1. The document is a construction proposal report for a small commercial construction project on a 30m x 30m empty land in Sibu, Sarawak, Malaysia.
2. The proposal is to build a two-level dining area/café with indoor and outdoor seating. The ground level will house the dining area and the upper level will have additional seating.
3. The materials selected include bean bag chairs, sofas, plants, lights, cabinets, and a staircase. A cost analysis is provided for the materials, maintenance, and staffing of the café.