Proposal for the Construction of
	
  
Food Grocer
Prepared by:
1. Teo Vi Vien (0321645)
2. Wong De-Vin (0319814)
Tutor: Miss Ann See Peng
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  2	
  
Content
	
  
	
  
Topic	
   Page	
  
Cover	
   1	
  
Content	
  
	
  2	
  
Introduction	
  	
   3	
  
Our	
  Site	
   4	
  
Site	
  Analysis	
  and	
  Observation	
   5-­‐8	
  
Rationales	
  and	
  Client	
  Evaluation	
  	
   9-­‐10	
  
Concept	
  Proposal	
   11-­‐12	
  
Plans	
  and	
  Elevations	
   13-­‐21	
  
Drainage	
  System	
   22	
  
Fire	
  Safety	
   23	
  
Attributes	
  of	
  Supermarket	
  Construction	
  
24	
  
Operational	
  Energy	
  Used	
   25	
  
Task	
  Of	
  Professions	
  Involved	
   26-­‐27	
  
Local	
  Authorities	
  Approval	
   28-­‐35	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  3	
  
INTRODUCTION	
  
	
  
	
  
This is our final project for the module introduction to
construction industry (ICI), for this assignment, we are required
to find a partner and produce a minimum 20 pages report. Our
task is to find a 30m x 30m (900 meters square) to 30m x 40m
(1200 meters square) empty land and come up with a proposal
to consult a potential client to construct a building in the site
chosen.
The proposing construct building is required to serve one of the
purposes as mentioned below: Recreation area, Commercial
area, Industrial area, Agricultural area, Tourism area and
Residential area.
The objective of this assignment is not only to enable students to
develop an understanding of the building team, its organization,
duties and inter-relations within which they will seek
employment, career progression or further study but also To
develop an awareness of their professional responsibilities and
to appreciate their profession in the construction industry.
To make this assignment successful for us, we are encouraged to
explain the need to coordinate and develop an understanding of
coherent working relations among various industry players and
to improve the communication channels. We are also to show
our ability to document our observations and understanding
from our visit to our site and also research towards our site.
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  4	
  
OUR	
  SITE	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Our	
  site	
  is	
  located	
  at	
  3.061732,	
  101.610481	
  on	
  Google	
  Maps.	
  	
  
The	
  area	
  is	
  67m	
  x	
  67m	
  (4489	
  meter	
  squares)	
  .	
  The	
  reason	
  
why	
  we	
  chose	
  this	
  site	
  is	
  because	
  it	
  is	
  an	
  open	
  space	
  which	
  
lacks	
  buildings	
  and	
  design.	
  It	
  is	
  a	
  big	
  waste	
  to	
  this	
  empty	
  
land	
  as	
  it	
  is	
  a	
  very	
  strategic	
  area	
  because	
  it	
  is	
  located	
  near	
  
residential	
  areas	
  and	
  also	
  a	
  university.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  5	
  
SITE	
  ANALYSIS	
  AND	
  OBSERVATION	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Our	
  site	
  is	
  located	
  1.5	
  km	
  away	
  from	
  Taylor’s	
  University	
  Lakeside	
  
Campus.	
  Our	
  site	
  can	
  be	
  reached	
  by	
  car,	
  which	
  is	
  5	
  minutes,	
  or	
  by	
  
walk,	
  which	
  is	
  22	
  minutes	
  from	
  Taylor’s	
  University.	
  Our	
  site	
  is	
  	
  	
  	
  	
  	
  
30m	
  x	
  35m	
  (1050	
  meter	
  square).	
  It	
  is	
  an	
  empty	
  land	
  next	
  to	
  a	
  High-­‐
Raised	
  Apartment.	
  The	
  only	
  entrance	
  that	
  vehicle	
  can	
  enter	
  to	
  this	
  
empty	
  land	
  is	
  from	
  an	
  entrance	
  which	
  shares	
  the	
  same	
  road	
  to	
  enter	
  
the	
  apartment.	
  Therefore	
  that	
  entrance	
  will	
  also	
  be	
  our	
  proposed	
  
entrance	
  for	
  our	
  commercial	
  building.	
  There	
  is	
  a	
  slope	
  at	
  the	
  East	
  end	
  
of	
  our	
  site	
  and	
  that	
  will	
  be	
  our	
  main	
  drainage	
  and	
  waste	
  system	
  for	
  
our	
  commercial	
  building.	
  The	
  traffic	
  rate	
  at	
  our	
  site	
  is	
  slightly	
  jam	
  
during	
  peak	
  hours	
  and	
  traffic	
  rate	
  is	
  low	
  during	
  normal	
  hours.	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  6	
  
Pictures	
  from	
  our	
  site:	
  
	
  
View	
  from	
  the	
  main	
  road	
  to	
  our	
  site	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  the	
  entrance	
  of	
  the	
  apartment	
  to	
  the	
  main	
  road	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  entrance	
  of	
  condominium	
  to	
  the	
  Highway	
  connecting	
  road	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  7	
  
View	
  from	
  the	
  main	
  road	
  to	
  the	
  apartment	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  main	
  road	
  to	
  the	
  entrance	
  of	
  apartment	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
View	
  from	
  apartment	
  to	
  our	
  site	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  8	
  
Advantages	
  
	
  
Our	
  site	
  is	
  located	
  just	
  outside	
  of	
  Taylor’s	
  Lakeside	
  with	
  a	
  distance	
  of	
  
1.5km.	
  This	
  is	
  one	
  of	
  the	
  main	
  advantages	
  of	
  building	
  our	
  site	
  as	
  the	
  
core	
  purpose	
  of	
  this	
  project	
  is	
  to	
  create	
  convenience	
  for	
  university	
  
students	
  who	
  stay	
  in	
  Bandar	
  Sunway	
  to	
  access	
  the	
  building	
  without	
  
the	
  hassle	
  of	
  traffic	
  congestion.	
  
Most	
  high-­‐rise	
  apartments	
  are	
  located	
  around	
  the	
  area	
  to	
  create	
  
convenience	
  for	
  the	
  residents	
  to	
  access	
  the	
  building,	
  especially	
  for	
  
those	
  who	
  do	
  not	
  own	
  a	
  vehicle	
  as	
  the	
  walking	
  distance	
  is	
  at	
  an	
  
average	
  of	
  5	
  minutes	
  from	
  the	
  proposed	
  building	
  to	
  the	
  apartments.	
  
There	
  is	
  a	
  wide	
  expanse	
  of	
  open	
  space	
  to	
  create	
  a	
  potential	
  space	
  for	
  
future	
  development.	
  It	
  also	
  has	
  an	
  existing	
  flat	
  ground	
  to	
  ease	
  the	
  
process	
  of	
  construction.	
  
	
  
	
  
	
  
Disadvantages	
  
	
  
Despite	
  the	
  good	
  potential	
  of	
  our	
  site	
  for	
  our	
  proposed	
  plan,	
  it	
  also	
  
has	
  its	
  down	
  side	
  that	
  might	
  be	
  the	
  reason	
  of	
  its	
  lack	
  of	
  usage	
  and	
  
abandoned	
  open	
  area.	
  
It	
  only	
  has	
  one	
  access	
  point	
  where	
  vehicles	
  have	
  to	
  turn	
  in	
  from	
  the	
  
apartment	
  located	
  next	
  to	
  our	
  site	
  before	
  entering.	
  Therefore,	
  the	
  
flow	
  of	
  traffic	
  is	
  a	
  difficult	
  procedure	
  as	
  it	
  only	
  has	
  one	
  entry	
  and	
  exit	
  
point.	
  
Our	
  site	
  is	
  located	
  at	
  a	
  low	
  area	
  where	
  it	
  holds	
  water	
  after	
  a	
  heavy	
  
rainfall.	
  Standing	
  water	
  creates	
  a	
  potential	
  spot	
  for	
  mosquitos	
  to	
  
breed	
  which	
  will	
  cause	
  a	
  huge	
  disadvantage	
  for	
  our	
  proposed	
  plan.	
  A	
  
storm	
  water	
  catch	
  basins	
  (system)	
  have	
  to	
  be	
  installed	
  to	
  solve	
  this	
  
problem.	
  
Our	
  site	
  does	
  not	
  have	
  a	
  good	
  view.	
  It	
  overlooks	
  a	
  low-­‐end	
  apartment	
  
and	
  it	
  is	
  located	
  next	
  to	
  a	
  cross	
  junction.	
  The	
  view	
  is	
  not	
  pleasing	
  to	
  
the	
  eyes.	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  9	
  
Rationale	
  and	
  Client	
  Evaluation	
  
	
  
After	
  thorough	
  discussion	
  and	
  research	
  on	
  our	
  site,	
  also	
  emphasizing	
  
on	
  the	
  advantages	
  and	
  disadvantages	
  of	
  the	
  existing	
  nature	
  of	
  the	
  
area,	
  we	
  have	
  decided	
  to	
  propose	
  a	
  commercial	
  area	
  with	
  a	
  mid-­‐end	
  
hypermarket,	
  food	
  court	
  and	
  fast	
  food	
  joint	
  with	
  drive-­‐thru	
  service.	
  
For	
  this	
  construction	
  project,	
  we	
  look	
  upon	
  the	
  weakness	
  of	
  the	
  
nearby	
  places	
  of	
  the	
  same	
  facilities	
  and	
  functions	
  to	
  compare	
  and	
  
improve	
  on	
  their	
  weaknesses	
  to	
  propose	
  a	
  plan	
  to	
  better	
  suit	
  the	
  
clients	
  of	
  our	
  project.	
  
We	
  have	
  distinguished	
  a	
  few	
  issues	
  that	
  are	
  not	
  suitable	
  for	
  our	
  
proposed	
  plan	
  and	
  came	
  up	
  with	
  a	
  list	
  of	
  improved	
  suggestions	
  
according	
  to	
  the	
  areas.	
  
	
  
High-­‐end	
  hypermarket	
  at	
  Sunway	
  Pyramid	
  	
  
	
  
1. Price	
  of	
  groceries	
  and	
  items	
  are	
  more	
  expensive	
  –	
  Price	
  of	
  
goods	
  sold	
  at	
  the	
  high-­‐end	
  hypermarket	
  are	
  placed	
  at	
  a	
  higher	
  
price	
  due	
  to	
  the	
  expensive	
  rental	
  and	
  emphasize	
  on	
  the	
  interior	
  
design.	
  
2. High	
  cost	
  of	
  imported	
  goods	
  –	
  High-­‐end	
  hypermarkets	
  
usually	
  import	
  quality	
  goods	
  that	
  are	
  priced	
  too	
  high	
  and	
  are	
  
not	
  affordable	
  for	
  students	
  who	
  live	
  near	
  the	
  area.	
  
3. Area	
  too	
  small	
  –	
  High-­‐end	
  hypermarket	
  are	
  smaller	
  compared	
  
to	
  mid-­‐end	
  hypermarkets,	
  hence	
  there	
  are	
  lesser	
  varieties	
  for	
  
customers	
  to	
  choose	
  from.	
  
Restaurants	
  in	
  Syopz	
  Mall	
  
	
  
1. Limited	
  choices	
  of	
  restaurants	
  –	
  The	
  students	
  of	
  Taylor’s	
  
University	
  face	
  dilemmas	
  of	
  what	
  to	
  eat	
  for	
  lunch	
  everyday	
  as	
  
there	
  are	
  not	
  much	
  variety	
  in	
  campus.	
  
2. Price	
  of	
  food	
  is	
  not	
  affordable	
  for	
  students	
  -­‐	
  The	
  price	
  starts	
  
from	
  RM15	
  and	
  above	
  with	
  no	
  
3. Closing	
  time	
  too	
  early	
  –	
  Most	
  restaurants	
  in	
  campus	
  are	
  closed	
  
at	
  9pm.	
  Only	
  the	
  “mamak”	
  and	
  convenient	
  stores	
  are	
  open	
  
24/7.	
  Most	
  students	
  who	
  overnight	
  at	
  campus	
  do	
  not	
  have	
  a	
  
complete	
  meal	
  to	
  eat.	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  10	
  
Fast	
  Food	
  Joint	
  next	
  to	
  Sunway	
  Toll	
  
1. No	
  direct	
  access	
  to	
  campus	
  from	
  the	
  restaurant	
  –	
  Students	
  who	
  
drive	
  have	
  to	
  make	
  a	
  huge	
  round	
  around	
  Subang	
  at	
  a	
  proximate	
  
duration	
  of	
  15	
  minutes	
  before	
  going	
  back	
  to	
  campus.	
  
2. Isolated	
  location	
  –	
  The	
  fast	
  food	
  joint	
  is	
  located	
  beside	
  the	
  toll	
  
in	
  a	
  non-­‐strategic	
  area	
  and	
  customers	
  have	
  to	
  pay	
  the	
  toll	
  after	
  
they	
  finished	
  dining.	
  
3. No	
  drive-­‐thru	
  service	
  –	
  Drive-­‐thru	
  service	
  is	
  not	
  available,	
  
customers	
  who	
  are	
  in	
  a	
  rush	
  will	
  not	
  enjoy	
  the	
  convenience	
  of	
  
taking	
  away	
  efficiently.	
  
	
  
	
  
Through	
  studying	
  the	
  weaknesses	
  of	
  these	
  areas,	
  we	
  have	
  decided	
  to	
  
improve	
  on	
  our	
  construction	
  project.	
  The	
  proposal	
  is	
  required	
  to	
  
fulfill	
  the	
  following	
  criteria.	
  
1. The	
  whole	
  project	
  will	
  be	
  finished	
  within	
  the	
  estimated	
  time.	
  
2. The	
  space	
  is	
  utilized	
  sufficiently.	
  
3. Benefit	
  the	
  society	
  and	
  improve	
  on	
  the	
  weakness	
  of	
  the	
  high-­‐
end	
  hypermarket,	
  restaurants	
  in	
  syopz	
  and	
  fast	
  food	
  joint	
  next	
  
to	
  the	
  Sunway	
  Toll.	
  
	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  11	
  
CONCEPT	
  
	
  
Rationale	
  of	
  our	
  concept:	
  
	
  
The	
  concept	
  of	
  our	
  site	
  is	
  to	
  provide	
  a	
  convenient	
  and	
  affordable	
  
hypermarket	
  including	
  an	
  efficient	
  food	
  court	
  on	
  the	
  ground	
  floor.	
  
We	
  also	
  aim	
  to	
  build	
  this	
  building	
  with	
  the	
  cheapest	
  yet	
  sustainable	
  
materials	
  with	
  an	
  attractive	
  exterior	
  design	
  of	
  the	
  building.	
  The	
  
interior	
  of	
  our	
  building	
  is	
  also	
  very	
  organized	
  for	
  the	
  customers	
  to	
  
have	
  a	
  comfortable	
  and	
  organized	
  grocery	
  shopping	
  experience.	
  
	
  
	
  
	
  
Organized	
  shelves	
  for	
  
easier	
  access	
  to	
  find	
  
products	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Attractive	
  and	
  
sustainable	
  design	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  12	
  
	
  
	
  
	
  
Advantages	
  of	
  our	
  concept:	
  
	
  
It	
  is	
  located	
  at	
  a	
  site	
  where	
  it	
  is	
  easy	
  to	
  be	
  accessed.	
  It	
  also	
  very	
  
convenient	
  for	
  the	
  residents	
  nearby.	
  Our	
  concept	
  is	
  also	
  very	
  
organized	
  and	
  it	
  is	
  easy	
  for	
  customers	
  to	
  find	
  the	
  products	
  they	
  need.	
  
There	
  is	
  also	
  a	
  food	
  court	
  and	
  a	
  fast	
  food	
  joint	
  located	
  at	
  the	
  ground	
  
floor	
  of	
  the	
  building	
  for	
  the	
  convenience	
  of	
  the	
  customers	
  in	
  rush.	
  
The	
  purpose	
  of	
  the	
  food	
  court	
  is	
  to	
  provide	
  more	
  varieties	
  for	
  the	
  
customers	
  as	
  there	
  are	
  limited	
  choices	
  of	
  restaurant	
  nearby.	
  	
  
	
  
Food	
  Court	
  with	
  varieties	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Drive	
  Thru	
  services	
  at	
  
fast	
  food	
  joints	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  13	
  
	
  
	
  
	
  
	
  
	
  
Location	
  Plan	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  14	
  
	
  
Existing	
  Plan	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  15	
  
Floor	
  Plan	
  
	
  
Ground	
  Floor	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  16	
  
	
  
	
  
First	
  Floor	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  17	
  
	
  
	
  
	
  
	
  
Second	
  Floor	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  18	
  
	
  
Front	
  Elevation	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  19	
  
	
  
	
  
	
  
	
  
	
  
	
  
Side	
  Elevation	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  20	
  
	
  
	
  
Cross	
  Section	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  21	
  
	
  
	
  
Car	
  park	
  and	
  traffic	
  flow	
  
	
  
Car	
  parks	
  are	
  often	
  associated	
  with	
  large	
  retail	
  complexes	
  and	
  steel	
  
framed	
  car	
  parks	
  are	
  a	
  common	
  solution.	
  Column	
  spacing	
  of	
  5.2m	
  
and	
  7.5m	
  align	
  with	
  2	
  or	
  3	
  car	
  park	
  spaces	
  and	
  spans	
  are	
  often	
  4.5m,	
  
7m	
  and	
  4.5m	
  so	
  that	
  a	
  central	
  aisle	
  is	
  created.	
  Long-­‐span	
  steel	
  framed	
  
car	
  parks	
  are	
  also	
  popular	
  and	
  16.5m	
  is	
  the	
  common	
  span	
  in	
  these	
  
cases.	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  22	
  
	
  
Drainage	
  System	
  
	
  
Catch	
  Basins	
  
	
  
A	
   catch	
   basin	
   is	
   an	
   inlet	
   to	
   a	
   storm	
  
drain	
   system	
   that	
   typically	
   includes	
  
a	
   grate	
   where	
   storm	
   water	
   enters,	
  
and	
   a	
   sump	
   to	
   capture	
   sediment,	
  
debris	
  and	
  associated	
  pollutants.	
  
Catch	
   basins	
   are	
   designed	
  
specifically	
   for	
   capturing	
   and	
  
conveying	
  storm	
  water.	
  Typically,	
  on	
  
private	
   commercial	
   or	
   industrial	
  
sites,	
   there	
   is	
   no	
   standard	
   for	
   the	
  
placement	
   of	
   catch	
   basins.	
   Storm	
  
water	
   drain	
   systems	
   are	
   often	
  
installed	
   based	
   on	
   the	
   best	
  
professional	
  judgment	
  and	
  experience	
  of	
  the	
  design	
  engineer.	
  
The	
   estimated	
   peak	
   storm	
   water	
   flow	
   rate	
   dictates	
   the	
   number	
   of	
  
catch	
  basins	
  needed	
  on	
  a	
  site.	
  The	
  percent	
  impervious	
  surface,	
  slope,	
  
average	
  rainfall	
  and	
  rainfall	
  intensity	
  are	
  all	
  factors	
  in	
  calculating	
  the	
  
peak	
  flow	
  rate.	
  
	
  
Vacuum	
  Drainage	
  System	
  
	
  
The	
   condensation	
   wastewater	
  
can	
   be	
   lifted	
   vertically	
   up	
   from	
  
the	
   freezer	
   and	
   transported	
  
through	
  piping	
  in	
  the	
  ceiling	
  to	
  a	
  
drain	
   elsewhere	
   in	
   the	
   building.	
  
Special	
   greater	
   tanks	
   called	
  
interceptors	
   are	
   used	
   to	
   ensure	
  
the	
   water	
   transport's	
   efficiency.	
  
The	
   piping	
   for	
   condensation	
  
water	
  can	
  be	
  moved	
  easily	
  when	
  
floor	
  plans	
  change.	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  23	
  
	
  
Fire	
  Safety	
  
	
  
Fire	
  safe	
  design	
  is	
  important	
  in	
  retail	
  buildings,	
  both	
  for	
  provision	
  of	
  
effective	
  means	
  of	
  escape	
  in	
  a	
  fire	
  and	
  also	
  to	
  protect	
  the	
  asset	
  value	
  
of	
  the	
  building	
  and	
  its	
  contents.	
  
The	
  fire	
  resistance	
  is	
  generally	
  120	
  minutes	
  and	
  a	
  life	
  safety	
  sprinkler	
  
system	
  is	
  also	
  required.	
  
	
  
Intumescent	
  coatings	
  are	
  paint	
  like	
  materials	
  which	
  are	
  inert	
  at	
  low	
  
temperatures	
  but	
  which	
  provide	
  insulation	
  as	
  a	
  result	
  of	
  a	
  complex	
  
chemical	
   reaction	
   at	
   temperatures	
   typically	
   of	
   about	
   200-­‐250°C.	
   At	
  
these	
  temperatures	
  the	
  properties	
  of	
  steel	
  will	
  not	
  be	
  affected.	
  
	
  
Boards	
  are	
  used	
  as	
  structural	
  fire	
  protection.	
  They	
  offer	
  the	
  specified	
  
a	
  clean,	
  boxed	
  appearance	
  and	
  have	
  the	
  additional	
  advantages	
  that	
  
application	
   is	
   a	
   dry	
   trade	
   and	
   may	
   not	
   have	
   significant	
   impacts	
   on	
  
other	
   activities.	
   Also,	
   boards	
   are	
   factory	
   manufactured	
   and	
  
thicknesses	
  can	
  be	
  guaranteed.	
  Furthermore,	
  boards	
  can	
  be	
  applied	
  
on	
  unpainted	
  steelwork.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  24	
  
	
  
Attributes	
  of	
  Supermarket	
  Construction	
  
	
  
1. Speed	
  of	
  construction	
  is	
  increased	
  by	
  pre-­‐fabrication.	
  	
  
• Supermarket	
  construction	
  is	
  fast,	
  with	
  contract	
  durations	
  for	
  
new	
  build	
  stores	
  of	
  6000–7000m2	
  typically	
  ranging	
  from	
  22	
  to	
  
26	
  weeks.	
  Rationalized	
  design	
  and	
  standard	
  products	
  are	
  
necessary	
  to	
  achieve	
  such	
  compressed	
  programs.	
  
	
  
2. Economy	
  in	
  terms	
  of	
  structure	
  cost	
  
• As	
  for	
  all	
  construction	
  clients,	
  supermarket	
  chains	
  are	
  
concerned	
  about	
  reducing	
  initial	
  build	
  cost,	
  but	
  as	
  owner	
  
occupiers,	
  they	
  also	
  take	
  into	
  account	
  the	
  long-­‐term	
  impact	
  of	
  
investment	
  decisions.	
  They	
  use	
  payback	
  and	
  life	
  cycle	
  costing	
  
assessments	
  to	
  determine	
  additional	
  investment	
  in	
  flexibility,	
  
reduced	
  running	
  costs	
  or	
  sustainability.	
  
	
  
3. Sustainable	
  design	
  and	
  lightweight	
  construction	
  
• A	
  store's	
  target	
  market	
  will	
  also	
  influence	
  the	
  architectural	
  
design	
  of	
  the	
  exterior	
  of	
  the	
  building,	
  and	
  the	
  materials	
  that	
  are	
  
used,	
  glazing	
  systems,	
  floor	
  finishes	
  etc.,	
  that	
  are	
  partially	
  
determined	
  by	
  location,	
  target	
  market	
  and	
  projected	
  turnover.	
  
	
  
4. Long	
  spans	
  for	
  flexible	
  use	
  of	
  space	
  
• Supermarkets	
  also	
  have	
  extensive	
  back-­‐of-­‐store	
  facilities	
  for	
  
staff,	
  offices	
  and	
  storage.	
  Target	
  figures	
  for	
  total	
  back-­‐of-­‐house	
  
space	
  have	
  fallen	
  from	
  50%	
  of	
  gross	
  internal	
  floor	
  area	
  to	
  25-­‐
40%,	
  depending	
  upon	
  the	
  size	
  and	
  target	
  market	
  of	
  the	
  store.	
  
	
  
5. Convenience	
  of	
  traffic	
  flow	
  
• Parking,	
  access	
  and	
  distribution	
  are	
  also	
  key	
  aspects	
  of	
  the	
  
design	
  solution.	
  The	
  space	
  for	
  car	
  parking	
  is	
  also	
  extensive	
  and	
  
in	
  some	
  locations,	
  double	
  level	
  car	
  parks	
  are	
  required.	
  Most	
  
supermarkets	
  are	
  serviced	
  at	
  night	
  which	
  requires	
  suitable	
  
access,	
  turning	
  and	
  off-­‐loading	
  space.	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  25	
  
	
  
Operational	
  energy	
  used	
  in	
  supermarkets	
  
	
  
Lighting	
  was	
  
found	
  to	
  be	
  the	
  
most	
  significant	
  
energy	
  demand,	
  
accounting	
  for	
  
around	
  a	
  half	
  of	
  
the	
  total	
  
operational	
  
carbon	
  
emissions.	
  
Consequently	
  
efficient	
  lighting	
  
systems	
  coupled	
  
with	
  optimum	
  
roof	
  light	
  design	
  
are	
  important	
  in	
  
delivering	
  operational	
  carbon	
  reductions.	
  The	
  complexity	
  of	
  the	
  
interaction	
  between	
  building	
  orientation,	
  roof	
  light	
  design,	
  lighting	
  
systems	
  and	
  daylight	
  dimming	
  lighting	
  controls	
  in	
  supermarket	
  
buildings	
  requires	
  detailed	
  dynamic	
  thermal	
  modelling	
  in	
  
conjunction	
  with	
  good	
  lighting	
  design	
  to	
  develop	
  an	
  optimum	
  
lighting	
  solution.	
  
	
  
Efficient	
  lighting	
  of	
  supermarkets	
  are	
  highly	
  dependent	
  on	
  the	
  
presence	
  and	
  configuration	
  of	
  the	
  shelving	
  and	
  racking	
  systems	
  used.	
  
Where	
  obstructions	
  such	
  as	
  high	
  bay	
  racking	
  are	
  installed,	
  the	
  
building	
  is	
  effectively	
  split	
  into	
  a	
  number	
  of	
  narrow,	
  corridor‐type	
  
spaces	
  which	
  require	
  many	
  more	
  fittings,	
  and	
  hence	
  more	
  energy,	
  to	
  
achieve	
  the	
  same	
  level	
  and	
  uniformity	
  of	
  lighting.	
  
Special	
  greater	
  tanks	
  called	
  interceptors	
  are	
  used	
  to	
  ensure	
  the	
  water	
  
transport's	
  efficiency.	
  The	
  piping	
  for	
  condensation	
  water	
  can	
  be	
  
moved	
  easily	
  when	
  floor	
  plans	
  change.	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  26	
  
	
  
Task	
  of	
  professions	
  involved	
  in	
  building	
  constructions	
  
	
  
1. Architect	
  
The	
  architects	
  provide	
  various	
  designs,	
  then	
  prepares	
  
drawings	
  and	
  a	
  report	
  presenting	
  ideas	
  to	
  the	
  client	
  based	
  on	
  
his	
  needs.	
  After	
  discussing	
  and	
  agreeing	
  on	
  the	
  initial	
  proposal,	
  
architects	
  develop	
  final	
  construction	
  plans	
  that	
  show	
  the	
  
building's	
  appearance	
  and	
  details	
  for	
  its	
  construction.	
  The	
  plan	
  
is	
  then	
  passed	
  to	
  the	
  Structural	
  Engineer	
  for	
  his	
  own	
  design.	
  
	
  
2. Structure	
  Engineer	
  
After	
  the	
  architectural	
  design	
  is	
  completed,	
  SE	
  are	
  the	
  next	
  
professionals	
  to	
  work	
  on	
  the	
  design.	
  	
  
	
  
The	
  job	
  scope	
  of	
  the	
  Structural	
  Engineer	
  includes	
  
-­‐	
  Designing	
  the	
  structural	
  members	
  (slabs,	
  beams,	
  columns	
  and	
  
foundations)	
  with	
  the	
  Geotechnical	
  Engineer.	
  	
  
-­‐	
  Determine	
  the	
  sizes	
  (thickness	
  span	
  and	
  depth)	
  of	
  structural	
  
members	
  and	
  the	
  quality,	
  size,	
  type	
  and	
  quantity	
  of	
  
reinforcements.	
  	
  
-­‐	
  Decide	
  on	
  the	
  quality	
  and	
  type	
  of	
  materials	
  used	
  for	
  structural	
  
members	
  and	
  the	
  required	
  concrete	
  strength	
  
-­‐Designs	
  the	
  roof	
  trusses	
  to	
  sustain	
  all	
  expected	
  loads	
  and	
  
forces	
  	
  
-­‐Produces	
  the	
  structural	
  drawings	
  which	
  is	
  required	
  for	
  
building	
  construction	
  approval.	
  
	
  
	
  
3. Quantity	
  Surveyor	
  
The	
  QS	
  estimates	
  the	
  project	
  budget,	
  analysis	
  the	
  effect	
  of	
  
design	
  changes	
  on	
  the	
  budget	
  and	
  the	
  most	
  noticeable	
  role	
  
preparation	
  of	
  Bill	
  of	
  Quantities	
  that	
  assist	
  in	
  the	
  tender	
  
process,	
  produce	
  tender	
  document	
  and	
  manage	
  the	
  tender	
  
process,	
  clarify	
  and	
  evaluate	
  tenders,	
  variations	
  control,	
  
contract	
  administration	
  and	
  assessment	
  of	
  claims,	
  negotiate	
  
and	
  settlement	
  of	
  accounts,	
  Valuing	
  completed	
  work	
  and	
  
arranging	
  for	
  payments,	
  expert	
  witness	
  report	
  in	
  case	
  of	
  
dispute.	
  
	
  
	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  27	
  
	
  
	
  
	
  
4. Builder	
  
The	
  Builder	
  study	
  the	
  production	
  information	
  that	
  is	
  the	
  
drawings,	
  schedules	
  and	
  specifications	
  they	
  analyze	
  the	
  build	
  
ability	
  and	
  maintainability	
  of	
  buildings.	
  He	
  writes	
  on	
  the	
  
construction	
  method	
  and	
  program,	
  assess	
  the	
  workmanship	
  
skill	
  of	
  artisan	
  and	
  suggest	
  solution	
  to	
  technical	
  problems.	
  
	
  
	
  
5. Consultant	
  
The	
  consultant	
  represents	
  the	
  owner	
  and	
  to	
  lend	
  practical	
  
expertise	
  to	
  the	
  job.	
  Working	
  on	
  behalf	
  of	
  the	
  owner,	
  the	
  
consultant	
  can	
  identify	
  and	
  address	
  potential	
  construction	
  
problems	
  in	
  the	
  design	
  stages	
  and,	
  as	
  an	
  independent	
  party,	
  
may	
  be	
  in	
  the	
  best	
  position	
  to	
  suggest	
  cost	
  saving	
  or	
  time	
  
saving	
  alternatives	
  and	
  to	
  evaluate	
  suggestions	
  made	
  by	
  the	
  
other	
  parties.	
  
	
  
6. Mechanical	
  and	
  Electrical	
  Engineer	
  
	
  
The	
  M&E	
  Engineers	
  design	
  layouts	
  and	
  requirements	
  for	
  
building	
  services	
  for	
  which	
  is	
  one	
  of	
  the	
  requirements	
  for	
  
building	
  approval.	
  Design	
  and	
  development	
  of	
  electrical	
  
systems	
  required	
  based	
  on	
  envisaged	
  power	
  consumption	
  for	
  
safety	
  and	
  energy	
  sustaining	
  operation	
  of	
  buildings,	
  
construction	
  and	
  operation	
  of	
  Heating,	
  ventilation	
  and	
  air	
  
conditioning	
  (HVAC)	
  systems.	
  
	
  
7. The	
  building	
  contractor	
  
The	
  BC	
  is	
  responsible	
  for	
  hiring,	
  supervising,	
  firing	
  and	
  
payment	
  of	
  workers	
  alongside	
  obtaining	
  materials	
  for	
  the	
  
project	
  to	
  precise	
  specifications,	
  mostly	
  using	
  the	
  services	
  of	
  
suppliers.	
  The	
  BC	
  works	
  based	
  on	
  agreed	
  contract	
  sum	
  with	
  
building	
  owners	
  so,	
  he	
  controls	
  Budget	
  issues,	
  follow	
  that	
  
budget	
  as	
  closely	
  as	
  possible	
  though	
  there	
  might	
  be	
  slight	
  
variation	
  at	
  the	
  end	
  of	
  the	
  project.	
  They	
  ensure	
  that	
  the	
  project	
  
is	
  completed	
  within	
  the	
  specified	
  time	
  frame	
  as	
  well	
  as	
  
reviewing	
  the	
  progress	
  and	
  implementing	
  any	
  changes	
  along	
  
the	
  course	
  of	
  completion.	
  
	
  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  28	
  
	
  
Local	
  Authorities	
  Approval	
  
	
   	
  
	
  
	
  
	
  
UNDANG - UNDANG KECIL BANGUNAN SERAGAM 1984
BORANG A
PERAKUAN PELAN - PELAN BANGUNAN / STRUKTUR
( Bagi endorsemen atas pelan - pelan untuk dikemukakan untuk diluluskan )
Undang - Undang Kecil 3 (1 ) ( C ) dan 16 ( 2 )
________________20_____
Kepada :
Yang Dipertua,
MAJLIS PERBANDARAN SUBANG JAYA
Saya memperakui bahawa butir - butir dalam pelan - pelan iaitu
atas *Lot / Lot - lot dan No. Bangunan
* Taman / Bandar /
kawasan
Jalan
bagi
adalah menurut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya
setuju terima tanggungjawab penuh dengan sewajarnya.
_______________________
Orang Yang Mengemukakan
Nama :
Alamat :
No. Pendaftaran :
Kelas :
MAJLIS PERBANDARAN SUBANG JAYA
Jabatan Bangunan
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  29	
  
	
  
	
  
	
  
	
  
	
  
*Potongmanayangtidakberkenaan
1.a)NamadanAlamat:
PemilikTanah/Bangunan
b)No.Telefon:
2.a)NamadanAlamatpemaju:
(JIkaberlainansepertidiatas)
b)No.Telefon:
3.TajukPermohonan:
(No.LotJalan,Mukim)
4.Bilangansetpelanyang:
dikemukakan(termasuk1setlinen)
5.Butir–butirpelanyangdikemukakanadalahsepertiberikut:-
Bil.TajukLukisanNo.Lukisan
Catitan:
1.Kerja–kerjapembinaantidakdibenarkansebelumpelandiluluskan.
Kegagalanpihaktuan/puanmematuhisyarat–syarattersebut,tuan/puanbolehapabiladisabitkan
dikenakandendatidaklebihdaripadaRINGGITMALAYSIA:LIMAPULUHRIBUSAHAJAdanjuga
bolehdikenakandendatambahansebanyakRINGGITMALAYSIA:SATURIBUSAHAJAbagitiap–
tiapharikesalahanituditeruskan,selepassabitandibawahSeksyen70(13)Undang–Undang
MalaysiaAktaJalan,ParitdanBangunan1974Akta133(Pindaan2007),Undang-UndangKecil
BangunanSeragam1984(Pindaan2007).
2.Sebarangpindaankepadapelankelulusanhendaklahdikemukakanterlebihdahuluuntukkelulusan
sebelumkerja-kerjapindaanditapakdilakukan.
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  30	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
1. KIRAAN UNTUK BAYARAN PROSES PELAN BANGUNAN DAN CAGARAN /
FI PENDAHULUAN SISA BAHAN BINAAN
NAMA PERUNDING :
NAMA PEMILIK :
JENIS RUMAH / BANGUNAN : .
JUMLAH YUNIT : .
BIL PERKARA KADAR
BAGI TIAP
- TIAP 9
METER
PERSEGI
LUAS
LANTAI
( METER
PERSEGI )
BAYARAN
MINIMUM
JUMLAH
1. TINGKAT BAWAH RM 14.00 RM 140.00
2. TINGKAT SATU RM 12.00 RM 120.00
3. TINGKAT DUA RM 10.00 RM 100.00
4. TINGKAT TIGA RM 8.00 RM 80.00
5. TINGKAT KEEMPAT
DAN TINGKAT ATASNYA
ATAU TINGKAT BAWAH
TANAH ( Selain Daripada
Tingkat Bawah Tanah
Terbuka ).
RM 6.00 RM 60.00
6. TINGKAT BAWAH
TANAH TERBUKA
RM 3.00 RM 30.00
7. BANGUNAN YANG
MEMPUNYAI SISI
TERBUKA ( Teres,
Langkan, Anjung Kereta,
Bangsal Terbuka Dan
Seumpamanya ).
½ daripada
fi yang
ditetapkan
di para 1 - 6
½ daripada
fi yang
ditetapkan
di para 1 - 6
8. PINDAAN PELAN
KELULUSAN YANG
MELIBATKAN
SUSUNATUR LANTAI
DAN PECAH DINDING
DALAMAN (Tidak
Melibatkan Pertambahan
Keluasan)
½ daripada
fi yang
ditetapkan
di para 1-6
½ daripada
fi yang
ditetapkan
di para 1-6
9. KOLAM RENANG,
DERMAGA, JAMBATAN
BANGUNAN KHAS LAIN
RM 50.00 RM 500.00
MAJLIS PERBANDARAN SUBANG JAYA
Jabatan Bangunan
MPSJ.RK.KPT(OSC)-07/01
PINDAAN : 03
TARIKH KUATKUASA : 01 OGOS 2014
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  31	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
BIL PERKARA KADAR
BAGI TIAP
- TIAP 9
METER
PERSEGI
LUAS
LANTAI
( METER
PERSEGI )
BAYARAN
MINIMA
JUMLAH
10. TEMBOK PENAHAN RM 6.00 RM 60.00
11. SATU PAPAN TANDA
PROJEK
RM 100.00
12. SATU PAGAR - - RM 100.00
13. JUMLAH FI BAGI SEBUAH BANGUNAN
14. PEPASANGAN
SANITARI @ 1 UNIT
WATER
CLOSET
BASIN /
SINK
‘LONG
BATH’ /
‘URINAL’
RM 5.00
15. JUMLAH FI BAGI SANITARI RM
16. JUMLAH BAYARAN PROSES PELAN – (13) + (15) RM
17.
SIJIL KELULUSAN BAGI TAMBAHAN/UBAHSUAIAN RUMAH
KEDIAMAN @ RM 10.00
RM
18. JUMLAH BAYARAN CAGARAN / PINDAAN @ RM 120.00 / FI
PENDAHULUAN SISA BAHAN BINAAN (DIBAYAR KEPADA ALAM
FLORA SDN. BHD)
RM
19. MENDEPOSITKAN BAHAN-BAHAN BINAAN ATAS JALAN RM
360.00 MINIMA (9 METER PERSEGI @ 1 BULAN) BAGI
TAMBAHAN/UBAHSUAIAN BANGUNAN
RM
20. PERMIT PEMASANGAN PAPAN DENDENG / KANVAS / PLASTIK /
@ RM 150.00 UNTUK TAMBAHAN/UBAHSUAI BANGUNAN
RM
21. BAYARAN 9 KALI GANDAAN FI PROSES PELAN BANGUNAN
(BAGI TAMBAHAN / UBAHSUAIAN RUMAH KEDIAMAN SEDIA ADA)
RM
22. JUMLAH BAYARAN KESELURUHAN (16) + (17) + (18) + (19) + (20)
+ (21)
RM
Disemak Oleh : Disahkan Oleh :
. . . .
Tarikh Tandatangan dan Cop Jawatan Tarikh Tandatangan dan Cop Jawatan
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  32	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
2. KIRAAN PROSES PELAN UNTUK SKIM PERUMAHAN BERBILANG TINGKAT /
RANGKAIAN / DERETAN BANGUNAN DAN LAIN-LAIN YANG BERKAITAN.
JENIS RUMAH :
JUMLAH YUNIT :
YUNIT
TINGKAT
(A)
1 yunit
100 %
2 hingga 5
4 x (A) x
90 %
6 hingga 10
5 x (A) x
85 %
11 hingga 25
15 x (A) x
75 %
26 ke atas
___x (A) x
60 %
JUMLAH
(RM)
Bawah
Minima RM 140.00
Satu
Minima RM 120.00
Dua
Minima RM 100.00
Tiga
Minima RM 80.00
Empat ke atas
Minima RM 60.00
Tingkat bawah
tanah
tertutup
Minima RM 60.00
Tingkat bawah
tanah terbuka
Minima RM 30.00
Lain-lain
JUMLAH FI BAGI BANGUNAN – (A) RM
PEPASANGAN SANITARI
SINK / BASIN - YUNIT X RM 5.00 RM
WC / SWC - YUNIT X RM 5.00 RM
URINAL - YUNIT X RM 5.00 RM
LONG BATH - YUNIT X RM 5.00 RM
JUMLAH FI BAGI SANITAR – (B) RM
JUMLAH KESELURUHAN - (A) + (B) RM
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  33	
  
	
  
	
  
	
  
	
  
3. PENGESAHAN BAYARAN PROSES PELAN / WANG CAGARAN / PINDAAN
DAN FI PENDAHULUAN SISA BAHAN BINAAN.
BIL. JENIS BANGUNAN JUMLAH BAYARAN
(RM)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
JUMLAH BAYARAN PROSES PELAN – (A)
BAYARAN CAGARAN/PINDAAN / FI PENDAHULUAN
SISA BAHAN BINAAN – (B)
JUMLAH BAYARAN – (A) + (B) RM
Disemak Oleh : Disahkan Oleh :
. . . .
Tarikh Tandatangan dan Cop
Jawatan
Tarikh Tandatangan dan Cop
Jawatan
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  34	
  
	
  
	
  
	
  
1 Borang Perakuan Pemohon | Jabatan Bangunan
MAJLIS PERBANDARAN SUBANG JAYA
Jabatan Bangunan
BORANG PERAKUAN PEMOHON
Ruj Kami :
Tarikh :
………………………………………………
………………………………………………
………………………………………………
………………………………………………
(Pemohon)
Kepada :
Yang Dipertua,
Majlis Perbandaran Subang Jaya
1. * CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS RUMAH TERES / RUMAH
BERKEMBAR  /  RUMAH  SESEBUAH  ……….  TINGKAT  YANG  SEDIADA  DI  ATAS
NO……….  P.T.  NO.  …………………JALAN  ……………………………………………….
TAMAN  /  BANDAR  /  KAWASAN  …………………………………………………………….
MUKIM * DAMANSARA / PETALING, SELANGOR DARUL EHSAN.
2. *  CADANGAN  MEMBINA  RUMAH  SESEBUAH  ……….  TINGKAT  DI  ATAS  NO.  ……...
P.T.  NO.  …………………  JALAN………………………………………TAMAN  /  BANDAR
/ KAWASAN ………………………………………………..  ……..MUKIM  *  DAMANSARA  
/ PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN.
UNTUK  :  …………………………………………………………………………………………
Merujuk kepada perkara di atas saya / kami dengan ini mengeluarkan perakuan bahawa pihak
pemilik : -
1.1 * Belum memulakan / telah memulakan kerja-kerja tambahan ubahsuaian di premis tersebut.
Pihak Majlis berhak mengeluarkan notis kompaun atau denda 10 x gandaan proses pelan
sebanyak  RM  ………………………..  sekiranya mendapati pembinaan telah dimulakan tanpa
kelulusan daripada pihak Majlis berdasarkan :-
Undang-undang kecil 17 dalam Jadual Pertama, Undang-Undang Kecil Bangunan
Seragam 1984, Pindaan 2007.
“  Bagi  semua  hal  jika  kerja  telah  dimulakan  sebelum  pelan-pelan diluluskan atau sesuatu
permit diperolehi, suatu fee yang sama dengan sepuluh kali ganda daripada yang
ditetapkan dalam paragraph yang releven terdahulu itu boleh dikenakan.Pembayaran fee
yang dinaikkan ini tidak akan mengecualikan seseorang daripada didakwa oleh pihak
berkuasa  tempatan  jika  ia  memutuskan  untuk  berbuat  demikian.  ”  
 
	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  35	
  
	
  
2 Borang Perakuan Pemohon | Jabatan Bangunan
2. Sekian, terima kasih.
………………………………………………….
( Tandatangan orang yang berkelayakan )
s.k. : ……………………………………………
……………………………………………
……………………………………………
……………………………………………
……………………………………………        
( Pemilik bangunan)
Nota
* Potong mana yang tidak berkenaan.

More Related Content

Similar to Ici final report PDF

Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
Amelisa Collins
 
Oberoi Esquire Brochure - Zricks.com
Oberoi Esquire Brochure - Zricks.comOberoi Esquire Brochure - Zricks.com
Oberoi Esquire Brochure - Zricks.com
Zricks.com
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
Jamie Lee
 
Westera Corp Booklet
Westera Corp BookletWestera Corp Booklet
Westera Corp Bookletadamide
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architects
Simon Woods
 
Max Estate 128 Brochure_.pdf
Max Estate 128 Brochure_.pdfMax Estate 128 Brochure_.pdf
Max Estate 128 Brochure_.pdf
Invest Mango
 
ICI Final project: Development Proposal
ICI Final project: Development ProposalICI Final project: Development Proposal
ICI Final project: Development Proposal
Lau Hui Ming Belinda
 
Final project(2)
Final project(2)Final project(2)
Final project(2)
Xying Lee
 
Iici final
Iici finalIici final
Iici final
Charles Teh
 
Ici final project
Ici   final projectIci   final project
Ici final project
Joeylau97
 
Project Management Group Report
Project Management Group ReportProject Management Group Report
Project Management Group Report
MuatasimahBillah
 
PM GROUP REPORT
PM GROUP REPORTPM GROUP REPORT
PM GROUP REPORT
abc def
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
Eyuel24
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
Angeline KH
 
Residential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architectsResidential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architects
Simon Woods
 
Geotech Blessings : The new address of affordability and modernity
Geotech Blessings : The new address of affordability and modernityGeotech Blessings : The new address of affordability and modernity
Geotech Blessings : The new address of affordability and modernity
Vijay Prakash
 
General Brochure - Dec 14
General Brochure - Dec 14General Brochure - Dec 14
General Brochure - Dec 14Gary Earle
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
leejanett3
 

Similar to Ici final report PDF (20)

Icip3 project brief
Icip3 project briefIcip3 project brief
Icip3 project brief
 
Oberoi Esquire Brochure - Zricks.com
Oberoi Esquire Brochure - Zricks.comOberoi Esquire Brochure - Zricks.com
Oberoi Esquire Brochure - Zricks.com
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
 
Westera Corp Booklet
Westera Corp BookletWestera Corp Booklet
Westera Corp Booklet
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architects
 
Max Estate 128 Brochure_.pdf
Max Estate 128 Brochure_.pdfMax Estate 128 Brochure_.pdf
Max Estate 128 Brochure_.pdf
 
ICI Final project: Development Proposal
ICI Final project: Development ProposalICI Final project: Development Proposal
ICI Final project: Development Proposal
 
Final project(2)
Final project(2)Final project(2)
Final project(2)
 
Iici final
Iici finalIici final
Iici final
 
Ici final project
Ici   final projectIci   final project
Ici final project
 
Project Management Group Report
Project Management Group ReportProject Management Group Report
Project Management Group Report
 
PM GROUP REPORT
PM GROUP REPORTPM GROUP REPORT
PM GROUP REPORT
 
Simplex_Projects_2016
Simplex_Projects_2016Simplex_Projects_2016
Simplex_Projects_2016
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
Lime Projects Capabilities
Lime Projects CapabilitiesLime Projects Capabilities
Lime Projects Capabilities
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Residential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architectsResidential housing company brochure beglinwoods architects
Residential housing company brochure beglinwoods architects
 
Geotech Blessings : The new address of affordability and modernity
Geotech Blessings : The new address of affordability and modernityGeotech Blessings : The new address of affordability and modernity
Geotech Blessings : The new address of affordability and modernity
 
General Brochure - Dec 14
General Brochure - Dec 14General Brochure - Dec 14
General Brochure - Dec 14
 
Ici - final project
Ici - final projectIci - final project
Ici - final project
 

More from Devin Wong

Social psychology video presentation
Social psychology video presentation Social psychology video presentation
Social psychology video presentation Devin Wong
 
Psychology Comic
Psychology  ComicPsychology  Comic
Psychology ComicDevin Wong
 
Psycho journal
Psycho journal Psycho journal
Psycho journal Devin Wong
 
Masteel Accounting
Masteel  AccountingMasteel  Accounting
Masteel Accounting
Devin Wong
 
Business report
 Business report Business report
Business reportDevin Wong
 
Business presentation
Business presentation Business presentation
Business presentation Devin Wong
 
English 2 report
English 2 report English 2 report
English 2 report Devin Wong
 
Final presentation-english2
Final presentation-english2 Final presentation-english2
Final presentation-english2 Devin Wong
 
Compare contrast essay english 2
Compare contrast essay english 2Compare contrast essay english 2
Compare contrast essay english 2Devin Wong
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdfDevin Wong
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product design
Devin Wong
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product design
Devin Wong
 
Enbe project report
Enbe project report Enbe project report
Enbe project report
Devin Wong
 

More from Devin Wong (14)

Social psychology video presentation
Social psychology video presentation Social psychology video presentation
Social psychology video presentation
 
Psychology Comic
Psychology  ComicPsychology  Comic
Psychology Comic
 
Psycho journal
Psycho journal Psycho journal
Psycho journal
 
Econ report
Econ report Econ report
Econ report
 
Masteel Accounting
Masteel  AccountingMasteel  Accounting
Masteel Accounting
 
Business report
 Business report Business report
Business report
 
Business presentation
Business presentation Business presentation
Business presentation
 
English 2 report
English 2 report English 2 report
English 2 report
 
Final presentation-english2
Final presentation-english2 Final presentation-english2
Final presentation-english2
 
Compare contrast essay english 2
Compare contrast essay english 2Compare contrast essay english 2
Compare contrast essay english 2
 
Ici final report pdf
Ici final report pdfIci final report pdf
Ici final report pdf
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product design
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product design
 
Enbe project report
Enbe project report Enbe project report
Enbe project report
 

Ici final report PDF

  • 1.                                                                                                                                                                                                                                                                                                                    1     Proposal for the Construction of   Food Grocer Prepared by: 1. Teo Vi Vien (0321645) 2. Wong De-Vin (0319814) Tutor: Miss Ann See Peng              
  • 2.                                                                                                                                                                                                                                                                                                                    2   Content     Topic   Page   Cover   1   Content    2   Introduction     3   Our  Site   4   Site  Analysis  and  Observation   5-­‐8   Rationales  and  Client  Evaluation     9-­‐10   Concept  Proposal   11-­‐12   Plans  and  Elevations   13-­‐21   Drainage  System   22   Fire  Safety   23   Attributes  of  Supermarket  Construction   24   Operational  Energy  Used   25   Task  Of  Professions  Involved   26-­‐27   Local  Authorities  Approval   28-­‐35  
  • 3.                                                                                                                                                                                                                                                                                                                    3   INTRODUCTION       This is our final project for the module introduction to construction industry (ICI), for this assignment, we are required to find a partner and produce a minimum 20 pages report. Our task is to find a 30m x 30m (900 meters square) to 30m x 40m (1200 meters square) empty land and come up with a proposal to consult a potential client to construct a building in the site chosen. The proposing construct building is required to serve one of the purposes as mentioned below: Recreation area, Commercial area, Industrial area, Agricultural area, Tourism area and Residential area. The objective of this assignment is not only to enable students to develop an understanding of the building team, its organization, duties and inter-relations within which they will seek employment, career progression or further study but also To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. To make this assignment successful for us, we are encouraged to explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. We are also to show our ability to document our observations and understanding from our visit to our site and also research towards our site.
  • 4.                                                                                                                                                                                                                                                                                                                    4   OUR  SITE                     Our  site  is  located  at  3.061732,  101.610481  on  Google  Maps.     The  area  is  67m  x  67m  (4489  meter  squares)  .  The  reason   why  we  chose  this  site  is  because  it  is  an  open  space  which   lacks  buildings  and  design.  It  is  a  big  waste  to  this  empty   land  as  it  is  a  very  strategic  area  because  it  is  located  near   residential  areas  and  also  a  university.                    
  • 5.                                                                                                                                                                                                                                                                                                                    5   SITE  ANALYSIS  AND  OBSERVATION                       Our  site  is  located  1.5  km  away  from  Taylor’s  University  Lakeside   Campus.  Our  site  can  be  reached  by  car,  which  is  5  minutes,  or  by   walk,  which  is  22  minutes  from  Taylor’s  University.  Our  site  is             30m  x  35m  (1050  meter  square).  It  is  an  empty  land  next  to  a  High-­‐ Raised  Apartment.  The  only  entrance  that  vehicle  can  enter  to  this   empty  land  is  from  an  entrance  which  shares  the  same  road  to  enter   the  apartment.  Therefore  that  entrance  will  also  be  our  proposed   entrance  for  our  commercial  building.  There  is  a  slope  at  the  East  end   of  our  site  and  that  will  be  our  main  drainage  and  waste  system  for   our  commercial  building.  The  traffic  rate  at  our  site  is  slightly  jam   during  peak  hours  and  traffic  rate  is  low  during  normal  hours.          
  • 6.                                                                                                                                                                                                                                                                                                                    6   Pictures  from  our  site:     View  from  the  main  road  to  our  site                   View  from  the  entrance  of  the  apartment  to  the  main  road                   View  from  entrance  of  condominium  to  the  Highway  connecting  road                
  • 7.                                                                                                                                                                                                                                                                                                                    7   View  from  the  main  road  to  the  apartment                 View  from  main  road  to  the  entrance  of  apartment                             View  from  apartment  to  our  site                        
  • 8.                                                                                                                                                                                                                                                                                                                    8   Advantages     Our  site  is  located  just  outside  of  Taylor’s  Lakeside  with  a  distance  of   1.5km.  This  is  one  of  the  main  advantages  of  building  our  site  as  the   core  purpose  of  this  project  is  to  create  convenience  for  university   students  who  stay  in  Bandar  Sunway  to  access  the  building  without   the  hassle  of  traffic  congestion.   Most  high-­‐rise  apartments  are  located  around  the  area  to  create   convenience  for  the  residents  to  access  the  building,  especially  for   those  who  do  not  own  a  vehicle  as  the  walking  distance  is  at  an   average  of  5  minutes  from  the  proposed  building  to  the  apartments.   There  is  a  wide  expanse  of  open  space  to  create  a  potential  space  for   future  development.  It  also  has  an  existing  flat  ground  to  ease  the   process  of  construction.         Disadvantages     Despite  the  good  potential  of  our  site  for  our  proposed  plan,  it  also   has  its  down  side  that  might  be  the  reason  of  its  lack  of  usage  and   abandoned  open  area.   It  only  has  one  access  point  where  vehicles  have  to  turn  in  from  the   apartment  located  next  to  our  site  before  entering.  Therefore,  the   flow  of  traffic  is  a  difficult  procedure  as  it  only  has  one  entry  and  exit   point.   Our  site  is  located  at  a  low  area  where  it  holds  water  after  a  heavy   rainfall.  Standing  water  creates  a  potential  spot  for  mosquitos  to   breed  which  will  cause  a  huge  disadvantage  for  our  proposed  plan.  A   storm  water  catch  basins  (system)  have  to  be  installed  to  solve  this   problem.   Our  site  does  not  have  a  good  view.  It  overlooks  a  low-­‐end  apartment   and  it  is  located  next  to  a  cross  junction.  The  view  is  not  pleasing  to   the  eyes.            
  • 9.                                                                                                                                                                                                                                                                                                                    9   Rationale  and  Client  Evaluation     After  thorough  discussion  and  research  on  our  site,  also  emphasizing   on  the  advantages  and  disadvantages  of  the  existing  nature  of  the   area,  we  have  decided  to  propose  a  commercial  area  with  a  mid-­‐end   hypermarket,  food  court  and  fast  food  joint  with  drive-­‐thru  service.   For  this  construction  project,  we  look  upon  the  weakness  of  the   nearby  places  of  the  same  facilities  and  functions  to  compare  and   improve  on  their  weaknesses  to  propose  a  plan  to  better  suit  the   clients  of  our  project.   We  have  distinguished  a  few  issues  that  are  not  suitable  for  our   proposed  plan  and  came  up  with  a  list  of  improved  suggestions   according  to  the  areas.     High-­‐end  hypermarket  at  Sunway  Pyramid       1. Price  of  groceries  and  items  are  more  expensive  –  Price  of   goods  sold  at  the  high-­‐end  hypermarket  are  placed  at  a  higher   price  due  to  the  expensive  rental  and  emphasize  on  the  interior   design.   2. High  cost  of  imported  goods  –  High-­‐end  hypermarkets   usually  import  quality  goods  that  are  priced  too  high  and  are   not  affordable  for  students  who  live  near  the  area.   3. Area  too  small  –  High-­‐end  hypermarket  are  smaller  compared   to  mid-­‐end  hypermarkets,  hence  there  are  lesser  varieties  for   customers  to  choose  from.   Restaurants  in  Syopz  Mall     1. Limited  choices  of  restaurants  –  The  students  of  Taylor’s   University  face  dilemmas  of  what  to  eat  for  lunch  everyday  as   there  are  not  much  variety  in  campus.   2. Price  of  food  is  not  affordable  for  students  -­‐  The  price  starts   from  RM15  and  above  with  no   3. Closing  time  too  early  –  Most  restaurants  in  campus  are  closed   at  9pm.  Only  the  “mamak”  and  convenient  stores  are  open   24/7.  Most  students  who  overnight  at  campus  do  not  have  a   complete  meal  to  eat.  
  • 10.                                                                                                                                                                                                                                                                                                                    10   Fast  Food  Joint  next  to  Sunway  Toll   1. No  direct  access  to  campus  from  the  restaurant  –  Students  who   drive  have  to  make  a  huge  round  around  Subang  at  a  proximate   duration  of  15  minutes  before  going  back  to  campus.   2. Isolated  location  –  The  fast  food  joint  is  located  beside  the  toll   in  a  non-­‐strategic  area  and  customers  have  to  pay  the  toll  after   they  finished  dining.   3. No  drive-­‐thru  service  –  Drive-­‐thru  service  is  not  available,   customers  who  are  in  a  rush  will  not  enjoy  the  convenience  of   taking  away  efficiently.       Through  studying  the  weaknesses  of  these  areas,  we  have  decided  to   improve  on  our  construction  project.  The  proposal  is  required  to   fulfill  the  following  criteria.   1. The  whole  project  will  be  finished  within  the  estimated  time.   2. The  space  is  utilized  sufficiently.   3. Benefit  the  society  and  improve  on  the  weakness  of  the  high-­‐ end  hypermarket,  restaurants  in  syopz  and  fast  food  joint  next   to  the  Sunway  Toll.                            
  • 11.                                                                                                                                                                                                                                                                                                                    11   CONCEPT     Rationale  of  our  concept:     The  concept  of  our  site  is  to  provide  a  convenient  and  affordable   hypermarket  including  an  efficient  food  court  on  the  ground  floor.   We  also  aim  to  build  this  building  with  the  cheapest  yet  sustainable   materials  with  an  attractive  exterior  design  of  the  building.  The   interior  of  our  building  is  also  very  organized  for  the  customers  to   have  a  comfortable  and  organized  grocery  shopping  experience.         Organized  shelves  for   easier  access  to  find   products                           Attractive  and   sustainable  design                          
  • 12.                                                                                                                                                                                                                                                                                                                    12         Advantages  of  our  concept:     It  is  located  at  a  site  where  it  is  easy  to  be  accessed.  It  also  very   convenient  for  the  residents  nearby.  Our  concept  is  also  very   organized  and  it  is  easy  for  customers  to  find  the  products  they  need.   There  is  also  a  food  court  and  a  fast  food  joint  located  at  the  ground   floor  of  the  building  for  the  convenience  of  the  customers  in  rush.   The  purpose  of  the  food  court  is  to  provide  more  varieties  for  the   customers  as  there  are  limited  choices  of  restaurant  nearby.       Food  Court  with  varieties                     Drive  Thru  services  at   fast  food  joints            
  • 13.                                                                                                                                                                                                                                                                                                                    13             Location  Plan                  
  • 14.                                                                                                                                                                                                                                                                                                                    14     Existing  Plan                
  • 15.                                                                                                                                                                                                                                                                                                                    15   Floor  Plan     Ground  Floor          
  • 16.                                                                                                                                                                                                                                                                                                                    16       First  Floor          
  • 17.                                                                                                                                                                                                                                                                                                                    17           Second  Floor          
  • 18.                                                                                                                                                                                                                                                                                                                    18     Front  Elevation            
  • 19.                                                                                                                                                                                                                                                                                                                    19               Side  Elevation            
  • 20.                                                                                                                                                                                                                                                                                                                    20       Cross  Section                
  • 21.                                                                                                                                                                                                                                                                                                                    21       Car  park  and  traffic  flow     Car  parks  are  often  associated  with  large  retail  complexes  and  steel   framed  car  parks  are  a  common  solution.  Column  spacing  of  5.2m   and  7.5m  align  with  2  or  3  car  park  spaces  and  spans  are  often  4.5m,   7m  and  4.5m  so  that  a  central  aisle  is  created.  Long-­‐span  steel  framed   car  parks  are  also  popular  and  16.5m  is  the  common  span  in  these   cases.            
  • 22.                                                                                                                                                                                                                                                                                                                    22     Drainage  System     Catch  Basins     A   catch   basin   is   an   inlet   to   a   storm   drain   system   that   typically   includes   a   grate   where   storm   water   enters,   and   a   sump   to   capture   sediment,   debris  and  associated  pollutants.   Catch   basins   are   designed   specifically   for   capturing   and   conveying  storm  water.  Typically,  on   private   commercial   or   industrial   sites,   there   is   no   standard   for   the   placement   of   catch   basins.   Storm   water   drain   systems   are   often   installed   based   on   the   best   professional  judgment  and  experience  of  the  design  engineer.   The   estimated   peak   storm   water   flow   rate   dictates   the   number   of   catch  basins  needed  on  a  site.  The  percent  impervious  surface,  slope,   average  rainfall  and  rainfall  intensity  are  all  factors  in  calculating  the   peak  flow  rate.     Vacuum  Drainage  System     The   condensation   wastewater   can   be   lifted   vertically   up   from   the   freezer   and   transported   through  piping  in  the  ceiling  to  a   drain   elsewhere   in   the   building.   Special   greater   tanks   called   interceptors   are   used   to   ensure   the   water   transport's   efficiency.   The   piping   for   condensation   water  can  be  moved  easily  when   floor  plans  change.            
  • 23.                                                                                                                                                                                                                                                                                                                    23     Fire  Safety     Fire  safe  design  is  important  in  retail  buildings,  both  for  provision  of   effective  means  of  escape  in  a  fire  and  also  to  protect  the  asset  value   of  the  building  and  its  contents.   The  fire  resistance  is  generally  120  minutes  and  a  life  safety  sprinkler   system  is  also  required.     Intumescent  coatings  are  paint  like  materials  which  are  inert  at  low   temperatures  but  which  provide  insulation  as  a  result  of  a  complex   chemical   reaction   at   temperatures   typically   of   about   200-­‐250°C.   At   these  temperatures  the  properties  of  steel  will  not  be  affected.     Boards  are  used  as  structural  fire  protection.  They  offer  the  specified   a  clean,  boxed  appearance  and  have  the  additional  advantages  that   application   is   a   dry   trade   and   may   not   have   significant   impacts   on   other   activities.   Also,   boards   are   factory   manufactured   and   thicknesses  can  be  guaranteed.  Furthermore,  boards  can  be  applied   on  unpainted  steelwork.                                              
  • 24.                                                                                                                                                                                                                                                                                                                    24     Attributes  of  Supermarket  Construction     1. Speed  of  construction  is  increased  by  pre-­‐fabrication.     • Supermarket  construction  is  fast,  with  contract  durations  for   new  build  stores  of  6000–7000m2  typically  ranging  from  22  to   26  weeks.  Rationalized  design  and  standard  products  are   necessary  to  achieve  such  compressed  programs.     2. Economy  in  terms  of  structure  cost   • As  for  all  construction  clients,  supermarket  chains  are   concerned  about  reducing  initial  build  cost,  but  as  owner   occupiers,  they  also  take  into  account  the  long-­‐term  impact  of   investment  decisions.  They  use  payback  and  life  cycle  costing   assessments  to  determine  additional  investment  in  flexibility,   reduced  running  costs  or  sustainability.     3. Sustainable  design  and  lightweight  construction   • A  store's  target  market  will  also  influence  the  architectural   design  of  the  exterior  of  the  building,  and  the  materials  that  are   used,  glazing  systems,  floor  finishes  etc.,  that  are  partially   determined  by  location,  target  market  and  projected  turnover.     4. Long  spans  for  flexible  use  of  space   • Supermarkets  also  have  extensive  back-­‐of-­‐store  facilities  for   staff,  offices  and  storage.  Target  figures  for  total  back-­‐of-­‐house   space  have  fallen  from  50%  of  gross  internal  floor  area  to  25-­‐ 40%,  depending  upon  the  size  and  target  market  of  the  store.     5. Convenience  of  traffic  flow   • Parking,  access  and  distribution  are  also  key  aspects  of  the   design  solution.  The  space  for  car  parking  is  also  extensive  and   in  some  locations,  double  level  car  parks  are  required.  Most   supermarkets  are  serviced  at  night  which  requires  suitable   access,  turning  and  off-­‐loading  space.              
  • 25.                                                                                                                                                                                                                                                                                                                    25     Operational  energy  used  in  supermarkets     Lighting  was   found  to  be  the   most  significant   energy  demand,   accounting  for   around  a  half  of   the  total   operational   carbon   emissions.   Consequently   efficient  lighting   systems  coupled   with  optimum   roof  light  design   are  important  in   delivering  operational  carbon  reductions.  The  complexity  of  the   interaction  between  building  orientation,  roof  light  design,  lighting   systems  and  daylight  dimming  lighting  controls  in  supermarket   buildings  requires  detailed  dynamic  thermal  modelling  in   conjunction  with  good  lighting  design  to  develop  an  optimum   lighting  solution.     Efficient  lighting  of  supermarkets  are  highly  dependent  on  the   presence  and  configuration  of  the  shelving  and  racking  systems  used.   Where  obstructions  such  as  high  bay  racking  are  installed,  the   building  is  effectively  split  into  a  number  of  narrow,  corridor‐type   spaces  which  require  many  more  fittings,  and  hence  more  energy,  to   achieve  the  same  level  and  uniformity  of  lighting.   Special  greater  tanks  called  interceptors  are  used  to  ensure  the  water   transport's  efficiency.  The  piping  for  condensation  water  can  be   moved  easily  when  floor  plans  change.                
  • 26.                                                                                                                                                                                                                                                                                                                    26     Task  of  professions  involved  in  building  constructions     1. Architect   The  architects  provide  various  designs,  then  prepares   drawings  and  a  report  presenting  ideas  to  the  client  based  on   his  needs.  After  discussing  and  agreeing  on  the  initial  proposal,   architects  develop  final  construction  plans  that  show  the   building's  appearance  and  details  for  its  construction.  The  plan   is  then  passed  to  the  Structural  Engineer  for  his  own  design.     2. Structure  Engineer   After  the  architectural  design  is  completed,  SE  are  the  next   professionals  to  work  on  the  design.       The  job  scope  of  the  Structural  Engineer  includes   -­‐  Designing  the  structural  members  (slabs,  beams,  columns  and   foundations)  with  the  Geotechnical  Engineer.     -­‐  Determine  the  sizes  (thickness  span  and  depth)  of  structural   members  and  the  quality,  size,  type  and  quantity  of   reinforcements.     -­‐  Decide  on  the  quality  and  type  of  materials  used  for  structural   members  and  the  required  concrete  strength   -­‐Designs  the  roof  trusses  to  sustain  all  expected  loads  and   forces     -­‐Produces  the  structural  drawings  which  is  required  for   building  construction  approval.       3. Quantity  Surveyor   The  QS  estimates  the  project  budget,  analysis  the  effect  of   design  changes  on  the  budget  and  the  most  noticeable  role   preparation  of  Bill  of  Quantities  that  assist  in  the  tender   process,  produce  tender  document  and  manage  the  tender   process,  clarify  and  evaluate  tenders,  variations  control,   contract  administration  and  assessment  of  claims,  negotiate   and  settlement  of  accounts,  Valuing  completed  work  and   arranging  for  payments,  expert  witness  report  in  case  of   dispute.        
  • 27.                                                                                                                                                                                                                                                                                                                    27         4. Builder   The  Builder  study  the  production  information  that  is  the   drawings,  schedules  and  specifications  they  analyze  the  build   ability  and  maintainability  of  buildings.  He  writes  on  the   construction  method  and  program,  assess  the  workmanship   skill  of  artisan  and  suggest  solution  to  technical  problems.       5. Consultant   The  consultant  represents  the  owner  and  to  lend  practical   expertise  to  the  job.  Working  on  behalf  of  the  owner,  the   consultant  can  identify  and  address  potential  construction   problems  in  the  design  stages  and,  as  an  independent  party,   may  be  in  the  best  position  to  suggest  cost  saving  or  time   saving  alternatives  and  to  evaluate  suggestions  made  by  the   other  parties.     6. Mechanical  and  Electrical  Engineer     The  M&E  Engineers  design  layouts  and  requirements  for   building  services  for  which  is  one  of  the  requirements  for   building  approval.  Design  and  development  of  electrical   systems  required  based  on  envisaged  power  consumption  for   safety  and  energy  sustaining  operation  of  buildings,   construction  and  operation  of  Heating,  ventilation  and  air   conditioning  (HVAC)  systems.     7. The  building  contractor   The  BC  is  responsible  for  hiring,  supervising,  firing  and   payment  of  workers  alongside  obtaining  materials  for  the   project  to  precise  specifications,  mostly  using  the  services  of   suppliers.  The  BC  works  based  on  agreed  contract  sum  with   building  owners  so,  he  controls  Budget  issues,  follow  that   budget  as  closely  as  possible  though  there  might  be  slight   variation  at  the  end  of  the  project.  They  ensure  that  the  project   is  completed  within  the  specified  time  frame  as  well  as   reviewing  the  progress  and  implementing  any  changes  along   the  course  of  completion.    
  • 28.                                                                                                                                                                                                                                                                                                                    28     Local  Authorities  Approval             UNDANG - UNDANG KECIL BANGUNAN SERAGAM 1984 BORANG A PERAKUAN PELAN - PELAN BANGUNAN / STRUKTUR ( Bagi endorsemen atas pelan - pelan untuk dikemukakan untuk diluluskan ) Undang - Undang Kecil 3 (1 ) ( C ) dan 16 ( 2 ) ________________20_____ Kepada : Yang Dipertua, MAJLIS PERBANDARAN SUBANG JAYA Saya memperakui bahawa butir - butir dalam pelan - pelan iaitu atas *Lot / Lot - lot dan No. Bangunan * Taman / Bandar / kawasan Jalan bagi adalah menurut kehendak - kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya. _______________________ Orang Yang Mengemukakan Nama : Alamat : No. Pendaftaran : Kelas : MAJLIS PERBANDARAN SUBANG JAYA Jabatan Bangunan
  • 29.                                                                                                                                                                                                                                                                                                                    29             *Potongmanayangtidakberkenaan 1.a)NamadanAlamat: PemilikTanah/Bangunan b)No.Telefon: 2.a)NamadanAlamatpemaju: (JIkaberlainansepertidiatas) b)No.Telefon: 3.TajukPermohonan: (No.LotJalan,Mukim) 4.Bilangansetpelanyang: dikemukakan(termasuk1setlinen) 5.Butir–butirpelanyangdikemukakanadalahsepertiberikut:- Bil.TajukLukisanNo.Lukisan Catitan: 1.Kerja–kerjapembinaantidakdibenarkansebelumpelandiluluskan. Kegagalanpihaktuan/puanmematuhisyarat–syarattersebut,tuan/puanbolehapabiladisabitkan dikenakandendatidaklebihdaripadaRINGGITMALAYSIA:LIMAPULUHRIBUSAHAJAdanjuga bolehdikenakandendatambahansebanyakRINGGITMALAYSIA:SATURIBUSAHAJAbagitiap– tiapharikesalahanituditeruskan,selepassabitandibawahSeksyen70(13)Undang–Undang MalaysiaAktaJalan,ParitdanBangunan1974Akta133(Pindaan2007),Undang-UndangKecil BangunanSeragam1984(Pindaan2007). 2.Sebarangpindaankepadapelankelulusanhendaklahdikemukakanterlebihdahuluuntukkelulusan sebelumkerja-kerjapindaanditapakdilakukan.
  • 30.                                                                                                                                                                                                                                                                                                                    30                                                                                                     1. KIRAAN UNTUK BAYARAN PROSES PELAN BANGUNAN DAN CAGARAN / FI PENDAHULUAN SISA BAHAN BINAAN NAMA PERUNDING : NAMA PEMILIK : JENIS RUMAH / BANGUNAN : . JUMLAH YUNIT : . BIL PERKARA KADAR BAGI TIAP - TIAP 9 METER PERSEGI LUAS LANTAI ( METER PERSEGI ) BAYARAN MINIMUM JUMLAH 1. TINGKAT BAWAH RM 14.00 RM 140.00 2. TINGKAT SATU RM 12.00 RM 120.00 3. TINGKAT DUA RM 10.00 RM 100.00 4. TINGKAT TIGA RM 8.00 RM 80.00 5. TINGKAT KEEMPAT DAN TINGKAT ATASNYA ATAU TINGKAT BAWAH TANAH ( Selain Daripada Tingkat Bawah Tanah Terbuka ). RM 6.00 RM 60.00 6. TINGKAT BAWAH TANAH TERBUKA RM 3.00 RM 30.00 7. BANGUNAN YANG MEMPUNYAI SISI TERBUKA ( Teres, Langkan, Anjung Kereta, Bangsal Terbuka Dan Seumpamanya ). ½ daripada fi yang ditetapkan di para 1 - 6 ½ daripada fi yang ditetapkan di para 1 - 6 8. PINDAAN PELAN KELULUSAN YANG MELIBATKAN SUSUNATUR LANTAI DAN PECAH DINDING DALAMAN (Tidak Melibatkan Pertambahan Keluasan) ½ daripada fi yang ditetapkan di para 1-6 ½ daripada fi yang ditetapkan di para 1-6 9. KOLAM RENANG, DERMAGA, JAMBATAN BANGUNAN KHAS LAIN RM 50.00 RM 500.00 MAJLIS PERBANDARAN SUBANG JAYA Jabatan Bangunan MPSJ.RK.KPT(OSC)-07/01 PINDAAN : 03 TARIKH KUATKUASA : 01 OGOS 2014
  • 31.                                                                                                                                                                                                                                                                                                                    31                   BIL PERKARA KADAR BAGI TIAP - TIAP 9 METER PERSEGI LUAS LANTAI ( METER PERSEGI ) BAYARAN MINIMA JUMLAH 10. TEMBOK PENAHAN RM 6.00 RM 60.00 11. SATU PAPAN TANDA PROJEK RM 100.00 12. SATU PAGAR - - RM 100.00 13. JUMLAH FI BAGI SEBUAH BANGUNAN 14. PEPASANGAN SANITARI @ 1 UNIT WATER CLOSET BASIN / SINK ‘LONG BATH’ / ‘URINAL’ RM 5.00 15. JUMLAH FI BAGI SANITARI RM 16. JUMLAH BAYARAN PROSES PELAN – (13) + (15) RM 17. SIJIL KELULUSAN BAGI TAMBAHAN/UBAHSUAIAN RUMAH KEDIAMAN @ RM 10.00 RM 18. JUMLAH BAYARAN CAGARAN / PINDAAN @ RM 120.00 / FI PENDAHULUAN SISA BAHAN BINAAN (DIBAYAR KEPADA ALAM FLORA SDN. BHD) RM 19. MENDEPOSITKAN BAHAN-BAHAN BINAAN ATAS JALAN RM 360.00 MINIMA (9 METER PERSEGI @ 1 BULAN) BAGI TAMBAHAN/UBAHSUAIAN BANGUNAN RM 20. PERMIT PEMASANGAN PAPAN DENDENG / KANVAS / PLASTIK / @ RM 150.00 UNTUK TAMBAHAN/UBAHSUAI BANGUNAN RM 21. BAYARAN 9 KALI GANDAAN FI PROSES PELAN BANGUNAN (BAGI TAMBAHAN / UBAHSUAIAN RUMAH KEDIAMAN SEDIA ADA) RM 22. JUMLAH BAYARAN KESELURUHAN (16) + (17) + (18) + (19) + (20) + (21) RM Disemak Oleh : Disahkan Oleh : . . . . Tarikh Tandatangan dan Cop Jawatan Tarikh Tandatangan dan Cop Jawatan
  • 32.                                                                                                                                                                                                                                                                                                                    32                   2. KIRAAN PROSES PELAN UNTUK SKIM PERUMAHAN BERBILANG TINGKAT / RANGKAIAN / DERETAN BANGUNAN DAN LAIN-LAIN YANG BERKAITAN. JENIS RUMAH : JUMLAH YUNIT : YUNIT TINGKAT (A) 1 yunit 100 % 2 hingga 5 4 x (A) x 90 % 6 hingga 10 5 x (A) x 85 % 11 hingga 25 15 x (A) x 75 % 26 ke atas ___x (A) x 60 % JUMLAH (RM) Bawah Minima RM 140.00 Satu Minima RM 120.00 Dua Minima RM 100.00 Tiga Minima RM 80.00 Empat ke atas Minima RM 60.00 Tingkat bawah tanah tertutup Minima RM 60.00 Tingkat bawah tanah terbuka Minima RM 30.00 Lain-lain JUMLAH FI BAGI BANGUNAN – (A) RM PEPASANGAN SANITARI SINK / BASIN - YUNIT X RM 5.00 RM WC / SWC - YUNIT X RM 5.00 RM URINAL - YUNIT X RM 5.00 RM LONG BATH - YUNIT X RM 5.00 RM JUMLAH FI BAGI SANITAR – (B) RM JUMLAH KESELURUHAN - (A) + (B) RM
  • 33.                                                                                                                                                                                                                                                                                                                    33           3. PENGESAHAN BAYARAN PROSES PELAN / WANG CAGARAN / PINDAAN DAN FI PENDAHULUAN SISA BAHAN BINAAN. BIL. JENIS BANGUNAN JUMLAH BAYARAN (RM) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. JUMLAH BAYARAN PROSES PELAN – (A) BAYARAN CAGARAN/PINDAAN / FI PENDAHULUAN SISA BAHAN BINAAN – (B) JUMLAH BAYARAN – (A) + (B) RM Disemak Oleh : Disahkan Oleh : . . . . Tarikh Tandatangan dan Cop Jawatan Tarikh Tandatangan dan Cop Jawatan
  • 34.                                                                                                                                                                                                                                                                                                                    34         1 Borang Perakuan Pemohon | Jabatan Bangunan MAJLIS PERBANDARAN SUBANG JAYA Jabatan Bangunan BORANG PERAKUAN PEMOHON Ruj Kami : Tarikh : ……………………………………………… ……………………………………………… ……………………………………………… ……………………………………………… (Pemohon) Kepada : Yang Dipertua, Majlis Perbandaran Subang Jaya 1. * CADANGAN TAMBAHAN DAN UBAHSUAIAN KE ATAS RUMAH TERES / RUMAH BERKEMBAR  /  RUMAH  SESEBUAH  ……….  TINGKAT  YANG  SEDIADA  DI  ATAS NO……….  P.T.  NO.  …………………JALAN  ………………………………………………. TAMAN  /  BANDAR  /  KAWASAN  ……………………………………………………………. MUKIM * DAMANSARA / PETALING, SELANGOR DARUL EHSAN. 2. *  CADANGAN  MEMBINA  RUMAH  SESEBUAH  ……….  TINGKAT  DI  ATAS  NO.  ……... P.T.  NO.  …………………  JALAN………………………………………TAMAN  /  BANDAR / KAWASAN ………………………………………………..  ……..MUKIM  *  DAMANSARA   / PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN. UNTUK  :  ………………………………………………………………………………………… Merujuk kepada perkara di atas saya / kami dengan ini mengeluarkan perakuan bahawa pihak pemilik : - 1.1 * Belum memulakan / telah memulakan kerja-kerja tambahan ubahsuaian di premis tersebut. Pihak Majlis berhak mengeluarkan notis kompaun atau denda 10 x gandaan proses pelan sebanyak  RM  ………………………..  sekiranya mendapati pembinaan telah dimulakan tanpa kelulusan daripada pihak Majlis berdasarkan :- Undang-undang kecil 17 dalam Jadual Pertama, Undang-Undang Kecil Bangunan Seragam 1984, Pindaan 2007. “  Bagi  semua  hal  jika  kerja  telah  dimulakan  sebelum  pelan-pelan diluluskan atau sesuatu permit diperolehi, suatu fee yang sama dengan sepuluh kali ganda daripada yang ditetapkan dalam paragraph yang releven terdahulu itu boleh dikenakan.Pembayaran fee yang dinaikkan ini tidak akan mengecualikan seseorang daripada didakwa oleh pihak berkuasa  tempatan  jika  ia  memutuskan  untuk  berbuat  demikian.  ”  
  • 35.                                                                                                                                                                                                                                                                                                                    35     2 Borang Perakuan Pemohon | Jabatan Bangunan 2. Sekian, terima kasih. …………………………………………………. ( Tandatangan orang yang berkelayakan ) s.k. : …………………………………………… …………………………………………… …………………………………………… …………………………………………… ……………………………………………         ( Pemilik bangunan) Nota * Potong mana yang tidak berkenaan.