM Corporate Update Presentation
AEM Corporate Update PresentationAEM Corporate Update Presentation
AEM Corporate Update Presentation
 
Q3 2012 results
Q3 2012 resultsQ3 2012 results
Q3 2012 results
 
Ohio Shale Study
Ohio Shale StudyOhio Shale Study
Ohio Shale Study
 
4.18.12 european gold forum final
4.18.12 european gold forum final4.18.12 european gold forum final
4.18.12 european gold forum final
 
Wesdome 2009 Annual Report
Wesdome 2009 Annual ReportWesdome 2009 Annual Report
Wesdome 2009 Annual Report
 
occidental petroleum 2005 Annual Report
occidental petroleum 2005 Annual Reportoccidental petroleum 2005 Annual Report
occidental petroleum 2005 Annual Report
 
Claude Resources Inc. Corporate Update
Claude Resources Inc. Corporate UpdateClaude Resources Inc. Corporate Update
Claude Resources Inc. Corporate Update
 
newmont mining Paydirt_Conference
newmont mining Paydirt_Conferencenewmont mining Paydirt_Conference
newmont mining Paydirt_Conference
 
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate PresentationEdgewater Exploration (TSX.V - EDW) Corporate Presentation
Edgewater Exploration (TSX.V - EDW) Corporate Presentation
 
Q2 2010 Results Presentation
Q2 2010 Results Presentation Q2 2010 Results Presentation
Q2 2010 Results Presentation
 
Claude Resources Inc. 2010 Annual Report
 Claude Resources Inc. 2010 Annual Report Claude Resources Inc. 2010 Annual Report
Claude Resources Inc. 2010 Annual Report
 
2.27.12 bmo final
2.27.12 bmo final2.27.12 bmo final
2.27.12 bmo final
 
May 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate PresentationMay 2010 Agnico Eagle Corporate Presentation
May 2010 Agnico Eagle Corporate Presentation
 
Google financial results
Google financial resultsGoogle financial results
Google financial results
 

Viewers also liked

Abs guide
Abs guideAbs guide
Abs guidelartuak
 
A11 howard hartrey tif expansion intro public hearing 20130812ppt 8.12.13
A11 howard hartrey tif expansion   intro public hearing 20130812ppt 8.12.13A11 howard hartrey tif expansion   intro public hearing 20130812ppt 8.12.13
A11 howard hartrey tif expansion intro public hearing 20130812ppt 8.12.13cityofevanston
 
APENDAMOS TODO SOBRE WIKI
APENDAMOS   TODO  SOBRE  WIKIAPENDAMOS   TODO  SOBRE  WIKI
APENDAMOS TODO SOBRE WIKILuz Herrera
 
Evanston trees citycouncil_08_12_13
Evanston trees citycouncil_08_12_13Evanston trees citycouncil_08_12_13
Evanston trees citycouncil_08_12_13cityofevanston
 
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...Suely Maia
 
Planificador de proyectos GLORIA-LILIANA-VILMA
Planificador de proyectos GLORIA-LILIANA-VILMAPlanificador de proyectos GLORIA-LILIANA-VILMA
Planificador de proyectos GLORIA-LILIANA-VILMAGuillermo Mondragon
 
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css3
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css313666 apprenez-a-creer-votre-site-web-avec-html5-et-css3
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css3jln94
 
Tipos de energía 2
Tipos de energía 2Tipos de energía 2
Tipos de energía 2Laurayusti26
 
A8 divvy bike share presentation to council 8.12.13 cnh final
A8 divvy bike share presentation to council 8.12.13 cnh finalA8 divvy bike share presentation to council 8.12.13 cnh final
A8 divvy bike share presentation to council 8.12.13 cnh finalcityofevanston
 
OpenStack and the Industry Shift with Open Cloud - Eric Wright
OpenStack and the Industry Shift with Open Cloud - Eric WrightOpenStack and the Industry Shift with Open Cloud - Eric Wright
OpenStack and the Industry Shift with Open Cloud - Eric WrightAngelo Luciani
 
Apw1 bus routes august 12, 2013
Apw1 bus routes august 12, 2013Apw1 bus routes august 12, 2013
Apw1 bus routes august 12, 2013cityofevanston
 
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)Deutsche EuroShop AG
 
Acta de la sentencia juicio laboral indh rit o 1935-2014
Acta de la sentencia juicio laboral indh rit o 1935-2014Acta de la sentencia juicio laboral indh rit o 1935-2014
Acta de la sentencia juicio laboral indh rit o 1935-2014vidasindical
 
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...SYRTO Project
 

Viewers also liked (20)

Abs guide
Abs guideAbs guide
Abs guide
 
A11 howard hartrey tif expansion intro public hearing 20130812ppt 8.12.13
A11 howard hartrey tif expansion   intro public hearing 20130812ppt 8.12.13A11 howard hartrey tif expansion   intro public hearing 20130812ppt 8.12.13
A11 howard hartrey tif expansion intro public hearing 20130812ppt 8.12.13
 
Acta 05
Acta 05Acta 05
Acta 05
 
Acta 01
Acta 01Acta 01
Acta 01
 
Acta 007
Acta 007Acta 007
Acta 007
 
APENDAMOS TODO SOBRE WIKI
APENDAMOS   TODO  SOBRE  WIKIAPENDAMOS   TODO  SOBRE  WIKI
APENDAMOS TODO SOBRE WIKI
 
Evanston trees citycouncil_08_12_13
Evanston trees citycouncil_08_12_13Evanston trees citycouncil_08_12_13
Evanston trees citycouncil_08_12_13
 
Acta 008
Acta 008Acta 008
Acta 008
 
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...
Nobre Norte Clube Residencial, RJZ Cyrella, Apartamentos ao lado do Norte Sho...
 
Planificador de proyectos GLORIA-LILIANA-VILMA
Planificador de proyectos GLORIA-LILIANA-VILMAPlanificador de proyectos GLORIA-LILIANA-VILMA
Planificador de proyectos GLORIA-LILIANA-VILMA
 
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css3
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css313666 apprenez-a-creer-votre-site-web-avec-html5-et-css3
13666 apprenez-a-creer-votre-site-web-avec-html5-et-css3
 
Decisão tjsc
Decisão   tjscDecisão   tjsc
Decisão tjsc
 
Tipos de energía 2
Tipos de energía 2Tipos de energía 2
Tipos de energía 2
 
A8 divvy bike share presentation to council 8.12.13 cnh final
A8 divvy bike share presentation to council 8.12.13 cnh finalA8 divvy bike share presentation to council 8.12.13 cnh final
A8 divvy bike share presentation to council 8.12.13 cnh final
 
OpenStack and the Industry Shift with Open Cloud - Eric Wright
OpenStack and the Industry Shift with Open Cloud - Eric WrightOpenStack and the Industry Shift with Open Cloud - Eric Wright
OpenStack and the Industry Shift with Open Cloud - Eric Wright
 
Apw1 bus routes august 12, 2013
Apw1 bus routes august 12, 2013Apw1 bus routes august 12, 2013
Apw1 bus routes august 12, 2013
 
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)
Deutsche EuroShop | Company Presentation | 03/13 (Preliminary Results)
 
Derechos de autor
Derechos de autorDerechos de autor
Derechos de autor
 
Acta de la sentencia juicio laboral indh rit o 1935-2014
Acta de la sentencia juicio laboral indh rit o 1935-2014Acta de la sentencia juicio laboral indh rit o 1935-2014
Acta de la sentencia juicio laboral indh rit o 1935-2014
 
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...
Bank Interconnectedness What determines the links? - Puriya Abbassi, Christia...
 

Similar to Impact Silver Corporate Presentation

March presentation final v2
March presentation final v2March presentation final v2
March presentation final v2primero_mining
 
Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28primero_mining
 
csx 02 annual
csx 02 annualcsx 02 annual
csx 02 annualfinance27
 
csx 02 annual
csx 02 annualcsx 02 annual
csx 02 annualfinance27
 
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast PresentationClaude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
Conference call ye 2012 final
Conference call  ye 2012 finalConference call  ye 2012 final
Conference call ye 2012 finalTeranga Gold
 
Star Bulk Q3 2012 results presentation
Star Bulk Q3 2012 results presentationStar Bulk Q3 2012 results presentation
Star Bulk Q3 2012 results presentationTradeWindsnews
 
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bqAuRico Gold
 
Q4 2012 Financial Results
Q4 2012 Financial ResultsQ4 2012 Financial Results
Q4 2012 Financial ResultsAuRico Gold
 
Q2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationQ2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationClaude Resources Inc.
 
Agnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 ResultsAgnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 ResultsAgnico Eagle Mines
 
SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012Silvercrestmines
 
goodrich 2Q06_Slides
goodrich  2Q06_Slidesgoodrich  2Q06_Slides
goodrich 2Q06_Slidesfinance44
 
goodrich 2Q06_Slides
goodrich  2Q06_Slidesgoodrich  2Q06_Slides
goodrich 2Q06_Slidesfinance44
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf callAgnico Eagle Mines
 

Similar to Impact Silver Corporate Presentation (20)

Presentation
PresentationPresentation
Presentation
 
Presentation
PresentationPresentation
Presentation
 
March presentation final v2
March presentation final v2March presentation final v2
March presentation final v2
 
Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28Bmo presentation draft 2013 03 28
Bmo presentation draft 2013 03 28
 
csx 02 annual
csx 02 annualcsx 02 annual
csx 02 annual
 
csx 02 annual
csx 02 annualcsx 02 annual
csx 02 annual
 
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast PresentationClaude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
Claude Resources Inc. Q4 2012 Conference Call and Webcast Presentation
 
Conference call ye 2012 final
Conference call  ye 2012 finalConference call  ye 2012 final
Conference call ye 2012 final
 
Star Bulk Q3 2012 results presentation
Star Bulk Q3 2012 results presentationStar Bulk Q3 2012 results presentation
Star Bulk Q3 2012 results presentation
 
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq
03 26-13 q4 2012 financial results webcast presentation(2) (2) v001-z362bq
 
Q4 2012 Financial Results
Q4 2012 Financial ResultsQ4 2012 Financial Results
Q4 2012 Financial Results
 
2 27 12 bmo final publish
2 27 12  bmo final publish2 27 12  bmo final publish
2 27 12 bmo final publish
 
2 27 12 bmo final publish
2 27 12  bmo final publish2 27 12  bmo final publish
2 27 12 bmo final publish
 
Q2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast PresentationQ2 2012 Conference Call and Webcast Presentation
Q2 2012 Conference Call and Webcast Presentation
 
Q4 2012 and full year results
Q4 2012 and full year resultsQ4 2012 and full year results
Q4 2012 and full year results
 
Agnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 ResultsAgnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 Results
 
SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012SilverCrest Mines | Corporate Presentation | September 2012
SilverCrest Mines | Corporate Presentation | September 2012
 
goodrich 2Q06_Slides
goodrich  2Q06_Slidesgoodrich  2Q06_Slides
goodrich 2Q06_Slides
 
goodrich 2Q06_Slides
goodrich  2Q06_Slidesgoodrich  2Q06_Slides
goodrich 2Q06_Slides
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf call
 

More from Adnet Communications

20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdfAdnet Communications
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources PresentationAdnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfAdnet Communications
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdfAdnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentationAdnet Communications
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/Adnet Communications
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Adnet Communications
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024Adnet Communications
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor PresentationAdnet Communications
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024Adnet Communications
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfAdnet Communications
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentationAdnet Communications
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Adnet Communications
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdfAdnet Communications
 

More from Adnet Communications (20)

20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdf
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentation
 
Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024Lundin Gold Corproate Presentation February 2024
Lundin Gold Corproate Presentation February 2024
 
20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf20240123 Calibre January 2024 Investor Presentation FIN.pdf
20240123 Calibre January 2024 Investor Presentation FIN.pdf
 

Impact Silver Corporate Presentation

  • 1. C O R P O R AT E P R E S E N T AT I O N T S X – V : I P T │ F R AN K F U R T : I K L
  • 2. Cautionary Disclaimer Forward Looking Statements Except for historical information, this presentation may contain certain “ forward-looking” statements and information relating to IMPACT that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, without limitations, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking statements. NI43-101 QUALIFIED PERSON George Gorzynski, P.Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the technical information in this presentation.
  • 3. Why IMPACT Silver? Profitable silver production from two 100%-owned adjacent mineral districts in south-central Mexico Corporate focus is on profits: 1,390% increase in net earnings from 2006 to 2011 A strong cash position of $19.6M as of Q3 2012, no debt and 90% of revenues from silver Construction of new mining district and open-pit operation, the Capire Production Centre, is now complete Many attractive exploration targets within land package to drive organic growth Investor-friendly, tightly managed share structure (72M Shares FD) 30,000,000 25,000,000 20,000,000 Revenues 15,000,000 Earnings before taxes 10,000,000 5,000,000 Operating cash flow before changes in non-cash working capital 0 2006 2007 2008 2009 2010 2011 As of Sept. 30 1 2012
  • 4. Financial Highlights – Nine Months Ended Sept 30, 2012 • Market cap: C$70 Million • Warrants: Nil • Cash position: C$19.6 Million • Debt: Nil • Shares outstanding: 68M (FD 72M) • Cash flow per share²: $0.04 Nine months ($000’000’s CDN except of EPS) ended Sept. 30, 2011 2010 2009 2012 Revenue $11.3 $24.3 $16.7 $12.2 Mine operating earnings $3.6 $12.9 $7.4 $4.2 Net earnings (loss) after taxes $(0.3) $7.6 $3.4 $1.6 EBITDA $2.1 $13.0 $6.5 $3.4 Operating cash flows¹ $2.4 $10.2 $5.4 $3.7 Cash $19.6 $30.8 $18.7 $5.3 Working capital $26.9 $31.9 $20.2 $6.3 Earnings per share $0.00 $0.12 $0.07 $0.02 ¹Before changes in non-cash working capital ²Non GAAP working measure; operating cash flow before changes in non-cash working capital divided by weighted average 2 number of common shares outstanding
  • 5. Board of Directors Frederick W. Davidson, CA – President & CEO, Director • 35+ years mining & corporate finance experience • Founding President of IMPACT Silver Corp. & Energold Drilling Corp. • Held senior management positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. George A. Gorzynski, P. Eng – VP Exploration, Director • 30+ years of international mineral exploration and mining experience. Currently Director of Tirex Resources Ltd., Defiance Silver Corp. and Berkwood Resources Ltd. H. Walter Sellmer, P. Geo – Director • Held senior management positions at Amax Exploration, Canamax Resources Inc. and TOTAL Energold Corp. Victor A. Tanaka, P. Geo – Director • Held senior positions in mineral exploration at Cominco, Asamera, Freeport McMoRan, Aber, Major General, Fjordland and Pathfinder. Currently President & CEO of Bayswater Uranium. Richard J. Mazur, P. Geo, MBA – Director • Held senior management positions at Canamax Resources Inc. and IMPACT. Currently CEO of Alto Ventures Ltd. and President & CEO of Forum Uranium Corp. Peter N. Tredger, P. Eng, MBA – Director • Held senior management positions at Glencairn Gold Corp., Wheaton River Minerals Ltd. and Blue Pearl Mining Ltd. Currently VP of Thompson Creek Metals Company Inc. Jean-Pierre Bourtin, MBA – Director • Former Treasurer of Xerox Corp., Latin America & Emerging Markets. Currently President & Money Manager of a 3 private investment firm in Wilton, Connecticut.
  • 6. Project Location & Overview District Location in Mexico Central zone of land package 4
  • 7. Growth in Production Silver Mines in Production: • San Ramon Mine • Capire Mine (open-pit) • Noche Buena Mine • Chivo Mine (stand-by) • Cuchara-Oscar Mine Nine Months Ended Dec 31 Dec 31 Dec 31 Sept 30, 2012* 2011 2010 2009 Silver production (oz) 472,182 833,607 750,259 823,571 Gold production (oz) 465 676 600 810 Lead production (t) 384 731 734 969 Zinc production (t) 611 1,248 1,212 1,098 Total tonnes milled 125,956 154,289 131,348 114,340 Tonnes milled per day 463 424 360 313 Revenue per tonne $98 $171 $123 $110 Direct Cost per tonne $63 $70 $63 $60 *Production decreased as operations transition from older, lower grade mines to new high grade mines during 2012 5
  • 8. Zacualpan & Capire Silver Districts Capire District Zacualpan District Valle de Oro Area Production in 2013: • San Ramon Mine • Noche Buena Mine • Cuchara-Oscar Mine • Capire Mine Exploration: • Valle de Oro area El Gigante Vein Carlos Pacheco Vein Huatecosco Vein • Zacualpan District La Condesa Vein Mirasol Prospect • Capire District Cruz Blanca Santa Rita 6 This map is reproduced in miniature on following slides
  • 9. Royal Mines of Zacualpan – Prolific Mining History The Royal Mines of Zacualpan is one of the oldest mining districts in the Americas, with 485 years of recorded mining history IMPACT bought the Zacualpan assets in 2006 and consolidated ownership of the entire district for the first time in its history IMPACT’s intensive exploration work has catalogued over 3,000 old mine workings in the GIS database, forming an invaluable basis for modern and effective exploration One of 42 historic processing plants found in the district attesting to a long history of silver mining 7
  • 10. One Land Package, Two Production Centres Guadalupe Production Centre Capire Production Centre The Guadalupe Processing Plant is rated at 500 The Capire pilot plant is rated at 200 tpd with the tpd and has been the main production centre potential to produce 200,000 ounces of silver per since 2006. year, with plans for future expansion . Fed by three underground silver mines: the San Capire Mine is an open-pit VMS deposit with Ramon, Noche Buena, Cuchara-Oscar NI43-101 measured and indicated resources of 7.2M oz Ag and 30,446 oz Au (January, 2011) Guadalupe Mill - 500 TPD crushing and flotation circuit Capire Pilot Plant - 200 TPD crushing and flotation circuit 8
  • 11. One Land Package, Multiple Mines San Ramon Mine – Restarted production in early 2008. Currently 50% of total production. Large veins and stockworks of high grade epithermal mineralization. Noche Buena Mine – Commenced production in 2010. Currently 30% of total production. Large epithermal veins located in the Valle de Oro area. Cuchara-Oscar Mine – Corridor of many wide and high-grade silver veins linking the legacy Cuchara Mine and the Santa Lucia zone. Commenced production in February 2013, currently 20% of total production. Chivo Mine & Gallega Mine – Both mines currently on stand-by; will be periodically mined for lead and zinc. Capire Mine – Open-pit, VMS deposit with high grade polymetallic mineralization. Commissioning of the 200 tpd pilot plan began in March 2013. Valle de Oro – Current exploration area. Widespread mesothermal veins indicate potential gold-copper subdistrict lying beneath the Zacualpan Silver District. Initial high grade drill results at the Carlos Pacheco and Huatecosco veins. 9
  • 12. New Mine Production: Cuchara-Oscar Mine Oscar is a high-grade silver vein corridor linking the past-producing Cuchara Mine and the Santa Lucia zone Production at Cuchara-Oscar began in February 2013, with mineralization feeding the nearby Guadalupe Mill Utilizing the legacy Cuchara Mine infrastructure allowed for lower capital costs and rapid mine development at Oscar 10
  • 13. Cuchara-Oscar & Santa Lucia Zone Drill Highlights A Selection of Oscar Vein Drill Highlights Drill Hole To (m) From (m) Interval (m) Ag (g/t) Au (g/t) Pb (%) Zn (%) Z11-64 36.60 43.20 6.60 223 0.08 0.18 0.52 Z11-69 0.70 3.35 2.65 408 0.62 0.73 1.12 Z11-74 21.35 22.35 1.00 1,875 0.74 2.65 6.88 Z12-05 92.50 97.60 5.10 234 0.05 0.14 0.49 A Selection of Santa Lucia Drill Highlights Z09-35 81.42 82.85 1.43 600 0.08 - - Z09-47 60.60 66.90 6.30 278 0.01 0.15 0.70 including 63.72 66.90 3.18 467 0.01 0.24 1.11 Z09-53 216.13 218.52 2.39 419 0.03 0.28 0.32 See News Releases dated: April 23, 2012, December 16, 2009 & October 6, 2009 11
  • 14. New Capire Mine and Production Centre Area of defined N Open-pit NI 43-101 Resource 200 tpd pilot mill 3D model of Remains planned open for open-pit expansion Mill Tailings facility Capire open-pit 3D model Capire open-pit Mine and Pilot Plant 2012 2015 & 2016 2013 & 2014 Construction Define plans to Began production to of 200 tpd construct a large, optimize design pilot plant; permanent plant at parameters for future Capire; size will be 11,850m drill plant expansion; determined by program minimum 10,000m exploration and pilot (completed) drill program 12 plant results
  • 15. NI 43-101 Mineral Resource Estimate – Capire Mine Published: February 2011 Metal Content for Capire Mine Ag (oz) Au (oz) Cu (lb) Pb (lbs) Zn (lbs) Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820 Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173 Measured & Indicated (M&I) 7,224,035 30,446 7,083,007 37,264,478 95,662,993 Inferred 435,959 1,919 475,594 2,260,089 5,823,490 Summary Table of Classified Mineral Resources – Measured & Indicated and Separate Inferred Zone Classification Tonnes Ag g/t Au g/t Cu (%) Pb (%) Zn (%) Capire M&I 3,104,944 46.46 0.19 0.06 0.33 0.93 Aurora 1 M&I 1,807,302 44.50 0.199 0.07 0.36 0.80 M&I 4,912,246 45.74 0.193 0.06 0.34 0.88 Total Inferred 371,066 36.54 0.161 0.06 0.28 0.71 • Drilling in 2010 showed Capire and Aurora 1 to be one continuous zone, now referred to as Capire • Initial mining grades anticipated to be 150 g/t silver 13
  • 16. Recent Capire Drill Highlights Drill From To Interval Ag Au Pb Zn Cu Hole (m) (m) (m) (g/t) (g/t) (%) (%) (%) C12-06 78.25 80.30 2.05 507 1.81 2.20 4.02 0.41 including 79.30 80.30 1.00 929 3.27 2.77 5.27 0.63 and 105.70 110.80 5.10 183 0.20 1.05 2.45 0.13 C12-21 83.35 110.10 16.75 153 0.40 1.14 2.71 0.21 including 92.40 97.00 4.60 435 0.71 3.13 5.99 0.48 C12-25 13.20 23.35 10.15 107 0.58 0.90 2.43 0.10 including 13.20 15.25 2.05 315 0.91 2.93 8.19 0.25 • Drill holes listed above were drilled vertically and all intersections are estimated to be close to true width • These holes expanded to the extent of the Capire mineralization to the north and south; the zone remains open for further expansion to the east and northeast • Exploration drilling in 2013 will initially be on the Cruz Blanca and Santa Rita prospects 14
  • 17. Capire Exploration VMS mineralization in Capire District is predominantly silver-rich with zinc, lead, copper and gold credits District covers the same stratigraphy as the Campo Morado VMS belt, where Nyrstar N.V. is in commercial production on the G-9 deposit Several VMS targets in close proximity to Capire will be drilled: Guadalupe, Cruz Blanca, Santa Rita & Aurora II 15
  • 18. Geology Veins in the METAL ZONING IN ORE SHOOTS Zacualpan Depth Strike Length Mining Level District tend to be 150-420 m (500-1400 ft) silver-rich near Surface (0m / 0 ft) Silver-rich at top Cuchara-Oscar Mine the top (commonly 1,000+ g/t) 200 – 1,000+ g/t Ag Noche Buena Mine Increasing San Ramon Mine lead and zinc 150 m (500 ft) & decreasing silver towards the bottom Lead & Zinc rich at bottom Chivo Mine 300 m (1,000 ft) 60 – 150 g/t Ag Significant Valle do Oro Area gold and Typical copper Mining Width Gold-Copper may lie at 3 m (10 ft) at depth depth 16
  • 19. Valle de Oro – Drill Highlights A Selection of Carlos Pacheco Drill Highlights Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Cu (%) Z08-68 Top of intercept - 85.74 2.90 19.6 68 0.29 including Top of intercept - 85.74 1.0 49.7 59 0.31 Z12-13 192.30 199.00 6.70 3.84 28 0.54 including 192.30 195.05 2.75 8.47 56 1.12 Z12-23 229.85 230.95 1.10 3.82 84 0.54 A Selection of Huatecosco Drill Highlights Pb Drill Hole From (m) To (m) Interval (m) Au (g/t) Ag (g/t) Zn (%) (%) Z11-17 54.51 59.25 4.74 3.44 117.6 0.59 0.81 Z11-19 114.65 117.40 2.75 3.53 320.8 0.43 0.57 Z11-20 167.90 178.20 10.30 3.97 48.7 1.69 2.62 including 167.90 172.50 4.60 6.96 84.3 2.89 5.11 Z11-48 351.70 355.80 4.10 5.22 30.10 0.69 1.78 including 353.75 354.50 0.75 25.0 50.10 0.49 1.59 17 See News Releases dated July 11, 2012, October 12, 2011 and June 2, 2011
  • 20. Rapid Exploration To Mine Development A cornerstone of IMPACT’s success has been rapid mine development to increase mill throughput and generate near-term cash flow EXPLORATION AND MINE DEVELOPMENT PROCESS FLOWCHART: RESEARCH FIELD WORK DRILLING MINE DEVELOPMENT MINE Compile old Surface & Drilling in PRODUCTION mines/ underground phases Mine Planning, & CASH prospects from sampling, based on Permitting and FLOW historic maps mapping success Construction • Capire (East) • San Ramon More than • Mirasol Prioritize and • Noche 3,000 old • Capire Mine select • El Gigante Buena mines and and Plant prospects areas and • Condesa & • Cuchara- Expansion catalogued prospects Cuchara North Oscar to date for drilling • Carlos Pacheco • Capire 18
  • 21. Exploration Targets An abundance of attractive exploration targets to drive organic growth and potentially advance into production Zacualpan District Capire District • Mirasol • Cruz Blanca • La Condesa • Santa Rita • Santa Efigenia • Manto Rico • Guadalupe Valle de Oro Area Dominican Republic • Carlos Pacheco • Early stage exploration • Huatecosco on legacy claims • Pilarica • El Gigante 19
  • 22. Summary of Operations IMPACT’s goal is to build a multimillion ounce precious metals producer with multiple mines feeding multiple processing centers 1. Zacualpan District • The San Ramon, Noche Buena, Cuchara- Oscar Mines currently feed the 500-tpd Guadalupe Processing Plant 1 2. Capire Production Centre • New production centre in new district • Initial production through 200-tpd pilot plant • Multiple silver targets in area 3. Valle De Oro Area • Area of both silver and gold-copper veins 3 • Drilling currently underway at El Gigante • Potential site of a third processing plant 2 4 4. Southeast Exploration Area • Currently mapping numerous old mine workings, early stage exploration 20
  • 23. Future Plans & Goals 2014 & Onward • Define expansion plan 2013 for the Capire Mine and Processing Centre • Begin production at both the Cuchara-Oscar Mine (completed) and the Capire Mine and Processing • Continue exploration and Centre (completed) expansion of mining activities with the aim to establish IMPACT as a • Continue aggressive exploration multimillion ounce across expansive land package to precious metals accelerate organic growth producer • Pursue accretive M&A opportunities of advanced stage assets 21
  • 24. Why IMPACT Silver? Strong cash position & zero debt Expanding silver Proven history of production profitable mining with two new success mines put production in Explore. Q1 2013 Produce. Profit! Tight share Numerous structure and small exploration market cap for a targets to This statue of a miner is located in front of the church in the town of Zacualpan, signifying the profitable junior drive organic importance and acceptance of mining within silver producer growth the community and the surrounding areas. 22
  • 25. Contact Us Telephone: 1 604 681 0172 Email: inquiries@impactsilver.com www.impactsilver.com TSX-V: IPT