Introduction to Construction Industry: Final Project
FNBE APRIL INTAKE 2014
INTRODUCTION TO CONSTRUCTION INDUSTRY
FINAL PROJECT REPORT
Name: Canisius Bong Wei Pheng
Student ID: 0318914
Name: Ong Jia Min
Student ID: 0318003
Introduction to Construction Industry: Final Project
CONTENT
Introduction to final project
Site analysis and observation
Understanding of rest area
Purpose
Site plan
Concept
Perspective
Application for building plan approval
Costing
Benefits
Conclusion
Introduction to Construction Industry: Final Project
Introduction to Final Project
For this final project, it is a group work that consists with only 2 people. In our
group there are only two of us, Canisius Bong Wei Pheng and Ong Jia Min. This final
project required us to find a specific land within Taylor’s University Lakeside
Campus to initiate a small construction project. The size of the land shall not be
more than 30m x 30m. Every group has to choose one out of five purpose which
include Recreation Area, Study Enhancement Area, Rest Area, Food and Beverage
(dining area) as well as Commercial Area. So, for us we’ve chosen rest are as our
purpose for this final project.
Introduction to Construction Industry: Final Project
Site Analysis and Observation
After understanding the final project brief of Introduction to Construction
Industry, we had chosen a 30m x 30m site to initiate our small
construction project. So our 30m x 30m site is located near the lake which
is in between the commercial block and block C,D and E building. The
whole lake measure approximately 30m x 60m and to build this rest area
we only require 30m x 30m of the entire space will be used which is half
of it. Towards to the west from our site, which is the commercial block
which we can see most of the restaurant place there. Towards to the south
from our site, besides seeing the lake we can also see car park and the
futsal court. Towards to the east from our site, it is our Campus block C,
block D and block E buildings. Towards to north from our site, it is our
Campus block A, block B and offices.
Introduction to Construction Industry: Final Project
A top view of our 30 x 30m site
This is the North view from our site.
Introduction to Construction Industry: Final Project
This is the East view from our site.
This is the South view from our site.
Introduction to Construction Industry: Final Project
However, the commercial block will be the West view from our site.
A different perspective view of our site to initiate rest area.
Introduction to Construction Industry: Final Project
Site Analysis- Measurement
60m
30m
Introduction to Construction Industry: Final Project
Site Analysis- View Surrounding Site
Taylor Campus Block A and Block B
Block C
BlockD
Block E
Futsalandbasketballcourt,lakeandcarpark
Commercial
Block
Introduction to Construction Industry: Final Project
Understanding of Rest Area
 Rest area is a place where people able to relax themselves and put all
their problems aside.
 Most of the rest area provides comfortable resting chairs and a very
quiet and peaceful environment so that people can relax themselves.
 Rest area can be located in anywhere as long as there are people around
that area.
 Besides our own home or bedroom, public area can also have a rest area
to let people to rest whenever they are tired.
 The purposes of having a rest area is mend to let people to have their
own sweet time and relax their mind.
Introduction to Construction Industry: Final Project
Purpose
The purpose we choose to initiate our site as a rest area is to
provide more resting area for students, lecturers and visitors because
there are limited places especially rest area in Taylor’s University
Lakeside Campus as Student Life Centre and library are the only places to
have a good and comfy place to sleep and rest.
The rest area also consist of cafeteria and vending machines so that
people don’t need to walk a long distance to grab themselves foods and
drinks. At the same time it can help to earn some income
This rest area is located around the lakeside in between the
commercial block and buildings of block C, D and E because it is a center
point in the campus as it is convenient for people to walk there within a
short period
Introduction to Construction Industry: Final Project
Site Plan
CafeteriaSlide and projector
Beanbag Chair
Wooden Bench
Walkway bridge
Plants
Introduction to Construction Industry: Final Project
Concept
The whole concept of this rest area design is to let people to rest, relax and
chill in a peaceful and quiet environment with many facilities provided
there. This rest area is divided into four part along with a walkway bridge.
The first two section are the theater room together with slide and projector
and red beanie chair. The third section is the cafeteria that sell light foods
where is convenient for people to grab some light food. The last section of
this rest area is the the bench area which there are only benches in this
section. People can just sit down and enjoy the peaceful and scenery of the
rest area.
The projectors and slides are provided in the rest area theater rooms for people to spend
their time and watch movie. All type of movies will be showing in different day and time.
The list of movies will be renew from time to time.
Introduction to Construction Industry: Final Project
Meanwhile, there are also red beanbags provided around the whole room of the theater
room of the rest area. People can choose either to rest on and watch a movie or sleep on it.
This set of table and chair will be the concept for our cafeteria’s dining
furniture in our rest area.
Introduction to Construction Industry: Final Project
Besides beanbag, wooden
benches will also be provided in
fourth section of our rest area.
So, there will be sufficient space
for people to rest, chill and
relax.
The artificial bushes has a purpose to make our
rest area looks greener and more eco-friendly.
Vending machines will also be
included in the rest area for
everyone convenient to grab
some snacks or drinks.
Introduction to Construction Industry: Final Project
Purple Persian Shield plant and Purple Hydrangea plant are used to make our rest area
more colorful and lively. Purple represent spiritually which will attract people’s attention.
Pink color represent nature and culturally. It brings nature one step closer to people and
also additionally brings joy and colors to our rest area. Besides that, people will get
attracted by the color pink and also the fragrance of Pink Azalea plant.
Introduction to Construction Industry: Final Project
Perspective
A perspective view of our proposed rest area on our
selected site.
Introduction to Construction Industry: Final Project
The view of our theater room in the rest area.
Perspective view of the
wooden benches for
people to sit at the rest
area.
Introduction to Construction Industry: Final Project
A perspective view of the cafeteria in the rest area
where people can have some drinks or tea break there.
Introduction to Construction Industry: Final Project
Application for Building Plan
Approval
Document Required
 Application letter using original letter head indicating application
reference and proposed construction.
 A copy of landownership or land title which has been certified as
true copy by commissioner of Oaths or Justice of Peace.
 Copies of valid documents such as power of attorney or sales and
purchase agreement or tenancy agreement if the owner is different
from the list of names in the landownership or land title.
 Six sets of building plans properly arranged and folded in A4 size
which has been prepared by a professional consultant. Examples
architect/engineer or registered draughtsman in accordance to
their respective limitations for submission of building plans.
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
PerakuanPemohon/Perunding:
Sayabagi pihak Pemohon/Perundingdenganini membuat perakuanbahawasemuadokumen-dokumenyangdisertakanadalahbenar serta
mematuhi keperluanpermohonanpembangunandi MajlisPerbandaranSubangJaya(MPSJ)
MAKLUMAN
Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan KPKT(02)799/6
Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan
Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei 2011.
Sebarangpertanyaandanpenjelasanlanjut berhubungpekelilingini bolehdikemukakankepada:
KETUAPENGARAH
JabatanKerajaanTempatan
KementerianPerumahan&KerajaanTempatan
Aras4, BlokK, Pusat BandaraDamansara,
50782KualaLumpur
(u.p.: BahagianPenyelidikandanPerundanganTeknikal)
No. Telefon : 03-20947033/ 20874501
No. Fax : 03-20955180/ 20953717
Sebarangpertanyaandanpenjelasanlanjut berhubungSenarai Semakdanperinciannya, silahubungi agensi / jabatanteknikal yangberkaitan.
.......................…………………………….
Nama, Tandatangan&CopPemohon/
Perunding
.......................…………………………….
Nama, Tandatangan&
CopPegawai OSC1
.......................…………………………….
Nama, Tandatangan&
CopPegawai OSC2
Tarikh : ……
…
… ………… Tarikh : ……
…
… …………… Tarikh : ……
…
… …………..
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
Introduction to Construction Industry: Final Project
3) JABATANKEJURUTERAAN
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1
Surat Permohonan Rasmi Ke Jabatan Kejuruteraan
(Cover Letter) 1
2
PelanBangunandalamskalaMetric
1
3 Sesalinan surat kelulusan Kerja Tanah/jalan Parit
yangdisahkanolehJabatanKejuruteraanMPSJ
1
1) JABATANBOMBADANPENYELAMAT
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1 Surat PermohonanRasmi
(Cover Letter) 2
2 PelanBangunandalamskalaMetric 2
3 PelanLantai 2
4 PelanKeratanRentas 2
5 PelanPandanganSisi 2
6 TajukCadanganPemajuanDenganTepat
7 SkalaPelanhendaklah1:100atau1:200( skala
laindengankebenaran)
8 PerakuanTanggungjawab, TandatanganDan
Cop Ra smi ‘O r ang Yang Berkelayakan’ di 
setiaphelaianpelan.
9 MencatitkanKehendak-KehendakKelengkapan
MenentangKebakaranAtauPerpasangan
KeselamatanKebakaranDi MukaHadapan
SetiapPerengganPelan
* NOTA: DokumenPerluDiasingkanDanDiikat Mengikut SusunanSetiapJabatan Yang Di tetapkan.
JABATAN/AGENSI TEKNIKALLUARAN
Introduction to Construction Industry: Final Project
Pengarah,
Jabatan Bomba & Penyelamat, Malaysia,
No. 3 Persiaran Tebar Layar,
Bukit Jelutung, Seksyen U8,
40150 Shah Alam,
Selangor Darul Ehsan.
Pejabat Zon Petaling,
Balai Bomba dan Penyelamat Puchong,
Jalan Bandar 2, Pusat Bandar Puchong
47100 Puchong Selangor D.E
SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN PENYELAMAT
MALAYSIA
BIL DOKUMEN BILANGAN
SET
SEMAKAN
KAUNTER
SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL
1 Surat Permohonan Rasmi 1
2 Pelan Arkitektural Lengkap 2
3 Pernyataan Tajuk Projek Dengan Jelas / Betul -
4 Pengiraan Beban Mengikut UBBL 1984 1
5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain
Dengan Kebenaran)
-
6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses
Perkakasan Bomba
1
7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba
Mengikut UBBL 1984 (Diwarnakan Kuning)
-
8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih
Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang
Lain) Dan Diwarnakan Merah.
-
9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan
Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984)
1
10 Pelan Arkitektural Perubahan/Tambahan Struktur Di
Warnakan Merah
-
11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada)
Diwarnakan Biru
-
12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang
Berkelayakan Di Setiap Helaian Pelan Arkitektural
-
13 Mencatitkan “Senarai  Syor-Syor  Kebombaan” Di Muka 
Hadapan Setiap Set Pelan Arkitektural.
-
14
Keperluan Kehendak-Kehendak Menentang Dan Mencegah
Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah
Diwarnakan Merah
-
Introduction to Construction Industry: Final Project
Tandatangan :
Nama Pemohon :       … …
… …
…
…
……………………………………
Nama Syarikat :    
 
 
…
…
… …
…
…
……………………………………
……………………………………………………
……………………………………………………
……………………………………………………
No Telefon :    
 
 
…
…
…
…
…
…
……………………………………
SEMAKAN JBPM – DITERIMA / TOLAK *
COP JBPM
PEGAWAI PENERIMA : …… ………………………………………………. .
TARIKH : ………………………………………………………
* Potong Yang Tidak Berkaitan
Introduction to Construction Industry: Final Project
Costing
BILL OF MATERIALS(COST ESTIMATION)
ITEM DESCRIPTION UNIT/SIZE RATE(RM) QUANTITY AMOUNT AMOUNT
A HARDSCAPE WORK
1 SLIDE PROJECTOR M² 799 2 1598
2 WOODEN TABLE NOS 500 6 3000
3 WOODEN BENCH NOS 270 4 1080
4 WOODEN CHAIR NOS 80 12 960
5 BEANBAG CHAIR NOS 250 30 7500
6 WOODEN PLANK FLOORING FT² 9 165 1485
7 UMBRELLA SHELTER FT² 500 1 500
8 LONG FOLOWER POT NOS 20 6 120
9 CEILING FANS M² 250 4 1000
HARDSCAPE TOTAL 17243
B SOFTSCAPE WORKS
10 PINK AZALEA
NOS
(POT) 55 15 825
11 PURPLE PERSIAN SHIELD PLANT
NOS
(POT) 34 15 510
12 FERTILIZERS KG 15 20 300
13 HYDRANGEA FLOWER
NOS
(POT) 40 15 600
14 SOIL KG 30 30 900
15 ARTIFICIAL BUSH
NOS
(PIECE) 200 8 1600
SOFTSCAPE TOTAL 4735
SUB TOTAL 21,978
CORRECTION TOTAL 22,000
Introduction to Construction Industry: Final Project
MAINTAINANCE BILL
ITEM DESCRIPTION UNIT/SIZE USAGE LIST
RATE(RM
)
QUANTIT
Y
AMOUN
T AMOUNT
1 WATER USAGE MONTH (M³)
0-20 0.57 20 11.4
>20-35 1.03 15 15.45
>35 2 965 1930
2
ELECTRIC
USAGE MONTH 0-200 0.218 74.4 16.2192
3 GARDENER MONTH 800 1 800
SUB TOTAL 2773.0692
CORRECTION TOTAL 2800
Introduction to Construction Industry: Final Project
Benefits
 Creating more rest area in this campus, there is a limited place for
students in Taylor’s to chill especially during their break time so
they can come to our site and rest.
 This resting area can be an attraction of this campus and it can also
attract more students, parents or lecturers to come and visit it.
 It can make our campus more lively especially during the night time
because most of the shops are closed in the campus but only our
resting area is still open for people to chill.
 Most importantly students who don’t drive to campus can chill or
spend time in our rest area before their parents pick them up from
campus.
 Our proposed rest area can also be a good place for people to meet
up and chit-chatting because there are also vending machines and
cafeteria for them to chill.
Introduction to Construction Industry: Final Project
Conclusion
In a nutshell, this 30m X 30m site are proposed to initiate as a rest area
for students, lecturers, staff and visitors in Taylor’s University Lakeside
Campus as there are limited rest area in the campus for people to rest. So, this
project to build a rest area around the lake serves as a solution to solve the
issues of limited rest area in the campus.
As soon as we fully understand our site, we started planning our site
based on our chosen concept which is rest area in order to serve as its purpose.
We came out with some ideas which is to provide a movie theater together
with beanbags in our rest area in order to create a different atmosphere as a
rest area. The whole concepts of the rest area along with the plants, furniture
and others also required to plan well to make sure it is suitable for it.
Last but not least, it require us a lot of procedures to get some items such
the documents from the authority. I’d like to thanks our lecturers and tutor for
giving us advice when we needed it and also some helps when we face the
problems doing this assignment.

Ici final project

  • 1.
    Introduction to ConstructionIndustry: Final Project FNBE APRIL INTAKE 2014 INTRODUCTION TO CONSTRUCTION INDUSTRY FINAL PROJECT REPORT Name: Canisius Bong Wei Pheng Student ID: 0318914 Name: Ong Jia Min Student ID: 0318003
  • 2.
    Introduction to ConstructionIndustry: Final Project CONTENT Introduction to final project Site analysis and observation Understanding of rest area Purpose Site plan Concept Perspective Application for building plan approval Costing Benefits Conclusion
  • 3.
    Introduction to ConstructionIndustry: Final Project Introduction to Final Project For this final project, it is a group work that consists with only 2 people. In our group there are only two of us, Canisius Bong Wei Pheng and Ong Jia Min. This final project required us to find a specific land within Taylor’s University Lakeside Campus to initiate a small construction project. The size of the land shall not be more than 30m x 30m. Every group has to choose one out of five purpose which include Recreation Area, Study Enhancement Area, Rest Area, Food and Beverage (dining area) as well as Commercial Area. So, for us we’ve chosen rest are as our purpose for this final project.
  • 4.
    Introduction to ConstructionIndustry: Final Project Site Analysis and Observation After understanding the final project brief of Introduction to Construction Industry, we had chosen a 30m x 30m site to initiate our small construction project. So our 30m x 30m site is located near the lake which is in between the commercial block and block C,D and E building. The whole lake measure approximately 30m x 60m and to build this rest area we only require 30m x 30m of the entire space will be used which is half of it. Towards to the west from our site, which is the commercial block which we can see most of the restaurant place there. Towards to the south from our site, besides seeing the lake we can also see car park and the futsal court. Towards to the east from our site, it is our Campus block C, block D and block E buildings. Towards to north from our site, it is our Campus block A, block B and offices.
  • 5.
    Introduction to ConstructionIndustry: Final Project A top view of our 30 x 30m site This is the North view from our site.
  • 6.
    Introduction to ConstructionIndustry: Final Project This is the East view from our site. This is the South view from our site.
  • 7.
    Introduction to ConstructionIndustry: Final Project However, the commercial block will be the West view from our site. A different perspective view of our site to initiate rest area.
  • 8.
    Introduction to ConstructionIndustry: Final Project Site Analysis- Measurement 60m 30m
  • 9.
    Introduction to ConstructionIndustry: Final Project Site Analysis- View Surrounding Site Taylor Campus Block A and Block B Block C BlockD Block E Futsalandbasketballcourt,lakeandcarpark Commercial Block
  • 10.
    Introduction to ConstructionIndustry: Final Project Understanding of Rest Area  Rest area is a place where people able to relax themselves and put all their problems aside.  Most of the rest area provides comfortable resting chairs and a very quiet and peaceful environment so that people can relax themselves.  Rest area can be located in anywhere as long as there are people around that area.  Besides our own home or bedroom, public area can also have a rest area to let people to rest whenever they are tired.  The purposes of having a rest area is mend to let people to have their own sweet time and relax their mind.
  • 11.
    Introduction to ConstructionIndustry: Final Project Purpose The purpose we choose to initiate our site as a rest area is to provide more resting area for students, lecturers and visitors because there are limited places especially rest area in Taylor’s University Lakeside Campus as Student Life Centre and library are the only places to have a good and comfy place to sleep and rest. The rest area also consist of cafeteria and vending machines so that people don’t need to walk a long distance to grab themselves foods and drinks. At the same time it can help to earn some income This rest area is located around the lakeside in between the commercial block and buildings of block C, D and E because it is a center point in the campus as it is convenient for people to walk there within a short period
  • 12.
    Introduction to ConstructionIndustry: Final Project Site Plan CafeteriaSlide and projector Beanbag Chair Wooden Bench Walkway bridge Plants
  • 13.
    Introduction to ConstructionIndustry: Final Project Concept The whole concept of this rest area design is to let people to rest, relax and chill in a peaceful and quiet environment with many facilities provided there. This rest area is divided into four part along with a walkway bridge. The first two section are the theater room together with slide and projector and red beanie chair. The third section is the cafeteria that sell light foods where is convenient for people to grab some light food. The last section of this rest area is the the bench area which there are only benches in this section. People can just sit down and enjoy the peaceful and scenery of the rest area. The projectors and slides are provided in the rest area theater rooms for people to spend their time and watch movie. All type of movies will be showing in different day and time. The list of movies will be renew from time to time.
  • 14.
    Introduction to ConstructionIndustry: Final Project Meanwhile, there are also red beanbags provided around the whole room of the theater room of the rest area. People can choose either to rest on and watch a movie or sleep on it. This set of table and chair will be the concept for our cafeteria’s dining furniture in our rest area.
  • 15.
    Introduction to ConstructionIndustry: Final Project Besides beanbag, wooden benches will also be provided in fourth section of our rest area. So, there will be sufficient space for people to rest, chill and relax. The artificial bushes has a purpose to make our rest area looks greener and more eco-friendly. Vending machines will also be included in the rest area for everyone convenient to grab some snacks or drinks.
  • 16.
    Introduction to ConstructionIndustry: Final Project Purple Persian Shield plant and Purple Hydrangea plant are used to make our rest area more colorful and lively. Purple represent spiritually which will attract people’s attention. Pink color represent nature and culturally. It brings nature one step closer to people and also additionally brings joy and colors to our rest area. Besides that, people will get attracted by the color pink and also the fragrance of Pink Azalea plant.
  • 17.
    Introduction to ConstructionIndustry: Final Project Perspective A perspective view of our proposed rest area on our selected site.
  • 18.
    Introduction to ConstructionIndustry: Final Project The view of our theater room in the rest area. Perspective view of the wooden benches for people to sit at the rest area.
  • 19.
    Introduction to ConstructionIndustry: Final Project A perspective view of the cafeteria in the rest area where people can have some drinks or tea break there.
  • 20.
    Introduction to ConstructionIndustry: Final Project Application for Building Plan Approval Document Required  Application letter using original letter head indicating application reference and proposed construction.  A copy of landownership or land title which has been certified as true copy by commissioner of Oaths or Justice of Peace.  Copies of valid documents such as power of attorney or sales and purchase agreement or tenancy agreement if the owner is different from the list of names in the landownership or land title.  Six sets of building plans properly arranged and folded in A4 size which has been prepared by a professional consultant. Examples architect/engineer or registered draughtsman in accordance to their respective limitations for submission of building plans.
  • 21.
    Introduction to ConstructionIndustry: Final Project
  • 22.
    Introduction to ConstructionIndustry: Final Project
  • 23.
    Introduction to ConstructionIndustry: Final Project PerakuanPemohon/Perunding: Sayabagi pihak Pemohon/Perundingdenganini membuat perakuanbahawasemuadokumen-dokumenyangdisertakanadalahbenar serta mematuhi keperluanpermohonanpembangunandi MajlisPerbandaranSubangJaya(MPSJ) MAKLUMAN Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei 2011. Sebarangpertanyaandanpenjelasanlanjut berhubungpekelilingini bolehdikemukakankepada: KETUAPENGARAH JabatanKerajaanTempatan KementerianPerumahan&KerajaanTempatan Aras4, BlokK, Pusat BandaraDamansara, 50782KualaLumpur (u.p.: BahagianPenyelidikandanPerundanganTeknikal) No. Telefon : 03-20947033/ 20874501 No. Fax : 03-20955180/ 20953717 Sebarangpertanyaandanpenjelasanlanjut berhubungSenarai Semakdanperinciannya, silahubungi agensi / jabatanteknikal yangberkaitan. .......................……………………………. Nama, Tandatangan&CopPemohon/ Perunding .......................……………………………. Nama, Tandatangan& CopPegawai OSC1 .......................……………………………. Nama, Tandatangan& CopPegawai OSC2 Tarikh : …… … … ………… Tarikh : …… … … …………… Tarikh : …… … … …………..
  • 24.
    Introduction to ConstructionIndustry: Final Project
  • 25.
    Introduction to ConstructionIndustry: Final Project
  • 26.
    Introduction to ConstructionIndustry: Final Project
  • 27.
    Introduction to ConstructionIndustry: Final Project
  • 28.
    Introduction to ConstructionIndustry: Final Project 3) JABATANKEJURUTERAAN BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Surat Permohonan Rasmi Ke Jabatan Kejuruteraan (Cover Letter) 1 2 PelanBangunandalamskalaMetric 1 3 Sesalinan surat kelulusan Kerja Tanah/jalan Parit yangdisahkanolehJabatanKejuruteraanMPSJ 1 1) JABATANBOMBADANPENYELAMAT BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Surat PermohonanRasmi (Cover Letter) 2 2 PelanBangunandalamskalaMetric 2 3 PelanLantai 2 4 PelanKeratanRentas 2 5 PelanPandanganSisi 2 6 TajukCadanganPemajuanDenganTepat 7 SkalaPelanhendaklah1:100atau1:200( skala laindengankebenaran) 8 PerakuanTanggungjawab, TandatanganDan Cop Ra smi ‘O r ang Yang Berkelayakan’ di  setiaphelaianpelan. 9 MencatitkanKehendak-KehendakKelengkapan MenentangKebakaranAtauPerpasangan KeselamatanKebakaranDi MukaHadapan SetiapPerengganPelan * NOTA: DokumenPerluDiasingkanDanDiikat Mengikut SusunanSetiapJabatan Yang Di tetapkan. JABATAN/AGENSI TEKNIKALLUARAN
  • 29.
    Introduction to ConstructionIndustry: Final Project Pengarah, Jabatan Bomba & Penyelamat, Malaysia, No. 3 Persiaran Tebar Layar, Bukit Jelutung, Seksyen U8, 40150 Shah Alam, Selangor Darul Ehsan. Pejabat Zon Petaling, Balai Bomba dan Penyelamat Puchong, Jalan Bandar 2, Pusat Bandar Puchong 47100 Puchong Selangor D.E SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN PENYELAMAT MALAYSIA BIL DOKUMEN BILANGAN SET SEMAKAN KAUNTER SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL 1 Surat Permohonan Rasmi 1 2 Pelan Arkitektural Lengkap 2 3 Pernyataan Tajuk Projek Dengan Jelas / Betul - 4 Pengiraan Beban Mengikut UBBL 1984 1 5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain Dengan Kebenaran) - 6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses Perkakasan Bomba 1 7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba Mengikut UBBL 1984 (Diwarnakan Kuning) - 8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang Lain) Dan Diwarnakan Merah. - 9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984) 1 10 Pelan Arkitektural Perubahan/Tambahan Struktur Di Warnakan Merah - 11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada) Diwarnakan Biru - 12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang Berkelayakan Di Setiap Helaian Pelan Arkitektural - 13 Mencatitkan “Senarai  Syor-Syor  Kebombaan” Di Muka  Hadapan Setiap Set Pelan Arkitektural. - 14 Keperluan Kehendak-Kehendak Menentang Dan Mencegah Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah Diwarnakan Merah -
  • 30.
    Introduction to ConstructionIndustry: Final Project Tandatangan : Nama Pemohon :       … … … … … … …………………………………… Nama Syarikat :         … … … … … … …………………………………… …………………………………………………… …………………………………………………… …………………………………………………… No Telefon :         … … … … … … …………………………………… SEMAKAN JBPM – DITERIMA / TOLAK * COP JBPM PEGAWAI PENERIMA : …… ………………………………………………. . TARIKH : ……………………………………………………… * Potong Yang Tidak Berkaitan
  • 31.
    Introduction to ConstructionIndustry: Final Project Costing BILL OF MATERIALS(COST ESTIMATION) ITEM DESCRIPTION UNIT/SIZE RATE(RM) QUANTITY AMOUNT AMOUNT A HARDSCAPE WORK 1 SLIDE PROJECTOR M² 799 2 1598 2 WOODEN TABLE NOS 500 6 3000 3 WOODEN BENCH NOS 270 4 1080 4 WOODEN CHAIR NOS 80 12 960 5 BEANBAG CHAIR NOS 250 30 7500 6 WOODEN PLANK FLOORING FT² 9 165 1485 7 UMBRELLA SHELTER FT² 500 1 500 8 LONG FOLOWER POT NOS 20 6 120 9 CEILING FANS M² 250 4 1000 HARDSCAPE TOTAL 17243 B SOFTSCAPE WORKS 10 PINK AZALEA NOS (POT) 55 15 825 11 PURPLE PERSIAN SHIELD PLANT NOS (POT) 34 15 510 12 FERTILIZERS KG 15 20 300 13 HYDRANGEA FLOWER NOS (POT) 40 15 600 14 SOIL KG 30 30 900 15 ARTIFICIAL BUSH NOS (PIECE) 200 8 1600 SOFTSCAPE TOTAL 4735 SUB TOTAL 21,978 CORRECTION TOTAL 22,000
  • 32.
    Introduction to ConstructionIndustry: Final Project MAINTAINANCE BILL ITEM DESCRIPTION UNIT/SIZE USAGE LIST RATE(RM ) QUANTIT Y AMOUN T AMOUNT 1 WATER USAGE MONTH (M³) 0-20 0.57 20 11.4 >20-35 1.03 15 15.45 >35 2 965 1930 2 ELECTRIC USAGE MONTH 0-200 0.218 74.4 16.2192 3 GARDENER MONTH 800 1 800 SUB TOTAL 2773.0692 CORRECTION TOTAL 2800
  • 33.
    Introduction to ConstructionIndustry: Final Project Benefits  Creating more rest area in this campus, there is a limited place for students in Taylor’s to chill especially during their break time so they can come to our site and rest.  This resting area can be an attraction of this campus and it can also attract more students, parents or lecturers to come and visit it.  It can make our campus more lively especially during the night time because most of the shops are closed in the campus but only our resting area is still open for people to chill.  Most importantly students who don’t drive to campus can chill or spend time in our rest area before their parents pick them up from campus.  Our proposed rest area can also be a good place for people to meet up and chit-chatting because there are also vending machines and cafeteria for them to chill.
  • 34.
    Introduction to ConstructionIndustry: Final Project Conclusion In a nutshell, this 30m X 30m site are proposed to initiate as a rest area for students, lecturers, staff and visitors in Taylor’s University Lakeside Campus as there are limited rest area in the campus for people to rest. So, this project to build a rest area around the lake serves as a solution to solve the issues of limited rest area in the campus. As soon as we fully understand our site, we started planning our site based on our chosen concept which is rest area in order to serve as its purpose. We came out with some ideas which is to provide a movie theater together with beanbags in our rest area in order to create a different atmosphere as a rest area. The whole concepts of the rest area along with the plants, furniture and others also required to plan well to make sure it is suitable for it. Last but not least, it require us a lot of procedures to get some items such the documents from the authority. I’d like to thanks our lecturers and tutor for giving us advice when we needed it and also some helps when we face the problems doing this assignment.