This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Automotive Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
T-Byte Digital Customer Experience July 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Digital Customer Experience
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely
This document brings together a set
of latest data points and publicly
available information relevant for
Manufacturing Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
IoT & AR Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Banking Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Hospitality Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
T-Byte Hybrid Cloud Infrastructure July 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Hybrid Cloud Infrastructure
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Automotive Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
T-Byte Digital Customer Experience July 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Digital Customer Experience
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely
This document brings together a set
of latest data points and publicly
available information relevant for
Manufacturing Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
IoT & AR Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Banking Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Hospitality Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
T-Byte Hybrid Cloud Infrastructure July 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Hybrid Cloud Infrastructure
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
IoT & AR Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Agile & AI Operations Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Platforms & Applications Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
IOT & AR Technology. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Agile & AI Operations Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication immensely.
This document brings together a set of latest data points and publicly available information relevant for Hybrid Cloud Infrastructure. We are very excited to share this content and believe that readers will benefit immensely from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Digital Customer Experience
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
The Circular Economy Handbook shows how companies are taking transformative steps toward circularity, creating new opportunities for competitiveness. Read more. (https://www.accenture.com/us-en/about/events/the-circular-economy-handbook?c=acn_glb_purposeslideshare_11151809&n=otc_0220)
T-Byte Hybrid Cloud Infrastructure March 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Hybrid Cloud Infrastructure
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set of latest data points and publicly available information relevant for Digital Customer Experience Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Platforms & Applications Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
Resetting Destination for Energy Decarbonization | Accentureaccenture
The transition to a decarbonized energy system is a transition like no other. Oil and gas companies are poised to lead the charge. Along the way, however, they must change what they do and how they do it. Here’s why https://accntu.re/34sLSGW
The Proof Is In The ROI: LinkedIn Marketing Insights From The Mouths of Marke...LinkedIn
The Proof Is In The ROI: LinkedIn Marketing Insights From The Mouths of Marketers
Find out what marketing professionals around the world have to say about LinkedIn Marketing!
This document brings together a set of latest data points and publicly available information relevant for Platforms & Applications Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely
The culmination of the megatrends of urbanization, climate change, digitalization and societal expectations in the context of a global pandemic has meant that
organizations have struggled with their capital investments and knowing how to respond to what’s coming next.
In tandem, The Big Quit is happening. This exacerbates the issues - businesses are paralyzed by not being able to find the people or skills that they need to move forward.
For technology companies, in particular, the focus was around aligning capacity to the demands of remote workers and shoppers. Now that these demands have been met, most are considering what comes next.
Against the backdrop of a seismic shift in societal expectations, businesses are having to step–up in the fight against climate change and inequity in a variety of people-based issues.
Our Tech + Built Environment Trends 22 document was created lovingly by Arcadians, sharing their experiences from real project delivery across the globe. This represents the trends we’ve seen and how we’re advising our clients to deal with their challenges.
This document brings together a set
of latest data points and publicly
available information relevant for
IoT & AR Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Agile & AI Operations Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Platforms & Applications Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
IOT & AR Technology. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Agile & AI Operations Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication immensely.
This document brings together a set of latest data points and publicly available information relevant for Hybrid Cloud Infrastructure. We are very excited to share this content and believe that readers will benefit immensely from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Digital Customer Experience
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Consulting & IT Services Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
The Circular Economy Handbook shows how companies are taking transformative steps toward circularity, creating new opportunities for competitiveness. Read more. (https://www.accenture.com/us-en/about/events/the-circular-economy-handbook?c=acn_glb_purposeslideshare_11151809&n=otc_0220)
T-Byte Hybrid Cloud Infrastructure March 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Hybrid Cloud Infrastructure
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set of latest data points and publicly available information relevant for Digital Customer Experience Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Platforms & Applications Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
Resetting Destination for Energy Decarbonization | Accentureaccenture
The transition to a decarbonized energy system is a transition like no other. Oil and gas companies are poised to lead the charge. Along the way, however, they must change what they do and how they do it. Here’s why https://accntu.re/34sLSGW
The Proof Is In The ROI: LinkedIn Marketing Insights From The Mouths of Marke...LinkedIn
The Proof Is In The ROI: LinkedIn Marketing Insights From The Mouths of Marketers
Find out what marketing professionals around the world have to say about LinkedIn Marketing!
This document brings together a set of latest data points and publicly available information relevant for Platforms & Applications Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely
The culmination of the megatrends of urbanization, climate change, digitalization and societal expectations in the context of a global pandemic has meant that
organizations have struggled with their capital investments and knowing how to respond to what’s coming next.
In tandem, The Big Quit is happening. This exacerbates the issues - businesses are paralyzed by not being able to find the people or skills that they need to move forward.
For technology companies, in particular, the focus was around aligning capacity to the demands of remote workers and shoppers. Now that these demands have been met, most are considering what comes next.
Against the backdrop of a seismic shift in societal expectations, businesses are having to step–up in the fight against climate change and inequity in a variety of people-based issues.
Our Tech + Built Environment Trends 22 document was created lovingly by Arcadians, sharing their experiences from real project delivery across the globe. This represents the trends we’ve seen and how we’re advising our clients to deal with their challenges.
This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Manufacturing Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set of latest data points and publicly available information relevant for Utilities Industry. We are very excited to share this content and believe that readers will benefit from this periodic publication immensely.
This document brings together a set of latest data points and publicly available information relevant Manufacturing for. We are very excited to share this content and believe that readers will benefit immensely from this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Energy Industry. We are very excited
to share this content and believe that
readers will benefit from this
periodic publication immensely.
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...Amanda Finkenbinder, MPM
The Wilton E. Scott Institute for Energy Innovation works through the academic units of Carnegie Mellon University to find solutions for the nation's and the world's energy challenges including pathways to a low carbon future, smart grid, new materials for energy, shale gas, and building energy efficiency through research, strategic partnerships, public policy outreach and education.
The Wilton E. Scott Institute for Energy Innovation at Carnegie Mellon Univer...Amanda Finkenbinder, MPM
The Wilton E. Scott Institute for Energy Innovation works through the academic units of Carnegie Mellon University to find solutions for the nation's and the world's energy challenges including pathways to a low carbon future, smart grid, new materials for energy, shale gas, and building energy efficiency through research, strategic partnerships, public policy outreach and education
Presented by Brian Joosse, Symmetri Marketing
Customer research found that there was no clear centralized industry resource for engineers in the oil/gas and petrochemical industries for news and advice on industrial facilities and their electrical system requirements, or a forum for asking/answering questions and contributing expertise. Now, EGS Electrical Group is providing these resources through its Power Panel Community site.
PowerPanelCommunity.com is an online community for specifying engineers who design, build and maintain oil, gas, petrochemical and other industrial facilities that operate heavy equipment in adverse and hazardous locations. The site aggregates global news from trade sources and general media, provides insights from industry experts and guest writers in a blog that invites member commentary, and gives engineers a moderated discussion forum for asking questions and engaging in conversation.
In this presentation we will show how:
• Inspiration for the community was rooted in customer research
• Strategy was developed to generate real business value
• Negotiating Emerson corporate support was key to project approval
• Community launch was orchestrated to maximize internal product team support
• High value content is developed and deployed monthly
• Social Media channel management is key to broader community success
• How you can apply this approach across other industrial automation markets
Zinc8 Energy Solutions: Getting de-risked and raised by a global network of c...Stephan Bogner
When some of the world´s brightest people and biggest companies unite, there must be an urgency to solve a bigger problem. In order to build a smarter, more sustainable future for the planet, a far-reaching multidisciplinary effort is needed to speed up the rate of greentech innovation together – and to finance the economies of the future.
Right now, there is an innovation-based industrial revolution going on to re-shape our world for the better.
Unfortunately, it´s happening too slow. Innovations and new technologies take too long to enter the market and to then scale in a meaningful way. Capital, capabilities (know-how) and connections are the greatest limiting factors.
US solar PPA / leasing sector - research summaryHarald Överholm
How can innovative sustainable technologies be spread to make an impact on global warming and resource scarcity? This research deals with how business model innovation can contribute to the take-up of sustainable technologies. Property owners who would otherwise consider installing solar panels have been put off by the up-front costs and
the steep learning curve involved. So a new type of firm has emerged that provides a ‘solar service’ to residential customers - the firm builds, owns and maintains the solar panels and sells the electricity back to the property owner.
The concept of Intelligent Energy Network is an effective way to highlight the importance of renewable energy sources. And Insights Success, in its upcoming edition “The 10 Most Intelligent Energy Tech Companies to Watch in 2021”,
This document brings together a set
of latest data points and publicly
available information relevant for
Healthcare Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Resources Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Business Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Telecommunication & Media
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Travel & Transportation Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Technology Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Energy Industry. We are very excited
to share this content and believe that
readers will benefit from this
periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Retail & Consumer Goods Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
ITShades.com has been founded with
the singular aim of engaging and
enabling the best and brightest of
businesses, professionals and
students with opportunities,
learnings, best practices,
collaboration and innovation from IT
industry.
This document brings together a set
of latest data points and publicly
available information relevant for
Insurance Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
ITShades.com has been founded with
the singular aim of engaging and
enabling the best and brightest of
businesses, professionals and
students with opportunities,
learnings, best practices,
collaboration and innovation from IT
industry.
This document brings together a set
of latest data points and publicly
available information relevant for
Financial Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Energy Industry. We are very excited
to share this content and believe that
readers will benefit from this
periodic publication immensely.
I-Byte Telecommunication & Media April 2021EGBG Services
This document brings together a set
of latest data points and publicly
available information relevant for
Telecommunication & Media
Industry. We are very excited to share
this content and believe that readers
will benefit from this periodic
publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Business Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Technology Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Travel & Transportation Industry. We
are very excited to share this content
and believe that readers will benefit
from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Retail & Consumer Goods Industry.
We are very excited to share this
content and believe that readers will
benefit from this periodic publication
immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Insurance Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
This document brings together a set
of latest data points and publicly
available information relevant for
Financial Services Industry. We are
very excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
Multi-source connectivity as the driver of solar wind variability in the heli...Sérgio Sacani
The ambient solar wind that flls the heliosphere originates from multiple
sources in the solar corona and is highly structured. It is often described
as high-speed, relatively homogeneous, plasma streams from coronal
holes and slow-speed, highly variable, streams whose source regions are
under debate. A key goal of ESA/NASA’s Solar Orbiter mission is to identify
solar wind sources and understand what drives the complexity seen in the
heliosphere. By combining magnetic feld modelling and spectroscopic
techniques with high-resolution observations and measurements, we show
that the solar wind variability detected in situ by Solar Orbiter in March
2022 is driven by spatio-temporal changes in the magnetic connectivity to
multiple sources in the solar atmosphere. The magnetic feld footpoints
connected to the spacecraft moved from the boundaries of a coronal hole
to one active region (12961) and then across to another region (12957). This
is refected in the in situ measurements, which show the transition from fast
to highly Alfvénic then to slow solar wind that is disrupted by the arrival of
a coronal mass ejection. Our results describe solar wind variability at 0.5 au
but are applicable to near-Earth observatories.
Richard's aventures in two entangled wonderlandsRichard Gill
Since the loophole-free Bell experiments of 2020 and the Nobel prizes in physics of 2022, critics of Bell's work have retreated to the fortress of super-determinism. Now, super-determinism is a derogatory word - it just means "determinism". Palmer, Hance and Hossenfelder argue that quantum mechanics and determinism are not incompatible, using a sophisticated mathematical construction based on a subtle thinning of allowed states and measurements in quantum mechanics, such that what is left appears to make Bell's argument fail, without altering the empirical predictions of quantum mechanics. I think however that it is a smoke screen, and the slogan "lost in math" comes to my mind. I will discuss some other recent disproofs of Bell's theorem using the language of causality based on causal graphs. Causal thinking is also central to law and justice. I will mention surprising connections to my work on serial killer nurse cases, in particular the Dutch case of Lucia de Berk and the current UK case of Lucy Letby.
A brief information about the SCOP protein database used in bioinformatics.
The Structural Classification of Proteins (SCOP) database is a comprehensive and authoritative resource for the structural and evolutionary relationships of proteins. It provides a detailed and curated classification of protein structures, grouping them into families, superfamilies, and folds based on their structural and sequence similarities.
The increased availability of biomedical data, particularly in the public domain, offers the opportunity to better understand human health and to develop effective therapeutics for a wide range of unmet medical needs. However, data scientists remain stymied by the fact that data remain hard to find and to productively reuse because data and their metadata i) are wholly inaccessible, ii) are in non-standard or incompatible representations, iii) do not conform to community standards, and iv) have unclear or highly restricted terms and conditions that preclude legitimate reuse. These limitations require a rethink on data can be made machine and AI-ready - the key motivation behind the FAIR Guiding Principles. Concurrently, while recent efforts have explored the use of deep learning to fuse disparate data into predictive models for a wide range of biomedical applications, these models often fail even when the correct answer is already known, and fail to explain individual predictions in terms that data scientists can appreciate. These limitations suggest that new methods to produce practical artificial intelligence are still needed.
In this talk, I will discuss our work in (1) building an integrative knowledge infrastructure to prepare FAIR and "AI-ready" data and services along with (2) neurosymbolic AI methods to improve the quality of predictions and to generate plausible explanations. Attention is given to standards, platforms, and methods to wrangle knowledge into simple, but effective semantic and latent representations, and to make these available into standards-compliant and discoverable interfaces that can be used in model building, validation, and explanation. Our work, and those of others in the field, creates a baseline for building trustworthy and easy to deploy AI models in biomedicine.
Bio
Dr. Michel Dumontier is the Distinguished Professor of Data Science at Maastricht University, founder and executive director of the Institute of Data Science, and co-founder of the FAIR (Findable, Accessible, Interoperable and Reusable) data principles. His research explores socio-technological approaches for responsible discovery science, which includes collaborative multi-modal knowledge graphs, privacy-preserving distributed data mining, and AI methods for drug discovery and personalized medicine. His work is supported through the Dutch National Research Agenda, the Netherlands Organisation for Scientific Research, Horizon Europe, the European Open Science Cloud, the US National Institutes of Health, and a Marie-Curie Innovative Training Network. He is the editor-in-chief for the journal Data Science and is internationally recognized for his contributions in bioinformatics, biomedical informatics, and semantic technologies including ontologies and linked data.
Richard's entangled aventures in wonderlandRichard Gill
Since the loophole-free Bell experiments of 2020 and the Nobel prizes in physics of 2022, critics of Bell's work have retreated to the fortress of super-determinism. Now, super-determinism is a derogatory word - it just means "determinism". Palmer, Hance and Hossenfelder argue that quantum mechanics and determinism are not incompatible, using a sophisticated mathematical construction based on a subtle thinning of allowed states and measurements in quantum mechanics, such that what is left appears to make Bell's argument fail, without altering the empirical predictions of quantum mechanics. I think however that it is a smoke screen, and the slogan "lost in math" comes to my mind. I will discuss some other recent disproofs of Bell's theorem using the language of causality based on causal graphs. Causal thinking is also central to law and justice. I will mention surprising connections to my work on serial killer nurse cases, in particular the Dutch case of Lucia de Berk and the current UK case of Lucy Letby.
Professional air quality monitoring systems provide immediate, on-site data for analysis, compliance, and decision-making.
Monitor common gases, weather parameters, particulates.
Slide 1: Title Slide
Extrachromosomal Inheritance
Slide 2: Introduction to Extrachromosomal Inheritance
Definition: Extrachromosomal inheritance refers to the transmission of genetic material that is not found within the nucleus.
Key Components: Involves genes located in mitochondria, chloroplasts, and plasmids.
Slide 3: Mitochondrial Inheritance
Mitochondria: Organelles responsible for energy production.
Mitochondrial DNA (mtDNA): Circular DNA molecule found in mitochondria.
Inheritance Pattern: Maternally inherited, meaning it is passed from mothers to all their offspring.
Diseases: Examples include Leber’s hereditary optic neuropathy (LHON) and mitochondrial myopathy.
Slide 4: Chloroplast Inheritance
Chloroplasts: Organelles responsible for photosynthesis in plants.
Chloroplast DNA (cpDNA): Circular DNA molecule found in chloroplasts.
Inheritance Pattern: Often maternally inherited in most plants, but can vary in some species.
Examples: Variegation in plants, where leaf color patterns are determined by chloroplast DNA.
Slide 5: Plasmid Inheritance
Plasmids: Small, circular DNA molecules found in bacteria and some eukaryotes.
Features: Can carry antibiotic resistance genes and can be transferred between cells through processes like conjugation.
Significance: Important in biotechnology for gene cloning and genetic engineering.
Slide 6: Mechanisms of Extrachromosomal Inheritance
Non-Mendelian Patterns: Do not follow Mendel’s laws of inheritance.
Cytoplasmic Segregation: During cell division, organelles like mitochondria and chloroplasts are randomly distributed to daughter cells.
Heteroplasmy: Presence of more than one type of organellar genome within a cell, leading to variation in expression.
Slide 7: Examples of Extrachromosomal Inheritance
Four O’clock Plant (Mirabilis jalapa): Shows variegated leaves due to different cpDNA in leaf cells.
Petite Mutants in Yeast: Result from mutations in mitochondrial DNA affecting respiration.
Slide 8: Importance of Extrachromosomal Inheritance
Evolution: Provides insight into the evolution of eukaryotic cells.
Medicine: Understanding mitochondrial inheritance helps in diagnosing and treating mitochondrial diseases.
Agriculture: Chloroplast inheritance can be used in plant breeding and genetic modification.
Slide 9: Recent Research and Advances
Gene Editing: Techniques like CRISPR-Cas9 are being used to edit mitochondrial and chloroplast DNA.
Therapies: Development of mitochondrial replacement therapy (MRT) for preventing mitochondrial diseases.
Slide 10: Conclusion
Summary: Extrachromosomal inheritance involves the transmission of genetic material outside the nucleus and plays a crucial role in genetics, medicine, and biotechnology.
Future Directions: Continued research and technological advancements hold promise for new treatments and applications.
Slide 11: Questions and Discussion
Invite Audience: Open the floor for any questions or further discussion on the topic.
1. IT Shades
Engage & Enable
I-Bytes
Utilities
July Edition 2021
Email us - marketing@itshades.com
Website : www.itshades.com
2. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
About Us
Who We are Aim of this IByte Reasons to talk to us
ITShades.com has been founded with
singular aim of engaging and
enabling the best and brightest of
businesses, professionals and
students with opportunities,
learnings, best practices,
collaboration and innovation from IT
industry.
This document brings together a set
of latest data points and publicly
available information relevant for
Utilities Industry. We are very
excited to share this content and
believe that readers will benefit from
this periodic publication immensely.
1. Publishing of your company’s solutions/
announcements in this document.
2. Subscribe to this and other periodic
publications i.e. I-Bytes, Solution Letters from
ITShades.com.
3. For placement of your company's click-able
logo and advertisements.
4. Feedback for us to improve the content and
format of these periodic publications.
3. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
Sponsoring Companies for this Edition
LOGO 1 LOGO 2 LOGO 3
LOGO 4 LOGO 5
4. IT Shades
Engage & Enable
For any queries, Please write to marketing@itshades.com
Table of Contents
1. Solution Updates.................................................................................................................................................1
2. Rewards and Recognition Updates...................................................................................................................4
3. Customer Success Updates...............................................................................................................................14
4. Partnership Ecosystem Updates......................................................................................................................16
5. Environment & Social Updates.......................................................................................................................47
5. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
Solutions Updates
Utilities Industry
6. Lorem ipsum
dolor sit amet,
consec-
tetuer
adipisc-
ing elit,
sed
diam
nonum-
my
nibh
euis-
mod
tincid-
unt ut
laoreet
dolore
magna
aliquam
erat
volutpat.
Ut wisi enim ad
minim veniam, quis nostrud exerci tation
ullamcorper
Lorem
ipsum dolor sit
amet, consectetuer
adipiscing elit, sed diam
nonummy
nib
Solution Updates
IT Shades
Engage & Enable
Duke (USA) Energy begins construction on largest solar plant in Surry
County N.C.
For any queries, Please write to marketing@itshades.com
1
Solution Description
Duke Energy continues to expand solar power in North Carolina with construction starting on its 22.6-megawatt (MW) Stony Knoll Solar power plant. Once
completed, it will be the largest solar plant in Surry County. The project will be owned and operated by Duke Energy Sustainable Solutions. The project was
selected as part of the competitive bidding process established by 2017’s solar legislation in North Carolina. The solar plant will contain 76,600 Trina Solar
bifacial modules with single-axis tracking. The plant will be located on 195 acres in Dobson, N.C. – near Rockford Road. The facility will power the
equivalent of 5,000 homes. It is targeting commercial operation by the end of 2021. Under North Carolina’s Competitive Procurement for Renewable Energy,
proposed projects must be built where there is a need for energy capacity on the Duke Energy system in North Carolina or South Carolina. The bids can come
from any company, including Duke Energy, and can be in the form of power purchase agreements (PPA), utility self-developed facilities or utility asset
acquisitions. During peak construction, Stony Knoll Solar will create about 70 jobs. Along with indirect economic benefits that accompany solar project
development, such as increased local spending in the service and construction industries, Stony Knoll Solar will also have a positive economic impact on the
local community by providing local tax revenues to the county and local school districts, as well as meaningful payments to the participating landowners.
Duke Energy Sustainable Solutions also supports the communities where its facilities and team members are based through the efforts of the Duke Energy
Foundation. In January, the company awarded $10,000 to Copeland Elementary School in Dobson to fund the purchase of Chromebooks for students.
7. Lorem ipsum
dolor sit amet,
consec-
tetuer
adipisc-
ing elit,
sed
diam
nonum-
my
nibh
euis-
mod
tincid-
unt ut
laoreet
dolore
magna
aliquam
erat
volutpat.
Ut wisi enim ad
minim veniam, quis nostrud exerci tation
ullamcorper
Lorem
ipsum dolor sit
amet, consectetuer
adipiscing elit, sed diam
nonummy
nib
Solution Updates
IT Shades
Engage & Enable
Exelon (USA) Foundation Launches First-Ever Hybrid STEM Leadership
Academy
For any queries, Please write to marketing@itshades.com
2
Solution Description
The Exelon Foundation in collaboration with Exelon Corp., a Fortune 100 company and the nation’s largest generator of carbon-free energy, has
announced the return of its annual STEM Leadership Academy, which was launched in 2018 to encourage female students to pursue careers in
Science, Technology, Engineering and Math (STEM). The Exelon Foundation hosts the STEM Academy events in cities where Exelon has
operating companies. The 2021 iteration of the Academy will be held for 180 students in Chicago (July 11-16), Philadelphia (July 25-30) and
Washington D.C./Baltimore (August 1-6). Amid easing pandemic restrictions, Academy participants will gather masked and in person for the first
day of each Academy. All participants will return to a virtual format for the remainder of each Academy, which will examine issues relating to
climate change. As part of the three week-long Academy events, 60 high school girls in each market will gather on the first day of the Academy to
pick up tools and needed supplies for experiments during the week, and then participate in online educational seminars, discussions and hands-on
workshops on the remaining days. Attendees also will take virtual field trips to noteworthy STEM-related landmarks in each host city. This year’s
Academy event will place a special focus on addressing the growing impacts of climate change and the disproportionate ways it is affecting the
most under-resourced populations. Students will be challenged to design their own energy-efficient product prototypes, with a panel of judges
selecting a winning project at the conclusion of each Academy.
8. Lorem ipsum
dolor sit amet,
consec-
tetuer
adipisc-
ing elit,
sed
diam
nonum-
my
nibh
euis-
mod
tincid-
unt ut
laoreet
dolore
magna
aliquam
erat
volutpat.
Ut wisi enim ad
minim veniam, quis nostrud exerci tation
ullamcorper
Lorem
ipsum dolor sit
amet, consectetuer
adipiscing elit, sed diam
nonummy
nib
Solution Updates
IT Shades
Engage & Enable
Snam (Italy) Launches Its First Techub
For any queries, Please write to marketing@itshades.com
3
Solution Description
Snam has inaugurated in Bologna its first district of the future entirely managed with the aid of digital technologies that help reduce emissions, improve the
safety and resilience of infrastructure and increase operational efficiency in the region. The TecHub is part of an overall plan to digitalise Snam’s activities,
which envisages 500 million euros in investments by 2024. The inauguration of the TecHub in Bologna was attended, among others, by the President of the
Emilia-Romagna Region Stefano Bonaccini, the assessor for Economic development, Green economy, Work and Training of the Emilia-Romagna Region
Vincenzo Colla, the professor of Philosophy and Information Ethics at the Oxford University and of Sociology of Communication at the Alma Mater
Studiorum University of Bologna Luciano Floridi, among the world’s leading experts in the field of artificial intelligence, the pro-rector of the Alma Mater
Studiorum University of Bologna Antonino Rotolo, and the CEO of Snam Marco Alverà. During the event, Marco Alverà and Antonino Rotolo signed a
collaboration agreement between Snam and Alma Mater University, aimed at launching research, development and innovation activities. The areas of
collaboration will concern, more specifically green hydrogen technologies and Industrial IoT (Industrial Internet of Things), as well as potential joint
initiatives in the field of education, career guidance and technology transfer, also involving start-ups. The central-eastern district, headquartered in Bologna,
controls more than 4,000 km of gas pipelines, 80 reduction plants and more than 1,000 redelivery points between Emilia-Romagna and Marche. It is one of
eight Snam districts, distributed along the entire Italian peninsula, which supervise and control the activities of the 48 maintenance centres operating
throughout the country.
9. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
Rewards & Recognition
Updates Utilities Industry
10. R & R Updates
IT Shades
Engage & Enable
AEP (USA) Receives Top Score on Disability Equality Index, Named A
Best Place to Work for Disability Inclusion
For any queries, Please write to marketing@itshades.com
4
American Electric Power received a score of 100 on Disability:IN’s Disability Equality Index and was named a Best Place
to Work for Disability Inclusion. This is the sixth consecutive year the company was recognized for its commitment to
disability inclusion and equality. The DEI is a benchmarking tool that helps Fortune 1000 companies measure disability
workplace inclusion against competitors. AEP’s score was based on its performance in multiple categories including
culture and leadership; enterprise-wide access; employment practices (benefits, recruitment, employment, education,
retention and advancement, accommodations); community engagement; and supplier diversity. In response to the
COVID-19 pandemic, the DEI added new non-weighted questions about innovative technology to advance digital and
remote accessibility; mental wellness benefits; services for Deaf and hard of hearing employees and flexible work options.
AEP was one of 319 companies that received a score of 80 or higher.
R&R Description
11. R & R Updates
IT Shades
Engage & Enable
AEP (USA) Ranked First For Utilities on Just Capital's Top 100 U.S.
Companies Supporting Healthy Communities and Families List
For any queries, Please write to marketing@itshades.com
5
American Electric Power was named to JUST Capital’s Top 100 U.S. Companies Supporting Healthy Communities and Families list, which recognizes
organizations that set the bar in promoting the health and wellness of their employees, their families and the communities they serve. The company ranked first
overall in the utilities sector and received the top spot in the workers category for utilities. AEP also tied for first place overall in the diversity, equity and inclusion
subcategory. JUST Capital, in partnership with the Robert Woods Johnson Foundation, created the list by evaluating Russell 1000 companies on key areas
including how they invest in employees, support communities, treat customers, deliver value to shareholders, and reduce their environmental impact. AEP also was
included on Forbes and JUST Capital’s JUST 100 list and Newsweek’s America’s Most Responsible Companies list this year. Learn more about AEP’s
commitment to its employees and the communities it serves. American Electric Power, based in Columbus, Ohio, is focused on building a smarter energy
infrastructure and delivering new technologies and custom energy solutions to our customers. AEP’s approximately 16,800 employees operate and maintain the
nation’s largest electricity transmission system and more than 223,000 miles of distribution lines to efficiently deliver safe, reliable power to nearly 5.5 million
regulated customers in 11 states. AEP also is one of the nation’s largest electricity producers with approximately 30,000 megawatts of diverse generating capacity,
including more than 5,500 megawatts of renewable energy. AEP’s family of companies includes utilities AEP Ohio, AEP Texas, Appalachian Power (in Virginia
and West Virginia), AEPAppalachian Power (in Tennessee), Indiana Michigan Power, Kentucky Power, Public Service Company of Oklahoma, and Southwestern
Electric Power Company (in Arkansas, Louisiana, east Texas and the Texas Panhandle).
R&R Description
12. R & R Updates
IT Shades
Engage & Enable
AEP (USA) Foundation Awards $1 Million Grant to Ywca Columbus--ennnn
For any queries, Please write to marketing@itshades.com
6
American Electric Power Foundation has awarded a $1 million, multi-year grant to the YWCA in Columbus, Ohio. The gift is part of the foundation’s
Delivering on the Dream: Social and Racial Justice grant program, which is a five-year, $5 million commitment to fund organizations with programs
dedicated to advancing social and racial justice in communities American Electric Power ) serves. Delivering on the Dream is a new initiative created by the
AEP Foundation to direct funds to programs addressing systemic racism and injustice. The company also is encouraging its workforce to make personal
commitments as allies and to act as catalysts for change. The YWCA will use the grant to advocate for policies that promote housing justice and economic
mobility for women and people of color. The YWCA’s multi-pronged approach includes Diversity, Equity & Inclusion training services to increase racial
literacy, increasing staff capacity for advocacy activities, developing new programming around local elections and civic engagement and other efforts to
support equitable policies to improve life outcomes for communities of color and women. The American Electric Power Foundation provides a permanent,
ongoing resource for charitable initiatives in the communities served by AEP and initiatives outside of AEP’s 11-state service area. The Foundation focuses
on improving lives through education from early childhood through higher education in the areas of science, technology, engineering and mathematics, and
by meeting basic needs for emergency shelter, affordable housing and the elimination of hunger. Other Foundation support may be offered to protect the
environment, support healthcare and safety, and enrich life through art, music and cultural heritage. The AEP Foundation is based in Columbus, Ohio.
R&R Description
13. R & R Updates
IT Shades
Engage & Enable
Duke (USA) Energy advances local workforce in Ohio, Kentucky with $300,000
in grants to help job seekers, students prepare for employment-ennnn
For any queries, Please write to marketing@itshades.com
7
Duke Energy is awarding $300,000 in grants to 14 workforce development and education programs in Ohio and Kentucky
to help job seekers and students prepare for employment, primarily in the energy sector. The grants will be used to support
education and training programs to prepare future employees with the necessary skills to enter the workforce. As the
energy industry continues its exciting transformation, the Duke Energy Foundation is investing in workforce programs in
the energy sector to help build the next generation workforce as well as create access to training and job skills programs
the community needs. One of this year’s recipients is Butler Technology and Career Development Center, which is
receiving a $100,000 grant to begin a utility pipeline installer program to train 24 students the first year. In Kentucky,
Gateway Community College will receive a grant to expand its Utility Lineworker Certificate Program.
R&R Description
14. R & R Updates
IT Shades
Engage & Enable
Entergy ((USA) Recognized as One of the 50 Most Community-Minded
Companies in the United States
For any queries, Please write to marketing@itshades.com
9
Points of Light, the world’s largest organization dedicated to volunteer service, has named Entergy Corporation as a 2021 honoree of The Civic 50. For the sixth
consecutive year, Entergy has been recognized as one of the 50 most community-minded companies in the United States. The Civic 50 provides a national standard
for corporate citizenship and showcases how companies can use their time, skills and resources to drive social impact in their communities and company. While
this recognition reinforces our business strategy to grow a world-class energy business that delivers long-term, sustainable value for our customers, employees,
communities and owners, Entergy has long promoted a culture of community involvement and volunteerism. Through its Community Connector program, Entergy
offers 16 hours of volunteer paid time off and volunteer grants, based on the number of hours served, to all employees. Since tracking began in the Community
Connectors volunteer portal in April 2008, Entergy employees and retirees have given more than one million hours in volunteer service. In 2020 alone, Entergy
employees and retirees contributed 95,000 volunteer hours valued at $3.4 million. More than 3,600 of the total volunteer hours were dedicated to pro bono service,
resulting in $932,000 of in-kind legal services. Since it was launched in 2012, The Civic 50 has provided a roadmap for good corporate citizenship and showcases
how committed companies are moving social impact, civic engagement and community to the center of their business. The honorees are companies with annual
U.S. revenues of at least $1 billion and are selected based on four dimensions of their corporate citizenship and social impact programs – investment of resources,
integration across business functions, institutionalization through policies and systems and impact measurement. To learn more about The Civic 50 and honorees,
visit www.Civic50.org.
R&R Description
15. R & R Updates
IT Shades
Engage & Enable
FirstEnergy Corp. (USA): Toledo Edison Recognized as a “Most Trusted,”
Top Performing U.S. Utility
For any queries, Please write to marketing@itshades.com
10
Toledo Edison, a FirstEnergy Corp. electric company, has been recognized by residential customers as a trusted and top performing utility in customer satisfaction
during the COVID-19 pandemic, according to a recent study evaluating the performance of electric, natural gas and combination utilities across the country.
Escalent, a consumer research firm, named Toledo Edison to its 2021 Most Trusted Utility Brands list within the Cogent Syndicated Utility Trusted Brand &
Customer Engagement™: Residential study, which is based on a nationwide survey of more than 76,000 residential customers of the 140 largest U.S. utility
companies. Survey feedback is used to determine a Brand Trust Index score that rates customer focus community support, communications effectiveness,
reliability, environmental dedication and company reputation. Customer trust in utility companies spiked to the highest score ever on Escalent's utility Brand Trust
Index – 706 on a 1,000-point scale. Toledo Edison earned a score of 713 and was recognized among the top 38 most trusted utilities. The study found that utilities
that focused on communications about customer programs, community partnerships during the pandemic and environmental efforts saw the highest increase in
customer satisfaction and trust last year. Utilities that offer digital options, like an online account portal and customer support on social media, were rated more
favorably by customers. From the start of the pandemic, FirstEnergy and its electric companies continued to deliver uninterrupted service to customers while
prioritizing the health and safety of customers and employees by implementing safety protocols for field crews, utilizing personal protective equipment and
following social distancing guidelines. Customer service teams continued to handle customer inquiries from remote workstations.
R&R Description
16. R & R Updates
IT Shades
Engage & Enable
FirstEnergy Corp. (USA): Toledo Edison Recognized as a “Most Trusted,”
Top Performing U.S. Utility
For any queries, Please write to marketing@itshades.com
10
Toledo Edison, a FirstEnergy Corp. electric company, has been recognized by residential customers as a trusted and top performing utility in customer satisfaction
during the COVID-19 pandemic, according to a recent study evaluating the performance of electric, natural gas and combination utilities across the country.
Escalent, a consumer research firm, named Toledo Edison to its 2021 Most Trusted Utility Brands list within the Cogent Syndicated Utility Trusted Brand &
Customer Engagement™: Residential study, which is based on a nationwide survey of more than 76,000 residential customers of the 140 largest U.S. utility
companies. Survey feedback is used to determine a Brand Trust Index score that rates customer focus community support, communications effectiveness,
reliability, environmental dedication and company reputation. Customer trust in utility companies spiked to the highest score ever on Escalent's utility Brand Trust
Index – 706 on a 1,000-point scale. Toledo Edison earned a score of 713 and was recognized among the top 38 most trusted utilities. The study found that utilities
that focused on communications about customer programs, community partnerships during the pandemic and environmental efforts saw the highest increase in
customer satisfaction and trust last year. Utilities that offer digital options, like an online account portal and customer support on social media, were rated more
favorably by customers. From the start of the pandemic, FirstEnergy and its electric companies continued to deliver uninterrupted service to customers while
prioritizing the health and safety of customers and employees by implementing safety protocols for field crews, utilizing personal protective equipment and
following social distancing guidelines. Customer service teams continued to handle customer inquiries from remote workstations.
R&R Description
17. R & R Updates
IT Shades
Engage & Enable
Iberdrola (Spain) awards fabrication of Baltic Eagle foundations to EEW
SPC and Windar--ennnn
For any queries, Please write to marketing@itshades.com
11
Iberdrola has finalised the procurement process for Baltic Eagle with the award of the project's last key contract, the manufacturing of offshore foundations, to
EEW SPC and Windar. German company EEW SPC will deliver 50 monopiles while Spanish company Windar will fabricate the same number of transition pieces,
which links the turbine towers to the foundations. Both companies have extensive experience in the offshore wind sector, having supplied components and
equipment to numerous projects across Europe. The monopiles will be fabricated at EEW's mega-factory in Rostock, located by the Baltic Sea. Grouped into deep
and shallow clusters, the monopiles are between 9m and 8.75m in diameter and their range in length varies from 75 to 90 meters, depending on the water depth for
each wind turbine position. The heaviest monopile is 1,402 tonnes and EEW SPC will be processing about 64,600 tonnes of steel for this order, starting in January
2022 and running through to January 2023. Load out will begin in April 2023 and the installation campaign is scheduled to last approximately six weeks. The main
construction activities for the transition pieces will be carried out in Windar´s shipyard located in Avilés. This manufacturing process will involve some 30 Windar
suppliers in the North of Spain, including steel production, components, equipment, and testing and auxiliary machinery companies. The contract will create 800
jobs and 1.3 million man-hours. Fabrication works will begin in October 2021 and will run through to December 2022, with load out planned for the beginning of
2023. With a production capacity of 476 MW, the Baltic Eagle offshore wind farm will supply renewable energy to 475,000 households, while saving nearly one
million tons of CO2 emissions each year. It is scheduled to be fully operational by the end of 2024.
R&R Description
18. R & R Updates
IT Shades
Engage & Enable
Iberdrola (Spain) wins more than 15% of new onshore wind capacity
auctioned in Poland
For any queries, Please write to marketing@itshades.com
12
Iberdrola is making progress in its commitment to develop renewables in Poland, one of the company's new growth markets for the years ahead.
The company has been awarded 50 megawatts (MW) of the total 300 MW of onshore wind capacity auctioned in the country, representing almost
17% of the total. This brings the company's onshore wind capacity in operation and under development in the country to 163 MW, after recently
completing its agreement with CEE Equity Partners, signed in March. This deal included the acquisition of two operational wind farms, with 112.5
MW of capacity, and access to a third, with 50 MW, confirmed at the auction. Almost all of Iberdrola´s onshore wind capacity in Poland is
associated with 10-year power purchase agreements (PPAs). The company also has a portfolio of seven offshore projects, with a potential capacity
of up to 7,300 MW, following the recent acquisition of 70% of the developer Sea Wind. With these offshore projects Iberdrola is working on the
implementation of the Baltic Sea Hub. The Hub will act as a focal point for offshore and onshore services, as well as providing local content for
Iberdrola's projects in Germany, Poland and Sweden. The Baltic Sea has an offshore wind development potential of 93,000 MW, of which 28,000
MW would be in Polish waters. The result of auction also confirms Iberdrola's commitment to Poland, where it operates a local development team.
It also reaffirms the company's strategy of growing in A-rated countries - more than 75% of its Ebitda in 2020 came from A-rated countries.
R&R Description
19. R & R Updates
IT Shades
Engage & Enable
Republic Services (USA) Employees Sweep 2021 Driver of the Year,
Operator of the Year Industry Awards
For any queries, Please write to marketing@itshades.com
13
Republic Services, Inc. announced that, for the first time, it swept all National Waste & Recycling Association (NWRA) Drivers of the
Year and Operator of the Year awards in the national category. A record four employees from one company were recognized, highlighting
Republic team members' exemplary safety and customer service records. James Davis of Fort Lauderdale, Fla., is National Residential
Driver of the Year; Dedra McKinley of Baton Rouge, La., is National Commercial Driver of the Year; Redgenel "Tony" Forrest of
Charlotte, N.C., is National Industrial Driver of the Year; and Victoria Barragan of Milpitas, Calif., is Operator of the Year. The Driver of
the Year awards recognize drivers who safely operate their trucks, maintain a superior performance record and enhance the overall safety
and image of the industry in eight categories. The Operator of the Year designation recognizes an employee working in post-collection
for a materials recovery facility, landfill or transfer station who responsibly operates heavy equipment, including a bulldozer, front-end
loader or compactor. Since 2009, Republic drivers have won more than 70 percent of NWRA's Driver of the Year awards. This is
Republic's third consecutive Operator of the Year award, which was added in 2017. Barragan is the first woman to be recognized as
NWRA Operator of the Year.
R&R Description
20. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
Customer Success
Updates Utilities Industry
21. Customer Success Updates
IT Shades
Engage & Enable
Ameren (USA) Illinois Electric Vehicle Charging Plan Approved by ICC
For any queries, Please write to marketing@itshades.com
14
Ameren Illinois, a subsidiary of Ameren Corporation is announcing the Illinois Commerce Commission (ICC) has approved the company's electric vehicle charging
tariff, which will help jump-start electric vehicle adoption and charging station installation in central and southern Illinois and accelerate progress on the state's green
energy goals. The tariff, filed in August of 2020, allows the company to support the development of a network of charging infrastructure, and implement special
time-based delivery service rates and other incentives to encourage greater adoption of electric vehicles. There are six components to Ameren Illinois' Electric Vehicle
Charging Program –
• Single Family Residential Charging. Includes a special delivery service rate to encourage at-home charging during non-peak hours.
• Multi-Family Residential Charging. Designed to encourage electric vehicle ownership among those living in multi-family facilities, while also giving those residents
an option to charge at home. Also provides a special delivery service rate and supplemental line extension allowance for property owners who install charging facilities
at their properties, with additional allowances for installations in low income areas.
• Education Facility Charging. Offers special delivery service rates and incentives for electric school bus operators. Will support clean transportation for school children
in the Ameren Illinois territory.
• Transit Facility Charging. Offers special delivery service rates and incentives for those customers who operate public electric transit buses. Will support Ameren
Illinois' low-to-moderate income customer base by providing a means for those who don't own a vehicle to participate in the electrification of the transportation sector.
Description
22. Customer Success Updates
IT Shades
Engage & Enable
Snam (Italy): Corinth Pipeworks Delivers First Hydrogen-certified Pipe-
line Project for Snam’s High Pressure Gas Network in Italy
For any queries, Please write to marketing@itshades.com
15
Corinth Pipeworks, the steel pipes segment of Cenergy Holdings, is executing with Snam, one of the world's largest energy infrastructure companies, orders for 440km
of pipes. The above orders are among the first high-pressure newly manufactured pipes certified to transport up to 100% hydrogen for a transmission gas pipeline in
Europe. Following the framework of ASME B31.12 Option B, Corinth Pipeworks and Snam cooperation provides a technically and economically feasible solution for
the safe transportation of hydrogen at high pressures through large diameter/high strength steel pipelines. Thus, pipes produced and installed in the current gas network
can cover the energy mix of tomorrow. As required by this standard the pipes, in L415ME steel grade with an outside diameter of 26” (660mm) and thicknesses of
11,1mm & 15,9mm, have been tested in laboratory at maximum pressure and 100% hydrogen. The full quantity of hydrogen certified pipes was manufactured in Corinth
Pipeworks' plant in Thisvi, Greece. Scope of supply also includes external 3LPE anti-corrosion coating and internal liquid epoxy lining applied at the same location as
pipe manufacturing. With the support of its long-term partner in Italy, PIPEX Italia, Corinth Pipeworks has been a trusted supplier of Snam for over a decade with more
than 1,000Km of completed and under execution pipeline projects. In the context of this commonly organized project, Corinth Pipeworks and Snam have successfully
concluded the necessary action plan enabling these gas line pipes to be certified for up to 100% hydrogen. Action plan incorporated analysis of hydrogen design codes,
development of pertinent qualification specifications and test procedures, design of steel according to recommended practices and specialized long-term test campaigns
for the qualification of weld and parent metal crack resistance at design pressure and 100% hydrogen. The action plan was implemented in cooperation with RINA, an
acknowledged external certification body, highly experienced in hydrogen testing and fracture mechanics.
Description
23. IT Shades
Engage & Enable
Feel free to contact us at marketing@itshades.com for any queries
Partner Ecosystem
Updates Utilities Industry
24. Partner Ecosystem Updates
IT Shades
Engage & Enable
AGL (Australia) and Truck Tech Group gear up for energy transition with
switch to solar
For any queries, Please write to marketing@itshades.com
16
AGL is supporting regional businesses to drive the energy transition working with independent heavy vehicle repairer
Truck Tech Group on a new solar installation that is delivering cost and emission efficiencies. AGL has installed a 98.4
kilowatt (kW) solar system featuring 240 solar panels across Truck Tech Group’s warehouses and commercial sites,
with the total clean energy generated equivalent to powering 25 average Australian households each year. AGL General
Manager Commercial and Industrial, Ryan Warburton said AGL was proud to have helped Truck Tech Group reduce
its operating costs and carbon footprint. Truck Tech Group CEO, Barry Saad said Truck Tech Group was pleased to
have found a partner in AGL who was at the forefront of the renewable energy transition. Truck Tech Group Finance
Advisor Andrew Macias said since switching to solar, the cost savings have given Truck Tech Group the opportunity
to invest in future business development, essential to their growth.
Description
25. Partner Ecosystem Updates
IT Shades
Engage & Enable
Invenergy and AEP (USA) Renewables Solar Project Lights up Las Vegas
Strip
For any queries, Please write to marketing@itshades.com
17
Invenergy, a leading privately-held global developer and operator of sustainable energy solutions, and AEP Renewables, a subsidiary of American Electric Power
announced the start of commercial operations at the 100-megawatt MGM Resorts Mega Solar Array project in Nevada. The project supports the renewable energy
goals of MGM Resorts International, supplying up to 90% of MGM Resorts’ daytime power needs at its 13 Las Vegas Strip properties. Located in the desert north
of Las Vegas, the Mega Solar Array generates enough electricity to power about 27,000 average U.S. homes annually. The project supported approximately 250
jobs during the construction period and will generate over $12 million of property tax revenue over the 35-year project operating life and $1.3 million in state sales
tax revenue as well as indirect benefits to local businesses. Developed and constructed by Invenergy, the Mega Solar Array is contracted under a 20-year Power
Purchase Agreement (PPA) with MGM Resorts International, a partnership which was announced in 2018. MGM Resorts will purchase all the energy generated
by the project to power 65 million square feet of buildings across 13 properties in Las Vegas. AEP Renewables has invested in the project at 75% ownership
interest, and Invenergy retains minority ownership. Invenergy Services, a subsidiary of Invenergy, will provide Operations and Maintenance and Balance of Plant
services under a long-term agreement, adding to the 10-gigawatt global sustainable energy project portfolio it manages. MGM Resorts, through the 100-megawatt
PPA, significantly accelerates progress toward its 2025 goal to reduce emissions by 45% per square foot. The launch of the project builds on multiple efforts by
MGM Resorts to achieve its long-term climate goals, including having invested over $60 million in energy efficiency in its U.S. properties from 2007 and 2019.
Description
26. Partner Ecosystem Updates
IT Shades
Engage & Enable
Basic Agreement Signed on the Introduction of Automatic LPG Meter Reading Service,
Using Chubu Electric Power's (Japan) Smart Meter Communications Network
For any queries, Please write to marketing@itshades.com
18
Enegene Co., Ltd. and Chubu Electric Power Co., Inc. are pleased to announce that they signed a basic agreement after reaching consensus on
Enegene’s adoption of the automatic gas meter reading service that makes use of Chubu Electric Power's smart meter communications network.
As Japan's population decreases and ages, information technology advances, and customer needs diversify further, expectations are high that
utilizing ICT and IoT will reduce labor required for meter reading and lead to the creation of new services. Enegene has been utilizing telephone
lines in some supply areas (in Shizuoka prefecture) to remotely obtain LPG usage, gas leakage as well as other information and data about alerts
and gas residual volumes. The company has also employed this technology to remotely shut off, restore and perform other LPG meter operations.
Pursuant to this Basic Agreement, both parties will strive to improve customer service and reduce labor involved in meter reading operations as
they proceed in FY2021 to install wireless communication terminals on LP gas meters and implement automatic meter reading and other services
utilizing Chubu Electric Power's smart meter communications network in Enegene’s service area principally west of the Fuji River. Chubu Electric
Power will continue to help LPG, city gas, and water service operators adopt automatic meter reading, using its smart meter communications
network, as part of the community support infrastructure business designed to contribute to resolving social issues.
Description
27. Partner Ecosystem Updates
IT Shades
Engage & Enable
Consolidated Edison (USA): Crestwood and Con Edison Announce Divestiture
of Stagecoach Gas Services
For any queries, Please write to marketing@itshades.com
19
Crestwood Equity Partners LP and Consolidated Edison, Inc. announced that their subsidiaries entered into a purchase and sale agreement to divest
Stagecoach Gas Services LLC ("Stagecoach"), to a subsidiary of Kinder Morgan, Inc. (NYSE: KMI) for $1.225 billion. The cash proceeds from
the divestiture will be split pro rata between Crestwood and Con Edison in line with each member's 50% ownership interest in the joint venture.
The agreement was signed on May 31, 2021 and is subject to two closing periods. The first closing consists of the transfer of the Stagecoach
subsidiaries (with the exception of Twin Tier Pipeline LLC) valued at $1.195 billion, and is expected to occur following approval under
Hart-Scott-Rodino, during the third quarter of 2021. Crestwood intends to use net proceeds to repay outstanding borrowings under its revolving
credit facility and opportunistically utilize free cash flow after distributions for its board approved common and preferred equity buy-back
program. Stagecoach is comprised of premier natural gas pipeline and storage facilities that provide a critical link between robust natural gas
supply sources and Northeast US demand markets. Located in New York and Pennsylvania, Stagecoach consists of four natural gas storage
facilities (Stagecoach, Thomas Corners, Steuben and Seneca Lake) with a combined storage capacity of approximately 41 Bcf and three natural
gas pipelines (MARC I, North/South and the Twin Tier Pipeline) with a combined throughput capacity of approximately 3 Bcf per day.
Description
28. Partner Ecosystem Updates
IT Shades
Engage & Enable
Crestwood and Consolidated Edison (USA) Announce Closing of Stagecoach
Gas Services Divestiture
For any queries, Please write to marketing@itshades.com
20
Crestwood Equity Partners LP and Consolidated Edison, Inc. announced the successful divestiture of the subsidiaries of Stagecoach Gas Services LLC
(“Stagecoach”), with the exception of Twin Tier Pipeline LLC, to a subsidiary of Kinder Morgan, Inc. for $1.195 billion. The cash proceeds from the divestiture
were shared between Crestwood and Con Edison in line with each member’s 50% ownership interest in the joint venture. The closing of the remainder of the
transaction, which consists of the Twin Tier Pipeline LLC, for an additional $30 million, is subject to New York state regulatory approval and is expected to close
during the first quarter 2022. Stagecoach is comprised of premier natural gas pipeline and storage facilities that provide a critical link between robust natural gas
supply and Northeast US demand markets. Located in New York and Pennsylvania, Stagecoach consists of four natural gas storage facilities (Stagecoach, Thomas
Corners, Steuben and Seneca Lake) with a combined storage capacity of approximately 41 Bcf and three natural gas pipelines (MARC I, North/South and the Twin
Tier Pipeline) with a combined delivery capacity of approximately 3 Bcf per day. Forward-looking statements reflect information available and assumptions at the
time the statements are made, and speak only as of that time. Actual results may differ materially from those included in the forward-looking statements because
of various factors such as those identified in reports Crestwood and Con Edison have filed with the Securities and Exchange Commission, which are available
through the SEC’s EDGAR system at www.sec.gov and on each party’s respective website. Readers are cautioned not to place undue reliance on forward-looking
statements. Crestwood and Con Edison assume no obligation to update forward-looking statements.
Description
29. Partner Ecosystem Updates
IT Shades
Engage & Enable
Dominion Energy (USA) and Berkshire Hathaway Energy Agree to Terminate Sale
of Questar Pipelines; Dominion Energy Commencing Competitive Sale Process
For any queries, Please write to marketing@itshades.com
21
Dominion Energy and Berkshire Hathaway Energy, an affiliate of Berkshire Hathaway Inc. announced they have agreed to terminate the
planned sale of Questar Pipelines to Berkshire Hathaway Energy. The decision is a result of ongoing uncertainty associated with
achieving clearance from the Federal Trade Commission under the Hart-Scott-Rodino Antitrust Improvements Act of 1976. Termination
of the sale, effective July 9, 2021, was a potential outcome provided for in the agreement to sell Questar Pipelines. The decision has no
impact on the sale of gas transmission and storage assets to Berkshire Hathaway Energy completed in November 2020. That sale
represented approximately 80% of the original transaction value. Dominion Energy is commencing a competitive process for the sale of
Questar Pipelines, with a target close of year-end 2021. Announcement does not change Dominion Energy's existing financial guidance.
Dominion Energy will continue to account for Questar Pipelines as discontinued operations. Dominion Energy intends to enter into a
364-day term loan. The company will use proceeds from the loan to repay the approximately $1.3 billion transaction deposit made by
Berkshire Hathaway Energy. That loan is expected to be repaid by year-end 2021 with proceeds from the sale of Questar Pipelines to an
alternative buyer.
Description
30. Partner Ecosystem Updates
IT Shades
Engage & Enable
Dominion Energy (USA), Ørsted and Eversource Reach Deal on Contract to
Charter Offshore Wind Turbine Installation Vessel
For any queries, Please write to marketing@itshades.com
22
Dominion Energy, Ørsted and Eversource announced an agreement for Ørsted and Eversource to charter Dominion Energy's Charybdis, the first Jones Act-qualified
offshore wind turbine installation vessel in the United States, for the construction of two offshore wind farms in the Northeast. Charybdis, which is expected to be sea
ready by late 2023, will first be deployed out of New London harbor to support the construction of Revolution Wind and Sunrise Wind, both under joint development by
Ørsted and Eversource, to serve nearly 1 million homes in Rhode Island, Connecticut and New York. Once complete, the two projects will generate more than 1.6
gigawatts of clean, renewable energy. The charter's terms will allow the vessel, subject to state regulatory approval, to support construction of Dominion Energy's 2.6
gigawatt Coastal Virginia Offshore Wind (CVOW) project off the coast of Virginia Beach, which is expected, consistent with prior guidance, to be completed in 2026.
Dominion Energy is leading a consortium of renowned naval engineering and fabrication firms to build Charybdis, which will support thousands of American jobs, assist
in the development of a new domestic supply chain for the growing North American offshore wind industry and be fully utilized in support of the installation of offshore
wind generation off the East Coast. The approximately $500 million vessel will operate as part of Dominion Energy's Contracted Assets segment. Dominion Energy's
regulated customers, including in Virginia, will not experience any bill impact associated with use of the vessel in support of the Revolution Wind and Sunrise Wind
projects. The 472-foot vessel is being constructed in Brownsville, Texas, at global marine shipbuilder firm Keppel AmFELS's shipyard, using domestically-sourced steel.
At peak construction, 1,000 U.S. workers will be employed on this project. Once complete, the vessel will be homeported in Hampton Roads, Va., one of the nation's
premier offshore wind installation harbors, and utilize an American crew.
Description
31. Partner Ecosystem Updates
IT Shades
Engage & Enable
Duke (USA): 20,000 spotted seatrout released in Florida’s Pine Island Park
For any queries, Please write to marketing@itshades.com
23
In collaboration with Hernando County, Duke Energy, Coastal Conservation Association (CCA) Florida and Florida Fish and
Wildlife Conservation Commission (FWC) have released about 20,000 hatchery-reared spotted seatrout at Alfred McKethan/Pine
Island Park. The juvenile spotted seatrout are approximately 4 inches in length. The addition of these fish at Pine Island Park will
allow the existing ecosystem to thrive and create more abundant recreational fishing opportunities. Spotted seatrout do not tend to
travel far from where they are introduced, and many are likely to remain in the area. The spotted seatrout were provided by the Duke
Energy Mariculture Center in Crystal River, a certified aquaculture facility and multispecies hatchery that grows and releases redfish
and spotted seatrout into the Gulf of Mexico. Since opening in 1991, the Duke Energy Mariculture Center has cultivated and released
more than 4.1 million fish and crustaceans. In addition, the center grows a variety of submerged aquatic vegetation, such as eelgrass,
for lake and spring restoration and saltwater marsh vegetation, such as mangroves, for living shoreline projects to support the overall
health of Florida’s fisheries and marine habitats. It is one of the most successful marine-stocking programs in Florida focused on
environmental stewardship and conservation.
Description
32. Partner Ecosystem Updates
IT Shades
Engage & Enable
EDP (Portugal), TechnipFMC and Partners Join Forces to Develop a Concept
Study for Green Hydrogen Production from Offshore Wind Power
For any queries, Please write to marketing@itshades.com
24
EDP, TechnipFMC and other research partners are joining forces to develop a conceptual engineering and economic feasibility study for a new
offshore system for green hydrogen production from offshore wind power, called the BEHYOND project. The study will include innovative
integration of equipment for the production and conditioning of green hydrogen and infrastructure that allows for its transportation to the coast.
The goal is to create a unique concept that can be standardized and implemented worldwide, allowing for large-scale hydrogen production.
BEHYOND brings together global players in energy, EDP and TechnipFMC, with the CEiiA research center - Center for Engineering and
Development, WavEC-Offshore Renewables, and the University of South-Eastern Norway (USN). The joint development will allow the
consortium partners to position themselves in the hydrogen value chain, developing new business models and creating engineering solutions, new
products and services for the hydrogen sector, worldwide. This consortium will strengthen cooperation between Portugal and Norway and increase
Portugal's competitiveness in the growth of the “blue economy.” The BEHYOND project was selected for support by the Blue Growth Programme
of the European Economic Area Financial Mechanism (EEA Grants). EDP, through the participation of EDP NEW and EDP Inovação, is the
project coordinator and the entity responsible for the implementation of several phases, namely the strategic evaluation of the offshore
wind-to-hydrogen market, the definition of viable business cases and the technology roadmap to reach commercial maturity.
Description
33. Partner Ecosystem Updates
IT Shades
Engage & Enable
Blue Elephant Energy and EnBW (Germany) sign long-term power purchase
agreements for PV projects in Spain
For any queries, Please write to marketing@itshades.com
25
The Hamburg-based operator of solar and wind power plants Blue Elephant Energy AG (BEE) and EnBW Energie
Baden-Württemberg AG (EnBW) entered into long-term power purchase agreements (PPAs) for a 150-megawatt solar
park project in the Spanish region of Andalusia. Both parties have agreed not to disclose any details about the economic
terms of the electricity price, which has been fixed for 10 years. The BEE project which consists of three solar parks,
each with an installed capacity of 50 megawatt, and a substation, is already under construction. Grid connection of the
solar power plants is scheduled for the second quarter of 2022. The solar power plants are expected to generate around
315 gigawatt hours of eco-friendly electricity every year. That is enough solar energy to meet the annual electricity
needs of around 95,000 households and reduce annual carbon emissions by about 96,000 metric tons.
Description
34. Partner Ecosystem Updates
IT Shades
Engage & Enable
Enel (Italy) Green Power Espana announces a 10-year agreement for a fully
renewable energy supply with Johnson & Johnson
For any queries, Please write to marketing@itshades.com
26
Enel Green Power España has signed a 10-year, fully renewable Pan-European Virtual Power Purchase Agreement (VPPA) with the international
healthcare company Johnson & Johnson for 270 GWh/year of renewable power originated from a total generation capacity of 104 MW. This VPPA
will start in January 2023 and, along with other agreements previously signed by the international healthcare company, will bring Johnson &
Johnson to the equivalent of 100% renewable electricity in Europe by 2023. This is a huge step towards its climate goal of 100% renewable
electricity globally by 2025. The energy supply envisaged by the VPPA will be generated in three renewable plants currently under construction,
creating a hybrid energy mix that will combine solar and wind sources. 85% of the power will come from the Campillo II and III Wind Farms,
which are part of a cluster located in the Spanish province of Cuenca that will begin construction in the last quarter of 2021. The remaining 15%
will be provided by the 47 MW PV plant Veracruz, which is located in Badajoz. Through the agreement, the renewable energy provided to Johnson
& Johnson will avoid the annual emission of around 130,720 tons of CO2 into the atmosphere. Johnson & Johnson is committed to using resources
efficiently and reducing greenhouse gas (GHG) emissions, which affect the climate. As a leader in the healthcare industry, the multinational
company knows that human health is inextricably linked to the health of the planet – healthy people need a healthy planet.
Description
35. Partner Ecosystem Updates
IT Shades
Engage & Enable
Enel (Italy) X and SFIS together to promote Circular Economy best practices in
fashion
For any queries, Please write to marketing@itshades.com
27
Enel X and SFIS an association active in the fashion industry promoting the principles of sustainable production and innovation in the
related supply chain, have signed a partnership with the aim of guiding the companies involved in the SFIS "Phygital Sustainability
EXPO" project in a virtuous path of sustainability and circular economy. Enel X, the Enel Group's global business line that offers services
to accelerate innovation and drive the energy transition, will provide partners with its know-how and the best available methodologies:
from the Circular Economy Report to carbon footprint analyses and product LCA studies with the aim of identifying a carbon neutrality
roadmap. Enel X's Circular Economy Report is an innovative tool inspired by the five pillars of the Circular Economy: sustainable inputs,
sharing, product as a service, and useful life extension of products, reuse and recycling. The analyses carried out cover various aspects:
from product and process design, procurement policies, mobility and logistics to waste management and energy sources, with a focus on
efficiency and energy management. Once any gaps have been identified, Enel X guides its partners along the path of sustainability by
defining a "Roadmap" able to improve the level of sustainability and circularity of the company, through a targeted selection of
opportunities that generate economic savings and simultaneously a reduction in environmental impact and CO2.
Description
36. Partner Ecosystem Updates
IT Shades
Engage & Enable
Enel (Italy) and the Koelliker Group: working together on logistics services and
electric mobility solutions in Italy
For any queries, Please write to marketing@itshades.com
28
Developing solutions to accelerate the spread of electric mobility and providing integrated logistics services in key Italian maritime hubs:
these are the key goals behind the memorandum of understanding signed by Enel and Koelliker, a leading Italian company specialized in
importing and commercially distributing automotive brands and related logistics. This collaboration sees Enel X committing itself to offer
integrated support for innovative services aimed at developing electric mobility, and also involves Enel Logistics, an Enel Group
company created with the aim of developing logistic hubs in areas inside former power stations situated near important maritime hubs in
Italy. More specifically, Enel Logistics will therefore be able to offer its logistical services to support the importation of electric vehicles,
by managing all the operational aspects of the process. Enel X will implement a commercial strategy with Koelliker to assist numerous
electric vehicle manufacturers – particularly those in Asia and the USA – which intend to export their brands to Italy. Enel X will also
support Koelliker by providing advanced solutions for charging electric vehicles both in the home and in the city. These will include the
installation of Enel X JuiceBoxes, the innovative home charging stations, in dealerships of the Koelliker Group automotive brands; the
electrification of Koelliker client companies’ corporate fleets; and the activation of charging stations at the Group's offices.
Description
37. Partner Ecosystem Updates
IT Shades
Engage & Enable
Exelon (USA) Foundation and Exelon Corp. Name Selected Startups in Second
Round of Climate Change Investment Initiative
For any queries, Please write to marketing@itshades.com
29
The Exelon Foundation and Exelon Corp., the nation’s largest generator of carbon-free energy, have selected nine startups to
receive funding to reduce greenhouse gas emissions and mitigate climate change as part of the company’s Climate Change
Investment Initiative (2c2i). Now in its second year, the initiative demonstrates the Exelon Foundation’s commitment to
support programs that benefit the environment, particularly those in underserved communities, which are disproportionately
impacted by climate change. The 2c2i initiative adds to Exelon Corp.’s continuing goal to create a clean, next-generation
energy grid, utilizing the innovative approach of impact investing to mitigate climate change. The first cohort of the Exelon
2c2i selected startups have been busy this past year, with projects ranging from Amidus Resilience’s distributed solar
installation in Washington, D.C., to the pending deployment of Dynamhex’s map-based decarbonization tool in the Baltimore,
Md., region to Greenprint Partner’s rain-friendly, green stormwater mitigation project about to break ground at Sankofa
Freedom Academy, a K-12 Charter school in Philadelphia. For a full list of the first 2c2i portfolio, please click here.
Description
38. Partner Ecosystem Updates
IT Shades
Engage & Enable
Fortum (Finland) partners with Nasdaq to accelerate growth of the carbon
removal marketplace Puro.earth
For any queries, Please write to marketing@itshades.com
30
Fortum has signed an agreement to sell a majority share of its carbon removal startup Puro.earth to Nasdaq, a multinational financial services company. The
partnership will create a shared ownership structure designed to accelerate Puro.earth’s global growth and long-term market development as the forerunner of B2B
carbon removal marketplaces. Puro.earth, founded in 2019, has been developed to its current form under Fortum’s Valkea Growth Club. Puro.earth is the first
marketplace to offer carbon removal from the atmosphere that is verifiable and tradable through an open, online platform. Unlike traditional carbon compensation,
Puro.earth allows companies to neutralise their carbon footprint, beyond zero, by helping them source carbon removal to fulfil climate commitments. The current
Puro.earth corporate clients include, e.g., Microsoft. Fortum launched Valkea Growth Club to offer business development support, funding, and premises for
startups and growth companies. Valkea invests in high growth, game-changing companies that can help deliver Fortum’s carbon neutrality ambitions. Valkea
develops Fortum’s experimented concepts to standalone companies, of which Puro.earth is a great example, as well as looks for external, early-stage startups to
directly assist them on their growth journey. To support Puro.earth’s growth, Nasdaq will leverage its unique position in the intersection of the financial, corporate,
and regulatory communities where it assists its clients with navigating the global environmental, social, and governance (ESG) landscape. In addition to CO2
removal, Valkea’s existing nine portfolio companies are developing, for instance, electric vehicle charging, battery diagnostics, and digital electricity retail. Valkea
is actively looking for new ambitious startups operating in the clean energy and circular economy space to join them in innovating towards a cleaner future, as well
as investors and partners with shared interests.
Description
39. Partner Ecosystem Updates
IT Shades
Engage & Enable
Fortum (Finland) eNext and Uniper (Germany) Engineering to make joint
service offering for utilities and energy-intensive industries
For any queries, Please write to marketing@itshades.com
31
Fortum eNext and Uniper Engineering are among the first business units within the Fortum Group, to collaborate more closely in order to create
added value for industrial and utility customers through expanded services and increased expertise. For this purpose a joint offering has been
developed focusing mainly on the area of turbine and generator maintenance and modernisation services as well as in engineering and delivering
solutions for smart, next-generation low-carbon energy systems. This alliance brings together two independent service providers with a combined
1,500 experts serving customers globally, and with a local presence in Germany, UK, Finland, and Sweden. Both companies have a strong market
position with an established portfolio based on broad experience in serving energy-intensive industries and extensive engineering know-how
covering the whole life cycle of a power plant. In connection with the strategy update in December 2020, Fortum and Uniper announced that they
have together identified cooperation benefits covering a wide variety of business initiatives with a positive cash impact of approximately EUR 100
million annually on a consolidated Group basis to be achieved in 2025. This year in May, Fortum and Uniper announced having jointly finalised
the first planning phase in the three strategic cooperation areas of Nordic hydro and physical trading optimisation, wind and solar development,
and hydrogen. The principle behind all cooperation actions is that they will create value for both Fortum and Uniper, and, in particular, for
customers of both companies.
Description
40. Partner Ecosystem Updates
IT Shades
Engage & Enable
Naturgy (Spain) and Sonatrach agree to start up the Medgaz expansion in the
fourth quarter of this year
For any queries, Please write to marketing@itshades.com
32
The president of Notary, Francisco Reynés, and the president of Sonatrach, Toufik Hakkar, agreed on the entry into operation
of the Medgaz expansion for next autumn. Both companies held a working meeting in the Algerian city of Oran as part of a
visit to Medgaz. The agreement foresees the expansion of the gas pipeline capacity by 2 bcm / year, which is 25% more, to
exceed 10 bcm / year as of the fourth quarter. The expansion has involved an investment of approximately 90 million dollars
(73 million euros) and the installation of a fourth turbocharger to increase capacity to 10 bcm per year. Once the expansion
comes into operation, 25% of Spanish natural gas consumption will go through Medgaz. After an uninterrupted decade of
operations and an initial investment of more than 1,000 million dollars, the entry into operation of the Medgaz expansion
reinforces the security of supply to Spain as it is a key infrastructure for the transportation of natural gas. Likewise, the
activation of the expansion of the gas pipeline capacity strengthens the strategic alliance between Naturgy and Sonatrach. The
Algerian company is one of the leading gas suppliers to Spain and is, in turn, Naturgy's fourth shareholder with a 4% stake.
Description
41. Partner Ecosystem Updates
IT Shades
Engage & Enable
Naturgy (Spain): Nedgia and CaixaBank will provide customers with the
installation of natural gas in their homes
For any queries, Please write to marketing@itshades.com
33
Nedgia and CaixaBank, through CaixaBank Payments & Consumer, a leading entity in consumer financing and payment methods in
Spain, have signed a collaboration agreement to finance, under very advantageous conditions, the cost of installing natural gas for
customers of the residential sector. The national agreement will finance 0% the cost of installation for new customers of the Naturgy
group gas distributor who wants to increase comfort in their homes by installing high-efficiency natural gas solutions that will be
connected to the Nedgia network. The signing ceremony was attended by the Director of Strategic Agreements of CaixaBank Payments
& Consumer, Igor Sanchez, and the Director of Commercial Strategy and Transformation of Nedgia,Elena Longarela . Thanks to this
initiative, customers will be able to enjoy very advantageous conditions, provided that they request it through installation companies
adhered to the campaign, with financing at 0% TIN for 36 months and the possibility of accessing either the installation of only hot water
(maximum financing of 900 euros) or heating to enjoy homogeneous heat throughout the home (with a maximum of 4,000 euros of
financing). For their part, the installation companies will be able to join the campaigns through a very simple and digitally accessible
process through the nedgia website.
Description
42. Partner Ecosystem Updates
IT Shades
Engage & Enable
Iberdrola (Spain) and MAPFRE move forward with their strategic alliance
via the incorporation of 100 new MW by way of a joint venture
For any queries, Please write to marketing@itshades.com
34
Iberdrola and MAPFRE are forging ahead with their strategic alliance in the energy field, which sees them join forces to invest in renewable energies
in Spain. Both companies have come together to form Energías Renovables Ibermap S.L., a pioneering co-investment vehicle which, after having
incorporated 95 new megawatts (MW), now has 325 MW: 195 MW of operational wind power and 130 MW of photovoltaic energy under development.
The alliance between both companies, leaders in their respective sectors, is aiming to incorporate more assets until the joint investment reaches 1,000
MW. The holdings in this newly formed co-investment vehicle are divided as follows: MAPFRE is the major stakeholder with 80 %, while Iberdrola
not only holds the remaining 20 %, but is also responsible for the promotion, construction and maintenance of the renewable energy projects. The
recently incorporated 95 MW correspond to operational wind farms, all of which are located in Andalusia, and join the 230 MW announced in April.
Of these, 100 MW of wind power are also operational and are generated in Castilla y León. The remaining 130 MW are photovoltaic and currently in
the development phase in Castilla-La Mancha, and their start-up is planned for the third quarter of 2022. The joint project being implemented by these
leaders of their respective sectors recently came into being with the launch, by Mapfre, of the Mapfre Energías Renovables I F.C.R. renewable energies
fund, which the insurance group will use to channel its investment. Furthermore, as has been the case with other similar investments made by MAPFRE
in other property assets, infrastructures, risk capital or traditional investment options, this fund is open to other institutional investors.
Description
43. Partner Ecosystem Updates
IT Shades
Engage & Enable
Iberdrola (Spain) signs a framework agreement with Navantia and Windar
for future offshore wind farms worth 400 million euros
For any queries, Please write to marketing@itshades.com
35
Iberdrola advances in its growth strategy in the offshore wind market and strengthens its role as a driving force in the local industry, after signing a
framework collaboration agreement with Windar and Navantia for the manufacture and supply of 130 XXL monopile foundations. Through this
agreement, Iberdrola could place orders with these manufacturers worth up to 400 million euros between 2023 and 2025 for future offshore wind farms
and it secures the preferential supply of a portion of these components for the coming years. From this signing, the consortium formed by Windar and
Navantia will start up an XXL monopile factory on land at the Navantia shipyard in Fene (A Coruña). The construction of this factory will improve the
capabilities of the Navantia shipyard in Fene, providing it with a new product within the fixed marine foundations sector. This diversification was not
accessible until now because it required very specific facilities, with the monopile being the star product in the foundations market over the last decade,
which will continue in the coming years. The investment planned by Windar-Navantia includes the adaptation of a building for curving thick sheet metal
with a diameter of up to 16 m, new paint booths and storage areas for finished products, as well as the latest technology equipment necessary for
manufacturing. The new XXL monopile factory, which will manufacture foundations over 100 m long and weighing up to 2,500 t, will be available
within 13 months and will be located in a part of the Fene shipyard facility, without interfering with the production facilities for the construction of other
offshore wind products, such as jackets and floating structures.
Description
44. Partner Ecosystem Updates
IT Shades
Engage & Enable
Iberdrola (Spain) and Grupo Huertas advance in their commitment to
promoting electric mobility
For any queries, Please write to marketing@itshades.com
36
Iberdrola and Grupo Huertas have signed a new collaboration agreement to continue to promote sustainable mobility through the installation of over 50
electric vehicle charging points at dealers of the leading vehicle distributor group in the Region of Murcia. The agreement covers the installation of
charging infrastructure for both in-house use by the dealers themselves - in this case 7.4 kilowatt (kW) chargers - as well as for public use on the street
with power ratings including semi-rapid (22 kW), rapid (50 kW), super rapid (150 kW) and ultra-rapid (350 kW). The initiative marks a strengthening
of the commitment on the part of both companies for a more sustainable business model and an electric mobility partnership initiated in 2019 following
the agreementExternal link, opens in new window. through which they offer customers solutions for installing charging points when they purchase an
electric vehicle. Present at the signing of the accord were Francisco Vidal, Managing Director of Grupo Huertas, Itziar Pérez, Iberdrola's Head of Retail
for the Region of Murcia, and Patricio Valverde, the company's institutional representative in the Autonomous Community. Users of the public charging
points will be charging their batteries with 100% green energy from renewable sources, with guarantee of origin certificates (GoOs). Also, the public
charging points will be shown on the Iberdrola Public Charging App, the only one in Spain with verified information about all electric charging points,
both Iberdrola's and those of other operators. The app enables drivers to locate charging stations, check the operational status in real time, book a
charging point and pay using a mobile phone.
Description
45. Partner Ecosystem Updates
IT Shades
Engage & Enable
NTPC (India) REL signs MoU with Union Territory of Ladakh to setup country’s
first green Hydrogen Mobility project
For any queries, Please write to marketing@itshades.com
37
NTPC REL, a 100% subsidiary of NTPC, signed a MoU with Union Territory of Ladakh, to setup country’s first green Hydrogen Mobility project in
the region. The signing of the MoU was also marked with the inauguration of NTPC’s first solar installations in Leh in form of solar trees and a solar
car port. The MoU was signed in the august presence of hon’ble Lt. Governer R K Mathur, senior dignitaries of government, NTPC and public
representatives. The MoU will enable NTPC to help Ladakh develop a carbon free economy based on renewable sources and green hydrogen. This is
also in line with Hon’ble Prime Minister’s vision of a ‘carbon neutral’Ladakh. Hon’ble LG mentioned that he would like Ladakh to become a hydrogen
state and is happy to partner with NTPC to achieve this long term goal. NTPC has planned to ply 5 hydrogen buses, to start with, in the region and the
company will be setting up a solar plant and a green hydrogen generation unit in Leh towards this end. This will put Leh as the first city in the country
to implement green hydrogen based mobility project. This would be zero emission mobility in true sense. NTPC has been aggressively pushing for
greening its portfolio and green hydrogen project is another step towards achieving low carbon footprint. NTPC has also been promoting usage of green
hydrogen based solutions in sectors like mobility, energy, chemical, fertilizer, steel etc. NTPC has recently revised its target of achieving 60GW
renewables capacity by 2032, almost doubling the earlier target. Recently, NTPC has commissioned India’s largest floating solar project of 10MW at
Vishakhapatnam.
Description
46. Partner Ecosystem Updates
IT Shades
Engage & Enable
Rosseti (Russia) Rosatom and Kamaz Have Agreed On Cooperation in
Development of Electric Transport in Russia
For any queries, Please write to marketing@itshades.com
38
PJSC Rosseti, State Corporation Rosatom and PJSC KAMAZ have signed a trilateral agreement on implementation of the
joint project – the development of a comprehensive solution for Russian regions and municipalities for electric transport,
charging infrastructure, and maintenance thereof at the St. Petersburg International Economic Forum. The initiative is
aimed at expanding the use of environmentally friendly transport within the Russian Federation. A special project team
will be formed to coordinate the work of the participants. On the part of Rosatom, the developer and manufacturer of
Russian batteries for electric transport – RENERA, LLC ("TVEL" company of Rosatom Fuel Company) – an integrator
of the nuclear industry in the field of energy storage systems will be responsible for the task. The parties are interested in
the development and strengthening a long-term and stable cooperation and are planning to join efforts to expand the use
of electric transport in the Russian Federation, including in order reducing the negative transport impact on the
environment.
Description
47. Partner Ecosystem Updates
IT Shades
Engage & Enable
Rosseti (Russia) and Rosneft Have Agreed On Cooperation in the Development
of Charging Infrastructure for Electric Vehicles
For any queries, Please write to marketing@itshades.com
39
PJSC Rosseti and PJSC OC Rosneft have signed an agreement on cooperation in the development of charging infrastructure for electric vehicles
at XXIV St. Petersburg International Economic Forum. The document was signed by Konstantin Mikhailik, Deputy Director General for Digital
Transformation of PJSC Rosseti, and Avril Conroy, Vice President for Retail Business and Internal Market Development of PJSC Rosneft. The
parties will consider the possibility of building fast-charging stations for electric vehicles at Rosneft gas stations in the regions of Russia. Rosseti
is already operating 263 charging stations, and the company expects to increase their number to more than 1 thousand units by 2025. 30 major
cities and highways in Russia will be covered – it will be possible to drive an electric car from Murmansk to Sochi and from Krasnoyarsk to
Kaliningrad. Rosseti is also planning to develop cooperation with Russian regions in the sphere of creating charging infrastructure for public
transport. At the moment, the retail network of Rosneft is operating 14 charging stations in Moscow, Tver and Leningrad regions, in Vladivostok,
Khabarovsk, and in the Krasnodar Territory. The development of charging infrastructure at gas stations will allow the drivers of electric vehicles
to move freely along the usual routes, using the developed network of Rosneft's gas stations. Round-the-clock operation and the accompanying
services at gas stations will allow every auto enthusiast to comfortably spend time at the gas stations while their electric car is being charged - to
drink freshly brewed coffee and have a snack in a cafe, to buy goods in a store or use other amenities at the gas station.
Description
48. Partner Ecosystem Updates
IT Shades
Engage & Enable
Rosseti (Russia) and Credit Bank of Moscow Have Agreed On Long-Term
Cooperation
For any queries, Please write to marketing@itshades.com
40
PJSC Rosseti and Credit Bank of Moscow (MCB) have signed an agreement on strategic cooperation at the St.
Petersburg International Economic Forum. The document was signed by Andrey Murov, First Deputy Director General
- Executive Director of PJSC Rosseti, and Vladimir Chubar, Chairman of MCB's Management Board. The parties
intend to join efforts to expand mutually beneficial cooperation in the areas related to providing financing for
operational and investment operations of Rosseti Group, and introduction of modern technologies for financial
resources management to improve the efficiency of the company. Rosseti is one of the world's largest energy
companies. For the bank, this agreement means not only an intention to provide financing for a large corporate client,
but also an opportunity to aid in the implementation of the social component," Vladimir Chubar commented.
Description
49. Partner Ecosystem Updates
IT Shades
Engage & Enable
Rosseti (Russia): Andrey Ryumin And Andrey Vorobyov Agreed To Consolidate Efforts For The
Development Of The Network Complex And The Economy Of The Moscow Region As A Whole
For any queries, Please write to marketing@itshades.com
41
PJSC Rosseti and Moscow Region have signed a long-term cooperation agreement. The document was signed by
Andrey Ryumin, Director General of the company, and Andrey Vorobyov, Governor of Moscow Region at the St.
Petersburg International Economic Forum. It is mainly focused on combining efforts to develop the network complex
in order to establish long-term mutually beneficial cooperation directly in the sphere of development of the power
supply system for data processing centers (DPC), as well as to realize the potential of Moscow region as a whole. The
agreement is aimed at increasing the investment attractiveness and competitiveness of the region's economy, creating
new jobs, and increasing tax revenues to the budget system of Moscow Region. From the part of Rosseti Group, the
implementation of projects for the power supply of DPCs will contribute to a significant increase in productive supply,
and as a result, in revenue growth.
Description
50. Partner Ecosystem Updates
IT Shades
Engage & Enable
Rosseti (Russia) and Psb Have Signed an Agreement on Comprehensive Banking
Services
For any queries, Please write to marketing@itshades.com
42
PJSC Rosseti and PSB have signed an agreement on strategic cooperation in the framework of the business program of the St. Petersburg
International Economic Forum. The document was signed by Andrey Murov, First Deputy Director General - the Executive Director of
PJSC Rosseti, and Petr Fradkov, Chairman of PSB, on the part of the bank. Under the terms of the agreement, PSB shall provide
comprehensive banking services to the company and its subsidiaries. Thus, the bank will provide financing of their operating activities
and investment projects, including with the help of capital market instruments, provide bank guarantees and letters of credit, escrow agent
services, leasing, cash settlement and factoring services, as well as banking support for contracts. In addition, the parties agreed on
cooperation within the framework of consumer and mortgage lending programs for the company's employees and on the introduction of
modern technologies for managing Rosseti's financial resources to improve the efficiency of its operations, including the use of modern
digital technologies and platform solutions. Under the agreement, the bank also participates in the development and implementation of
integration solutions for Rosseti's accounting systems based on Host-To-Host technologies, and in digital transformation processes,
including cooperation in the application of blockchain technologies in the electric power industry.
Description
51. Partner Ecosystem Updates
IT Shades
Engage & Enable
Sembcorp (Singapore) to Collaborate on Development of the UK's First Net Zero
Emissions Power Plant - Whitetail Clean Energy
For any queries, Please write to marketing@itshades.com
43
Sembcorp Industries through its UK subsidiary Sembcorp Energy UK announces a collaboration agreement with Zero Degrees Whitetail Development
Ltd., the UK subsidiary of US innovation firm 8 Rivers Capital, to explore the development of the UK’s first Net Zero emissions NET Power station at
SEUK’s Wilton International site on Teesside. Named Whitetail Clean Energy (Whitetail), the project is expected to produce about 300 megawatts
(MW) of clean, efficient, low-cost electricity, with potential expansion options in the future. The Wilton International site in northeast England offers
convenient port and pipeline access, where all Whitetail’s captured carbon dioxide can be conveniently transported to UK sequestration sites to be
permanently stored in secure geological formations deep under the North Sea. Subject to UK regulatory support and if finalised to proceed, the
collaboration agreement is an important milestone in advancing the decarbonisation of Teesside towards Net Zero, through the deployment of new
technology. The Whitetail facility is expected to harness the Allam-Fetvedt Cycle (AFC), a new type of power cycle pioneered by 8 Rivers Capital and
NET Power, LLC, a clean energy technology company in the United States. The process combusts natural gas with oxygen, rather than air, and uses
supercritical carbon dioxide (CO2) as a working fluid to drive a turbine instead of steam. As a result, all air emissions, including traditional pollutants
and CO2, are eliminated and pipeline-quality CO2 is produced so that it can be captured and stored offshore, making Whitetail a Net Zero emissions
plant.
Description
52. Partner Ecosystem Updates
IT Shades
Engage & Enable
Sempra Energy (USA) and National Renewable Energy Laboratory Collaborate
to Advance Future Net-Zero Energy Systems
For any queries, Please write to marketing@itshades.com
44
Sempra Energy announced it has signed a Memorandum of Understanding (MOU) with the U.S. Department of Energy's National Renewable Energy Laboratory
(NREL), providing a framework for a joint effort to advance future net-zero energy systems. The MOU, which builds off nearly 10 years of ongoing collaboration, will
continue current work researching and developing innovative solutions to help shape a lower-carbon future through technology and applications capable of withstanding
increasing energy demand and broad adoption while advancing future innovation. Sempra Energy and NREL have been collaborating for nearly a decade on cooperative
and multi-year projects exploring the development, access and integration of low-carbon fuels and microgrid technology. In 2013, Sempra Energy's subsidiary San Diego
Gas & Electric Co. (SDG&E) and NREL joined to establish the nation's first utility-owned community microgrid in Borrego Springs, Calif., connected to a local
26-megawatt solar field (owned by a third party), two battery storage systems, two generators, and an ultracapacitor. The microgrid, which is being upgraded so that it
can operate on 100% clean energy, was designed to provide consistent power flowing to the remote desert town during emergencies and planned outages on the larger
grid. In 2017, Sempra Energy's subsidiary Southern California Gas Co. (SoCalGas) and NREL partnered to create, validate and integrate the nation's first carbon-free,
power-to-gas pilot-system. The technology takes excess electricity and converts it to hydrogen, which can be used, stored, or combined with carbon dioxide and fed to a
bioreactor to produce renewable natural gas (RNG). This innovative technology could provide North America with a large-scale, cost-effective solution for storing excess
energy produced from renewable sources. Additionally, Sempra Energy and NREL have coordinated efforts to research the impacts of hydrogen blending in natural gas
networks, and studied potential pathways for wholesale market access to hydrogen production facilities.
Description
53. Partner Ecosystem Updates
IT Shades
Engage & Enable
Leonardo and Snam (Italy) Team Up For Innovation and Safety in the Energy
Industry and Development of the Hydrogen Economy
For any queries, Please write to marketing@itshades.com
45
Leonardo and Snam have signed a Memorandum of Understanding (MoU) to develop their respective technological expertise to support innovation and
sustainability in the energy industry. The partnership will specifically focus on digitalisation, monitoring, physical and cyber security of processes, networks
and infrastructures in order to increase their resilience and operational efficiency. The agreement is centred on developing the hydrogen economy, which will
play a key role in achieving Europe’s decarbonisation targets. The partnership between Leonardo, the only Italian company dedicated to overseeing strategic
technologies for the security of the countries in which it operates, and Snam, one of the world’s leading energy infrastructure companies, will mainly focus
on the cyber security of strategic infrastructures, IoT (Internet of Things) technologies and advanced sensors for monitoring energy networks and introducing
hydrogen into the aerospace sector. Large networks have recently experienced a rapid digital transformation of their physical assets. The Leonardo and Snam
partnership will explore the possibilities offered by the most innovative technologies for increasing the operational efficiency and resilience of industrial
plants. The areas of collaboration range from Industry 4.0 – with applications for the digitalised management of infrastructures and industrial processes based
on IT, OT, IoT (Internet of Things), artificial intelligence and machine learning, big data, blockchain, advanced analytics and digital twin – to infrastructure
security, using situational awareness solutions, mission critical communication technologies and advanced sensors, and the use of drones and satellites for
asset monitoring. In cyber security, the partnership will relate to threat analysis, monitoring, identification and response to cyber-attacks.
Description
54. Partner Ecosystem Updates
IT Shades
Engage & Enable
Shell and Uniper (Germany) join forces to drive development of hydrogen
economy in Europe
For any queries, Please write to marketing@itshades.com
46
Shell Gas & Power Developments B.V. and Uniper Hydrogen GmbH have signed a memorandum of understanding (“MoU”) to explore accelerating the
development of a hydrogen economy in Europe. Under the MoU they intend to find joint opportunities to couple industrial and mobility demand with
hydrogen supply, production and storage. The companies will begin by assessing the opportunity to develop potential synergies to accelerate existing projects
in Germany, the Netherlands and potentially other European countries. Taking a full value chain approach Shell and Uniper will work backwards from
customer demand to identify key opportunities to develop the foundation of a new hydrogen economy in Europe. Exploring future options including the
necessary infrastructure for large scale transport of hydrogen and CO2 from the ports of Rotterdam and Wilhelmshaven to North Rhine Westphalia (NRW)
– the industrial heartland of Germany – will be at the centre of the announced collaboration. Among the projects considered will be Shell’s Rheinland
transformation where work is ongoing to transform an existing refining asset into a state-of-the-art energy and chemicals park; Shell officially opened a
10MW PEM electrolyser, the largest of its kind in Europe,on July 2nd and are working with partners to expand the capacity to 100MW. Uniper will further
explore the supply of hydrogen from the existing Uniper production sites at Rotterdam and Wilhelmshaven to the Shell Energy and Chemicals Park
Rheinlandlocations at Wesseling and Godorf. In addition, Uniper intends to connect its power plant in Gelsenkirchen Scholven as well as some large-scale
customers with its coastal hydrogen production plants.
Description
55. IT Shades
Engage & Enable
For any queries, Please write to marketing@itshades.com
Environment & Social Updates
Utilities Industry
56. Environment & Social Updates
IT Shades
Engage & Enable
Ameren (USA) Illinois Distributes More Than $29 Million in Bill Forgiveness
For any queries, Please write to marketing@itshades.com
47
Ameren Illinois has worked to significantly reduce or completely eliminate past due utility bills and avoid service disconnections in
the wake of the COVID-19 pandemic. More than $29 million was provided to 26,000 families across central and southern Illinois.
The assistance came in the form of a one-time credit that was applied toward utility bills with balances up to $5,000, households
slated for service disconnection, and customers who had received state energy assistance through the Low-Income Home Energy
Assistance Program (LIHEAP) or Percentage of Income Payment Plan (PIPP). The assistance was made possible by the Utility
Disconnection Avoidance Program (UDAP), a first-time program developed to help customers during the pandemic. Ameren Illinois
collaborated closely with the Illinois Department of Commerce and Economic Opportunity to distribute the credits. Though all the
program funds have been exhausted, customers who still need assistance paying their utility bills are encouraged to call Ameren
Illinois at (800) 755-5000 to discuss options including deferred payment arrangements. Ameren Illinois can also help point customers
to community assistance agencies who can determine eligibility for further assistance.
Description
57. Environment & Social Updates
IT Shades
Engage & Enable
Ameren (USA) Missouri donates 800 air conditioners and energy assistance
funds to Cooldownstlouis.org
For any queries, Please write to marketing@itshades.com
48
Ameren Missouri donated $165,000 to Cooldownstlouis.org and Cooldownmissouri.org to support the most vulnerable customers in St. Louis and eastern Missouri. The company also donated
800 Energy Star® rated window air conditioners and 800 four-packs of LED lightbulbs for distribution throughout Missouri. On average, the energy-efficient air conditioners cost less than a
dollar a day to operate. This year's air conditioner donation marks the 21st anniversary of Cooldownstlouis.org and Cooldownmissouri.org’s “Save our seniors” (S.O.S) Cooling Summer
Project. It is the 16th year of participation by Ameren Missouri, resulting in more than 9,000 window air conditioning units delivered to qualified seniors and people with disabilities across
the region. Ameren Missouri resources are available for seniors and those with medical concerns. Customers and their families are encouraged to visit AmerenMissouri.com/HealthAndSafety
for information on Medical Equipment Registry (MER), the Caring Contact Program and energy assistance options including the Keeping Cool Program and low-income weatherization
assistance.
• Medical Equipment Registry – Allows customers to register electrically operated life-sustaining medical equipment so Ameren Missouri can notify them about planned maintenance
outages.
• The Caring Contact Program –Eligible customers may designate a person or agency for Ameren Missouri to contact prior to disconnection for nonpayment. Caring Contact helps protect
the health and safety of older adults and people with disabilities who may need additional support in handling potential disconnection of service.
• Keeping Cool Program – Helps make summer energy bills more affordable for seniors, people with disabilities, the chronically ill or households with young children. It includes up to three
monthly electric bill credits in the summer months to keep customers cool and safe.
Older adults and people with disabilities, as well as low- to moderate-income families, are encouraged to apply for the energy assistance funds by visiting Cooldownstlouis.org and
Cooldownmissouri.org or by calling 314.241.0001 or 314.657.1599, which are their hotlines for seniors and people with disabilities only.
Description
58. Environment & Social Updates
IT Shades
Engage & Enable
Ameren (USA) Missouri donates first-of-its-kind fire truck to St. Louis Fire
Department
For any queries, Please write to marketing@itshades.com
49
The St. Louis Fire Department has welcomed to its fleet a unique, state-of-the-art fire truck designed to help fight underground electrical fires. Ameren
Missouri donated the fire truck to help fight these uncommon but challenging fires that are especially hazardous to firefighters. The specialized fire truck cuts
down the time it takes to fight these fires from hours to minutes, speeding service restoration time for Ameren Missouri customers. Crews have already used
the fire truck multiple times, battling complex underground fires in downtown St. Louis and the recent chemical fire in Affton. St. Louis is the first city in
the nation to have a fire truck designed specifically for this purpose, thanks to this donation from Ameren Missouri. St. Louis is the first city in the nation to
have a fire truck designed specifically for this purpose, thanks to this donation from Ameren Missouri. The new St. Louis Fire Department truck includes:
• A 4,000-gallon low pressure carbon dioxide (CO2) tank
• A foam agent system
• A specially designed nozzle to fit Ameren Missouri equipment
• A high pressure pump for high-rise firefighting
• A large dry chemical system
Firefighters can use these tools on various fires involving electrical equipment.
Description
59. Environment & Social Updates
IT Shades
Engage & Enable
Duke (USA) Energy’s $50,000 donation helps revitalize community park in
Richland, Texas
For any queries, Please write to marketing@itshades.com
50
The Duke Energy Foundation has given the city of Richland, Texas, in Navarro County, a $50,000 Duke Energy Sustainable
Solutions grant to support the revitalization of Richland Community Park. The grant was used to replace existing playground
equipment with a new playscape and park benches and enhance landscaping around the new equipment. To commemorate the
reopening of Richland Community Park, the city held a community event June 12. Earlier this month, Duke Energy
Sustainable Solutions* announced the construction of the 250-megawatt Pisgah Ridge Solar site, also in Navarro County,
which will generate enough energy to power approximately 63,000 homes in the state. Currently, the company operates nearly
1,500 MW of wind, 500 MW of solar and a 36-MW battery storage facility in Texas. The grant was made possible through
the Duke Energy Foundation, which provides philanthropic support to meet the needs of communities where Duke Energy
customers live and work. The foundation contributes more than $30 million annually in charitable gifts and is funded by Duke
Energy shareholder dollars.
Description
60. Environment & Social Updates
IT Shades
Engage & Enable
FirstEnergy Corp. (USA) Donates $2.2 Million in Personal Protective Equipment
to Organizations in Need
For any queries, Please write to marketing@itshades.com
51
FirstEnergy Corp. is donating tens of thousands of face masks, gloves, cleaning supplies, and other forms of personal protective equipment (PPE) to the United Way to benefit
the health and safety of communities served by the company. Valued at $2.2 million, they will be distributed to 15 United Way chapters across FirstEnergy's service area. The
items being donated include:
• 7,300 face masks
• 18,800 N-95 respirators
• 3,000 nitrile powder-free gloves
• 6,000 hand-pump hand sanitizer dispensers
• 2,400 half-gallon hand sanitizer refills
• 280 one-gallon hand sanitizer containers with pumps
• 172,000 packets of disinfectant wipes
• 31,300 canisters of disinfectant wipes
FirstEnergy is dedicated to integrity, safety, reliability and operational excellence. Its 10 electric distribution companies form one of the nation's largest investor-owned electric
systems, serving customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. The company's transmission subsidiaries operate approximately 24,000
miles of transmission lines that connect the Midwest and Mid-Atlantic regions. Follow FirstEnergy online at www.firstenergycorp.com and on Twitter @FirstEnergyCorp.
Description
61. Environment & Social Updates
IT Shades
Engage & Enable
Fortum (Finland) to support Save the Children’s Covid-19 relief work in
India
For any queries, Please write to marketing@itshades.com
52
Fortum donates one hundred thousand euros to support the Save the Children organisation’s efforts to help children and
families suffering from the Covid-19 crisis in India. The second Covid-19 wave has ravaged India throughout the spring.
The health care services are under extreme pressure, and restriction measures have interrupted children’s education. As a
result of the situation, the people have no access to basic services, and the consequences impact children in particular. The
need for help in India is acute, and the need for support will continue for a long time. Save the Children uses donations to
help children and families in India survive in the midst of the crisis. The donated funds support the operations of clinics
and hospitals by ensuring that children and the families in the worst situation receive vital services, food, monetary aid,
and hygiene supplies. In particular, the aid targets those children whose parents or caregivers have become ill or have died
by offering them psychosocial support, identifying these children and supporting the arrangements for their alternative
care.
Description
62. Environment & Social Updates
IT Shades
Engage & Enable
“Saudi Electricity” (Saudi Arabia) Employees Donate Over Sr18 Million To
Support The Programs Of Charitable Societies.
For any queries, Please write to marketing@itshades.com
53
The Saudi Electricity Company announced that its employees have donated over SR18 million in four years, to support the programs of 54 various
societal and charitable societies and foundations in different regions of the Kingdom. It further said that this contribution emanates from the values of
#SEC employees in donating and urging others to do good deeds, from the standpoint of social responsibility towards the community. SEC said the total
donations by its employees have exceeded SR18 million during a period of four years. In the breakdown of figures according to the years, the total
donations in 2017 reached SR3.2 million, SR4.3 million in 2018, SR5,116,714 in 2019, and SR5,498,892 in 2020. It pointed out that these donations
were meant to support 54 social and charitable societies at the level of the Kingdom, in several fields, like memorization of the Holy Qur’an, health
awareness, care for orphans, safeguarding bounties, development of women, religious call and guidance offices, chronic diseases, and other societies
working in the important social and charitable fields in the Kingdom’s cities. It is noteworthy that “Saudi Electricity” launched an (SAP) electronic
program in 2017, which allows all SEC employees to choose the charitable society they want to donate to, with the objective of supporting the programs
and initiatives of the societal and charitable societies and authorities. In this regard, several files have been prepared to acquaint the employees on the
goals and initiatives of the society and its field of work, on the social responsibility page on the internal website of the company.
Description